Bridges Renewal Program Round Two Projects as at 15 September 2017 ACT Four Bridges on the Monaro Highway (3190, 3178, 3179, 3161) Strengthening NS...

300KB Sizes 1 Downloads 10 Views

Recommend Documents

Global infrastructure investment - PwC
The role of private capital in the delivery of essential assets and services. Global infrastructure investment ..... 201

Infrastructure Investment Pipeline - Investment Strategy for Northern
Buisness Case approved. DE. £2m - £4m. ✓. Click Here. St Ronan's (Amalgamation of St Mary's GS St Pauls. GS & St Mic

Department of Transportation and Infrastructure Renewal - nsrba
Sep 17, 2014 - Berthier, Jerome. Bridge Maintenance Worker. Transportation & Infra. ..... Flynn, Paul. Operations Superv

unlocking investment in infrastructure - PwC
the ability to raise capital from savers, shareholders or policyholders. For example, fair value‑related fluctuations

Infrastructure Investment and Connectivity - asean
Metro Pacific Investments Corp. Philippines. Road construction. 2,997. 932 Indonesia, Thailand, Viet Nam. Muhibbha. Mala

Infrastructure Tracker - Investment Guru India
Oct 5, 2017 - and Adani Group as well as Prem Watsa's Fairfax Group are believed to be circling the same target, long co

CapMan establishes infrastructure investment area
Feb 2, 2017 - Infra as part of CapMan's growth strategy. 2 February 2017. 2. Buyout. Growth. Equity. Credit. Real Estate

Two Nordhavn's Round The Horn - Nordhavn.com
While tales of the Drake Passage and it have two of its production power boats make around “the Horn". last unspoiled

transmission infrastructure program projects - WAPA
9, 2011, Western and TransWest Express LLC (TransWest), a wholly owned subsidiary of the Anschutz. Corporation, executed

infrastructure needs program ii - USAID
Feb 8, 2013 - Rawabi City Internal Roads Project was part of USAID's ... the primary transportation infrastructure of Ra

Bridges Renewal Program Round Two

Projects as at 15 September 2017 ACT

Four Bridges on the Monaro Highway (3190, 3178, 3179, 3161) Strengthening

NSW

Bathurst Regional Council Rivulet Road Bridge Replacement Bega Valley Shire Council Murrah River Bridge Upgrade Blacktown City Council - Rouse Road Bridge Replacement Bellingen Shire Council - Reids Bridge Replacement Blayney Shire Council - Coombing Creek Bridge Replacement Boorowa Council - Bennett Springs Bridge Replacement Cessnock City Council - Fosters Bridge Replacement Cessnock City Council - Frame Drive Bridge Replacement

NSW NSW NSW NSW NSW NSW NSW

NSW NSW NSW NSW NSW NSW NSW NSW

NSW NSW NSW NSW NSW NSW NSW

NSW NSW NSW NSW

Clarence Valley Council - Jacks Bridge Replacement Clarence Valley Council Kinghorn Bridge Replacement Clarence Valley Council - Romiaka Channel Bridge Replacement Coffs Harbour City Council Seccombes Bridge Replacement Coffs Harbour City Council Taylors Bridge Replacement Eurobodalla Shire Council Tyrone Bridge Replacement Gilgandra Shire Council - Luckie’s Gully Bridge Replacement Gilgandra Shire Council Wallumburrawang Creek Bridge Replacement Gilgandra Shire Council - Webb’s Crossing Bridge Replacement Goulburn Mulwaree Council Komungla Bridge Replacement Greater Taree City Council Abdoos Bridge Replacement Greater Taree City Council - Kellys Creek Bridge Replacement Gunnedah Shire Council Simpson Bridge Replacement Guyra Shire Council - Tenterden Road Bridge Replacement Hawkesbury City Council - West Portland Road Bridge Replacement Kyogle Council - Barretts Bridge Replacement Kyogle Council - Renewal of Six Bridges on Gradys Creek Narrabri Shire Council - Eulah Creek Road Bridge Replacement Orange City Council - Forest Road Bridge Replacement

Strengthening of three box culvert bridges and one single span bridge to support Higher Productivity Vehicles as part of the ACT Freight Strategy network. Replace a one-lane timber bridge with a two lane concrete bridge. Upgrade substructure of iconic timber bridge. Replace existing causeway with a bridge.

$1,000,660

$2,001,320

$390,000

$782,962

$210,000

$420,000

$3,500,000

$7,000,000

Bellingen Shire Council - Reids Bridge replacement. Replace a one-lane timber bridge with a one lane concrete bridge. Replace a one-lane timber bridge with a two lane concrete bridge. Replace a one-lane timber bridge with a twolane bridge to remove load limit. Replace a single lane closed timber bridge with a two lane concrete bridge and pathway. Replace a two-lane timber bridge with a concrete pipe culvert. Replace a two-lane timber bridge with a two lane concrete bridge. Replace a two lane concrete bridge with two lane concrete bridge with footpath. Replace a two-lane timber bridge with a two lane concrete bridge. Replace a one-lane temporary timber bridge with a two lane concrete bridge. Replace a one-lane timber bridge with a one lane concrete bridge. Replace existing pipe culvert with two lane concrete bridge. Replace a timber bridge with a two lane concrete bridge.

$192,000

$384,000

$165,000

$330,000

$478,000

$956,000

$2,200,000

$4,400,000

$2,000,000

$4,000,000

$24,377

$48,755

$194,000

$388,000

$1,731,000

$3,462,000

$341,000

$682,000

$176,898

$353,795

$1,250,000

$2,500,000

$434,500

$869,000

$627,000

$1,254,000

$401,500

$858,762

$1,526,000

$3,052,000

$200,000

$424,930

Replace timber bridge with concrete culvert.

$600,000

$1,200,000

Replace a single lane timber bridge with a two lane concrete bridge. Replace a single lane timber bridge with a two lane concrete bridge. Replace a single lane timber bridge with a two lane concrete bridge on an improved alignment. Replace a single lane timber bridge with a single lane concrete and steel bridge. Replacement of six timber bridges on Gradys Creek and Lions Roads Replace a single lane timber bridge with a two lane concrete bridge. Duplicate a narrow lane bridge to increase the capacity for Higher Productivity Vehicles.

$800,000

$2,170,000

$530,000

$1,060,000

$920,000

$2,184,229

$228,600

$457,200

$1,973,400

$3,946,800

$378,000

$756,000

$1,250,000

$2,500,000

Replace a damaged culvert with two lane concrete bridge. Replace a single lane concrete causeway with a two lane concrete bridge. Replace timber bridge with concrete culvert.

Bridges Renewal Program Round Two

Projects as at 15 September 2017 NSW NSW NSW NSW

NSW NSW

NSW NSW NSW

NSW

NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW

NSW NSW

NSW NSW NSW NSW NT

Palerang Council - Back Creek Bridge Replacement Parkes Shire Council - Kadina Bridge Replacement Port Macquarie - Hastings Council - Bulli Creek Bridge Replacement Port Macquarie-Hastings Council - Albert Street Bridge Replacement Port Macquarie-Hastings Council - O’Neill’s Bridge Replacement Shoalhaven City Council - Moona Moona Creek Bridge Replacement Singleton Council - Brookers Bridge Replacement Tamworth Regional Council Rimbanda Bridge Replacement Tamworth Regional Council Swamp Creek Bridge Replacement Tumut Shire Council Replacement of Three Bridges on Wee Jasper Road Upper Hunter Shire Council Middlebrook Bridge Replacement Wagga Wagga City Council Eunony Bridge Replacement Walcha Council - Aberbaldie Road Bridge Replacement Walcha Council - Flags Niangala Bridge Replacement Walcha Council - Kangaroo Flat Road (5218) Bridge Replacement Walgett Shire Council - Blacks Timber Bridge Replacement Walgett Shire Council - Harris Timber Bridge Replacement Walgett Shire Council - Wanourie Timber Bridge Replacement Warrumbungle Shire Council Allison Bridge Replacement Warrumbungle Shire Council Ross Crossing Bridge Replacement Weddin Shire Council - Blacks Bridge Replacement Wellington Council - Gundy Creek Bridge Replacement Wingecarribee Shire Council Belanglo Rd Culvert Replacement Wyong Shire Council - Sohier Park Bridge Replacement Yass Valley Council - Dicks Creek Road Bridge Replacement Young Shire Council - McHenrys Creek Bridge Widening Katherine Town Council - Leight Creek Bridge Replacement

Replace a one-lane timber bridge with a two lane concrete bridge. Replace a two-lane culvert with a two lane concrete bridge. Replace a single lane timber bridge with two lane concrete bridge. Replace a one-lane timber bridge with twolane concrete box culvert.

$875,000

$1,750,000

$297,000

$595,000

$800,000

$1,600,000

$200,000

$400,000

Replace a two-lane timber bridge with two lane reinforced concrete culverts. Replace a two-lane timber bridge with a two lane concrete bridge.

$240,000

$480,000

$750,000

$1,600,000

Replace a one-lane timber bridge with a two lane concrete bridge. Replace a one-lane timber bridge with a one lane concrete causeway. Replace a one-lane timber bridge with a one lane concrete bridge.

$1,100,000

$2,200,000

$82,500

$165,000

$190,850

$381,700

$392,000

$785,000

$1,164,000

$2,328,000

$4,906,000

$9,812,000

$248,500

$497,000

$152,500

$305,000

$238,500

$477,000

$445,500

$891,000

$445,500

$891,000

$668,250

$1,336,500

$965,000

$2,010,000

$350,000

$700,000

$425,000

$850,000

$620,041

$1,240,082

$202,500

$405,000

$680,000

$1,360,000

$723,000

$1,446,000

$419,000

$838,000

$1,500,000

$3,865,000

Replace three single lane timber bridges, with three single lane concrete bridges. Replace a single lane timber bridge with a two lane concrete bridge. Replace the existing Eunony Bridge with a Higher Mass Limit capacity bridge. Replace a two-lane timber bridge with a wider two-lane bridge. Replace a one-lane timber bridge with a wider, higher load limit one-lane bridge. Replace a single lane timber bridge with a single lane concrete bridge. Replace a single lane timber bridge with a two lane concrete bridge. Replace a single lane timber bridge with a two lane concrete bridge. Replace a single lane timber bridge with a two lane concrete bridge. Replace a two-lane bridge increasing the capacity. Replace a one-lane timber bridge with a concrete bridge. Replace a single lane timber bridge with a two lane concrete bridge. Replace a two-lane timber bridge with a two lane concrete bridge for Higher Mass Limit vehicles. Replace a one-lane culvert with a two-lane culvert and improve the road approaches. Replace a two-lane timber bridge with a two lane concrete bridge. Replace a one-lane timber bridge with a two lane concrete bridge. Widen the bridge and increase the load capacity. Replace low-level bridge with a raised bridge to increase flood immunity and year round access.

Bridges Renewal Program Round Two

Projects as at 15 September 2017 QLD

Banana Shire Council - Callide Creek Bridge Replacement

QLD

Boulia Shire Council - Georgina River Bridge Upgrade Boulia Shire Council - Wills River Bridge and Double Creek Bridge Upgrades Bundaberg Regional Council Monduran Road Bridge Replacement Cairns Regional Council - Deep Creek Bridge Replacement Cairns Regional Council - Rudge Bridge Replacement Cassowary Coast Regional Council - Victory Creek Bridge Replacement Charters Towers Regional Council - Eight Mile Creek Bridge Replacement Charters Towers Regional Council - Reedybrook Creek Bridge Replacement Somerset Regional Council Gallanani Bridge Replacement Somerset Regional Council Larkhill Boundary Road Bridge Replacement South Burnett Regional Council Marshlands Bridge Replacement Southern Downs Regional Council - Boxs Bridge Replacement Southern Downs Regional Council - Connells Bridge Replacement Whitsunday Regional Council Gregory River Bridge Replacement Toowoomba Regional Council Lemontree-Bostock Road Bridge Replacement Toowoomba Regional Council Scrubby Road Culvert Replacement Western Downs Regional Council - Charleys Creek Bridge Two Replacement Townsville City Council Rollingstone Bridge Upgrade Rockhampton Regional Council Sandy Creek Bridge Replacement Scenic Rim Regional Council Adams Bridge Replacement Scenic Rim Regional Council Tramway Bridge Replacement Somerset Regional Council Crossdale Bridges 1 and 2 Replacements Somerset Regional Council Duffys Bridge Replacement

QLD

QLD

QLD QLD QLD

QLD

QLD

QLD QLD

QLD QLD QLD QLD

QLD

QLD

QLD

QLD QLD QLD QLD QLD

QLD

Replace a low-level floodway and culvert with a two-lane bridge including sealed approach works. Upgrade a one lane concrete bridge and approaches to current standards. Upgrade a concrete bridge on Wills River Crossing and a concrete bridge and a culvert on Double Creek. Replace existing one lane timber bridge with a two lane concrete bridge.

$2,365,000

$4,730,000

$41,000

$82,000

$126,500

$253,000

$1,590,000

$3,180,000

Replace a one lane steel girder bridge with a two lane concrete bridge. Replace a one lane steel girder bridge with a two lane concrete bridge. Replace a one-lane bridge with a two-lane bridge with realigned approaches.

$1,200,000

$2,400,000

$1,900,000

$3,800,000

$1,518,000

$3,036,000

Replace a one-lane grid bridge with a strengthened one lane concrete bridge.

$200,000

$400,000

Replace a one-lane grid bridge with a strengthened one lane concrete bridge.

$95,500

$191,000

Replace a single lane timber bridge with a two lane concrete bridge. Replace a single lane timber bridge with a double lane concrete bridge.

$522,382

$1,044,765

$553,532

$1,107,065

Replace a timber bridge reduced to single lane with a two lane concrete bridge. Replace a single lane timber bridge with a concrete bridge. Replace a single lane timber bridge with a concrete bridge. Replace a single lane timber bridge with a two lane concrete bridge.

$800,000

$1,600,000

$634,000

$1,268,000

$737,000

$1,474,000

$1,250,000

$2,500,000

$1,390,250

$2,780,500

$207,500

$415,000

$1,140,000

$2,280,000

$680,000

$1,360,000

$338,000

$676,000

$1,666,000

$3,332,000

$694,372

$1,388,745

$637,542

$1,275,086

$556,704

$1,113,409

Lemontree-Bostock Road Bridge Replacement. Scrubby Road Culvert Replacement.

Replace a single lane timber bridge with a new two lane concrete bridge. Upgrade closed bridge with new superstructure. Replace existing timber bridge with five cell concrete box culverts. Replace single lane bridge with a dual lane concrete bridge. Replace a single-lane timber bridge with a concrete bridge. Replace two single lane timber bridges with two single lane concrete crossings. Replace a two-lane timber bridge with a two lane concrete bridge.

Bridges Renewal Program Round Two

Projects as at 15 September 2017 QLD

QLD

QLD

QLD

QLD

QLD QLD QLD

QLD

QLD QLD

QLD QLD QLD SA SA

SA

SA

SA

SA

SA TAS TAS TAS

City of Gold Coast Council Chardon Road Bridge Replacement Fraser Coast Regional Council Gutchy Creek Bridge Replacement Gladstone Regional Council - NRG Balloon Loop Railway Crossing Upgrade Gympie Regional Council Goomong Road Bridge Replacement Gympie Regional Council Kandanga Creek Road Bridge Replacement Isaac Regional Council - Cherwell Creek Bridge Replacement Mareeba Shire Council - Oakey Creek Bridge Replacement McKinlay Shire Council Punchbowl Rd Bridge Replacement Moreton Bay Regional Council Drapers Crossing Bridge Replacement North Burnett Regional Council Deep Creek Bridge Replacement Palm Island Aboriginal Council Sandy Boyd Creek Bridge Upgrade Rockhampton Regional Council Louisa Creek Bridge Replacement Scenic Rim Regional Council Churchbank Bridge Replacement Somerset Regional Council Dunlops Bridge Replacement Clare and Gilbert Valley Councils - Simmo's Bridge Replacement Kangaroo Island Council - Bark Hut Road Bridges (10 & 11) Upgrades Light Regional Council - Orchard Bridge Replacement Naracoorte Lucindale Council Sandstone Ave/Cadgee Road Bridge Replacement City of Port Lincoln - London Street Bridge Replacement The District Council of Mount Remarkable - Spear Creek Rd Bridges (1077, 9024, 9025,9030) Upgrades Town of Gawler Council - Gawler Bridge Upgrade Dorset Council - Dead Horse Hill Road Bridge (1614) Replacement Meander Valley Council - Union Bridge Replacement Break O’Day Council - Cornwall Road Bridge Replacement

Replace a one-lane timber bridge with a two lane concrete bridge.

$1,610,000

$3,220,000

Replace a timber bridge with a two lane concrete bridge.

$1,143,667

$2,287,334

Increase the structural capacity of the bridge to maintain load limit requirements for a Higher Mass Limit route. Replace a single lane timber bridge with a concrete bridge.

$250,000

$500,000

$955,500

$1,911,000

Replace timber bridge with a two lane concrete bridge.

$920,500

$1,841,000

$2,750,000

$5,500,000

$170,000

$340,000

$1,771,152

$3,542,304

Replace a low-level single lane timber bridge and causeway with a high level two lane concrete bridge. Replace the existing timber bridge with a concrete bridge. Upgrade width, strength and safety of existing bridge.

$3,430,000

$6,860,000

$2,200,000

$4,400,000

$216,000

$432,000

Replace existing timber bridge with three cell concrete box culverts. Replace a one-lane timber bridge with a two lane concrete bridge. Replace a single lane timber bridge with a single lane concrete crossing. Replace a one-lane bridge with a two-lane bridge. Strengthening and widening of two bridges to support heavy vehicles.

$180,000

$360,000

$1,360,000

$2,720,000

$111,707

$223,415

$165,000

$330,000

$53,500

$107,000

Replace a load-limited concrete and stone masonry bridge with a reinforced concrete arch bridge. Replace existing culvert with a wider culvert and increase load limit.

$300,000

$600,000

$73,000

$146,000

Replacement of the London Street bridge with a bridge suitable for Greater Mass Limit vehicles. Strengthen one culvert and three masonry arches to enable heavy vehicle access.

$2,242,500

$4,485,000

$192,500

$385,000

Structural renewal and remediation of the historic Gawler Bridge. Replace a single lane timber and concrete bridge with a single lane concrete bridge. Replace a single lane timber bridge with a dual lane concrete bridge. Replace a one-lane timber bridge with a twolane concrete bridge.

$660,000

$1,320,000

$192,405

$384,810

$1,110,000

$2,220,000

$110,000

$253,054

Replace existing narrow low-level bridge. Replace a one-lane timber bridge with a one lane concrete bridge. Replace a one-lane culvert with a one lane, concrete bridge and realign the road.

Bridges Renewal Program Round Two

Projects as at 15 September 2017 TAS TAS

TAS

TAS VIC

Northern Midlands Council - Lake River Bridge Replacement Derwent Valley Council - Tyenna and Newbury Road Bridges Replacement Break O’Day Council - Golden Fleece Rivulet Bridge Replacement Burnie City Council - Tittie Gee Creek Bridge Replacement Alpine Shire Council - Morses Creek Bridge Upgrade

VIC

Alpine Shire Council - Smarts Creek Bridge Upgrade

VIC

Ararat Rural City Council Ritchies Bridge Replacement Baw Baw Shire Council - Daveys Road Bridge Replacement Benalla Rural City - Williams Road Bridge Strengthening Cardinia Shire Council - BunyipModella Road Bridge Replacement Central Goldfields Shire Council Parker’s Bridge Replacement City of Ballarat - Kennedys Road Culvert Renewal City of Ballarat - Miners Rest Road Bridge Replacement Strathbogie Shire Council Curries Road Bridge Upgrade

VIC VIC VIC

VIC VIC VIC VIC

VIC VIC VIC

VIC

VIC

VIC

VIC

VIC VIC

VIC

Strathbogie Shire Council Nelsons Road Bridge Upgrade Warrnambool City Council Ziegler Parade Bridge Upgrade Yarriambiack Shire Council Dunmunkle Creek Culverts Upgrade Horsham Rural City Council Polkemmet Road Culvert Replacement Horsham Rural City Council Three Bridges Road Bridge Replacement Mansfield Shire Council Mansfield Heavy Vehicles Bypass Bridge Replacement Macedon Ranges Shire Council Romsey Road Culvert Replacement Rural City of Wangaratta Council Morton’s Bridge Replacement Strathbogie Shire Council Cullens Road Bridge Replacement Moyne Shire Council - Scotts North Road Bridge Strengthening and Realignment

Replace a single lane timber bridge with a two lane concrete bridge. Replace two single lane timber bridges with single lane concrete bridges.

$719,500

$1,463,953

$270,000

$570,000

Replace a single lane timber bridge with a two-lane concrete bridge.

$682,000

$1,364,000

Replace a single lane timber bridge with a two lane concrete bridge. Strengthen load-limited bridge to provide access for heavy vehicles and emergency services. Strengthen a load-limited bridge to provide access for heavy vehicles and emergency services. Replace a single lane, load limited timber bridge with a two lane concrete bridge. Replace a 15 tonne limit bridge with a 70 tonne limit concrete bridge. Strengthen the existing bridge to maintain load limits. Replace a 10 tonne load limited bridge to provide access for heavy vehicles and emergency services. Replace a one lane timber and steel bridge with a two lane concrete bridge. Strengthen the existing bridge to maintain load limits. Replace a load-limited bridge with a concrete bridge. Re-deck timber bridge to increase load limit and provide access to heavy vehicles and emergency services. Replace one abutment to increase load limit.

$121,500

$243,000

$131,831

$263,662

$23,169

$46,338

$229,718

$459,437

$332,624

$665,249

$190,042

$380,084

$694,000

$1,388,000

$250,000

$500,000

$95,000

$190,000

$265,621

$531,242

$30,000

$105,333

$25,000

$53,380

Upgrade bridge to increase load limit.

$600,000

$1,200,000

$44,000

$110,000

$50,000

$100,101

Replace the bridge on Three Bridges Road over Mackenzie River.

$538,500

$1,077,000

Replace one lane, low level crossings with two lane concrete bridges.

$450,000

$950,000

Replace two culverts on an existing two-lane road.

$62,500

$176,334

Replace a single lane timber bridge with two lane concrete bridge. Replace a load-limited bridge with a bridge providing access to heavy vehicles and emergency services. Strengthening and realignment of the bridge suitable for B-Double and Higher Mass Limit vehicles.

$174,300

$348,600

$161,789

$323,578

$110,000

$220,000

Renew and upgrade major culverts over the Dunmunkle Creek, on the Banyena Pimpinio Road. Replacement of a major box culvert.

Bridges Renewal Program Round Two

Projects as at 15 September 2017 VIC

Moyne Shire Council - Tarrone Lane Bridge Upgrade

VIC

Mitchell Shire Council - Highlands Rd (1405 & 1411) Bridge Replacements Mitchell Shire Council Dropmore Road (1394) Bridge Replacement City of Wodonga CouncilConisbee Lane Bridge Replacement Corangamite Shire Council Castle Carey Road Bridge Replacement East Gippsland Shire Council Lindenow Glenaladale Road Bridge Replacement Gannawarra Shire Council - Wells Bridge Replacement Golden Plains Shire Council Pitfield-Cressy Rd Bridge Replacement City of Greater Bendigo Council Sheepwash Creek Bridge Replacement Shire of Boyup Brook - Bridge 270, Cranbook Road Bridge Replacement Shire of Pingelly - Bullaring Road Bridge (1191) Replacement Shire of Donnybrook - Balingup, Bridge 3643A, Trevena Road Bridge Replacement

VIC

VIC

VIC

VIC

VIC VIC

VIC

WA

WA WA

Widening, strengthening and realignment of a single lane bridge suitable for B-Doubles and Higher Mass Limit vehicles. Replace two bridges (1405 and 1411) to a 160 tonne load limit.

$309,215

$618,431

$292,034

$584,068

Replace a one-lane 20 tonne limit concrete bridge with a two-lane 160 tonne limit concrete bridge. Replace a load limited timber bridge with six cell concrete box culverts.

$184,000

$398,843

$35,000

$154,900

Replace and realign a one-lane timber bridge with a two lane concrete bridge.

$2,600,000

$5,200,000

Replace a one lane steel and timber 44 tonne limit bridge with a one-lane 70 tonne limit concrete bridge. Replace a one lane timber and steel bridge with a two-lane concrete bridge. Replace a 15 tonne limit two-lane bridge with a 68 tonne limit two lane concrete bridge. Replace a one lane timber and steel bridge with a two lane concrete bridge.

$1,202,500

$2,405,000

$838,000

$1,707,323

$300,000

$602,665

$741,545

$1,483,090

Replace a single lane timber bridge with a two lane concrete bridge.

$2,450,000

$4,900,000

$81,000

$163,000

$750,000

$1,500,000

Replace a two lane timber bridge with a two lane strengthened box culvert. Replace a one-lane timber bridge with a two lane concrete bridge.