CITY OF Los ANGELES - City Clerk

CITY OF Los ANGELES - City Clerk

BOARD OF PUBLIC WORKS MEMBERS CITY OF Los ANGELES CALIFORNIA DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING KEVIN JAMES PRESIDENT HEATHER MARIE...

2MB Sizes 0 Downloads 16 Views

Recommend Documents

Office of the City Clerk, City of Los Angeles This
May 8, 2006 - 2-14-06 - Parks - Jerome Douglas Trotter. Parks - Christopher William Smith. LaBonge - David L. Abell. 2-1

Office of the City Clerk, City of Los Angeles This
Union (SEIU) Justice for Janitors campaign has been successful in Los Angeles and around the country in improving standa

Office of the City Clerk, City of Los Angeles This
Oct 7, 2011 - LaBonge for Thomas P. O'Malley, William Fuqua, Hoyt S. Pardee, Dennis Cole; Huizar for Jerry A. Miller; Sm

Office of the City Clerk, City of Los Angeles This
Oct 13, 2012 - Leslie Nielsen and Don Meredith; Koretz for Shirley Roberts; Rosendahl for Maureen T. Bonin Bedard, Debor

Office of the City Clerk, City of Los Angeles This
Jan 3, 2014 - Andrew Simon; Koretz for Max Webb Day. 03/16/2012 Council action; Koretz for Rabbi Aaron D. Benson; Zine f

Office of the City Clerk, City of Los Angeles This
Indeed, "straw" buyers often purchase weapons which they pass on to criminals, gang members, and others unable to purcha

Office of the City Clerk, City of Los Angeles This
Apr 2, 2008 - Zine - Michael Fabian. Greuel - John Pasternak. Alarcon - Alice May Points. Weiss - Devorah Levenberg. 3-1

°1~(~ - City Clerk Internet Site - City of Los Angeles
Dec 2, 2013 - 17. 607 HUNTLEY DR, WEST HOLLYWOOD, CA 90069-5006. TSU IRENE TRUST. NAGY IVAN. 4337-014-056. LOS ANGELES,

5i#j - City Clerk Internet Site - City of Los Angeles
May 31, 2016 - Began broadcast career at KPCC in news department headed by Larry ... host many TV shows, including shows

City of Los Angeles - City Clerk Internet Site
Jun 15, 2016 - herebyGRANT(s)to Charles Arthur Ballard and Kathryn Joy Ballard, ... the following real property in the c

BOARD OF PUBLIC WORKS MEMBERS

CITY OF

Los ANGELES CALIFORNIA

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING

KEVIN JAMES PRESIDENT

HEATHER MARIE REPENNING

GARY LEE MOORE, PE, ENV SP CITY ENGINEER

VICE PRSIDENT

MICHAEL R. DAVIS

1149 S. BROADWAY. SUITE 700 LOS ANGELES. CA 90015-2213

PRESIDENT PRO TEMPORE

JOEL F. JACINTO COMMISSIONER

http://eng .lacity. or9

ERIC GARCETTI

VACANT COMMISSIONER

MAYOR

FERNANDO CAMPOS EXECUTIVE OFFICER

August 19, 2016

CONSTRUCTION ORDER Mr. Brian Kelley United Riggers and Erectors 4188 Valley Blvd. Walnut, CA 91789

On-Call Contract C-114649 FILE: PRW-3-8 HTP-XXX-7-6

Subject: CONSTRUCTION ORDER - Emergency Contract Request - HTP - DiCE-2 Building Repairs Dear Mr. Kelley On August 18, 2016, the City's Board of Public Works authorized the City Engineer to utilize an On-Call Contractor to complete structural repair of the Dewatering Centrifuge Expansion - Phase 2 (DiCE-2) Building. The building sustained extensive damage as a result of the catastrophic failure of Centrifuge No 4 on the evening of 8/17/16. August 18, 2016 United Riggers and Erectors (URE), the top listed Emergency On-Call Contractor was contacted, advised of the emergency work required and jobsite meetings were held on 8/18 and 81119 to assess the extent of structural damage and develop the required scope of work. On August 18, 2016, URE communicated with the Assistant Division Engineer, Sean Kenney, with the City's Environmental Engineering Division that they would accept this project. On August 19, 2016, a Pre-Construction Meeting was conducted by the City at the project site at 10 am. At this meeting the City explained the proposed scope, answered questions and discussed various aspects of the project. This project includes but is not limited to the removal and replacement damaged portions of existing roof, walls and floors of the DiCE-2 building. It will also include but is not limited to the demolition of the existing Polymer Testing Facility, repair of a damaged walkway, roof repair of the C-7 building and concrete repair at the Truck Loading Facility. The Engineer will issue separate task work orders for the specific work to be performed. The work shall be issued on agreed price and/or time and material basis, as required.

TRANSMITTAL NO. 2 AN EQUAL EMPLOYMENT OPPORTUNITY EMPLOYER

Recydable and made from

recyc~

wast..

0

Progress payments will be made on a monthly basis. This Construction Order (Notice of Project Award) is based on URE's acceptance of the project and the provisions of the "Agreement Between the City of Los Angeles and Murray Co., For On-Call Emergency Repair Services and Construction Services at the City's Wastewater Treatment Plants and Other Wastewater Facilities", supplemented by Task Work Orders to be issued for the project. The following Construction Order (Notice of Award of Project) is hereby issued: 1.

Not later than September 2, 2016, the Contractor shall file an acceptable surety bond with the City in principal amount equal to one million-two hundred thousand dollars ($1,000,000.00). This is based on Article IX of the On-Call Agreement and the Engineer's estimate of $1,000,000.00 for all materials, labor and equipment for this project. This surety bond shall be filed with Ms. Mary Carter at the City Board of Public Works.

2.

The City will issue a written Notice-to-Proceed (NTP) after contractor licenses and evidence of insurance are verified.

3.

After receiving the NTP, you are instructed to construct the project in accordance with the Contract Documents and subsequent Task Work Orders. All work shall be done in accordance with the Task Work Orders, On-Call Emergency Contract and as modified by written direction of the Engineer.

4.

The Contract representative and Construction Manager for the City is Mr. Adil Samed, Environmental Engineering Division, who can be reached at (310) 6486195. All correspondences, directives, communications, questions, etc., shall be directed to him. All work assignments, schedule changes, personnel changes and other work related activities will be issued by the contract representative or his designee.

5.

Billing for compensation on a program payment basis shall be in accordance with the terms of Article VIII, "Wages, Invoices and Payments", in the On-Call Agreement between the City and your company as modified by the "General Requirements" for this specific project.

6.

Any changes to these terms shall be issued in writing through the City's Construction Managers.

7.

City will be utilizing electronic document control system e2020 for this project.

If you have any questions regarding this matter, please contact Sean Kenney at (310) 648-6105 .

Sin~~I~, ~~ , Mic~r~.E.

\

Engl~r ~ p.

Division Environment Engineering Division SKI:sk Q:\6230\CM\Construction Order cc: S. Kenney (EED) E. Ohanian (EED) J. Olinger (Con-Ad) A. Samed(EED)

M. Carter (Board Office)