EXHIBIT A FORM OF AGREEMENT Table of Contents Amendment No. 3 to Contract No. 99-0844 Notices Appendix A – ASTRO 25 Upgrade Proposal Letter of Tra...

17MB Sizes 1 Downloads 19 Views

EXHIBIT A FORM OF AGREEMENT

Table of Contents

Amendment No. 3 to Contract No. 99-0844 Notices

Appendix A – ASTRO 25 Upgrade Proposal Letter of Transmittal Table of Contents Section 1 - Executive Summary Section 2 - System Description Section 3 - Statement of Work Section 4 - Acceptance Test Plan Section 5 - Cutover Plan Section 6 - Training Plan Section 7 - Implementation Section 8 - Warranty & Maintenance Section 9 - Equipment List Section 10 - Pricing

City of Philadelphia 800 MHz Radio System Upgrade

Table of Contents March 12, 2009 i

Options: 1-10 Channel Expansion 1-a System Description 1-b Statement of Work 1-c Equipment List 1 -d Acceptance Test Plan 2-11th Site 2-a System Description 2-b Statement of Work 2-c Equipment List 2-d Acceptance Test Plan 3-Prison & Training 3-a System Description 3-b Statement of Work 3-c Acceptance Test Plan 4-Software Subscription Option

Appendix B – Supplemental Schedule of Project Costs Appendix C – Economic Opportunity Plan Appendix D – Software License Agreement Appendix E – [Reserved] Appendix F – Milestone Payment Schedule Appendix G – Preliminary Project Schedule Appendix H – [Reserved] Appendix I – System Controller Performance Testing Results Appendix J – Applicable Laws Appendix K – Open Source Software and Third Party Software

City of Philadelphia 800 MHz Radio System Upgrade

Table of Contents August 31, 2007 ii

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Contract No. 99-0844 Amendment No. 3

Amendment Agreement This Amendment Agreement No. 3 (“Amendment Agreement” or “Amendment” or “Amendment No. 3”) to Contract No. 99-0844 (the “Agreement” or the “1999 Agreement”) between the City of Philadelphia (“City”) and Motorola, Inc., a Delaware corporation (“Motorola” or “Contractor”), is entered into this ____________day of _______ and is effective as of __________. 2009 (the “Effective Date”). BACKGROUND A. The City and Contractor entered into a certain Contract, Contract No. 99-0844, dated June 30, 1999, which includes all exhibits, attachments, and executed Change Orders thereto (collectively, the “Base Contract” or “Contract”). B. The City entered into the Base Contract by and through its Procurement Department (“Procurement”). C. Under the Contract, Contractor agreed to furnish all Equipment, personnel and labor, Software, Documentation, Services and Deliverables required to install and fully implement a 800 MHz trunked radio communications system, as defined in the Contract and set forth in detail therein. D. The City and Contractor have agreed to amend certain terms and conditions of the Base Contract to provide for upgrade of the City’s circuit-based ASTRO 800 MHz trunked municipal radio system to Motorola’s ASTRO 25 Internet Protocol-based 800 MHz trunked municipal radio system, as set forth herein. IN CONSIDERATION of the mutual obligations set forth herein, and each intending to be legally bound hereby, the City and Motorola covenant and agree, as of the Effective Date, that the 1999 Agreement is hereby amended as set forth in Sections 1-13 below. With the exception of the amendments set forth in Sections 1-13, and subject to councilmanic appropriation of funds, the terms and conditions of the 1999 Agreement shall be and remain in full force and effect and shall apply to the Upgrade Project. References to “Article 1,” “Article 2,” etc. and to “Section 1”, “Section 2” etc. are references to the correspondingly numbered articles and sections of the 1999 Agreement.

-1800MHz-MotorolaUpgrade-Amendment#3 3-16-09

1. Definitions. Article 1 Section 1.1 (“Definitions”) of the 1999 Agreement is amended to provide that the following terms shall have the following definitions when used in this Amendment Agreement and solely as applied to the Upgrade Project. Capitalized terms not otherwise defined in this Amendment Agreement shall have the meanings set forth in the 1999 Agreement. 1.1 Amendment Agreement or Amendment or Amendment No. 3 – shall mean Sections 1-13 hereof, together with all Appendices, exhibits, and attachments hereto, all of which are incorporated by reference in this Amendment. 1.2 Coverage Requirements - shall mean the radio coverage requirements as set forth in Section 4.1 (Coverage) of Appendix A (“ASTRO 25 Upgrade Proposal as Revised”) 1.3 Cutover Plan – shall mean the Upgrade/Cutover Upgrade Implementation Plan (UIP) / Implementation Time Line (ILT) developed during the Detailed Design Review phase of the Upgrade Project, which is discussed in Section 5 of Appendix A to this Amendment No. 3. 1.4 Deliverables - shall mean the deliverables for each Phase of the Project as outlined in Section 3 of Appendix A, (“ASTRO 25 Upgrade Proposal as Revised”), and in the Project Schedule set forth in Section 3.7.4 of Appendix A (“ASTRO 25 Upgrade Proposal as Revised”). 1.5 Documentation - shall mean the documentation itemized in Section 3.17 of Appendix A (“ASTRO 25 Upgrade Proposal as Revised”). 1.6 Equipment - shall mean the equipment required for the successful implementation of the Upgrade System, including Fixed Network Equipment and Subscriber Equipment, test and support equipment, and all other equipment as set forth in Section 9 of Appendix A (“ASTRO 25 Upgrade Proposal as Revised”). 1.7 Final Acceptance – shall mean the point in time at which Motorola completes all Work identified in the Punchlist created by the City and Motorola, and the City accepts such Work and provides written notice to Motorola of the Final Acceptance of the Upgrade Project. 1.8 Fixed Network Equipment (FNE) - shall mean the equipment designated as such in Section 9 of Appendix A (“ASTRO 25 Upgrade Proposal as Revised”). 1.9 Final Implementation Schedule (FIS) – shall mean the refinement of the Preliminary Project Schedule (Appendix G to this Amendment No. 3) for the Upgrade -2800MHz-MotorolaUpgrade-Amendment#3 3-16-09

Project, which is to be prepared during the Detailed Design Review phase of the Upgrade Project and is to be agreed upon by Motorola and the City. 1.10 Functional Requirements – shall mean Functional Requirements as provided in Appendix A to this Amendment and Exhibit A, Section 1.0 (“System Description”), relating to Functional Requirements. 1.11 1999 System – shall mean the circuit-based ASTRO 800 MHz radio communications system provided by Motorola to the City pursuant to the 1999 Agreement. 1.12

Notice Date – shall mean the date of execution of this Amendment No. 3.

1.13 Operational Communications Functionality – shall mean conformance with Performance Standards as defined in Section 1.1 of the 1999 Agreement, which consists of the standards and requirements set forth in the following Exhibits to the 1999 Agreement: Exhibit A, Section 5.2R1, (Coverage); Exhibit C, (System Acceptance Test Plan); Exhibits I (800 MHz Voice Quality Definition) and J, (800 MHz Voice Quality Definition – Audio Sample); and Exhibit K (System Throughput Performance Standard). 1.14 Performance Standards – shall mean, collectively, the standards and requirements set forth in the following Appendices to this Amendment: Appendix A, Section 4.1, (Coverage); Appendix A, Section 4.10, (Functional Acceptance Test Plan); and Appendix I (System Controller Performance Testing Results), and the following Exhibits to the 1999 Agreement Exhibit I (800 MHz Voice Quality Definition), Exhibit J (800 MHz Voice Quality Definition – Audio Sample) and Exhibit K (System Throughput Performance Standard). 1.15 Project or Upgrade Project - shall mean and include the furnishing of all Equipment, personnel and labor, Software, Documentation, Services and Deliverables and complete performance by the Contractor required to install and fully implement the upgrade of the City’s circuit-based ASTRO 800 MHz trunked municipal radio system to Motorola’s ASTRO 25 Internet Protocol-based 800 MHz trunked municipal radio system in accordance with the terms of this Amendment. 1.16 Project Milestone - shall mean each milestone as set forth in the following Appendices to this Amendment No. 3: Milestone Payment Schedule (Appendix F), Preliminary Project Schedule (Appendix G), and/or the Final Implementation Schedule. 1.17 Preliminary Project Schedule - The schedule for the work provided initially by the Contractor and included in this Amendment as Appendix G.

-3800MHz-MotorolaUpgrade-Amendment#3 3-16-09

1.18 Punchlist – shall mean a list of minor product or system deficiencies of the Upgrade Project identified by the City with the assistance of Motorola and to be corrected by Motorola prior to Final Acceptance, which Punchlist may be supplemented up to 30 calendar days after the System Acceptance. Following are examples of possible Punchlist items: • Subscriber problems (hardware and/or software/programming), up to 5% of the spares or less than 10 spare units. • Errors with the manuals/documentation • Deficiencies in workmanship, which does not effect the normal operation of the system, such as clean-up work at the sites, dents/scratches on equipment, etc. • As built drawing not available • Grounding issues. • Requested Subscriber equipment still not delivered 1.19 Software means, collectively, the computer software programs, including but not limited to object code but not including source code, furnished to the City for the 800 MHz Upgrade Project pursuant to Amendment No. 3, including (i) proprietary software in object code format, and all Motorola provided or authorized adaptations, translations, de-compilations, disassemblies, emulations, or derivative works of such software; (ii) any modifications, enhancements, new versions and new releases of the software provided by Motorola; (iii) computer software programs owned by a third party supplier which Motorola has the right to license to the City; (iv) Third Party Software that is furnished by Motorola but licensed by the publisher of the software; and (v)software programs that are embedded or pre-loaded in products furnished by Motorola pursuant to Amendment No. 3; and (vi) Motorola Directly Licensed Third Party Software. 1.20 Statement of Work - shall mean Section 3 of the Appendix A (“ASTRO 25 Upgrade Proposal as Revised”) submitted to City by Motorola June 13, 2008, as revised through negotiation, and except with the deletion of Appendix A thereto (“Communications System Agreement”), attached hereto. 1.21 Subscriber Radios or Subscribers – shall mean mobile radios, portable radios, Control Stations, and the accessories required for their operation and intended use. 1.22 System or Upgrade System - shall mean, collectively, the City’s 800 MHz radio communications system, upgraded to the Motorola ASTRO 25 Internet Protocolbased 800 MHz trunked municipal radio system required under this Amendment, and the work comprising such upgrade of the System, including all Equipment, Software, Services and Deliverables required therefor.

-4800MHz-MotorolaUpgrade-Amendment#3 3-16-09

1.23 System Acceptance -shall mean the point in time at which the Upgrade Project satisfies all the material requirements set forth in Section 7.2 of this Agreement and the City issues its written notice to Contractor of System Acceptance of the Upgrade Project, with the caveat that the parties agree that Motorola shall complete any specified Punchlist requirements identified by the City. 1.24 System Staging - as defined and described in Appendix A, Section 3.9.4 (Factory Testing) and Section 3.14 (Acceptance Testing). 1.25 Work - the construction, labor, materials, Equipment, Software and contractual requirements for the Upgrade Project as indicated in this Amendment No. 3 and its related documents and exhibits.

2. Term. Article 2 (“Term of Agreement”) of the 1999 Agreement is amended to change the expiration date to the later of: (i) four years from Amendment execution; or (ii) Contractor’s completion of all of its obligations as set forth in the Agreement (including, without limitation, completion and delivery of the System, successful completion of all Acceptance Tests, the City’s System Acceptance and Final Acceptance of the Project as provided in Article 7 (Acceptance), the completion of all warranty and maintenance obligations, and the expiration of all warranty periods and all periods of maintenance provided in Exhibit A to the 1999 Agreement and any amendment of the Contract to provide for additional periods of maintenance); unless sooner terminated by the City or Contractor pursuant to the terms of the Agreement. In accordance with the Philadelphia Home Rule Charter, Section 8-200(3), the City reserves the right to terminate this Agreement at the option of the City at any time after the expiration of four years from the Effective Date of this Amendment No. 3 without liability to Motorola for damages or loss of profits which would have been realized had the Agreement not been terminated. 3. Scope of Work.

3.1 Article 3 (“Scope of Work”) of the 1999 Agreement is amended to add the following new Sections 3.1(g), (h) and (i): (g) All Equipment, personnel and labor, Software, Documentation, Services, and Deliverables required to install and fully implement the Upgrade Project, as set forth in Appendix A and Appendix B to Amendment No. 3 to this Agreement; provided, however, that Contractor shall furnish, in accordance with the terms and conditions of this Agreement, at no cost to the City additional to the costs set forth in Article 4, any Equipment, labor, Software, Documentation, Services, and Deliverables additional to or different from those set forth in Appendix A and -5800MHz-MotorolaUpgrade-Amendment#3 3-16-09

Appendix B to Amendment No. 3 that may be required in order to cause the Upgrade Project to conform to the Performance Standards (including, without limitation, Coverage Requirements) and Functional Requirements provided in the foregoing Appendices and in the 1999 Agreement and the Exhibits thereto. (h) Motorola shall maintain all Operational Communications Functionality of the City’s current 800 MHz Radio System, as it exists at the Effective Date of this Amendment, through the City’s Conditional Acceptance {Article 7}of Project Milestone #19 (Transition SmartZone 3.0 to SmartX and New ASTRO25 Mastersite (3600 A & B Simulcast System – Embassy / Elite console system) as set forth in the Project Schedule attached as Appendix G to Amendment No. 3. After Conditional Acceptance of Project Milestone #19 Motorola shall maintain all such Operational Communication Functionality on the Upgrade System through Final Acceptance and thereafter. Provided, however, that during the Cutover only, communications shall be maintained as provided in accordance with the Cutover Plan developed during the Detailed Design Review and accepted by the City in writing. (i) Software for the Upgrade System furnished pursuant to Amendment No. 3 shall be subject to the terms and conditions of Appendix D, Software License Agreement, to Amendment No. 3. If any Software furnished by Motorola for the Upgrade Project require a license directly between the City and the Software owner, Motorola shall furnish each applicable license for the Upgrade Project as described in Appendix K to the City at the commencement of the Detailed Design Review for its review and written approval or rejection (such approval not to be unreasonably withheld) which shall be not later than sixty (60) days after delivery of the licenses, and it shall be a condition of start of manufacturing that the City shall have received and so approved all such licenses. Motorola to provide any additional such licenses that are identified during the Detailed Design Review by the completion of the Detailed Design Review. Any such rejection shall if necessary result in mutually agreed to extension of the Project Schedule. 3.2 Article 3 is amended to add the following subsections at the end of Section 3.4 (“Detailed Design”), which subsections shall apply to the Upgrade Project: Upgrade Detailed Design Document. The Upgrade Project shall be designed and installed in accordance with Appendix A. Not later than the delivery date for the Detailed Design Project Milestone(s) as set forth in the Preliminary Project Schedule (Appendix G), Contractor shall deliver the Detailed Design Document to the City for its review, comment and approval. The Detailed Design Document shall conform to Appendix A, and shall fully detail and specify the Upgrade Project, including, without limitation, the following: complete technical specifications for the Upgrade Project, including, without limitation, performance -6800MHz-MotorolaUpgrade-Amendment#3 3-16-09

specifications, propagation studies, and coverage maps; floor plans, equipment layouts, equipment drawings, equipment termination drawings, cable layout drawings, electrical power and confirmation of the existing HVAC capacity as sufficient for the Upgrade Project, for each individual site or facility furnished by the City. All such plans, drawings and information will be provided to a level of detail sufficient for delivery to a construction contractor as a work package or bid specification. Provided that the City and Motorola agree the Detailed Design Review Document is satisfactory to both, the City shall within fifteen (15) calendar days of receipt notify Contractor in writing of its comments and any changes in the Detailed Design Document that the City may require. Contractor shall revise the Detailed Design Document to incorporate such comments and changes; provided, however, that if Contractor contends that the City's comments and changes are not within the scope of Appendix A, then Contractor shall notify the City in writing, not less than 10 calendar days following receipt of the City's notice of comments and changes, describing in reasonable detail the comments and changes that it believes are outside the scope of Appendix A and the reasons for its contention. The City shall determine whether it requires such comments and changes notwithstanding Contractor's notice. Any such changes and comments that constitute a change in scope of the work will be subject to Article 8 (Changes). Contractor's failure to timely provide the written notice required under this Section 3.4 shall constitute waiver of Contractor's right to a change in compensation or time of performance on account of changes to the Detailed Design Document required by the City except by written Change Order signed by both Motorola and the City. City's failure to timely provide the written comments on the Detailed Design Document required under this Section 3.4 shall constitute waiver of City's right to change the Detailed Design Document except by written Change Order signed by both Motorola and the City. In no event shall any change to the Detailed Design Document made at the City's request, or the City's approval of the Detailed Design Document or Conditional Acceptance of the Project Milestone that includes the Detailed Design Document, in any way limit, alter, or excuse Contractor's obligation to design and install the Upgrade Project in accordance with Appendix A, and the Performance Standards, as they may be modified, if they are modified, by written Change Order executed by both Contractor and the City. In no event shall Contractor perform any work on the Project except the work comprising the Project Milestone(s) for the Detailed Design Document, nor shall the City have any payment or other obligation with respect to work not included in such Project Milestones, unless and until the City has approved the Detailed Design Document in writing; except as agreed otherwise by the City in writing.

-7800MHz-MotorolaUpgrade-Amendment#3 3-16-09

3.3 Upgrade Options. The following Section 3.6 (a) is added to Section 3.6 of the 1999 Agreement: (a) The City shall have the right, in its sole discretion, to purchase the options set forth in Appendix A under the “Options” tab for the prices set forth at pages 28 and 29 of Appendix B under the heading “Optional Offerings”. 4. Price and Payment. 4.1 Article 4 (“Price and Payment”) of the 1999 Agreement is amended to add the following section at the end of Section 4.1 (“Project Price”) (references to “Project Price” in provisions of the 1999 Agreement are deemed to refer to the “Upgrade Project Price,” as defined below, to the extent they remain in effect under this Amendment and apply to the Upgrade Project): Contractor's total compensation for all Equipment, personnel and labor, Software, Documentation, Services, and Deliverables required to install and fully implement the Upgrade Project in accordance with Amendment No. 3 to the Agreement (the "Upgrade Project Price") shall be the Upgrade Project Price set forth in Appendix B to Amendment No. 3, Supplemental Schedule of Project Costs under the heading “Total Equipment and Services with Discounts” on page 27, which amount is equal to $34,492,433.00. Such amount shall be due and payable in accordance with the Milestone Payment Schedule set forth in Appendix F to Amendment No. 3; provided, however, that no Milestone Payment shall become due or payable - unless and until all work comprising the Project Milestone (including, without limitation, delivery and installation of all Equipment, Software, and Deliverables which may be required for the Project Milestone) has been completed and Conditionally Accepted by the City, in writing, in accordance with Article 7 (Acceptance), or, in the case of the final Milestone Payment, unless and until the City has Finally Accepted the Upgrade Project as a whole, in writing, in accordance with Article 7 (Acceptance). The Upgrade Project Price shall be based on and shall reflect the line item costs set forth in the Supplemental Schedule of Project Costs (Appendix B to Amendment No. 3). Contractor shall furnish, at no cost to the City additional to that set forth in this Article 4, any Equipment, personnel and labor, Software, Documentation, Services, and Deliverables additional to or different from those set forth in Appendix A to Amendment No. 3 and elsewhere in this Agreement that may be required in order to cause the Upgrade Project to conform to the Performance Standards (including, without limitation, Coverage Requirements) and Functional Requirements provided in Appendix A to Amendment No. 3 and Exhibit A, Section 1.0 (System Description), relating to Functional Requirements, and with respect to Performance Standards, Exhibit A, Section 5.2R1 (Coverage), Exhibit C (System Acceptance Test Plan), Exhibits I (800 MHz Voice Quality Definition), -8800MHz-MotorolaUpgrade-Amendment#3 3-16-09

Exhibit J (800 MHz Voice Quality Definition – Audio Sample), and Exhibit K (System Throughput Performance Standard). 4.2 Article 4 (“Price and Payment”) is amended to add the following at the end of Section 4.2 (“Prices for Options”): Prices for Options for the Upgrade Project (as set forth in Appendix A to Amendment No. 3, under the “Options” tab in Section 2 ) shall be as set forth in Appendix B to Amendment No. 3, Supplemental Schedule of Project Costs. Notwithstanding anything to the contrary that may be stated in Appendix A, it is understood that the Acceptance Test Plan for any such Option will be created at the time the City exercises such option and shall be subject to City written approval. 4.3 Article 4 (“Price and Payment”) is amended to add the following at the end of Section 4.3 (“Prices for Maintenance and Support”): Contractor’s annual price for maintenance services for the Fixed Network Equipment and the mobile radios for the Upgrade Project, following expiration of the warranty period through the tenth year after the Effective Date of Amendment No. 3 to the Agreement, shall be in accord with the maintenance contract pricing set forth below: Maintenance contract pricing assumes the initial two years are needed for implementation and the third year is the Warranty Period for the Fixed Network Equipment. Year Four pricing is calculated by reference to the usual Total Maintenance Services Sale Price of $2,342,882.77, from which is deducted $407,132.60 to account for portable radios not covered by the proposed maintenance contracts (3010 portables x $135.26 = $407,132.60), with a remainder of $1,935,750.17. Annual Escalation is 5% for Maintenance Cost for FNE + mobiles. Maintenance Cost for FNE + mobiles: Year 4 $ 1,935,750.17 Year 5 $ 2,032,537.68 Year 6 $ 2,134,164.57 Year 7 $ 2,240,872.79 Year 8 $ 2,352,916.43 Year 9 $ 2,470,562.26 Year 10 $ 2,594,090.37

-9800MHz-MotorolaUpgrade-Amendment#3 3-16-09

If the City chooses to enter into a maintenance contract with Motorola at a price set forth above in this Section 4.3, for any period following the expiration of the Warranty Period through the tenth year after the Effective Date, Motorola will provide the following services to the City pursuant to such maintenance contract: • Dispatch Service, Network and Security Monitoring Services with Pre-Tested Anti-Virus Subscription, Technical Support • Radio Repair Services including Depot Repair and Preventive Maintenance for 744 Mobile Units • Wireless Pickup and Delivery • Infrastructure Repair with Advanced Replacement Service • Premier OnSite Infrastructure Response Service with Dedicated Technicians • Consolette Repair Services • Local Admin System Management Service • Database Management • Template Conversions • Template Management • Tower Maintenance Additional Maintenance Services available for the portable radio is $135.26 per unit per year to include radio repair service including depot repair and preventive maintenance. 4.4 Article 4 is amended to add the following at the end of Section 4.12 (“Long-Term Pricing; Application of Project Price Discounts”): Contractor shall guarantee Equipment pricing for the ten-year period beginning on the execution date of Amendment No. 3 to this Agreement, as follows: (a) For the period commencing on the date of this Agreement and ending on the One Hundred and Eightieth (180th) calendar day following the date of execution of Amendment No. 3 to this Agreement, the City shall have the right to purchase additional Fixed Network Equipment at the stated percentage discount list in the itemized equipment list provided in the Pricing Section of Appendix A (“ASTRO 25 Upgrade Proposal as Revised”) (b) For the five (5) year period beginning on the date of execution of Amendment No. 3 to this Agreement (the “Initial Pricing Period”) Contractor shall extend the long term Subscriber pricing currently in effect between the City of Philadelphia and Motorola. The negotiated discounts for Subscriber units are listed in the table below. - 10 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

Product

Discount

Mobile Radios ASTRO Digital XTL5000 Family Mobiles

22%

ASTRO Digital XTL2500 Family Mobiles

15%

ASTRO Digital XTL1500 Family Mobiles

15%

Portable Radios ASTRO Digital XTS5000 Family Portables

22%

ASTRO Digital XTS2500 Family Portables

15%

ASTRO Digital XTS1500 Family Portables

15%

For XTL5000 Mobile Radios and XTS5000 Portable Radios, Motorola will extend an additional discount of: 3% For volumes of 100-499 units on a single purchase order 6% For volumes of 500+ units on a single purchase order

(c) Direct FNE product replacements for cancelled Motorola manufactured equipment (Subscribers and FNE), shall be offered at the stated discount listed in the Pricing Schedule of Exhibit A. This pricing provision is applicable during a ten (10) year period beginning on the date of execution of Amendment No. 3 to this Agreement. (d) Motorola FNE products that are not currently available (new technology), when introduced, will be offered at a 15% discount off the applicable Motorola list price at the time of purchase. This pricing is available for the ten (10) year period following the date of execution of Amendment No. 3 to this Agreement. 4.5 Article 4 is amended to add the following at the end of Section 4.14 (“Contractor’s Guarantee of Parts Availability”): Motorola represents and warrants that replacement parts for all Equipment furnished for the Upgrade Project under this Agreement shall be available until December 31, 2018. Motorola reserves the right to supply either assemblies or piece parts during the above described time frame. The City will have the option - 11 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

to purchase the Upgrade Assistance Program – UAP during the life of the System, on the condition that the City has obtained and installed the then-current release of the system software (and required hardware). Software shall be governed by the terms set forth in the Software License Agreement attached hereto as Appendix D. 5. Project Schedule; Liquidated Damages for Delay. 5.1 Project Schedule. Article 5 is amended to add the following Section 5.1(a) at the end of Section 5.1 of the 1999 Agreement: (a) Subject to the occurrence of a “Force Majeur Event” (as defined in Section 5.5 of the 1999 Agreement) or the other provisions of this Agreement, Contractor shall commence performance of the Upgrade Project within 10 days following execution of Amendment No. 3 by the City. Subject to the occurrence of a “Force Majeur Event” (as defined in Section 5.5 of the 1999 Agreement) or delays caused by the City, and subject to the other provisions of this Agreement, Contractor represents and warrants that it will complete each Project Milestone on or before the due date provided in the Final Implementation Schedule, as from time to time revised with the City’s written approval. The Final Implementation Schedule shall conform to the Preliminary Schedule attached as Appendix G, except as agreed otherwise by both parties. Contractor shall create and maintain a Critical Path Method ("CPM") schedule for the Upgrade Project that identifies and schedules each task and activity required for the Upgrade Project as well as each Project Milestone, using a CPM methodology, with Microsoft Project or Workbench software that is approved in writing by the City (which written approval must be issued by the City prior to Contractor's commencement of performance). The CPM schedule shall be consistent with the Final Implementation Schedule, and shall be updated at least once in every thirty (30) calendar days (or more frequently, if requested by the City in writing). A copy of each updated CPM schedule shall be delivered to the City's Project Manager immediately upon creation by Contractor. No change in the Final Implementation Schedule that results in a change in a Liquidated Damages Milestone may be made except by Change Order executed by both the City and Contractor. 5.2 Article 5 Section 5.3 (“Liquidated Damages for Delay”) is amended to add the following subsection at the end of Section 5.3, which subsection shall apply to the Upgrade Project: Contractor acknowledges and agrees that the City will incur costs and damages for each day that Contractor fails to complete any of the following Project Milestones by the dates of Acceptance provided for them in the Preliminary - 12 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

Project Schedule, or if later, a Final Implementation Schedule agreed upon by the City and Motorola: (a) successful completion of Factory System Acceptance Testing (Preliminary Project Schedule, Line 10, “Staging”), (b) successful completion of first 30-day Reliability Test (Preliminary Project Schedule, Line 17), (c) successful performance of Functional Acceptance Test Plan and Coverage Acceptance Test Plan (Preliminary Project Schedule, Line 22), (d) the Final Acceptance date of twenty-one (21) months following execution of Amendment No. 3, or such different date for System Acceptance that may be agreed by the City and Contractor as set forth in the Final Implementation Schedule (the “System Acceptance Date”). If Contractor fails to complete Project Milestone (b) by the completion date provided for it in the Project Schedule, then the City may, in its sole discretion, assess liquidated damages in the amount of Six Thousand Five Hundred Dollars ($6,500) per day for every calendar day after such completion date that the Project Milestone is not completed. If Contractor fails to complete Project Milestones (a) or (c) by the completion dates provided for them in the Project Schedule, then the City may, in its sole discretion, assess liquidated damages in the amount of Three Thousand Dollars ($3,000) per day for every calendar day after such completion date that the Project Milestone is not completed. If Contractor fails to complete System Acceptance by the System Acceptance Date, then the City may, in its sole discretion, assess liquidated damages in the amount of Six Thousand Five Hundred Dollars ($6,500) per day for every calendar day after the System Acceptance Date that System Acceptance is not achieved; provided that, in no event shall Contractor be liable for liquidated damages for any day of delay that is caused solely by the City or a Force Majeur Event. The total amount of such liquidated damages assessed pursuant to this Amendment shall not exceed five percent (5%) of the Upgrade Project Price. 5.3 Section 5.4 (“Contractor’s Remedy for Delay; Submission of Claims”) is amended by substituting the following rates in the table for Motorola’s direct labor daily rates, such rates to apply to the Upgrade Project and this Amendment: Motorola Direct Labor Daily Rate Project Manager/Supervisor Project Engineer System Technologist Application Specialist

2009 - 2013 rates $1,591 $1,545 $1,600 $1,591

2014 – 2018 rates $1850 $1805 $1860 $1850

6. Project Management. 6.1

Section 6.1 (“Project Managers”) is amended to add the following:

Contractor's initial Project Manager for the Upgrade Project shall be Selina Lam. The City's initial Project Manager for the Upgrade Project shall be Frank Punzo. - 13 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

7. Acceptance 7.1 Section 7.1 (“Conditional Acceptance”) is amended to delete subsection 7.1(a) in its entirety and to replace it with the following new subsection 7.1(a): Contractor shall notify the City in writing when Contractor contends that all Work comprising a Project Milestone as set forth in Appendix F to Amendment No. 3 (“Milestone Payment Schedule”) is completed and ready for Conditional Acceptance by the City. Within thirty (30) days following receipt of Contractor's written notice, the City shall issue its written statement of Conditional Acceptance of the corresponding Project Milestone, or its written notice that the Work comprising the corresponding Project Milestone is not Conditionally Accepted. Conditional Acceptance will not be unreasonably withheld provided that all Work comprising the Project Milestone is completed and conforms to the Warranty Standards, as defined in Article 9 (Warranty), and successfully completes all applicable Conditional Acceptance Tests (as defined in Article 7 (Acceptance), in accordance with the Conditional Acceptance Test Plan(s) (as set forth in Article 7). 7.2 Section 7.2 (“Final Acceptance”) is amended to add the following subsection at the end of Section 7.2: System Acceptance and Final Acceptance of the Upgrade Project. Contractor shall notify the City in writing when Contractor contends that all Work required per the Final Implementation Schedule for the Upgrade Project is completed and that the Upgrade System and all other components of the Upgrade Project have been installed and optimized in accordance with Amendment No. 3, including, without limitation, the Warranty Standards, and the Work is ready for System Acceptance Test(s). Following receipt of such notice, the City shall establish a schedule for commencing and conducting the System Acceptance Test(s), the commencement date of which shall be not more than ten (10) business days following the date on which the City receives Contractor's notice except as may be agreed otherwise by the parties in writing. The Upgrade Project shall not be considered to have achieved System Acceptance unless and until all of the following conditions are satisfied: (a) The Upgrade System and all other components of the Upgrade Project function together as an integrated whole in accordance with the Warranty Standards; (b) The Upgrade System and, as applicable, all other components of the Upgrade Project successfully complete the System Acceptance Test(s) in - 14 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

accordance with the System Acceptance Test Plan(s), as approved by the City; and (c) The Upgrade System shall have successfully completed all Reliability Periods. If the City determines that these conditions have been met, the City will provide written notification to Motorola of System Acceptance. Motorola and the City will identify additional Punchlist requirements, which is Work that must be completed by Motorola to complete the Upgrade Project, and to attain the final Payment Milestone, but which do not prevent the attainment of System Acceptance. Following completion of Motorola of all Work listed on the Punchlist, and its acceptance by the City, the City will provide Motorola written notification of Final Acceptance in accordance with Article 7 and will make the final payment. 7.3 Article 7 is amended to add the following at the end of Section 7.3 (“Acceptance Test(s); Test Plan(s)”): The Services and Deliverables comprising each Project Milestone in the Milestone Payment Schedule in Appendix F to the Amendment Agreement shall be subject to conditional acceptance testing as approved and accepted by the City, if any (the "Conditional Acceptance Tests"), and the Services and Deliverables as an integrated system shall be subject to final acceptance testing as approved and accepted by the City (the "System Acceptance Tests"). No Conditional or System Acceptance Test or other test of the Services and Deliverables shall commence unless and until Contractor has delivered and the City has accepted and approved, in writing, Contractor's written plan or plans setting forth, for the Conditional Acceptance Test(s) and the System Acceptance Test(s), a test method and criteria and standards of performance that must be satisfied for the test to be successful (collectively, the "Test Plan(s)"). The Test Plan(s) shall include, without limitation, test methods and criteria and standards of performance identified in Appendix A, Section 4 (Acceptance Test Plan) for all Project Milestones, shall include all elements and otherwise conform to the general test requirements set forth in Appendix A; and shall fully test the System for conformance to the Performance Standards (excluding the System Throughput Performance Standard set forth in Exhibit K, but including, without limitation, Coverage Requirements) and other Warranty Standards. The Test Plan(s) shall be Deliverables under the Agreement. 7.4 Article 7 is amended to add the following at the end of Section 7.4 (“Reliability Period”): - 15 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

It shall be a condition of the Conditional Acceptance of the Upgrade Project that the completed and fully integrated System function in conformance with the Warranty Standards and without failure or interruption for the Reliability Periods provided in Appendix A as set forth therein. The City may not use the system until Motorola confirms the System availability for reliability testing. However, in the event of a catastrophic failure of the old system (which shall be defined as the failure of one of the two prime controller sites which can not be repaired in a reasonable period of time), then the City and Motorola will jointly review the current status of the new system to determine whether use of the new system is the preferable course of action. If the City and Motorola can not agree then the City has the right to use the new system upon written notice to Motorola at which time warranty period will commence. In the event the System suffers failure or interruption prior to the expiration of a Reliability Period, Contractor shall remedy such failure and the defects that caused such interruption, and a new reliability period (the "Following Reliability Period") shall begin on the day that Contractor notifies the City that the remedy has been completed. In the event the System does not successfully complete the Following Reliability Period, the City may, at its sole discretion, terminate the Agreement for default and exercise any one or more of the remedies provided to the City in Article 13 (Termination). 8. Warranty. Section 9.1 (“Warranty; Warranty Standards”) is amended to add the following terms and conditions at the end of Section 9.1, such terms and conditions to apply to the Upgrade Project: Subject to the other provisions of this Article 9, Contractor warrants that for a period of twelve (12) months following the City's System Acceptance of Project in accordance with Article 7 (the “Project Warranty Period”), all Equipment, Documentation, Services, and Deliverables furnished for the Upgrade Project, whether by itself or by its Subcontractors and suppliers, shall be free from defects and errors in material, design, workmanship, and execution, and shall function together as an integrated system in conformance with items (1)-(5) following (collectively the "Warranty Standards"): (1) the descriptions of functionality and performance, and all standards of performance, compliance with FCC National Public Safety Plan Region 28 and FCC requirements, compliance with other codes and standards, and Radio Coverage that are set forth below in this Article 9, in the Statement of Work (Appendix A), in the Performance Standards; and the Functional Requirements set forth at Appendix A, Section 2.1 and elsewhere in this Agreement; (2) the Documentation; (3) the manufacturer's (including, without limitation, Contractor's, where applicable) most current published specifications for all Equipment and Deliverables; (4) all design documents prepared by Contractor under the Contract, including, without limitation, the - 16 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

Detailed Design, as approved and accepted by the City; and (5) all acceptance criteria, including without limitation, test criteria and standards of performance specified in Article 7 (Acceptance); and/or in the Statement of Work (Appendix A, Section 3), including, without limitation, any such criteria or standards of performance set forth in the "Test Performance Plan(s)" as defined in Article 7 (Acceptance) and which also shall include, without limitation, test methods and criteria and standards of performance as identified in Appendix A, Section 4 (System Acceptance Test Plan) that are accepted and approved by the City in writing, including, without limitation, modifications accepted and approved by the City during Design Review; provided, however, that the Warranty shall apply to Subscriber Equipment for the following periods: Portable radios – three (3) years commencing on the date on which the radios are delivered to the City ("Portable Radio Warranty Period"); mobile radios – three (3) years commencing on the date on which the radio is installed ("Mobile Radio Warranty Period"). If the last day of the Project Warranty Period or the Portable or Mobile Radio Warranty Periods, falls on a Saturday, Sunday, national holiday, state holiday, or City holiday, such Warranty Period(s) shall be deemed to be extended until midnight of the next business day. With respect to any conflict or variance relating to warranty terms between the provisions of Sections 1-13 of Amendment No. 3 and the 1999 Agreement on the one hand, and the provisions of Section 8 (“Warranty and Maintenance”) of Appendix A to Amendment No. 3 on the other, the provisions of Sections 1-13 of Amendment No. 3 and the 1999 Agreement shall govern; in the event of conflict or variance related to warranty terms between Amendment No. 3 (other than Section 8 of Appendix A) and the 1999 Agreement, Amendment No. 3 shall govern. 9. Independent Contractor; Indemnification. 9.1 Article 10 is amended to add the following new subsection 10.2(c) to the end of Section 10.2: (c) Limitation of Liability for Upgrade Project. In no event shall either the Contractor or the City be liable to the other for consequential or incidental damages arising from the performance of the Upgrade Project or Amendment No. 3. The liability of Contractor and the City to each other for direct damages relating to claims arising under Amendment No. 3 or in relation to the Upgrade Project shall not exceed, in aggregate dollar amount, the total amount of (a) the Upgrade Project Price, plus (b) the total of the price(s) for each Change Order executed by the City and Contractor with respect to the Upgrade Project, plus (c) the price of each amendment to the 1999 Agreement executed by both parties subsequent to this Amendment, plus (d) the price of each Purchase Order issued by the City with respect to the Upgrade Project (unless reflected in (a), (b), (c) or (e)), plus (e) the price of each Option (including but not limited to the options set - 17 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

forth in Appendix B) that is purchased by the City from Contractor. Provided, however, that nothing contained in this Section 10.2(c) shall limit, alter, or apply to Contractor’s liability under Section 10.2(a) with respect to losses, costs, claims, suits, actions, damages, liability and/or expenses relating to loss of life, bodily injury, personal injury, or property damage to Contractor’s obligation to indemnify and defend the City from claims of infringement of patent rights or copyright as set forth in Section 10.3; or to the City’s liability with respect to losses, costs, claims, suits, actions, damages, liability and/or expenses relating to loss of life, bodily injury, or personal injury, or claims of infringement of patent rights or copyright set forth in Section 10.3(d) (provided, that nothing herein shall waive or amend any defense or immunity which the City, its officers, agents or employees may have under the Pennsylvania Political Subdivision Tort Claims Act, 42 Pa.C.S.A. §8541 et. seq.). 9.2 Article 10 is amended to add the following subsection 10.3(d) to the end of Section 10.3, which subsection shall apply solely to the Upgrade Project and the Upgrade System: 10.3(d) Patent, Copyright And Other Proprietary Rights Indemnity – Upgrade Project. (1) Contractor warrants that all Equipment, Software (with the exception of the Third Party Software programs identified in Appendix D, Software License Agreement, which shall be subject to the terms and conditions of the publisher's license), Documentation, and Deliverables furnished for the Upgrade Project under this Amendment No. 3 (collectively referred to in this Section 10.3 as the "Indemnified Work"), do not and will not infringe upon or violate any United States patent or copyright, of any third party. In the event of any claim, suit or action by any third party against the City alleging that the Indemnified Work infringes any United States patent or copyright, the City shall promptly notify Contractor in writing and Contractor shall defend such claim, suit or action at Contractor's expense, to the extent it is based on such claim of infringement, and Contractor shall indemnify the City against any loss, cost, damage, expense or liability arising out of such claim, suit or action (including, without limitation, damages and costs resulting from loss of use, replacement costs, litigation costs and reasonable counsel fees) whether or not such claim, suit or action is successful. (2) For the Upgrade Project performed under this Amendment No. 3, Contractor will have no duty to defend or indemnify for any such infringement claim to the extent infringement is finally determined by a court of competent jurisdiction to be the result of (1) the City's modification of the Indemnified Work or its use of the Indemnified Work in a manner not intended by the parties or - 18 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

contemplated by this Agreement; (2) the City's failure to use corrections or enhancements to Software that are furnished by Contractor at no cost to the City additional to that set forth in Article 4 (Price and Payment) and that do not materially alter the functionality of the Software as it exists at the time the Software was furnished under the Agreement; or (3) the act or omission of the third party supplier of a software product used in combination with Contractor's Software but not furnished by Contractor under this Agreement; or (4) use of the Product in a manner for which the Product was not intended or that is inconsistent with the terms of Amendment No. 3. Prior to such final determination, however, Contractor shall remain fully responsible, at its expense, for the defense and indemnification of any infringement claim in accordance with this Section 10.3; provided, that to the extent the claimed infringement is finally determined to be the result of one or more of (1)-(4) preceding, the City will reimburse Contractor for its reasonable expenses (including reasonable litigation costs and attorneys fees) incurred in such defense. (3) The indemnification requirements set forth in this Section 10.3(d) apply only to the specific subject matter hereof. With respect to any and all other losses, costs (including, but not limited to, litigation and settlement costs and reasonable counsel fees), claims, suits, actions, damages, liability and expenses, the requirements set forth in Section 10.2, as amended, shall apply.

10.

Termination; Suspension of the Work. 10.1 Article 13 is amended to add the following new subsections 13.2(g) and (h) to the end of Section 13.2 (“Termination for Default”), to state additional events of default:

(g) Contractor’s failure to materially comply with any provision, term or condition of Amendment No. 3 to this Agreement. (h) Contractor’s failure to materially comply with any provision, term or condition of the Economic Opportunity Plan, Appendix C to Amendment No. 3 to this Agreement.

11.

Insurance; Performance and Payment Bonds.

11.1 Article 14 (“Insurance; Performance and Payment Bonds”) is amended in Section 14.1 (“Insurance”) in the first paragraph, to restate the second to last sentence: “The City of Philadelphia, its officers, employees and agents shall be named as additional insureds on the General Liability Insurance policy and Umbrella Liability Insurance policies”. - 19 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

11.2 Article 14 (“Insurance; Performance and Payment Bonds”) is amended to add the following subsection at the end of Section 14.2. (“Performance and Labor and Materialman's Bonds”). Performance and Labor and Materialman's Bonds for the Upgrade Project. Prior to commencing work on the Upgrade Project, and within the time period specified by the City's Procurement Department, Contractor shall furnish a properly executed performance bond and labor and materialmans bond, as prepared by the City on the City's form, each in an amount equal to the Upgrade Project Price, and having as surety thereon such surety company or companies as are approved by and acceptable to the City, (which approval will not be unreasonably withheld provided that the financial capacity of the surety is sufficient to ensure payment of the obligation). The City reserves the right to require Contractor to increase the amounts of such bonds to equal the total amount of the Limitation of Liability for the Upgrade Project as provided in Section 10.2(c) of the 1999 Agreement as amended, in the event the amount of Contractor’s compensation for the Upgrade Project increases, because of Change Orders, options, or otherwise, subsequent to execution of the Agreement, and the parties agree that if the total amount of Contractor’s compensation for the Upgrade Project decreases, then the amounts of such bonds may be reduced correspondingly. Contractor agrees to pay promptly any required performance bond fee within the time period specified by the City. 12.

Economic Opportunity.

The following provisions, applicable to the Upgrade Project and this Amendment, are added to Article 16 (“Executive Order 1-93”). (a) Executive Order 02-05 and 14-08. In accordance with Executive Order 02-05, the City established an antidiscrimination policy that relates to the solicitation and inclusion of Minority Business Enterprises (“MBE”), Woman Business Enterprises (“WBE”), and Disabled Business Enterprises (“DSBE”) (collectively, “M/W/DSBE”) in City contracts. The purpose of Executive Order 02-05 is to ensure that all businesses desiring to do business with the City have an equal opportunity to compete by creating access to the City’s procurement process and meaningfully increasing opportunities for the participation by M/W/DSBEs in City contracts at all tiers of contracting, as prime contractors, subcontractors and joint venture partners. (“Antidiscrimination Policy”). Executive Order 14-08 transfers administration of the Antidiscrimination Policy from the Minority Business Enterprise Council (“MBEC”) and to the Office of Economic Opportunity (“OEO”). (b) Chapter 17-1600 of The Philadelphia Code. In support of the City’s Antidiscrimination Policy, Chapter 17-1600 of The Philadelphia Code requires the creation and implementation of “Economic Opportunity Plan(s)” for certain classes of - 20 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

contracts and covered projects as defined in Section 17-1601. The Economic Opportunity Plan (“EOP”) memorializes the Contractor’s best and good faith efforts to provide meaningful and representative opportunities for M/W/DSBEs in the Contract and identifies Contractor’s outreach and hiring activities for employing an appropriately diverse workforce in connection with the Contract. (1)

In furtherance of the foregoing, Contractor agrees to the

following: a) Contractor represents that it has entered into legally binding agreement(s) with M/W/DSBEs as participants under this Amendment Agreement for the services and in the dollar amount(s) and percentage(s) as specified in Appendix C (“Economic Opportunity Plan”) to this Amendment Agreement. b) Contractor shall secure the prior written approval of OEO before making any changes or modifications to any Amendment Agreement commitments made by Contractor herein, including, without limitation, substitutions for its MBEs, WBEs and/or DSBEs, changes or reductions in the services provided by its M/W/DSBE Subcontractors, or changes or reductions in the dollar and/or percentage amounts of commitments with its M/W/DSBE Subcontractors. c) Unless otherwise specified in a legally binding agreement as described in (2) (a) above, Contractor shall, within five (5) business days after receipt of a payment from the City for work performed under the Amendment Agreement, deliver to its M/W/DSBE Subcontractors the proportionate share of such payment for services performed by its M/W/DSBE Subcontractors. In connection with payment of its M/W/DSBE Subcontractors, Contractor agrees to fully comply with the City’s payment reporting process which may include the use of electronic payment verification systems. d) Contractor shall, in the event of an increase in units of work and/or compensation under the Amendment Agreement, increase its commitments with its M/W/DSBE Subcontractors proportionately. The OEO may from time to time request documentation from Contractor evidencing compliance with this provision. e) Contractor shall submit, within the time frames prescribed by the City, any and all documentation the City may request, including, but not limited to, copies of Subcontract(s) with M/W/DSBEs, participation summary reports, M/W/DSBE Subcontractor invoices, telephone logs and correspondence with M/W/DSBE Subcontractors, cancelled checks and certification of payments. Contractor shall maintain all documentation related to this Section for a period of five (5) years from the date of Contractor’s receipt of final payment under the Amendment Agreement. - 21 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

f) Contractor agrees that the City may, in its sole discretion, conduct periodic reviews to monitor Contractor’s compliance with the terms of the EOP. g) Contractor agrees that in the event the City determines that Contractor has failed to comply with the terms of the EOP attached as Appendix C to Amendment No. 3, the City may, in addition to any other rights and remedies it may have under the 1999 Agreement and Amendment No. 3, exercise one or more of the following remedies which shall be deemed cumulative and concurrent: 1) Debar Contractor from proposing on and/or participating in any future contracts for a maximum period of three (3) years. 2) Recover as liquidated damages, one percent (1%) of the total dollar amount of the Amendment Agreement, which amount shall include any increase by way of further amendments to the Base Contract for the Upgrade Project, for each one percent (1%) (or fraction thereof) of the shortfall in commitment(s) to Contractor’s M/W/DSBE Subcontractors. h) No privity of contract exists between the City and any M/W/DSBE Subcontractor identified herein and the City does not intend to give or confer upon any such M/W/DSBE Subcontractor(s) any legal rights or remedies in connection with the subcontracted services pursuant to the EOP or by reason of this Amendment Agreement except such rights or remedies that the M/W/DSBE Subcontractor may seek as a private cause of action under any legally binding contract to which it may be a party. The remedies enumerated above are for the sole benefit of the City and City’s failure to enforce any provision or the City’s indulgence of any noncompliance with any provision hereunder, shall not operate as a waiver of any of the City’s rights in connection with this Amendment Agreement nor shall it give rise to actions by any third parties including identified M/W/DSBE Subcontractors. (2) It is understood that false certification or representation made in connection with Executive Order 02-05 may be subject to prosecution under Title 18 Pa. C.S. Sections 4107.2 and 4904. (c) Motorola’s Economic Opportunity Plan (“EOP”), Appendix C to Amendment No. 3, is incorporated in and made a part of Amendment No. 3. Motorola shall comply with all provisions of the EOP. Non-compliance of Motorola with any material provision, term or condition of the EOP shall be an Event of Default pursuant to Section 13.2 of the 1999 Agreement, and the City may, in the event of such default, terminate the Agreement pursuant to Section 13.2, or, in its sole discretion, exercise one - 22 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

or more of the contract remedies as provided in Sections 13.3 and 13.4 of the 1999 Agreement. 13.

Miscellaneous Provisions.

13.1 Section 17.1 (“Contract Documents; Order of Precedence”) is amended to add the following at the end of current Section 17.1: 13.2 For the purposes of Amendment No. 3, Contract Documents shall include Amendment No. 3, Sections 1-13, together with all Appendices, attachments, and exhibits thereto; and the Order of Precedence of the Contract Documents shall consist of the following: (a) Amendment No. 3 (which includes Sections 1-13 and the Appendices A through K thereto), (b) the Agreement dated June 30, 1999 between the City and Motorola, and Exhibits A-N to the 1999 Agreement. With respect to the Upgrade Project and Amendment No. 3, in the event of conflict or variance between Amendment No. 3 and any other Contract Document, Amendment No. 3 shall govern, and in the event of conflict or variance between Sections 1-13 of Amendment No. 3 and any Appendix to Amendment No. 3, Sections 1-13 shall govern. With respect to the 1999 System only, in the event of conflict or variance between the 1999 Agreement and any other Contract Document, the 1999 Agreement shall govern. The Contract Documents shall not include the City’s RFP pursuant to which the 1999 Agreement was awarded, Contractor’s proposal for the 1999 System, or Contractor’s proposal for the Upgrade System. 13.3 Section 17.16 (“Notices”) is amended to add the following, which shall apply to Amendment No. 3 and the Upgrade Project: Any notice required or permitted to be given under the Amendment Agreement shall be given in writing and shall be personally delivered by hand with receipt obtained, by a national overnight express carrier (such as Federal Express), by facsimile (with copy by registered or certified United States mail) or by registered or certified United States mail, return receipt requested, addressed as follows (provided, that the individuals and addresses specified below may be changed from time to time by the written agreement of both parties): IF TO CITY: Attn: Frank Punzo, Deputy Commissioner City of Philadelphia Department of Public Property City Hall, Room 732 Philadelphia, PA 19107 With copies to:

- 23 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

Procurement Commissioner City of Philadelphia Municipal Services Building, Room 120 15th Street and JFK Boulevard Philadelphia, PA 19102 and City of Philadelphia City Solicitor 1515 Arch Street, 17th Floor Philadelphia, PA 19102

IF TO CONTRACTOR: Attn.: Selina Lam, Project Manager Motorola, Inc. 101 Tournament Drive Horsham, PA 19044 With copy to: Motorola Law Dept. 5 Paragon Drive, Suite 200 Montvale, NJ 07645

- 24 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

13.4

Applicable Laws. Article 17 is amended to add the following new Section

17.29: 17.29. Applicable Laws. Contractor shall comply with all Applicable Laws as set forth in Appendix J to Amendment No. 3, and provides the representations and warranties stated in Section 1.8 of Appendix J.

IN WITNESS WHEREOF, the parties hereto, intending to be legally bound, have executed this Amendment as of the day first written above.

MOTOROLA, INC. CORPORATE SEAL:

By:___________________________ Patty Holtschneider MSSI Vice President

______________________________ Assistant Secretary ______________________________ Typed or Printed Name and Title

APPROVED AS TO FORM:

ACCEPTED AND EXECUTED:

______________________________ Deputy City Solicitor

________________________ Procurement Commissioner City of Philadelphia

- 25 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

APPENDICES Appendix A – ASTRO 25 Upgrade Proposal submitted to City by Motorola June 13, 2008, as revised through negotiation, and except with the deletion of Appendix A thereto (“Communications System Agreement”). Appendix B – Supplemental Schedule of Project Costs Appendix C – Economic Opportunity Plan Appendix D – Software License Agreement Appendix E – [Reserved] Appendix F – Milestone Payment Schedule Appendix G – Preliminary Project Schedule Appendix H – [Reserved] Appendix I – System Controller Performance Testing Results Appendix J – Applicable Laws Appendix K – Open Source Software and Third Party Software (to be finalized during Detailed Design Review)

- 26 800MHz-MotorolaUpgrade-Amendment#3 3-16-09

Notice of Trade Secrets and Confidential Proprietary Information Pursuant to the Commonwealth of Pennsylvania’s Right-to-Know Act, as codified at 65 P.S. §§67.101-3104 (“Act”), this written statement serves as notice under 65 P.S. 707(b) that the following records, attached as Appendices to Amendment No. 3 to Contract No. 99-0844 between the City of Philadelphia (“City”) and Motorola, Inc. and provided by Motorola to the City, contain trade secrets or confidential proprietary information or both (as those terms are defined in the Act): Appendix A – ASTRO 25 Upgrade Proposal Appendix B – Supplemental Schedule of Itemized Costs Appendix D – Software License Agreement Appendix F – Milestone Payment Schedule Appendix K – Open Source Software and Third Party Software In the event that the City receives a request for one or more of the records identified above, Motorola understands that the City will provide Motorola with notification of the request and an opportunity to provide input on the release of the record(s) as provided in the Act.

MOTOROLA, INC. By:___________________________ Patty Holtschneider Title: MSSI Vice President Date:

Section 1. Executive Summary Motorola takes great pride in having been a partner with the City of Philadelphia over the last decade, supplying and supporting mission critical emergency communications for all City Public Safety and Public Service departments. Through this partnership, we have been able to better understand the critical needs of the City, and your vision of the future. The 800 MHz radio communications network represents a major technology investment for the City. Motorola has completed a review of the City's current system, and is very pleased to present this firm proposal for a system upgrade. This upgrade will preserve a major portion of the City's past investments and provide the City the requested obsolescence protection. Our proposed solution will upgrade the City's circuit-based network to our open-standards, IP based ASTRO 25 IP network with a roadmap to the future. Our solution also incorporates the use of City certified MBEs and WBEs wherever possible

1.1

Technology Platform for the Future Motorola’s solution provides a cost-effective migration to a scalable ASTRO 25 IP based technology platform for City users. This new technology platform includes: ♦

Scalable IP network design that facilitates future expansion for new users and technologies, as the City’s communications requirements grow ♦ Current network lifecycle extended by at least 8-10 years ♦ Reuse of the majority of the City’s existing 800Mhz radio system network equipment ♦ Existing mobile and portable radios will be upgraded to operate on the new ASTRO 25 IP platform

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Executive Summary June 13, 2008 1-1



APCO Project 25 compliant system supports subscribers from any APCO 25 compliant vendor ♦ Improved network security ♦ Continued outstanding voice coverage using linear simulcast technology

1.1.1

Combination of IP and APCO Project 25 Standards-Based Technology The proposed system architecture will provide an optimized Internet Protocol (IP) network that supports Mission Critical operations. Unlike vendors who specialize in the commercial marketplace, where immediate access to the network is not essential, Motorola has leveraged our 65 years of experience and expertise to design and implement Mission Critical IP networks that truly meet the needs of the public safety community. The ASTRO 25 network uses many of the same protocols and components found in commercial and corporate data networks, reducing your overall network costs by eliminating the need for customized circuit based equipment. Our ASTRO 25 infrastructure incorporates many commercial off-the-shelf (COTS) components found in corporate and industrial data networks. However, our Mission Critical IP design uses equipment with faster call setup times than commercial IP networks. We utilize enhanced routers and switches to improve audio quality during peak traffic loads, and customized the design to route around component failures in seconds. Our proposed upgrade uses redundant equipment to prevent a single point of failure from reducing overall system performance, and ensures the network will meet the stringent demands of Fire, Police, Municipal, and Airport communications. The result is the best combination of COTS and enhanced COTS equipment, giving the City of Philadelphia the benefits of IP architecture without compromising the reliable performance required by public safety users.

1.2

Mission Critical Reliability and Capacity The term "Mission Critical" is used to describe a network created to operate flawlessly and reliably every time. Motorola's network is designed to meet the reliability, capacity, and control requirements of the City's Public Safety and Public Service users.

1.2.1 1.2.1.1

Mission Critical Reliability Reliability Designed for Mission Critical applications, with multiple levels of fault-tolerance, redundancy, and back-up power

City of Philadelphia ASTRO 25 Upgrade

Executive Summary June 13, 2008 1-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1.2.1.2

Capacity Capability to accommodate a multitude of public safety users during emergencies with orderly and prioritized system access

1.3

Control Motorola’s ASTRO 25 Network will provide the City an audit trail of who is communicating, when they communicate, and whom they communicate with. Our proposed network upgrade is designed to meet the reliability, capacity, and control needs of the City's users. The proposed City of Philadelphia system upgrade is designed with a combination of fault tolerance and redundancy. Our Mission Critical IP network has built-in robustness with no single point of failure. By employing distributed architecture, local failures will not propagate throughout the network. The system will be monitored 24 hours a day, 7 days a week to ensure that the network will always be available. The ASTRO 25 network has the capacity to operate reliably during both routine and emergency situations. A major advantage of our simulcast design is that all channels in each cell are available to all users at all times. Since no one knows where the next emergency will occur, a full complement of channels throughout the City assures that your public safety users will have adequate resources. A simulcast configuration ensures that your system will operate dependably during peak access times. The ASTRO 25 network will allow the City to manage and monitor whom they are communicating with, and when they communicate. This level of control will allow the City to designate priority access to first responders, to ensure that your Mission Critical communications will get through no matter how many users access the network.

1.4

Comprehensive System Support We have proposed a comprehensive total support plan that can be tailored by the City. Our Systems Support Center (SSC) in Schaumburg, Illinois provides 24 hours per day, 7 days per week system support. Our expert technicians at the SSC remotely monitor the health of systems throughout the world. If a problem should arise with the City of Philadelphia network, the SSC will promptly diagnose and correct it quickly. In many cases, we have remotely diagnosed system issues before users even knew there was a problem. Motorola's experienced project team is ready today to implement and maintain the upgraded system for the City of Philadelphia. Service to the City will continue to be provided by our local field service and installation team, which includes Motorola employees and qualified technicians from Wireless Electronics, that have been trained by Motorola in maintaining trunking and microwave systems for public safety Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Executive Summary June 13, 2008 1-3

users. Together this team will also provide on-site first echelon support for mobile and portable radios. Our Radio Support Center will provide depot repair services. Additionally a comprehensive training plan coordinates dispatcher, maintainer, and end-user training within the proposed system implementation schedule. Motorola has also included refresher training for mobile and portable operation, as we recognize this to be an extremely important component to the success of the radio system.

1.5

Flexible Financing Options A flexible, tax exempt municipal lease/purchase plan is available to the City of Philadelphia through Motorola Credit Corporation. This plan enables the City to receive low interest rates resulting from tax benefits received by Motorola. The tax exempt municipal lease/purchase plan also offers the City the following: ♦ ♦ ♦ ♦ ♦

1.6

100% transaction financing Even, graduated, or deferred payment streams Up to 20 year terms Fixed or floating rate structure Flexible payment structure

Summary Our solution provides the City of Philadelphia: ♦

A Technology Platform for the Future ♦ IP-based network with new capabilities and compliance with APCO Project 25 ♦ Upgraded IP based transmitters ♦ Upgraded network that will be controlled by existing dispatch consoles ♦ Upgraded mobile and portable radios ♦ Mission Critical Reliability and Capacity ♦ Redundancy and fault-tolerant design for critical network reliability ♦ Capacity for prioritized and orderly access during emergencies ♦ Control to designate priority access for first responders ♦ Cost-Effective Standards Based Technology ♦ APCO Project 25 digital standards ♦ Standards-based IP network design for scalability and lower total cost of ownership ♦ Mission Critical network enhancements

City of Philadelphia ASTRO 25 Upgrade

Executive Summary June 13, 2008 1-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page



Flexible Interoperability ♦ Common platform for all City public safety users ♦ Distributed IP architecture for increased reliability and lower costs ♦ Comprehensive System Support ♦ Experienced support network in place today in the City of Philadelphia ♦ 24 x 7 system monitoring with rapid response times ♦ Detailed training plans coordinated with implementation schedule ♦ Motorola Credit Corporation ♦ 100% transaction financing ♦ Municipal Lease-Purchase Plan with aggressive rates ♦ Flexible terms and payment structures

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Executive Summary June 13, 2008 1-5

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade

Executive Summary June 13, 2008 1-6

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Section 2. System Description Motorola is proposing an upgrade as a cost effective approach to migrate from the City of Philadelphia’s existing Smart Zone 3.0Z system to Motorola’s premier ASTRO 25 platform. The City of Philadelphia’s new ASTRO 25 system will utilize the existing radio sites, simulcast channel configuration and subscribers that are currently in use by the SmartZone 3.0Z 800 MHz system. MOTOA4™ provides you with technology that is Second Nature and enables continuous interoperable communications that are vital to your first responders to save lives, assess threats, enforce laws, and serve the public. Our standards-based technology ensures improved coverage, maximizes reliability through system capacity, and increases interoperability with neighboring agencies, while providing you a cost-effective and predictable migration to future technology.

2.1

Technology that’s second nature: The MOTOA4 Portfolio ™ Our MOTOA4 portfolio represents a full evolution of advanced public safety communications from analog voice to digital technologies based on Project 25 standards to broadband networking solutions and mobile data devices optimized for a wide range of Mission Critical environments. MOTOA4 solutions are built around a fundamental need for technology that is ‘second nature’, enabling responders to focus on the mission and not the technology. Motorola’s extensive portfolio includes wireless networks, advanced devices and advanced applications, allowing agency personnel to receive better information so they can make better decisions for better outcomes. City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-1

MOTOA4 enables public safety agencies to confidently take the next step in mission critical communications beyond the basics to the most reliable and innovative wireless solutions. It is based on providing seamless connectivity, real-time information in the hands of users. MOTOA4 stands for the 4 advanced evolutions of mission critical Advanced Voice, Advanced Integrated Voice and Data, Advanced Wide Area Data to Advanced Broadband Data. It incorporates networks, applications, devices and services, providing: ♦

Seamless Connectivity - Ultra-reliable mission critical communications – across networks, applications and devices. Anywhere. Anytime. ♦ Real-Time Information - Mobile intelligence and instant awareness when you need it most. Suite of advanced applications that deliver actionable, accurate, realtime information to the field. ♦ In the Hands of Users - Rugged. Dependable. Easy-to-use devices. So you can focus on the mission – each time, every time.

2.2

ASTRO 25 IP Motorola’s proposed solution for the City of Philadelphia is our ASTRO 25 platform with Integrated Voice and Data, the foundation of the MOTOA4 Mission Critical Portfolio. This platform offers a Project 25 standards-based Internet Protocol (IP) modular solution, providing your first responders with: ♦

Cost savings – reduces costs by integrating your voice and data needs into a single solution.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-2



Interoperability– Compliant with APCO Project 25 standards, offering seamless interoperability with other compliant systems and radios, putting the highest level of interoperability in the end users’ hands, without the need of gateways or console patches. rd ♦ Reliability – Pre-release software and upgrade testing, 3 party hardware and software certification process, fault tolerant architecture with multiple fall back modes, multiple levels of redundancy, and real-time network and security monitoring provide Mission Critical reliability. ♦ Increased security – Information Assurance (IA) enhances the confidentiality, integrity, and availability of the Radio Network Infrastructure (RNI). Multiple encryption algorithms keep end-to-end voice and data transmissions confidential. ♦ Enhanced productivity – Easy and intuitive interfaces to critical real-time information is delivered to the user when and where they need it. ♦ Flexibility – Scaleable, flexible design allows ASTRO 25 to dynamically adapt to the operational demands of any size organization - the IP-based design supports a unique mix of voice, data, and geographical requirements, permitting easy system enhancements as the users’ needs evolve. A description of the features, benefits, system architecture, and hardware components are provided in this system description.

2.2.1 Proposed Solution Our ASTRO 25 IP solution provides scalability, flexible system architecture, unparalleled network management, and easy migration to future capabilities, offering the City of Philadelphia a world class mission critical Motorola ASTRO 25 communication system. The system includes the following: ♦

Migrate both of the City’s existing 10 site simulcast subsystems (System A – 15 Channels, and System B 20 channels) to ASTRO25 and integrate them into the new ASTRO25 Master site. At the direction of the City, Motorola is designing the new system around using the new GTR8000 series base stations with IPSimulcast transport. The migration and reuse of the existing Quantar base stations and associated existing circuit based TeNSr transport network is now being presented as an option.



Citywide dispatch network – Migrate the existing dispatch network over to the new ASTRO25 Master site. This will allow the City reuse of the existing CENTRACOM Gold Elite operator positions.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-3



Digital radios – The City of Philadelphia’s existing subscriber base of mobile and portables will be upgraded to support the ASTRO25 network. Re-use of existing Mobile and Portable radios to the greatest extent possible will allow the City to leverage their initial investment.

The proposed City of Philadelphia ASTRO25 System will utilize the radio sites that are currently in use by the two separate 800MHz simulcast sub-cells. The existing sites locations being re-used on the ASTRO system are as follows: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

City Hall Room 626m – Master Site City Hall 10th Floor – Prime Site for System A w/ Co-located A&B system Remote Sites 320 Domino Lane – Prime Site for System B w/ Co-located A&B Remote Sites Engine 9 – Remote RF Site Ford & Belmont – Remote RF Site Victory Garden – Remote RF Site 31st & Grays Ferry – Remote RF Site Streets & Highways Department - Remote RF Site Police Academy – RF Remote Site Bustleton & Hoffnagle – RF Remote Site South Hampton – RF Remote Site

Motorola has taken great care to propose an offering that will provide a cost-effective way for the City of Philadelphia to upgrade to Motorola’s newest ASTRO 25 platform. This upgrade will meet the City of Philadelphia’s needs today and in the future.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-4

Figure 2-1: Network Site Connectivity

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-5

2.2.2 System Features ASTRO 25 is a feature-rich, modular platform that has been configured to maximize the utility of the system to your unique needs. The following sections provide discussion of the key ASTRO 25 IP System Features to include: ♦

System Access Features User Talkgroup Features Individual Call Features Integrated Voice and Data Encryption Capabilities Network Management Features Information Assurance Network Monitoring User Accessibility Features Simulcast Operation Reports

♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

2.2.2.1

System Access Features To ensure system access, simplify radio operation, and limit operator involvement, the ASTRO 25 platform has many access features, as described below. Busy Queuing/Call Back This system has been designed to maximize availability to the end user. In the unlikely event that all the channels are busy, a user depressing their Push-To-Talk (PTT) will be given a busy signal, and placed into a busy queue. When a channel becomes available, the system assigns the users to a channel via pre-assigned priority levels. Once a channel is assigned, the system notifies the user with a call back tone. This feature makes it unnecessary for the radio operator to waste valuable time rekeying their radio in an effort to gain channel access. Automatic Retry If a channel request is not received at the Zone Controller, the individual radio unit continues sending channel requests until the Controller acknowledges the request, or until a total of 16 automatic retries occur. This feature eliminates the need for the operator to continually key and de-key their radio, or to keep their radio keyed in an effort to gain system access.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-6

Recent User Priority To ensure uninterrupted communications, a recent radio user priority provides those users who have been recently assigned a voice channel priority over the other system users. Recent user priority ensures that a talkgroup engaged in a conversation receives priority system access for up to 10 seconds between transmissions. Misdirected Radio Protection To ensure that a radio from one talkgroup cannot accidentally be assigned to a voice channel being used by a different talkgroup, the system utilizes embedded signaling. If a unit from a different talkgroup is accidentally assigned the same channel, the radio will recognize that it has been assigned incorrectly, and will automatically revert to the control channel. Continuous Assignment Updating Once a talkgroup is assigned a voice channel, the control channel continues to transmit the channel assignment for as long as that talkgroup is using the channel. This ensures that a radio just coming into service will be sent to the appropriate voice channel to join the rest of its talkgroup. Talk Prohibit Tones In the event that a user attempts to perform an unauthorized function as defined by system permissions, a talk prohibit tone is given.

2.2.2.2

User Talkgroup Features To enhance user functionality, the ASTRO 25 platform has many talkgroup features, as described below. These features are configurable by the System Administrator Emergency Alarm/Call Emergency alarm/call provides users the capability to inform dispatch personnel of a life-threatening situation. By pressing the radio’s emergency alarm button, an audible and visible alarm and the user’s ID are sent to the dispatcher, and optionally all talkgroup members. In emergencies, the dispatch center is notified immediately, regardless of whether the system is busy. If one or more voice channels are available, one of those channels will be assigned immediately to the emergency call when the user presses the PTT switch. The duration of the emergency call can be defined by the system administrator.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-7

In the event that the system is busy, two alternatives are provided for handling emergency traffic: ♦

Top of the Queue—when an emergency is initiated and no channel is available, the emergency user is put at the top of the busy queue. As soon as the first user on any channel de-keys, the emergency caller is assigned that channel. The major advantage to this approach is that there is no contention for the channel. ♦ Ruthless Preemption—when an emergency is initiated and no channel is available, the Zone Controller selects the channel assigned to the lowest priority user and assigns it to the emergency caller – a feature unique to Motorola trunking systems. Multiple Priority Levels The system provides 10 priority levels, allowing administrators to segment their users according to their communications needs. Priority 1 is always reserved for emergencies. Priorities 2 through 10 can be assigned by the System Manager on a per radio or talkgroup basis. These priorities are only applicable when the system is busy. Multi-Group Call Multi-group call is used to make a simultaneous call to multiple talkgroups, and allow all units to be configured for talk back capability. The System Manager can program this call to operate in one of two ways: ♦

The requesting user waits for all requested talkgroups to finish all calls in progress. ♦ The requested call immediately interrupts other conversations in progress without waiting for active users to de-key. Radio users who are transmitting on a voice channel will not hear the call until they de-key. Dispatch Console/Talkgroup Merge Talkgroup merge is a dispatch function that allows multiple talkgroups to operate together on one voice channel, improving channel efficiency. This is a standard feature of Motorola wireline consoles. Non-Priority Scan Non-priority scan allows the radio user to scan between multiple systems, talkgroups, or conventional channels.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-8

Priority Monitor Priority monitor allows the radio user to scan talkgroups in their system, and mark up to two talkgroups in their scan list as Priority. A non-priority conversation will be interrupted by Priority 1 or Priority 2 talkgroup activity.

2.2.2.3

Individual Call Features To further enhance user functionality, the ASTRO 25 platform has individual call features in addition to user talkgroup features, as described below. These features are configurable by the system administrator. Call Alert Call Alert allows a dispatcher or radio user to selectively page an individual’s radio. Call Alert signaling is conducted over the control channel and does not affect voice channel capacity. The Call Alert produces an audible and visual alert on the receiving radio. Indicators on the initiating radio acknowledge delivery of the Call Alert. If the receiving unit has a display, it will show and store the sending unit’s ID. In-Call User Alert In-Call User Alert is a feature that builds upon Call Alert. When In-Call User Alert is enabled on the system, radios will be able to receive Call Alerts even when involved in voice and data services. Radio Talkgroup Muting Radio Talkgroup Muting is a feature that utilizes the Call Alert feature. Radio Talkgroup Muting allows the radio user to mute all voice traffic for the currently selected talkgroup. The radio can be automatically un-muted by the console dispatcher or another radio user by sending the muted radio a Call Alert. With In-Call User Alert enabled, the Call Alert will reach the muted radio when it is on the voice channel or a data channel, as well as if it is idle on the control channel. Private Call Private Call allows a radio user or console dispatcher to selectively call and carry on a private conversation with another individual radio, as long as that unit is not already engaged in another Private Call. The calling unit will receive an acknowledgment of a successful Private Call. If the receiving radio has a display, it will show the calling party’s unit ID.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-9

2.2.2.4

Integrated Voice and Data (IV&D) The Project 25 compliant IV&D operation allows data traffic to seamlessly utilize your ASTRO25 stations, improving in-field efficiency. Voice is prioritized, allowing mission critical traffic to always take precedence over data transmissions. The IV&D service creates a data transport layer capable of supporting both industry standard IP and customer-developed applications such as: ♦ ♦ ♦ ♦ ♦

Text Messaging GPS Location Over the Air Programming (POP25) Over the Air Rekeying (OTAR) NCIC Queries

Users can achieve a number of important benefits, including: ♦ ♦ ♦ ♦ ♦

Conservation of valuable airtime Increased communications accuracy Allows users in field to perform textual look up queries without dispatch Better return on investment – same assets for multiple functions Utilizes common radio units for both voice and IV&D data applications

This proposal includes a Packet Data Gateway (PDG), General Gateway Service Node (GGSN) Router which allows the system to support IV&D operations. Motorola’s proposal also includes one (1) Customer Network Interface (CNI) consisting of a Firewall Appliance, Peripheral Router, Boarder Router and DMZ Ethernet Switch. The CNI provides the interface at a network level between the Mobile Data Network and the customer’s enterprise network. It also isolates, for network security purposes, the customer’s network from the mission critical Radio Network Interface. Please note that some mobile applications may require the use of separate, dedicated CNIs; Motorola’s ASTRO25 IP Radio System can support multiple CNI’s. Over-the-Air Programming Motorola’s over-the-air programming feature is called Programming Over P25 (POP25). POP25 allows a radio to be remotely configured from your network by sending a sequence of commands over-the-air via the IV&D transport layer. POP25 enables the reconfiguration of a radio’s code-plug via the Motorola Customer Programming Software (CPS) without having to be physically connected to the radio. POP25 allows end users and radio users to stay in the field during the reconfiguration process, thus saving valuable time and resources.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-10

Other substantial benefits include: ♦

No loss of communications while reprogramming occurs ♦ Programming resumes automatically after interruption ♦ Quicker network optimization ♦ Eliminates time spent tracking assets for reprogramming Motorola’s proposal includes a separate option for adding the necessary server and software (Presence Notifier) to the Fixed Network Equipment to allow POP25 functionality on the ASTRO25 IP Radio Network. The option also includes details on the per subscriber radio pricing to include POP25 functionality on XTS/XTL5000, 2500 or 1500 radios. Please note that XTS3000 portable radios or ASTRO Spectra Mobiles cannot support POP25 functionality. Text Messaging Service Similar to text messaging on a cell phone, the Text Messaging Service provides a convenient means of communication between all network users. A user can send a text message of up to 200 characters to another radio or dispatcher. Dispatchers and radio users may be a part of a named text messaging group, allowing point-multipoint service. Text Messaging Service makes use of the IV&D transport layer, and provides a store and forward function, ensuring message delivery. At the direction of the City, Text Messaging Service is not being proposed at this time.

2.2.2.5

Encryption Capabilities When it's absolutely critical that communications not be monitored by unauthorized parties, radio systems can be configured with encryption. Encryption assures that only authorized units in the system can listen to transmissions being made. Encrypted calls are protected end-to-end throughout the network. Project 25 Encryption Algorithms ASTRO systems can be equipped with current Project 25 algorithms, and fully compliant with all Federal Information Processing Standards (FIPS). Please note that Motorola’s proposal includes the continued use of DES-OFB encryption.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-11

Over-the-Air Rekeying Over-The-Air Rekeying (OTAR) provides all the features of multikey (multiple keys) and enables you to distribute encryption keys over the air without physically touching the radio. OTAR is designed to work on the IV&D transport layer. Encryption is configured by distributing unique keys to designated user(s). OTAR eliminates the burden of manually rekeying your radios on a regular basis. It enables key distribution and key management to be conducted securely over-the-air. Key Management Facility (KMF) The Key Management Facility (KMF), a centralized key manager, is the essential key management controller for Motorola’s Project 25 Over the Air Rekeying (OTAR) feature. Utilizing the KMF, information can easily be created, inventoried, archived, and distributed to end-users. Combining centralized key management with our standards-based OTAR capability enables effective planning, implementation, and execution of robust security procedures. Motorola’s proposal includes a separate option for adding the necessary KMF server, one KMF client and associated software to the Fixed Network Equipment to allow OTAR functionality on the ASTRO25 IP Radio Network. The option also includes details on the per subscriber radio pricing to include OTAR functionality on XTS/XTL5000 radios. Please note that XTS3000 portable radios and ASTRO Spectra Mobiles cannot support OTAR functionality.

2.2.2.6

Included Network Management Features The following Network Management Features have been included in this proposal; please see System Design Details Section for details on numbers of concurrent licenses where applicable. Flexible Air Traffic Information Access (ATIA) The Flexible ATIA interface feature provides an access point for air traffic call information. Customers can generate detailed billing reports or management reports with third-party products or services. Security Partitioning This feature allows the creation of security groups in order to limit access to selected database records. It allows system administrators to control access to network management data by department, geography, or individual user.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-12

Basic Radio Control Manager The Radio Control Manager (RCM) application provides the ability to generate radio commands and to display radio events. Users also have the capability to generate RCM reports. Some features of the RCM are: ♦

Dynamic Regrouping - Allows a dispatcher or system manager to dynamically program an affiliated radio user to a particular talkgroup. The radio will generate an audible noise indicating to the user that the radio has been regrouped. ♦ Storm Plans – Provide the system with an automated, predefined procedure for special or emergency situations. ♦ Selective Radio Inhibit – Denies system access to lost or stolen Motorola radios. When a radio is reported missing, a network management terminal operator can send a Selective Radio Inhibit command to the system controller, rendering the radio unit inoperable. Once found, the radio can be reactivated and restored to normal operations over the air.

Figure 2-2: Sample Radio Control Manager Screen

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-13

ZoneWatch Our customers say ZoneWatch is the single most important application for real-time monitoring of their network.

ZoneWatch provides customizable displays and graphs to monitor real-time communications activity and network health. It is a set of diagnostic tools allowing individuals to make more efficient system management decisions. An administrator defined display of information can be created down to individual unit or talkgroup activity. ♦

At a glance, provides a real-time snapshot of the system ♦ Color coded display allows for quick network status indications ♦ Enables faster identification and resolution of potential issues

Figure 2-3: ZoneWatch Control Display Example

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-14

Channel Partitioning The Channel Partitioning feature provides agencies or departments, with exclusive use of specific RF channels. The use of this feature allows the segregation of one set of users from another to ensure dedicated resources for a specific group. Affiliation Display The Affiliation Display provides a dynamic view of the sites to which all operating units are currently affiliated, making it easy to track and troubleshoot radios in the system. Provides a dynamic view of ♦

Sites ♦ Talkgroups ♦ Individual Radios This allows a manager to understand the loading characteristics of their system in real-time. Graphing capabilities are also included. Figure 2-4 provides a selected site graph example.

Figure 2-4: Selected Site Graph Example

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-15

Computer-Aided Dispatch Interface Computer-Aided Dispatch Interface (CADI) provides access to radio traffic information and some control functions. This capability provides a method for a customer provided Computer-Aided Dispatch (CAD) host to interface to the network via the CNI. Alphanumeric Paging Alphanumeric Paging forwards user configurable system alarms through a customer selected paging service, providing real-time alerts to designated personnel.

2.2.2.7

Information Assurance (IA) ASTRO 25's Information Assurance services are organized in a multi-level hierarchy, as shown in Figure 2-5. To build a well-protected system, it is necessary to implement all the services in one layer before proceeding to the next. The extent to which a customer needs to implement IA services is determined by that customer’s operational needs. Motorola’s proposal includes the first three layers of the IA pyramid shown below (“Part of Every System”, “Perimeter Protection”, & “Master Site Protection”. Motorola will be pleased to work with the City to determine if additional IA layers are needed.

Remote Site Protection Zone Core Protection Router Encryption Remote Site Protection (Configuration) MAC Port Lockdown / 802.1x Authentication Secure NM – SNMPv3 Authentication and Encryption SSH Master Site Protection Centralized Logging and Centralized Authentication Install/Backup Service Perimeter Protection AntiVirus, Dial-in Authentication/Access, Network Interface Barrier (CEN/RNI Firewall and IDS) Part of Every System Router ACLs Transparent Full Element Hardening for Windows Devices - Orderable Full Element Hardening for Solaris and Linux Devices - Inherent

Figure 2-5: Information Assurance Hierarchy

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-16

The three key benefits of Information Assurance are: ♦

Confidentiality - Protecting the system’s working voice and data traffic from unauthorized monitoring. Shielding information from being read, copied or monitored by anyone who has not been explicitly authorized access by the owner of the information. ♦ Integrity - Protecting the system’s network from unauthorized access. Securing information (including programs) from being deleted or altered in any way without the permission of the owner of that information. This includes log files, backup tapes, documentation, etc. ♦ Availability - Providing high network uptime through routine maintenance, secure service access, and remote storage of critical system operating information. Protecting services so they are not degraded or made unavailable without authorization.

2.2.2.8

Network Monitoring The ASTRO 25 platform’s suite of network monitoring applications continuously monitors the health and status of all network devices and applications, providing network managers instant visibility to status changes throughout the network. The applications include: ♦ ♦

♦ ♦ ♦

Hardware Element Monitoring – The radio system monitors and reports the status of all the hardware elements in the network. Software Process Monitoring – The system monitors and reports the status of all the critical software processes running on the various hardware elements. If a change in a software process is detected, self-healing actions may be initiated to correct the process. Refer to the Self-Healing Actions feature for more information. Network Link Integrity Monitoring – Any changes in the network links are reported to the radio system’s fault manager. SNMP Trap Forwarding – The system supports the reporting of status to the radio system’s network manager via the SNMP protocol. Self-Healing Actions – The system automatically takes actions to remedy errors detected by its fault management routines to ensure continuation of critical communications.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-17

2.2.2.9

User Accessibility Features Enhanced Intermodulation (IM) Reduction Motorola has developed an enhanced IM reduction feature (configurable feature in CPS) that helps to improve our radios performance in the presence of strong nearchannel transmissions. Please consult with your Motorola system’s engineer and Systems Technologist prior to implementing this feature. Noise Reduction Software Our unique Noise Reduction Software (NRS) feature provides improvements in audio quality by minimizing background noise, and maximizing audio quality in high noise environments. Adaptive Power Control Adaptive Power Control (configurable feature in CPS) optimizes the transmit power on the portable radio to extend battery life and minimize interference. Please consult with your Motorola system’s engineer and Systems Technologist prior to implementing this feature. Radio Generalized Gain Control People talk at different levels depending on their personal usage characteristics or environmental situations. Generalized Gain Control (GGC) is used to reduce audio level variations. Adjacent Control Channel Outbound Signaling Packet In an ASTRO 25 Trunking system, Motorola radio units maintain a list of the adjacent sites. Each RF site (ASTRO Repeater Site and Simulcast Subsystem) in wide area trunking mode transmits a series of Outbound Signaling Packets (OSPs) containing the following: ♦

The zone/site identification. ♦ The active control channel of adjacent sites. ♦ The alternate control channels at the current site. ♦ The channel resource capabilities. When a Motorola radio is registered with a site, the adjacent site list is updated with the information obtained from the Adjacent OSPs on the Control Channel (CC) and Link Controls (LCs) on assigned channels from that site.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-18

After being registered on a site, and during a period of inactivity on the control channel, the radio will periodically scan the internal list of potential control channels at adjacent sites. The radio performs this control channel scan to determine the current signal strength of the control channel at the adjacent sites. Depending on the strength of the new signal, the radio may either attempt to register on the new site, or it may simply remember the new site signal strength and remain on the original site to which it is registered. By repeating this process a number of times, the internal list of potential control channels will be updated with relative signal strength measurements. Automatic Site Registration Site Registration is the automatic registration process that takes place when a radio roams from one site to another, which is transparent for the user. On power up, or selection of a new system, the radio must do a Full Registration. Once completed, a procedure is used by the Motorola radio to inform the Fixed Network Equipment (FNE) of its current location upon roaming to a new site. The system tracks the location of each radio user making site switching more efficient and reducing system traffic overhead. Radio Deregistration Deregistration of a radio unit occurs in two forms: ♦

Radio activated ♦ Timeout activated Radio activated deregistration is a radio function that sends in a deregistration signal to the system when turning off power or going to another trunking system or conventional personality. Timeout activated deregistration occurs when no activity has been seen from a radio for a pre-selected time. When the timeout occurs, the radio is deregistered. Radios are polled after timeout occurs. If the radio responds to the polling, the timer is restarted. The timeout period is programmable by talkgroup, allowing the Zone Controller to conserve channels for future calls. Dynamic Network Access Code (DNAC) The dynamic network access code is used to reduce co-channel and co-site interference. The radio decodes the Network Access Code (NAC) associated with the control channel at a site and uses it for both transmit and receive on the ASTRO 25 voice channel at that particular site. NAC serves as the ASTRO 25 equivalent of connect tone. Each site can have one of the 16 unique NACs allowed within the system. Interference protection is provided from nearby systems as well as between sites in the customer system.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-19

Preferred Site Preferred Site Operation allows a radio to use an additional site ranking criteria to select an alternative, pre-programmed preferred site in trunking mode. Signal quality measured by the radio is used to determine what the radio should do in preferred site operation. The combination of the signal quality reading and the preferred site status results in the "site ranking" for that site. Preferred status allows a system administrator to better manage the capacity and traffic of their system, increasing availability of system resources to users in the field. There are four variations of preferred site status: ♦

Always preferred – In all modes, the radio unit remains affiliated, always using this site if it has an acceptable signal quality. ♦ Preferred – In wide area trunking, the radio unit uses this site if it has an acceptable signal quality rating. ♦ No preference site - The radio unit uses the site with the best signal. This is the default setting for radios. ♦ Least preferred - The radio unit only uses this site when no other sites with an acceptable signal quality are available for use. Given Philadelphia’s unique system configuration of two completely overlapping simulcast sites and potentially two underground stand alone repeater sites, Motorola strongly recommends the City’s radio templates and personalities are re-optimized for improved site selection. Site Trunking Indication Radios detect if a site is in wide area trunking or site trunking. Radio models with a display will indicate to the user when the site is operating in site trunking. The radio alternately displays the selected talkgroup and “Site Trunking.” User Initiated Site Search This Motorola radio feature allows the user to manually search for the site with the next best signal quality. Please consult with your Motorola system’s engineer and Systems Technologist prior to implementing this feature. Site Lock/Unlock This Motorola radio feature allows the radio to lock onto a specific site and not roam among wide-area talkgroup sites. Please consult with your Motorola system’s engineer and Systems Technologist prior to implementing this feature.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-20

Failsoft by Talkgroup Subsystem/Site Failsoft is a fall back means of communication if a site no longer maintains wide area or subsystem trunking operations. Failsoft operation provides communications via repeaters/base radios in order to maintain vital communications. Each talkgroup is associated to a given frequency, the radio checks the frequency associated with its current talkgroup first. It also allows some balancing of radios across the various channels at a site and provides some basic group partitioning. Alternately, the control channels are the default Failsoft channel for each subsystem/site.

2.2.2.10 Simulcast Operation A simulcast land mobile radio system provides continuous coverage over a large geographic region using a single set of frequencies. Simulcast solutions extend a system’s RF coverage, especially in areas where available frequencies are limited, and in areas where physical barriers (e.g. mountains and buildings) can cause reduced signal coverage. Originally, trunked simulcast was developed by Motorola to meet the needs of users who were outgrowing their single-site radio systems. Today, the City of Philadelphia enjoys the following simulcast benefits: ♦

Improved Coverage – One radio site may not provide the coverage necessary for the application in question. Simulcast expands the coverage area by expanding the number of radio sites without adding additional frequencies. ♦ Efficient Use of Frequencies — Adding sites typically requires more frequencies. In a simulcast system, the same frequencies are used at every site in the system. This makes very efficient use of the available spectrum. ♦ Simplified Radio Operations —Because the simulcast architecture operates like a single-site system, operations are simplified and radios are easy to use. Motorola’s approach to solving audio quality problems was to develop highly specialized simulcast equipment to eliminate the simulcast distortion problems inherent in off-the-shelf equipment. Motorola’s latest ASTRO 25 digital simulcast system as proposed for the City of Philadelphia uses the newest simulcast technology. This newest ASTRO 25 digital simulcast technology still uses proven GPS based time launch to insure that all sites transmit in synchronization, and eliminates the need for remote site (ReSC) call processing equipment. This technology also uses a new Linear simulcast RF repeater station with a Linear Power Amplifier (PA). The use of a Linear transmitter allows up to twice the signal delay spread tolerance of non-linear simulcast in narrowband 12.5 kHz channels. This means that audio quality is enhanced in the site ‘overlap’ areas. Users hear clearer, cleaner messages, which correlate to better system acceptance. City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-21

Motorola’s Project 25 solution is designed to provide consistent reliable coverage throughout the designated coverage area. Our proven simulcast technology will allow the City of Philadelphia to take true advantage of the key element in simulcast design—overlapping coverage. Motorola simulcast systems encourage the use of overlapping coverage by assuring the simultaneous reception of signals from multiple transmitter sites and the incorporation of enhanced composite signal receiver voting for the inbound signals. The capability to realize the significant benefits of composite outbound and inbound signals can only be achieved utilizing simulcast technology designed to standards that far exceed the systems offered by any other manufacturer. The simulcast subsystems proposed for the voice system are based on IP technology. The IP technology has been extended for the Project 25 platform to include a cost effective IP Simulcast offering that eliminates the need for circuit switched channel banks for trunking system operation.

2.2.2.11 IP Simulcast Subsystem Architecture An IP simulcast subsystem has the capacity for a prime site and up to 15 simulcast remote sites. A simulcast remote site will be co-located at each prime site. The simulcast cell also can handle a maximum of 30 channels/talk paths. An IP simulcast subsystem supports a 100Base-T LAN. The simulcast prime site communicates with the simulcast remote sites over an IP network. A prime site acts as a control point for the digital audio of the simulcast subsystem. Each comparator at a prime site collects the data for a single channel from all of the simulcast remote sites. It then selects the best received packets from all of its inputs and routes a single data stream to the multicast group. The voted audio from the comparator is sent as IP packets that are routed to all of the required sites. The Prime Site contains redundant prime site simulcast controllers, comparators, and networking equipment interface with the master site and remote simulcast sites. The simulcast RF transmitters and receivers are located at the simulcast remote sites. These sites simultaneously transmit identical information from each site to the subscribers. The receivers at these sites receive the audio from the user radios, and pass the audio back to the prime site for audio voting. Equipment at a simulcast prime site in Motorola’s proposal includes a GCP 8000 simulcast site controller, GCM 8000 comparators, and networking equipment. Simulcast remote sites contain GTR 8000 simulcast base radios, and networking equipment to interface with the prime site.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-22

2.2.2.12 Reports ASTRO 25 provides users with numerous reports including: ♦ ♦ ♦ ♦ ♦

Zone and System Historical Reports Dynamic reports Custom reports Affiliation User Reports Radio Control Manager Reports

These reports provide historical and real-time traffic data to aid in system optimization, allow system managers to view real time call activity to be proactive in making resource planning decisions, and monitor system usage by identifying the sites that are used the most and determining where radio users are located throughout the system. Historical Reports ASTRO 25 allows users to manually or automatically generate historical performance reports through the use of standard templates contained. The Historical Reports application generates reports of statistical data that is gathered at specific, predefined time intervals. Users can then create reports from this data to monitor and analyze information about zones, sites, channels, talkgroups, and users. This data is displayed using predefined report templates and parameters. Figure 2-6 shows an example of a Historic Report.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-23

Figure 2-6: Historical Reports Example

Dynamic Reports User Licenses: ASTRO 25 allows users to generate near real-time graphical reports showing system utilization for talk group, private, and interconnect calls. Dynamic Reports provides several predefined report templates that can be used to display statistics for a zone, site, or a console site (but not for a system) in near real time. Some of these include: ♦

Templates for Zone-Level Reports – Dynamic Reports allows you to create and run reports to capture statistics across a zone. For example, the Zone Call Activity report provides statistics for determining the levels of different call activities within the zone, such as call rejects or call terminations. ♦ Templates for Site-Level Reports – Dynamic Reports allows you to create and run reports to capture statistics across a site. For example, the Site Busy Count report provides statistics for determining the number of busies caused by lack of resources at this site or the number of busy calls originating at this site. ♦ Templates for Console Site-Level Reports – Dynamic Reports allows you to create and run reports to capture statistics across a console site. For example, the Console Site Link Bandwidth Usage report provides the percentage of bandwidth to a console site consumed by trunking calls in the time interval. An example of a Dynamic Report for Zone Call Activity is shown in Figure 2-7.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-24

Figure 2-7: Example of Dynamic Report: Zone Call Activity

Custom Reports Custom Reports lets you create or modify reports to meet your specific needs using the statistical data elements supported by the Performance Reports application. This can be applied for either Historical or Dynamic Reports. The Custom Report is created using the Crystal Reports® application and is an optional feature of the ASTRO 25 platform. Affiliation User Reports Affiliation User Reports allows a user to observe selected real time affiliations in the zone for sites, talkgroups, or individual radio users. Also provides graphing capabilities.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-25

Radio Control Manager Reports Radio Control Manager (RCM) Reports will allow you to create and view standard reports from the following categories: ♦

Emergency Alarms Reports - Provides a historical listing of all Emergency Alarms received by the RCM in a selected period of time. The report can display all Emergency Alarms in the active or historical events queues. These reports include: • Emergency Alarms by Radio Report • Emergency Alarms by Talkgroup Report • Emergency Alarms in the Deleted State Report • Emergency Alarms in the Responded State Report ♦ Current Login Sessions Reports - Provides information about the RCM users currently logged into the system. ♦ Radio Command Reports - Shows the commands that have been sent to radio users, such as Regroup, Inhibit, and Selector Lock. These reports include: • Radio Commands by Command Report • Radio Commands by User Report • Radio Commands by Radio Report

2.2.3 System Upgrades and Expansion Capabilities Motorola systems are designed with expandability and future migration in mind. ASTRO 25 is an IP Standards Based scalable platform. This fact, in conjunction with our experience in designing and implementing solutions to specifically address your needs, makes us uniquely suited to solve your current communications needs as well as providing a foundation for your future growth.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-26

2.3

Failure Mode Analysis and Reliability One of the most important attributes of the proposed system is how it performs during various failure conditions. ASTRO 25 is designed with multiple levels of redundancy and the ability to provide continued communications should failures occur. A large communications system can be a lifeline to your users. There is no tolerance for system failure. The ASTRO 25 system can withstand multiple failures and still provide full-featured trunked communications. To ensure that the City of Philadelphia’s ASTRO 25 IP Radio System functions even in the event of multiple component failures, Motorola employs three proven design techniques: 1. Redundancy 2. Fault Tolerance 3. Fault Distribution By incorporating these design techniques within every subsystem, Motorola provides for a graceful degradation of system performance even in the event of major failures.

Redundancy is defined as two independent components with one in an active mode and one in a hot standby mode. If a component fails, the redundant component immediately comes on line such that system operation is unaffected. A typical master site is equipped with two Motorola Zone Controllers in a redundant configuration such that if the first Zone Controller fails, the second Zone Controller assumes system-wide control. Similarly, the Prime Sites contain two Prime Site Controllers each in a redundant configuration such that if the first Prime Site Controller fails, the second Prime Site Controller assumes simulcast control. Fault tolerance incorporates redundant subcomponents within a main component. If a subcomponent fails, the redundant subcomponent comes on line immediately and the main component remains in operation. An example of fault tolerance can be found in Motorola’s Zone Controller. If a power supply fails, a redundant power supply with that Zone Controller will back-up the component. Fault distribution is a design approach where multiple components are incorporated such that a failure of any one component does not disable the system but rather reduces the available resources. For example, multiple Ethernet switches will be distributed among the City’s base stations at the simulcast remote sites. Therefore, in the event of the failure of one of the switches, only the base stations associated with that particular switch will be impacted. In the event of multiple system failures, Motorola also designs into the system two reduced feature operational modes: site trunking and failsoft. Site trunking is full City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-27

featured, wide-area simulcast operation with the exception of dispatch consoles. Failsoft is conventional wide-area operation. In both of these reduced feature modes, the most important capability of any system, reliable coverage, is fully maintained.

The following pages contain a comprehensive analysis of the possible infrastructure failure scenarios and the system redundancy for mitigating that particular scenario. Table 2-1 is a summary of the main components of the ASTRO 25 System and their reliability design. Table 2-1: System Redundancy and Reliability Fixed Network Equipment Description Master Site (City Hall Rm626m)

Redundancy/Distribution Description

MZC 5000 Zone Controller Enterprise Ethernet Switch Core Router

Redundant Zone Controllers Redundant Master Site Ethernet Switches Redundant Core Routers Provide management function only. Therefore, these are Network Management Servers not redundant as a failure of a server will not fail the radio system. Prime Sites (City Hall 10th Floor and Domino Lane) Prime Controllers Redundant Prime Controllers Prime Site Router Redundant Prime Site Routers back to master site Two Prime Site Ethernet Switches with channels Prime Site Ethernet Switches distributed (odds & evens) to each of these switches. Simulcast Remote Sites Redundant Site Routers Site Router

Site Ethernet Switch Channels GPS Frequency Standard Gold Elite Dispatch Console Sites Console Unit Embassy Network Console Router

Embassy Network Console Switches

(Please Note: Requires dual T1 links per system, per site. Redundant Site Routers Not included as part of this proposal at City’s direction) Redundant Site Ethernet Switches Multiple potential control channels (i.e. four redundant control channels per simulcast system) Fault Tolerant Atomic Clock backs up GPS 1PPS; Redundant Atomic Modules Failure of single console only effects that console Provide management function only. Therefore, these are not redundant as a failure of a server will not fail the radio system. Provide management function only. Therefore, these are not redundant as a failure of a server will not fail the radio system.

The following pages contain a comprehensive analysis of the possible infrastructure failure scenarios and the system redundancy for mitigating that particular scenario. system reliability equates to system availability. City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-28

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-29

2.3.1 Master Site 2.3.1.1

Main ASTRO 25 MZC5000 Zone Controller To Enterprise Switch 2 Core Router 1 Switch 1 Enterprise

Zone Controller A Core Router 3

Interface Panel

Core Router 2

Core Router 4

MOSCAD Alarm Terminal Interface Panel

Gateway Router 1

Gateway Router 2

Network Management Terminal

Zone Controller B

Exit Router 1

Interface Panel

Enterprise Switch 2

To Enterprise Switch 1

Network Management Servers Exit Router 2

Master Site

Figure 2-8: Failure of Zone Controller A at the Primary Master Site

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-30

Main ASTRO 25 MZC5000 Zone Controller

Scenario:

Failure of Zone Controller A at the Primary Master Site.

Result:

Motorola has provided redundant MZC5000 Zone Controllers at the Master Site. Failure of the active Zone Controller at the Master site will result in automatic switchover to the redundant Zone Controller. During the transition between the Primary and Backup Zone Controllers the simulcast cells and ASTRO 25 Repeater Sites will be in Site Trunking. During the transition the dispatch operators will revert to operating on Control Stations. In a matter of seconds following the switch to the Backup Zone Controller, the sites will return to Wide Area operation. The Zone Controllers have redundant power supplies as a standard feature, which will help keep the controllers operational in case of a failure of that component. The redundant controller is regularly updated with all pieces of critical information so that if it needs to become the active controller, the current system configuration and operational characteristics are maintained.

Protection:

Redundant Zone Controllers at the Master site and spare boards for the Zone Controllers.

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-31

2.3.1.2

Main & Redundant ASTRO 25 MZC5000 Zone Controllers To Enterprise Switch 2 Core Router 1 Enterprise Switch 1

Core Router 3

Interface Panel

Zone Controller A

Core Router 2

Core Router 4

MOSCAD Alarm Terminal Interface Panel

Gateway Router 1 Gateway Router 2

Network Management Terminal

Zone Controller B

Exit Router 1

Interface Panel

Enterprise Switch 2

To Enterprise Switch 1

Network Management Servers Exit Router 2

Master Site

Figure 2-9: Failure Scenario Diagram – Failure of Zone Controller A and B at the Master Site

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-32

Main & Redundant ASTRO 25 MZC5000 Zone Controllers Scenario:

Failure of Zone Controller A and B at the Master Site.

Result:

In the unlikely event that both the active and redundant Zone Controllers fail, the simulcast cells and the ASTRO 25 Trunked Repeater sites will go into Site Trunking. All active calls will be lost. The dispatch operators will revert to operating on Control Stations.

Protection:

Spare boards for MCZ5000 Zone Controller

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-33

2.3.2 Master Site Enterprise Switch To Enterprise Switch 2 Core Router 1 Enterprise Switch 1

Core Router 3

Zone Controller A

Interface Panel

Core Router 2

Core Router 4

MOSCAD Alarm Terminal Interface Panel

Gateway Router 1 Gateway Router 2

Network Management Terminal

Zone Controller B

Exit Router 1

Interface Panel

Enterprise Switch 2

To Enterprise Switch 1

Network Management Servers

Master Site

Exit Router 2

Figure 2-10: Failure Scenario Diagram – Failure of a Master Site Enterprise Switch

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-34

Master Site Enterprise Switch

Scenario:

Failure of a Master Site Enterprise Switch at the Master Site.

Result:

Motorola’s ASTRO 25 system employs redundant Master Site Ethernet Switches at both the Primary and Backup Master Sites. Failure of one Ethernet Switch on the active Master site will result in automatic switchover to the redundant switch. The entire system remains in the simulcast wide area trunking mode. The failure is transparent to all system users.

Protection:

Redundant Master Site Ethernet Switches.

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-35

2.3.2.1

Both Master Site Enterprise Switches To Enterprise Switch 2 Core Router 1 Enterprise Switch 1

Core Router 2

Interface Panel

Core Router 3

Zone Controller A

Core Router 4

MOSCAD Alarm Terminal Gateway Router 1

Interface Panel

Gateway Router 2

Network Management Terminal

Zone Controller B Interface Panel Enterprise Switch 2

To Enterprise Switch 1

Exit Router 1 Network Management Servers

Master Site

Exit Router 2

Figure 2-11: Failure Scenario Diagram: Failure of both Master Site Enterprise Switches

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-36

Both Master Site Enterprise Switches

Scenario:

Failure of both Master Site Enterprise Switches at the Master Site.

Result:

In the unlikely event that both Enterprise Switches fail, the simulcast cells and the ASTRO 25 Trunked Repeater sites will go into Site Trunking. All active calls will be lost. The dispatch operators will revert to operating on Control Stations.

Protection:

Spare Enterprise Switch.

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-37

2.3.2.2

Master Site Core Router To Enterprise Switch 2 Core Router 1 Enterprise Switch 1

Core Router 2

Interface Panel

Core Router 3

Zone Controller A

Core Router 4

MOSCAD Alarm Terminal Gateway Router 1

Interface Panel

Gateway Router 2

Network Management Terminal

Zone Controller B Interface Panel Enterprise Switch 2

To Enterprise Switch 1

Exit Router 1 Network Management Servers

Master Site

Exit Router 2

Figure 2-12: Failure Scenario Diagram – Failure of a Master Site Core Router

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-38

Master Site Core Router

Scenario:

Failure of a Master Site Core Router at the Master Site.

Result:

The Core Routers are configured so that site links to Simulcast Cells or to ASTRO25 Stand-alone Repeater Sites are distributed across multiple Core Routers. Failure of one Core Router at the active Master site will result in automatic switchover to the redundant Core Router. The entire system remains in Wide Area operation. The failure is transparent to all system users.

Protection:

Redundant Core Router, Spare Core Router, Redundant site links (to Simulcast Prime Sites or ASTRO25 Stand-alone Repeater Sites).

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-39

2.3.2.3

Master Site Core Routers To Enterprise Switch 2 Core Router 1 Enterprise Switch 1

Core Router 2

Interface Panel

Core Router 3

Zone Controller A

Core Router 4

MOSCAD Alarm Terminal Gateway Router 1

Interface Panel

Gateway Router 2

Network Management Terminal

Zone Controller B Interface Panel Enterprise Switch 2

To Enterprise Switch 1

Exit Router 1 Network Management Servers Exit Router 2

Primary Master Site

Figure 2-13: Failure Scenario Diagram – Failure of Both the Main and Redundant Core Routers

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-40

Master Site Core Routers

Scenario:

Failure of all the main and redundant Core Routers at the Master Site.

Result:

In the unlikely event that all Core Routers fail, the simulcast cells and the ASTRO 25 Trunked Repeater sites will go into Site Trunking. All active calls will be lost. The dispatch operators will revert to operating on Control Stations.

Protection:

Spare Core Router.

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-41

2.3.2.4

Network Management Servers To Enterprise Switch 2 Core Router 1 Enterprise Switch 1

Core Router 2

Interface Panel

Core Router 3

Zone Controller A

Core Router 4

MOSCAD Alarm Terminal Gateway Router 1

Interface Panel

Gateway Router 2

Network Management Terminal

Zone Controller B Interface Panel Enterprise Switch 2

To Enterprise Switch 1

Exit Router 1 Network Management Servers

Master Site

Exit Router 2

Figure 2-14: Failure Scenario Diagram – Failure of the Network Management Servers

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-42

Network Management Servers

Scenario:

Failure of the Network Management Servers at the Primary or Redundant Master Site.

Result:

There are several Network Management servers on the ASTRO 25 Network LAN. The failure of any specific server on the LAN at the Master site will result in loss of the management function associated with the specific server, while the entire system will remain in the wide area trunking mode. The failure is transparent to all radio and dispatch console users. The failure will affect the Network Management system user.

Protection:

Multiple servers running separate applications. Spare components for server computers.

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-43

2.3.2.5

Simulcast Prime Site Controller GPS Subsystem

MOSCAD

Comparator

Comparator

Redundant Site Controller

Prime Site Controller Switch 1

Main Prime Site Router

Switch 2

Interface Panel

Simulcast Prime Site

Backup Prime Site Router

Sub-Site Access Routers

Interface Panel

To Master Site

Figure 2-15: Failure of the Simulcast Prime Controller

Scenario:

Failure of the Simulcast Prime Site Controller at a Simulcast Prime Site.

Result:

Motorola has provided redundant Simulcast Prime Controllers (GCP 8000) at the Prime sites. Failure of the active controller will result in automatic switchover to the redundant controller. The entire system remains in the simulcast wide area trunking mode. The failure is transparent to all voice system users. Dispatch console operation remains unaffected.

Protection:

Redundant Prime Simulcast Controllers, spare controller modules.

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-44

2.3.2.6

Main and Redundant Simulcast Prime Site Controllers GPS Subsystem

MOSCAD

Comparator

Comparator

Redundant Site Controller

Prime Site Controller Switch 1

Main Prime Site Router

Switch 2

Interface Panel

Simulcast Prime Site

Backup Prime Site Router

Sub-Site Access Routers

Interface Panel

To Master Site

Figure 2-16: Failure Scenario Diagram – Failure of the Simulcast Prime and Redundant Controllers

Scenario: Failure of the Simulcast Prime and Redundant Site Controllers at a Simulcast Prime Site. Result:

In the unlikely event that both the Main Prime Simulcast Controller and the Redundant Prime Simulcast Controller fail at any of the Simulcast Prime sites, the Simulcast cell will revert to Simulcast Failsoft, where all transmitters’ sites operate in the conventional simulcast mode. Coverage for the simulcast cell will not be degraded. Dispatchers will be able to communicate to the simulcast cell via control stations or portable radios. The unaffected simulcast cells will remain in wide area operation but will not be able to communicate to the field units in conventional simulcast mode, unless a dispatcher can patch the conventional and trunked resources together. Additionally, depending on how the subscriber radios are programmed, the subscriber radios will attempt to roam to a cell or site in wide-area trunking mode.

Protection:

Spare controllers, backup consolettes, and subscriber programming.

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-45

2.3.2.7

Simulcast Prime Site Router GPS Subsystem

MOSCAD

Comparator

Comparator

Redundant Site Controller

Prime Site Controller Switch 1

Main Prime Site Router

Switch 2

Interface Panel

Simulcast Prime Site

Backup Prime Site Router

Sub-Site Access Routers

Interface Panel

To Master Site

Figure 2-17: Failure Scenario Diagram: Failure of a Simulcast Prime Site Router

Scenario:

Failure of a Simulcast Prime Site Router at a Simulcast Prime Site.

Result:

Motorola’s ASTRO 25 system employs redundant Prime Site Routers. Failure of one Site Router at any of the Simulcast Prime sites will result in automatic switchover to the redundant router. The entire system remains in the wide area trunking mode. The failure is transparent to all system users.

Protection:

Redundant Simulcast Prime Site Router.

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-46

2.3.2.8

Main and Redundant Simulcast Prime Site Routers GPS Subsystem

MOSCAD

Comparator

Comparator

Redundant Site Controller

Prime Site Controller Switch 1

Main Prime Site Router

Switch 2

Interface Panel

Simulcast Prime Site

Backup Prime Site Router

Sub-Site Access Routers

Interface Panel

To Master Site

Figure 2-18: Failure Scenario Diagram: Failure of a Prime Site and Redundant Site Router

Scenario: Failure of a Simulcast Prime Site Router and Redundant Site Router at a Simulcast Prime Site. Result:

In the unlikely event that both the Primary and Redundant Site Routers fail at any of the Simulcast Prime sites, the simulcast cell will revert to simulcast site trunking. The dispatchers for that cell will need to revert to the fallback control stations to communicate with the users within that cell. The simulcast cell will continue to operate until the wide area connection is restored. Users that have roamed to another simulcast cell or stand alone repeater site will not be able to communicate with users within the failed cell, unless the dispatcher can patch together the wide area and site trunked simulcast cells.

Protection:

Spare Site Routers, backup control stations at dispatch locations.

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-47

2.3.2.9

Simulcast Prime Site Ethernet Switch GPS Subsystem

MOSCAD

Comparator

Comparator

Redundant Site Controller

Prime Site Controller Switch 1

Main Prime Site Router

Switch 2

Interface Panel

Simulcast Prime Site

Backup Prime Site Router

Sub-Site Access Routers

Interface Panel

To Master Site

Figure 2-19: Failure Scenario Diagram – Failure of a Simulcast Prime Site Ethernet Switch

Scenario:

Failure of a Simulcast Prime Site Ethernet Switch at a Simulcast Prime Site.

Result:

Motorola’s ASTRO 25 system employs redundant Simulcast Prime Site Ethernet Switches. Failure of one Ethernet Switch at any of the Simulcast Prime sites will result in a loss of the channels connected to the failed switch. The entire system remains in Wide Area. Dispatch console operation remains unaffected.

Protection:

Redundant Simulcast Prime Ethernet Switches, spare Simulcast Prime Ethernet Switch

Detection: Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-48

2.3.2.10

Simulcast Remote Site Router

Backup Remote Site Router

Main Remote Site Router

MOSCAD

Switch 1

Switch 2

GPS GTR8000 Base Radio

GTR8000 Base Radio

5 MPPS w/ embedded 1 PPS

Simulcast Remote Site

Figure 2-20: Failure Scenario Diagram – Failure of a Simulcast Remote Site Router

Scenario:

Failure of a Simulcast Remote Site Router

Result:

The system is capable of employing redundant remote site routers. Failure of one Site Router at a remote site will result in automatic switchover to the redundant router. The entire system remains in the simulcast trunking mode. The failure is transparent to all system users.

Protection:

Standby Simulcast Remote Site router. Please Note: Redundant Simulcast Remote Site routers requires dual T1 links per system, per site. Redundant Site Routers Not included as part of this proposal at City’s direction

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-49

2.3.2.11

Primary and Redundant Simulcast Remote Site Router Diagram

Main Remote Site Router

Backup Remote Site Router

MOSCAD

Switch 1

Switch 2

GPS GTR8000 Base Radio

GTR8000 Base Radio

5 MPPS w/ embedded 1 PPS

Simulcast Remote Site

Figure 2-21: Failure Scenario Diagram – Failure of a Primary and Redundant Simulcast Remote Site Router

Scenario:

Failure of a Simulcast Primary and Redundant Simulcast Remote Site Routers

Result:

In the unlikely event that both the Primary and Redundant Simulcast Remote Site Routers fail, the failed remote site will be removed from the simulcast cell, and the remaining simulcast remote sites within that cell will remain unaffected. The coverage from that site will no longer be available, possibly reducing the coverage footprint. Network Management alarms and software download capability will be lost for this remote site. All other remote simulcast sites within the cell will have Network Management Alarming capability.

Protection:

Spare Remote Site Router. Simulcast coverage design overlap. Please Note: Redundant Simulcast Remote Site routers requires dual T1 links per system, per site. Redundant Site Routers Not included as part of this proposal at City’s direction

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-50

2.3.2.12 Simulcast Remote Site Primary Ethernet Switch

Main Remote Site Router

Backup Remote Site Router

MOSCAD

Switch 1

Switch 2

GPS GTR8000 Base Radio

GTR8000 Base Radio

5 MPPS w/ embedded 1 PPS

Simulcast Remote Site

Figure 2-22: Failure Scenario Diagram – Primary Simulcast Remote Site Ethernet Switch

Scenario:

Failure of the Primary Simulcast Remote Site Ethernet Switch.

Result:

Failure of the Primary Simulcast Remote Site Ethernet Switch will result in a loss of the channels connected to the failed switch. The entire system remains in the simulcast trunking mode. The failure is transparent to all system users.

Protection:

Redundant Simulcast Remote Site Ethernet Switch

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-51

2.3.2.13 T1 Site Link Scenario:

Failure of a T1 Site Link.

Result:

The failure of a T1 Site Link path between any sites without redundant path protection will result in loss of Wide Area Communications for those sites. Dispatch console operation remains unaffected to those sites still connected by a properly functioning T1 site links. If sufficient T1 links are lost to the Embassy/Elite based dispatch centers, then the dispatchers working on consoles connected to the effected CEBs will revert to control station operation. If the T1 link to a MCC7500 deployed for Prisons or Police training is lost the dispatchers must revert to subscriber radios for wireless access to the system.

Protection:

Redundant T1 links proposed between master site and simulcast prime sites. However please note that redundant site routers and therefore T1 site links at simulcast sub-sites, the underground sites and at the Prison/Police MCC7500 console sites have not been proposed at City’s direction. Existing CEBs at Embassy/Elite dispatch centers will continue to support resources distributed over multiple T1 circuits using X-Bus configuration.

Detection:

Alarm on Manager Terminal.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-52

2.3.2.14 Single Simulcast Channel (Base Station or Comparator) GPS Subsystem

MOSCAD

Comparator

Comparator

Redundant Site Controller

Prime Site Controller Switch 1

Main Prime Site Router

Switch 2

Interface Panel

Simulcast Prime Site

Backup Prime Site Router

Sub-Site Access Routers

Interface Panel

To Master Site

Figure 2-23: Failure Scenario Diagram – Failure of a single Simulcast channel.

Scenario:

Failure of a single Simulcast channel.

Result:

In a trunking system, multiple channels inherently provide redundancy. The failure of one channel (Comparator or Base Station) will be transparent to all system users. The failure of a repeater or a comparator will result in the ASTRO 25 Zone Controller removing the channel from the system, resulting in some reduced channel capacity. Any calls in progress on the failing channel will be lost, and on the next push-to-talk, radio traffic will be restored. All other channels in the simulcast cell remain unaffected. The entire system remains in the simulcast trunking mode. Dispatch console operation remains unaffected.

Protection:

Multiple channels, multiple potential control channels, spare modules.

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-53

2.3.2.15 Single Simulcast Control Channel Main Remote Site Router

Backup Remote Site Router

MOSCAD

Switch 1

Switch 2

GPS GTR8000 Base Radio

GTR8000 Base Radio

5 MPPS w/ embedded 1 PPS

Simulcast Remote Site

Figure 2-24: Failure Scenario Diagram – Failure of a single control channel.

Scenario:

Failure of a single control channel.

Result:

Motorola trunking systems provide up to four possible control channels in a Simulcast cell or ASTRO 25 Repeater site. If the currently active control channel fails, another channel automatically takes over and the control channel as the failed channel is automatically taken out of service. All other channels within the simulcast cell remain unaffected. The simulcast cell remains in the wide-area trunking mode. The failure is transparent to all system users. Dispatch console operation remains unaffected.

Protection:

Multiple potential control channels

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-54

2.3.2.16 MCC 7500 Dispatcher Operator Position

Site Router

HP Switch 1

HP Switch 2

RTUAUX I/O

Operator Position

Operator Position

Dispatch Center

Figure 2-25: Failure Scenario Diagram – Failure of a Single Dispatch Operator Position

Scenario:

Failure of a single dispatch operator position.

Result:

The failure of a dispatch operator position would result in that particular dispatcher moving to another operator position or reverting to a fallback control station or portable radio. All other dispatch terminals operate normally and remain unaffected. The entire system remains in the simulcast trunking mode.

Protection:

Fallback control stations, multiple independent dispatch positions.

Detection:

Console user detection, console diagnostics.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-55

2.3.2.17 MCC 7500 Dispatch Center Ethernet Switch

Site Router

HP Switch 1

HP Switch 2

RTUAUX I/O

Operator Position

Operator Position

Dispatch Center

Figure 2-26: Failure Scenario Diagram – Failure of a Dispatch Center Ethernet Switch

Scenario:

Failure of a Dispatch Center Ethernet Switch.

Result:

The ASTRO 25 network was designed with dual Ethernet switches that connect the operator positions to the network. Any operator positions connected to the failed switch will be taken out of service.

Protection:

Dual redundant switches. Spare switches. Please note that the optional console positions proposed for Prison have only a single position at each location thus negating the need for redundant switches.

Detection:

Console user detection, console diagnostics.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-56

2.3.2.18 GPS / Rubidium Site Frequency Control Standard

Main Remote Site Router

Backup Remote Site Router

MOSCAD

Switch 1

Switch 2

GPS GTR8000 Base Radio

GTR8000 Base Radio

5 MPPS w/ embedded 1 PPS

Simulcast Remote Site

Figure 2-27: Failure Scenario Diagram: Failure of GPS Frequency Standard

Scenario: Result:

Failure of GPS Frequency Standard. The GPS device is implemented with redundant power supplies, GPS receiver modules, and redundant antennas. If the GPS receiver should fail the Rubidium Frequency Standard will automatically take over the 1 pps signal to the base radios. The simulcast system’s performance and audio quality will be the same as before the failure. All radio users will be unaware that a failure has occurred. The Rubidium Frequency Standard has redundant Rubidium modules. Failure of the primary module would result in the automatic activation of the standby module. Simulcast audio should be completely unaffected for several days. Gradual degradation of audio quality in overlap areas may be seen after days of no GPS synchronization. The failure is transparent to all system users until the base radio frequency drifts out of Motorola specification. Dispatch console operation remains unaffected.

Protection:

Atomic Clock backs up GPS 1 pps; Redundant Atomic Modules

Detection:

Alarm on Manager Terminal

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-57

2.3.2.19 Failure Indications at Supervisory Console The radio system's fault manager monitors and reports the status of all the hardware elements in the radio and console subsystems. Each supervisory console at the dispatch center is provided with a fault management terminal. This allows the entire radio and console network to be fault managed from the same point at which the rest of the radio system is fault managed. The specific hardware elements which are monitored are the dispatch consoles, the archiving interface servers (as applicable) and any networking equipment which support the console elements. Each of these hardware elements monitors critical internal hardware sub-elements and reports their status. This allows a failure within a hardware element to be detected and displayed on the fault management terminal.

2.4

RF System Components An ASTRO 25 system consists of a Master Site, ASTRO 25 Repeater Site(s), and ASTRO 25 Simulcast Cell(s). This section discusses the various components that make up the proposed system.

2.4.1 Master Site Components The Master Site is the central point for all system traffic in each ASTRO 25 zone. Call processing and system management occur at the Master Site. The Master Site equipment is described briefly in the following sections.

2.4.1.1

Zone Controller The Zone Controller is a redundant processor that provides trunking call processing for ASTRO 25 system operation. The Zone Controller forms the heart of a wide area radio system by providing the central processor for the zone with the necessary hardware and software capabilities to provide call processing and mobility management. The Zone Controller builds upon the strength and experience of Motorola Wide Area Trunking Systems to deliver multiple layers of reliability for business critical, mission critical and life critical applications.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-58

The Zone Controller is supplied in a redundant controller configuration, and provides the following: ♦

System Availability – The Zone Controller allows software upgrades once loaded, providing enhanced system availability. ♦ Intelligent Switchover – The Redundant Configuration provides automatic switchover to the standby controller if a loss of wide area communications is detected. Notification can be sent to the user if other components fail, allowing the user to manually switch to the standby controller if desired. ♦ Cross Controller Compatibility – Capable of running two different versions of software simultaneously, ensuring that upgrades are fully functional with one controller before upgrading the second controller. ♦ Redundant Configuration – The Redundant Zone Controller is a computer platform with redundant-processors that provide trunking call processing for ASTRO 25 wide area radio communication systems. The Redundant Zone Controller is designed to detect failures by automatically switching operation to the standby controller, minimizing interruption of call processing functionality.

2.4.1.2

Network Management Servers The Network Management System (NMS) can be viewed as a set of software applications or tools used to manage the ASTRO 25 wide area trunked radio system and its constituent components. The NMS supports the following services: ♦

Network Monitoring – Applications are included for monitoring the status of the transport network and the individual infrastructure components; displaying status information; forwarding alert information; and performing diagnostic procedures. ♦ Configuration Management – Facilities are provided for entering and maintaining the operational parameters of the infrastructure components and user devices (i.e., the mobile and portable radios). ♦ Accounting Management– NMS supports the tracking of radio usage of the system by providing an optional interface to third-party accounting and/or billing applications. ♦ Performance Management – Standard and optional applications are available for monitoring, reporting, controlling, and optimizing the use of system resources. City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-59



Security Management – NMS includes features for setting user privileges and controlling their access to view and/or modify information contained in the configuration databases.

The NMS subsystem is comprised of the following servers at the zone and system levels of the ASTRO 25 system. ♦

NMS Zone-level Servers (one each per zone): Air Traffic Router, Zone Database Server, FullVision INM Server, Unified Event Manager, and Zone Statistics Server. ♦ System-level Servers (one each per system): User Configuration Server (UCS), and System Statistics Server (SSS). Air Traffic Router (ATR) The ATR hosts a variety of real-time, data processing applications to support user and system applications. The ATR server receives air traffic information from the Zone Controller, creates Air Traffic Information Access (ATIA) packets, and sends them to the customer server which is located on the customer network. This includes processing real-time call transactions, sourcing Air Traffic Information Access (ATIA) data stream to third-party applications, logging all ATIA data to disk, routing Radio Control Manager command and status packets to/from the Zone Controller, and routing call logging packets from the Zone Controller to the Statistics servers. Zone Database Server (ZDS) The ZDS handles a variety of tasks; including hosting the zone configuration database, administering applications licenses, authenticating network manager users accessing the system, and performing back-end support for user applications. The Zone Database Server (ZDS) performs the following database server functions: ♦

Maintains the infrastructure (zone configuration) database for the zone ♦ Exports the infrastructure information from its database to the Zone Controller where it is stored as the local infrastructure database ♦ Maintains a replica of the current UCS database and home zone map ♦ Exports the radio information it receives from the UCS to the Zone Controller The ZDS also performs all network management and fault management polling of system devices to support the network management clients. The fault management information that the ZDS collects is passed on to the FullVision® Integrated Network Management (INM) server.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-60

The ZDS handles a variety of administrative tasks, including the following: ♦

Administering the standard and optional applications licenses ♦ Authenticating network manager users accessing the system ♦ Performing back-end support services for user applications ♦ Handling telephone interconnect record processing FullVision® Integrated Network Management (INM) Server The FullVision® Integrated Network Management (INM) server provides fault management for the system. It hosts the FullVision INM and FullVision Web applications, along with a Router Manager application and optional MOSCAD™ application for monitoring alarms of third-party devices. FullVision INM allows access to status, alarm messages, and other fault management information obtained from the ZDS and other IP-managed devices via a network management client workstation. The FullVision INM application provides a centralized view of system operational status by displaying intuitive, graphical representations (subsystem topology maps) of the system. FullVision INM also maintains a data warehouse, storing event history for report generation. FullVision® INM scans system-level and zone-level configuration information to monitor the health of system and zone-level objects such as servers, Zone Controllers, and sites. There is one FullVision INM server per zone. In a multiple zone system, one of the FullVision INM servers is equipped with the ability to collect and present information from all zones. Zone Statistics Server (ZSS) and System Statistics Server (SSS) The statistics servers are the data repositories for data statistics necessary to drive Historical Reports. Statistics such as the number of calls, push-to-talks, and busies are accumulated over preset time intervals. User Configuration Server (UCS) The UCS provides database storage and back-end processes required for most system-wide functions. The UCS makes it possible for management personnel to configure home zone maps, users, radios, talkgroups, critical sites, Adjacent Control Channels (ACC), security information at a system-level, and other system-level parameters. Group and Unit ID home zone assignments are also made at the UCS level. This information is configured using the User Configuration Manager (UCM) application and is saved in the UCS database.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-61

Unified Event Manager (UEM) The UEM provides a central location for managing all radio, Zone Maps > Physical > Summary View transport, and environmental devices on the system. The application automatically discovers devices on the network to determine their real-time status. Color-coded symbols displayed on a topography map provide a geographical and hierarchical representation of the entire network. The UEM allows each user to filter out and customize the pertinent information important to their roles and responsibilities. Zone Maps

Physical

Detail View

Service

Features and benefits of the UEM are outlined in Table2-2. Table 2-2: Benefits of the UEM Feature

Benefit

Centralized View of Entire Communications Network

Network Managers can view the entire ASTRO 25 system status and quickly isolate problems to the board level. Network Managers can be quickly notified of failures on the system and diagnose device problems, utilizing a display and an intuitive GUI. Components are automatically discovered and map views are created to show the overall health of the network. Persistent single view all failure conditions in the network and a quick reference summary of alarms by severity allows users to quickly pinpoint the highest priority failures SNMPv3 protocol with Triple DES and AES 256 bit encryption to prevent security breach attempts Real time event stream using a standard industry protocol that can be used to forward events to a higher level management application for added flexibility. User specified event notifications sent via email – which could also be forwarded to a portable mobile device – allows System Managers to simultaneously address other tasks

Intuitive Graphical User Interface (GUI) Auto Discovery of Devices Active Alarms View and Alarm Summary Secure Device Access Northbound Interface

Email Notifications

Network Monitoring Capabilities

Archive and export event history data for analysis

Remote Command Operation

Remote state change capability helps to avoid unnecessary sites trips

The Unified Event Manager (UEM) gives the Network Manager virtually instantaneous notification of any system deficiency or element failure. City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-62

UEM Event Browser

Figure 2-28: UEM Event Browser Sample Screen

The UEM event browser (Figure 2-28) provides a way to look at all the events (or a filtered subset of events) that are received by UEM. By default, when viewing an event, the event browser displays Severity, Date/Time, Managed Resource, Entity, and Message. Additional display properties are available.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-63

UEM Alarm Browser The UEM alarm browser (Figure 2-29) allows the user to view all alarms, or a filtered subset of alarms. By default, when viewing an alarm, the alarm browser displays Severity, Date/Time, Managed Resource, Entity, Message, and Owner/Assignee information. Additional display properties are available. UEM supports exporting events and alarms for future analysis.

Figure 2-29: UEM Alarm Browser Sample Screen

2.4.1.3

Network Management Terminals The NMS Windows-based client/server architecture distributes most of the user application processing to the client PC workstations. The following applications run on or may be accessed from the Network Management terminal: ♦

System Profile ♦ User Configuration Manager ♦ Software Download City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-64

♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

2.4.1.4

Historical Reports (System-level) Zone Profile Zone Configuration Manager ZoneWatch Affiliation Display Air Traffic Information Access (ATIA) Log Viewer Dynamic Reports Historical Reports (Zone-level) Fault Manager using FullVision Integrated Network Manager (INM) FullVision Administration FullVision Web Browser Radio Control Manager (RCM) Radio Control Manager Reports

Packet Data Gateway The Packet Data Gateway (PDG) is a modular platform designed to link the wireline IP Data Network to Motorola‘s ASTRO 25 Trunked radio frequency (RF) network. The PDG software platform manages IP message traffic to and from the wireless network supporting wide area roaming. With wide area roaming, data radios can roam seamlessly throughout the coverage area of the ASTRO 25 Trunked System without the need to select a different channel or have any specific knowledge of the RF network. The PDG supports SNMP-based network management by providing detailed statistics and alarm information to monitor system activity and performance. These statistics and alarms allow you to monitor system operation and loading to support audit, diagnostic, and optimization activities using SNMP-based standard. The information can be viewed directly via the PDG local console or through the Network Management System.

2.4.1.5

Motorola GPRS (General Packet Radio Service) Gateway Service Node (GGSN) Router The Motorola GGSN router provides for the internetworking between the Customer’s Network and the ASTRO 25 data system allowing for independent management of IP addresses across networks.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-65

The Motorola GGSN router handles the IP routing services in support of End-to-End IP data messaging. These services include Static and Dynamic IP addressing, IP fragmentation and ICMP error reporting messaging for diagnostics and troubleshooting.

2.4.1.6

Motorola Gold Elite Gateway The Motorola Gold Elite Gateway (MGEG) is an interface that allows existing CENTRACOM Elite dispatch systems to communicate over and control a packetbased ASTRO 25 trunked radio system. The MGEG allows for support of the CENTRACOM Gold Series architecture (Ambassador Electronics Bank (AEB), Central Electronics Bank (CEB), and Elite operator positions) within the ASTRO 25 system. As part of an ASTRO 25 system, the MGEG allows console dispatch operators to participate in secure encrypted communications if the encryption option is purchased for the system and radios. The audio between the MGEG and the radio is encrypted; however, the audio between the MGEG and the console is not encrypted. The Motorola Gold Elite Gateway (MGEG) Crypto Card provides the encryption and decryption functions to the MGEG to allow secure dispatch communications.

2.4.1.7

Ambassador Electronics Bank (AEB) The AEB provides an interface for audio and call control to the wide-area trunking system. The AEB allows multiple CEBs to interface into the ASTRO 25 system, allowing for expanded dispatch capabilities. The AEB allows any dispatch operator to access any assigned channel within the entire console subsystem.

2.4.1.8

Network Transport Subsystem The ASTRO 25 release transport core is engineered to meet the performance requirements of a real time system transporting voice, call control, network management, and ancillary network services. The Transport Network is a closed network. Only Motorola supplied equipment, applications and services can be used on the network. Enterprise Ethernet Switch The Enterprise Ethernet Switch (LAN Switch) is used to aggregate all the Ethernet interfaces for all servers, clients, and routers. To ensure system availability, redundant LAN switches are provided in the ASTRO 25 system.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-66

Cooperative WAN Routing The Motorola Cooperative WAN Routing (CWR) solution allows core and exit routers at the Master site to interface directly with stand-alone RF sites, simulcast prime sites, network management sites, console sites, and interzone links The CWR solution has the following advantages: ♦

Provides redundant router failover capabilities ♦ Allows for easy configuration, testing, and maintenance ♦ Minimizes downtime during upgrades There are three different types of routers in the CWR: ♦

Core Routers - The Core Routers perform the routing control of audio and data in and out of the zone, while achieving the fast access levels required by real-time voice systems. To increase availability, two Core Routers are used. ♦ Gateway Routers - Gateway Routers are used for devices that are multicasting beyond their local LAN, such as to Integrated Voice and Data (IV&D) and High Performance Data (HPD) packet data gateways. ♦ Exit Routers - Exit Routers are routers that handle Inter-Zone links. To increase availability, redundant Exit Routers are used. Zone Core Synchronization The Zone Core is synchronized by the Network Time Protocol server at the Master site. The clock source for both types of synchronization is a Stratum 1 source, which is derived from the Global Positioning Satellite (GPS) system. The device used includes redundant GPS receivers and antennas, redundant DC power supplies, and a back-up oscillator. Additionally, a back-up oscillator is employed in the unlikely event of lost GPS signal.

2.4.1.9

Information Assurance Elements Keeping any network secure from unauthorized intrusions is critical. Keeping your Public Safety communications network secure is even more important. Motorola takes ASTRO 25 network security very seriously. The integration of Information Assurance (IA) is another step towards the continuing enhancement of making sure that these mission critical networks remain operational so that the users can do their jobs better and more efficiently.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-67

The next several paragraphs explain some of the processes, hardware and software that can be implemented with an ASTRO 25 system. We will work closely with your security team to make sure that this system experiences minimal disruption due to outside sources. ASTRO 25's Information Assurance features, including our network security services, are organized in a hierarchy illustrated in Figure 2-30. Each feature builds upon the previous level. The Information Assurance program is scaleable to meet each customer’s security requirements. Motorola’s proposal includes the first three layers of the IA pyramid shown below (“Part of Every System”, “Perimeter Protection”, & “Master Site Protection”. Motorola will be pleased to work with the City to determine if additional IA layers are needed.

Figure 2-30: Information Assurance

Below are listed several of the key services that are provided in our Information Assurance package. Full Element Hardening “Hardening" a system (or a system component) makes the operating system resistant to intrusion or attack. Motorola provides comprehensive hardening on key components throughout the system.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-68

Router ACL (Access Control List) Router ACLs ensure that only required ports and protocols can pass through the routers, providing an additional layer of protection against unauthorized or malicious traffic. SSH (Secure Shell) SSH encrypts the content carried by IP-based network protocols, preventing unauthorized access to information. Antivirus Service The Antivirus (AV) Service detects, quarantines, and repairs viruses before they can infect a network. Anti-Virus definitions require regular updates to ensure that the network is continuously protected. All antivirus programs are tested on a similar system prior to implementation to verify that these will not interfere with the networks functionality. "Dial-In" System Service Interface This System Service Interface utilizes RSA two factor authentication to allow remote system access by authorized individuals, allowing them to perform maintenance tasks and monitor system health. Hardened Passwords Hardened passwords follow generally accepted strong password guidelines. Implementation of hardened passwords are limited to those protecting default or software service accounts. Passwords protecting user accounts, and that are user accessible, are not included in this feature. Zone Core Protection The Zone Core Protection feature protects the System Core site from unauthorized access by providing a combination of Firewalls and Intrusion Detection. Firewall The firewall controls the traffic allowed to pass between networks to mitigate any risk to the operational integrity of the ASTRO 25 Radio Network Infrastructure System, and is recommended when the system will be connected to external networks.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-69

Intrusion Detection The ASTRO 25 system's core or master radio system site is monitored by the Intrusion Detection Sensor (IDS), which analyzes traffic crossing the interface between the radio system master/core site and an external network to detect attempts to compromise the confidentiality, integrity, or availability of a systems resource. Intrusion Detection and Firewalls complement one another; IDS detects and notifies/logs intrusion events while Firewalls block unauthorized traffic. Centralized Backup Service (Part of Install/Backup Service) In conjunction with Element Provisioning, the Centralized Backup Service provides a means to quickly recover a failed or compromised network element. This service provides a repository where volatile data generated and used by the system (configuration files, log data, etc.) is stored. The information stored by the backup service is used to recover system elements to a known state in the event of a failure. Element Provisioning Service (Part of Install/Backup Service) The Element Provisioning Service provides a repository for all non-volatile data necessary to provision system elements including operating system, patches, and application software. This repository provides all components necessary to upgrade, restore or replace system elements. Centralized Event Logging (System Core and Remote Sites) Centralized Event Logging provides a location to which significant events are forwarded for analysis and storage in the network. This feature provides accountability data and audit records that are an industry recognized element of good system security practices. Centralized Authentication Service Centralized Authentication provides the system with a central server which manages user accounts and implements password policies for the ASTRO 25 system from a single interface. This is intended to prevent unauthorized users from accessing the network. Port Security (MAC Port Lockdown) The Port Security feature prevents use of any port by any unauthorized device. Port security is the implementation of MAC Port Lockdown for all layer 2 devices in the radio network.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-70

Secure Network Management SNMPv3 SNMPv3 is the part of current network management protocol standard suite. It provides enhanced security provisions such as: ♦

Authentication - validating the source of the message ♦ Encryption - protecting the contents of a packet to prevent its contents from being read by an unauthorized source Router Encryption (not proposed at this time) Router Encryption equips a system's Core, Exit, and Site routers with encryption modules and provides cryptographic protection for all traffic sent over all site and zone links. Service Access Architecture (Secure Service Access) This feature extends the boundary protection provided by the firewall and IDS to the core site to protect the site from potential malicious traffic. It permits a permanent connection between a radio system's core and a geographically separate location for remote system monitoring or maintenance. The feature also reconfigures the "Dial-in" Service Interface to operate through the firewall and IDS. Network Interface Barrier The Network Interface Barrier (NIB) is an optional set of hardware and software components providing boundary enforcement and attack detection features to provide enhanced network security protection. Deploying NIBs at each connection point between radio system resources and external networks provides an important and necessary level of security in a mission critical network. Each Network Interface Barrier is composed of two pieces of equipment: a network interface barrier firewall and an Intrusion Detection Sensor. ♦

The firewall ensures that only legitimate traffic is allowed to traverse between authorized points in external networks and the radio system. ♦ The Intrusion Detection Sensor monitors allowed connections and traffic in order to detect anomalies and potential attacks; works with the firewall to block inprogress attacks. Motorola’s proposal includes one NIB as part of the Customer Network Interface (CNI).

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-71

2.4.1.10 Alarm and Control Equipment (MOSCAD) The Motorola Supervisory Control and Data Acquisition (MOSCAD) Graphic Master Central (GMC) coupled with the MOSCAD Remote terminal Unit (RTU) creates a fault management subsystem that ports non-SNMP alarms, such as environmental alarms, over to the SNMP alarming system (FullVision/UEM). MOSCAD also provides control capabilities through dry-contact relays, and limited programming capabilities to non-IP-based site equipment such as channel banks (as applicable), microwave equipment (as applicable), TRAK GPS receivers, and legacy base stations. Detailed graphics and display logs allow more information to be displayed on devices monitored by the MOSCAD RTU. Geographic displays and “front panel” views of remote site equipment permit enhanced recognition of component problems and simplifies customer operator training. Custom graphics allow easy navigation from high-level geographical system view down to individual site details. All events, alarms and control actions are time stamped, stored in the appropriate files and can be printed for hard copy record keeping. History files allow for retrieval of information at all times. Motorola’s proposal includes replacing the existing alarm and control system with a new, SDM based MOSCAD Network Fault Management System for ASTRO25. The new MOSCAD will be configured to provide the same quantity of DI alarm inputs as with the existing SMARTZONE 3.0z system and to monitor the existing TRAK9100 GPS units and existing TeNSr channel banks to the extent they are maintained in the final system configuration. Please note that as the City of Philadelphia’s new ASTRO 25 integrated MOSCAD system will use high-speed IP based networking, dial-up modem based fall back reporting of alarms from remote sites will no longer be supported. During discussions prior to this submittal, it was inquired if the new MOSCAD system needs to duplicate the existing MOSCAD system’s TRAK GPS Monitoring & Module Switching functionality. This existing functionality was an SP (Special) feature developed specifically for Philadelphia’s SMARTZONE 3.0z system, to address an extremely unique event which occurred on a single TRAK8900 series GPS unit during burn-in testing of the original system. To Motorola’s knowledge, after almost eight years of monitoring, the unique event for which this feature was implemented has never reoccurred. It is also worth noting, the TRAK8900 series units were replaced at both existing Prime sites by the TRAK9100 series several years ago. ASTRO25 IP Radio systems utilize the TRAK9100 series GPS. Motorola’s proposal does not include the referenced SP Functionality in the upgraded MOSCAD system.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-72

2.4.2 RF Site Components 2.4.2.1

GCP 8000 Site Controller The GCP 8000 Site Controller (GCP 8000) is the control interface between the transmitter/receiver subsystem and the Zone Controller. The GCP 8000 Site Controller comprises redundant site controller modules; one site controller module acts as the active module, and the second module as standby. The redundancy helps minimizes the possibility of a single point of failure at the site. The GCP 8000 provides the following functions: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Manages the channels to maximize throughput and channel availability Administers registration and context activation requests Monitors base stations and interacts with the MOSCAD site device manager to facilitate centralized alarm and control monitoring Provides redundant site control Enables redundant site link routing for master to prime site path redundancy. Enables upgradeability to Dynamic System Resiliency (DSR) at the site (when also using GCM comparators and GTR base stations). Enables site with upgradeability to TDMA (when also using GCM comparators and GTR base stations) Enables site with upgradeability to Dynamic Dual Mode (DDM) allowing the site to adapt for use with both FDMA and TDMA subscribers (when also using GCM comparators and GTR base stations).

Additionally, the GCP 8000 provides IP simulcast capability, enabling true end-toend IP connectivity in a simulcast configuration.

2.4.2.2

GCM 8000 Comparator The GCM 8000 Comparator ensures the broadcast of the best possible voice signal by combining the best parts of a single signal that has been received by multiple sites in a Multisite (simulcast) system. The comparator features a state-of-the-art digital voting methodology: Frame Diversity Reception. The comparator selects the data frame or signals with the lowest BER and forwards it. By using the best pieces of each input signal, the result is the best possible composite signal.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-73

2.4.2.3

GTR 8000 Station The GTR 8000 base radio is Motorola’s Next Generation platform, in which Motorola has incorporated benefits such as: ♦

Software-definable station allows for flexibility in implementation for multi-site configuration, simulcast configuration, or HPD configuration. A common hardware platform requires fewer Field Replaceable Units (FRU) Innovative design allows for upgrades within systems via hardware and/or software to avoid total infrastructure replacement Enables upgradeability to Dynamic System Resiliency (DSR) at the site. Enables site with upgradeability to TDMA Enables site with upgradeability to Dynamic Dual Mode (DDM) allowing the site to adapt for use with both FDMA and TDMA subscribers.

♦ ♦ ♦ ♦ ♦

The GTR 8000 is available in several different configurations: ♦

GTR 8000 Base Radio (shown in Error! Reference source not found.) as proposed to City of Philadelphia to allow for a 1:1 physical replacement of existing Quantar stations. ♦ GTR 8000 Site Subsystem (available only in HPD systems) ♦ GTR 8000 Expandable Site Subsystem (available only in Site Repeater and HPD)

Figure 2-31: GTR 8000 Base Radio

2.4.2.4

Remote Site Router The Site Router provides an interface that handles all of the IP Network Management traffic between the Master Site and the Remote Site. The Site Router provides the following: ♦

Media conversion – the router converts Ethernet to the selected transport medium. ♦ Traffic prioritization – the router applies a prioritization marking to the packets leaving the site. ♦ Fragmentation – the router fragments large IP packets per industry standards. City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-74

2.4.2.5

Site LAN Switch The site LAN Switch provides a LAN interface for site equipment and a LAN port for the site router. Through the switch, the service technicians gain access to service the site, and also access the system's Graphical User Interface.

2.4.2.6

Frequency Reference The TRAK 9100 Simulcast Site Reference is a GPS-based frequency and time reference. The TRAK frequency reference provides the simulcast system 1 PPS (Pulse per Second), 5 MPPS, and 1 PPS + 5 MPPS composite signals. These signals are used to synchronize the transmission of a simulcast system to improve overall performance and coverage. This unit provides a high level redundancy including redundant GPS receivers, backup rubidium standard, and redundant power supplies.

2.4.3 System Design Details 2.4.3.1

Frequency Plan The City of Philadelphia’s existing SmartZone 3.0z system is currently operating on thirty-five (35) licensed 821 MHz Public Safety NPSPAC channels, administered by the Region 28 NPSPAC committee. The ASTRO25 IP Radio System has been designed to operate on these same frequencies again in 12.5 kHz bandwidth channels allowing for reuse of existing antennas, lines, channel combining and receive multicoupling devices at the remote sites. Changes to these frequencies may necessitate changes to these devices; those changes would be handled via the change order process. Also, Motorola is not responsible for mitigating or correcting any existing interference on any of these channels.

2.4.3.2

ASTRO 25 Master Site The proposed ASTRO25 IP Radio System Upgrade includes the Master site. The Master site acts as the control hub for the two simulcast cells the optional underground ASTRO25 Stand-alone sites and dispatch sites (to include the upgraded Embassy/Elite Console system and any future MCC7500 based console sites.) The Master Site will continue to be located at 626M City Hall and proposed to have the following equipment: ♦

Qty(2) MZC5000 Zone Controllers ♦ Qty(1) Network Management Server

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-75

♦ ♦ ♦ ♦ ♦

Qty(1) Air Traffic Router Qty(1) Zone Database Server Qty(1) Full Vision Server Qty(1) Zone Statistics Server Qty(1) User Configuration Server with following system licenses: • CA01209AB ASTRO25 IV&D SITES ‚ Licenses provided to support up to twenty-four (24) sites. Please note all sites (simulcast or standalone) count toward total quantity • CA01225AB MCC7500 DISPATCH OPERATORS ‚ Licenses for up to twenty (20) MCC7500 operator positions to support Prisons, Police Training and System Manager’s position. These licenses are in blocks of five (5) Operator Positions. • CA01208AA RADIO USERS ‚ Licenses for up to ten thousand (10,000) radios • D999AL SECURITY PARTITIONING ‚ Allows the creation of security groups in order to limit access to selected database records. • CA00966AA FLEXIBLE AIR TRAFFIC INFORMATION ACCESS ‚ Allows an external computer to access non-buffered air traffic information. ‚ Includes Qty(1) ZA00103AA providing up to 10 hours of Motorola phone assistance to those developing 3rd party interfaces to the ATIA. • D980AM CADI SOFTWARE OPTION ‚ Provides access to radio traffic information and some control functions for a customer provided 3rd party CAD server. The radio traffic information includes PTTs, Emergency IDs received, and Status Messages received. The control functions available include: Dynamic Regrouping, Individual Selective Radio Inhibit and Radio-to-Radio or Console-to-Radio Call Alert. ‚ Includes Qty(1) ZA00104AA providing up to 40 hours of Motorola phone assistance to those developing 3rd party interfaces to the CADI. • CA00965AA CHANNEL PARTITIONING ‚ Allows the system manager to configure the system such that agencies, or a subset of agencies, have exclusive use of specific RF channels. This is a zone level option and may be ordered for all or any zone.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-76



Z07AA ALPHANUMERIC PAGING ‚ Forwards system alarms in the FullVision application through a customer selected paging service. The paging feature requires a dedicated paging modem and an alphanumeric paging service that provides a modem bank to accept computer-generated paging requests. This feature has been specifically tested with SKYTEL paging service and RAM-PAGE paging service. ♦ Qty(8) Network Management Terminals each with a 21inch non-touch, black LCD monitor and capable of using the following system network management applications. Quantity of NM Terminals assumes one terminal each at Rm626m, SMO, Municipal dispatch, FAB, PHQ, PIA and at two other T.B.D. locations using City provided T1 interconnect. Quantities of licenses shown below are for “concurrent licenses”: • Qty(6) CA01224AB UNIFIED EVENT MANAGER (UEM) ‚ Network Fault Management tool. This option also includes the FullVision Integrated Network Management application. • Qty(7) Z13AG UNIFIED NETWORK CONFIGURATOR (UNC) ‚ Provides the capability for a user to enter configuration information for all infrastructure and transport objects. • Qty(8) Z802AF USER CONFIGURATION MANAGER (UCM) ‚ Provides the capability for a user to enter configuration information for all radio users, console users and some security. • Qty(8) DA00148AG ZONE HISTORICAL REPORTS ‚ Provides the capability for users to manually or automatically generate historical performance reports through the use of standard templates. • Qty(5) ZA00149AD DYNAMIC REPORTS ‚ Provides the capability for users to generate near real-time graphical reports showing the total system utilization for talkgroup, private, and interconnect calls. • Qty(8) Z801AM RADIO CONTROL MANAGER ‚ This option also includes Dynamic Regrouping and Status capability. • Qty(5) D52AJ ZONEWATCH ‚ Provides a graphical display of channel activity for an entire zone by channel. • Qty(5) ZA00151AG AFFILIATION USER REPORTS ‚ Allows a user to observe selected real time affiliations in the zone for sites, talk groups, or individual radio users. Also provides graphing capabilities.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-77

♦ ♦



♦ ♦

♦ ♦ ♦ ♦ ♦ ♦ ♦

Qty(4) Zone Domain Controllers Network Security Equipment consisting of: • Qty(1) Core Security Management Server • Qty(1) Firewall • Qty(1) Intrusion Detection Server Qty(1) TRAK9100 GPS Network Time Protocol Server • Provide NTS to all servers and dispatch consoles. Eliminates need for WWVB BIMs. Qty(1) ASTRO Network Switching Center with Dual Site Link Capability • Contains redundant Enterprise LAN switches, core and gateway routers MOSCAD SDM3000 Alarm And Control Equipment • Qty(1) Graphic Master Central Servers ‚ To be installed in SMO • Qty(1) Graphic Work Stations ‚ To be installed in Municipal Dispatch • Qty(1) SDM3000 RTU with 48 digital inputs, 16 digital outputs and 8 analog inputs Qty(1) Network Transport Performance Server with INFOVISTA Qty(1) 48 Port Out of Band Terminal Server with Qty(1) dial-up modem Qty(1) IV&D Packet Data Gateway Qty(1) GPRS Gateway Server Node (GGSN) Qty(2) Motorola Gold Elite Gateways (MGEG) ASTRO25 Upgrades for existing AEB ASTRO25 Upgrades for existing Muni CEB

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-78

2.4.3.3

ASTRO Prime Site w/ Co-located Remote Site Each of the ASTRO25 IP Radio System’s two simulcast cells contains one site which acts as the cell’s “Prime Site” for control of simulcast launch timing, receive voting and interface back to the master site. Each of the simulcast prime sites are also colocated with an RF site and are proposed to have the following equipment: Simulcast System “A” Prime Site w/ co-located remote located on 10th Floor City Hall ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦



Qty(2) Prime Site – Master Site Link Routers Qty(2) Prime Site Ethernet switches Qty (2) GCP 8000 Simulcast Controllers Qty (15) GCM8000 Comparators • Deployed two (2) comparators per G-Series BR Style chassis enclosure Qty(1) IP Simulcast Remote Site Access Switching Center Qty(1) SDM3000 MOSCAD NFM with 48 digital inputs, 16 digital outputs and 8 analog inputs Reuse of the Existing TRAK9100 GPS Qty(1) Co-located Remote Site – Prime Site Link Router Qty(2) Co-located Remote Site Ethernet switches Qty (15) GTR8000BR IP Simulcast stations Reuse the existing TX Combining Network Reuse the existing RX Multi-coupling Network Reuse the existing RX Tower Top Amplifier Reuse of existing Antennas & Transmission line networks • Basic testing of the existing antenna/line networks at the site will be performed to verify proper performance. If a performance problem is suspected more detailed testing will be performed. Necessary replacement of any part of the existing antenna/lines network will be handled via the change order process. Qty (1) Genesis “GenWatch3 for 9600” terminal with two P25 Over-the-Air system inputs via EFJRS53SL Radios. Proposed with the following options: • Qty (1) GW3-H-CORE This is the collection of minimum required modules for Control Channel based GenWatch3. This can be operated as a Stand Alone GW3 or GW3 Host. This includes: RIMII Input or P25 Input from EFJRS53SL, LaunchPad, Security Manager, License Connection Manager, SysLog, Alias Manager.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-79







• •

• •







Qty (1) GW3-RIMII Additional RIMII Control Channel Input Module or P25 from EFJRS53SL connections **First one is included in the CORE selection above (all located on GW3 ‘server’ machine, one for each System ID) ** GW3-H-CORE can support up to 5 RIMII inputs at one time. Qty (1) GW3-Grp Displays talkgroup dispatch call activity, one TG per sizable and colorable window. Maximum of 2048 TGs. Very GUI interface that displays Talkgroup based dispatch call activity, most recent activity for any open Talkgroup window, Emergency display, short term logging and alerts. Optionally, a setting can be changed to turn this window into simple basic Talkgroup based PTT activity window that can be resized. Each pane can be also sized and colored and all fonts can be changed. Qty (1) GW3-SysSum Summary Grid of all system activity. Summaries can be created every 1min,5min,15min,60min, 3hr,6hr,12hr,24hr. Also includes quick graphing of that information. Qty (1) GW3-AFF Displays Affiliations and Deaffiliations. Search for and display current affiliation of a single ID is included. Qty(1) GW3-ARCHiver Archives control channel data to SQL database. Storage length is limited to 9GB (apx 1 year for a single site) when database is co-located on the HOST PC. With Genesis engineering assistance, it can be moved to another machine where the DB limit is raised to 25Gb (apx. 3 years for a single site). Only one GW3-ARCHIVE is needed per location. Qty(1) GW3-SQL-WGP This is Microsoft for Workgroups with 5 CAL. This MUST be used if the Archiver is purchased. Qty(1) GW3-CoreRpt Full Suite of core excel based reports relevant to industry requirements. Includes a graphical report launching interface that shows an icon of the report to be run Qty(1) GW3-CHAN Graphically displays channel status for each channel on the system. Includes window showing all diagnostics and busies. Also includes a window that shows global system settings reported by the Control Channel and system rejects. Qty(1) GW3-GSP-SWII Specialized GenSPOut output to emulate the SWII 'printer' output to a COM port. GSP will also send the specialized output to a TCP/IP connection. Qty(1) GW3-DISCRPT This is a specialized report to aid in Rebanding or auditing radio programming. This will uniquely search the database and report on all radios, all Talkgroups each radio has used, all services each radio has used and much more. Excellent audit tool. *Requires all required core modules plus Archiver.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-80



• • •





• •

Qty(1) GW3-GOSRPT This is a highly specialized and informative report. There are two versions that come in this report group. One will automatically select your Busy Hour from a range of dates and then calculate Site Utilization, show busies, Channel Usage, Erlangs and much more. Qty(1) GW3-CloneWatch Dynamically find and show radios suspected of being cloned. Qty(1) GW3-TRIG Monitors an array of Control Channel activity and alerts the desktop when selected events happen. * GW3-Archiver is required. Qty(1) GW3-EA USB hardware box that closes up to 8 relays based on GW3-Trigger events. Use this to turn on alarms, lights, etc. *All Core Required modules are required plus Trigger Qty(1) GW3-HW-CPU1 Intel™ Pentium® Dual Core Processor or better, apx. 3.00GHz, Windows® XP Professional, 128MB PCIe x16 NVIDIA Quadro NVS 285, Dual Monitor VGA Capable, 4GB, SDRAM Memory, CD/DVD-RW, 160GB SATA, 10K RPM Hard Drive, 2 Native COM Ports, 16 Port RocketPort Card (gives up to 16 COM ports for SMT, RF-modems, etc.) 17 inch (or better) Flat Panel, Sound plus basic speakers, Keyboard, Mouse, Modem, MS Office Basic, PC Anywhere, NAV (not activated) MS SQL for Workgroups Qty(2) EFJ-53SL-BUN EFJ RS53SL Radio (700-800MHz) Includes: interfaces and connectors from radio to PC; Power Supply; Firmware for 3600 and P25 systems. Qty(1) GW3-INST On Site in Philadelphia one person, install, , 3 days work Qty (1) GW3-TRAIN One person for 2 days at customer location. 5-10 students.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-81

Simulcast System “B” Prime Site w/ co-located remote site located at Domino Lane ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

♦ ♦ ♦ ♦

Qty (2) Prime Site – Master Site Link Routers Qty (2) Prime Site Ethernet switches Qty (2) GCP 8000 Simulcast Controllers Qty (20) GCM8000 Comparators • Deployed two (2) comparators per G-Series BR Style chassis enclosure Qty(1) IP Simulcast Remote Site Access Switching Center Qty(1) SDM3000 MOSCAD NFM with 48 digital inputs, 16 digital outputs and 8 analog inputs Reuse of the Existing TRAK9100 GPS Qty(1) Co-located Remote Site – Prime Site Link Router Qty(2) Co-located Remote Site Ethernet switches Qty (15) GTR8000BR IP Simulcast stations Reuse of the Existing five (5) NPSPAC Mutual Aid Channels • Assumes City maintains existing TeNSr channel bank connectivity back to BIM cards in Municipal CEB Reuse the existing TX Combining Network Reuse the existing RX Multi-coupling Network Reuse the existing RX Tower Top Amplifier Reuse of existing Antennas & Transmission line networks • Basic testing of the existing antenna/line networks at the site will be performed to verify proper performance. If a performance problem is suspected more detailed testing will be performed. Necessary replacement of any part of the existing antenna/lines network will be handled via the change order process.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-82

2.4.3.4

A & B System Simulcast Remote RF Sites Each Remote RF Site (South Hampton, Police Academy, S.W.W.W.T.P, Eng. #9, 31st & Grays Ferry, Streets & Highway Dept, Ford & Belmont, and Bustleton & Hoffnagle are proposed to have the following equipment: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Qty(1) A-System Remote Site – Prime Site Link Router Qty(2) A System Remote Site Ethernet switches Qty (15) A-System GTR8000BR IP Simulcast stations Qty(1) B-System Remote Site – Prime Site Link Router Qty(2) B System Remote Site Ethernet switches Qty (20) B-System GTR8000BR IP Simulcast stations Qty (1) SDM3000 MOSCAD NFM with 48 digital inputs, 16 digital outputs and 8 analog inputs Reuse of the Existing TRAK9100 GPS Reuse the existing TX Combining Network Reuse the existing RX Multi-coupling Network Reuse the existing RX Tower Top Amplifier Reuse of existing Antennas & Transmission line networks • Basic testing of the existing antenna/line networks at the site will be performed to verify proper performance. If a performance problem is suspected more detailed testing will be performed. Necessary replacement of any part of the existing antenna/lines network will be handled via the change order process.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-83

2.4.4 Embassy/Elite Console Network Dispatch Sites The existing dispatch console centers, (Municipal, Fire, Philadelphia International Airport & Police Headquarters) are proposed to have the following equipment: Municipal Dispatch Center ♦ ♦ ♦

♦ ♦

♦ ♦ ♦

♦ ♦ ♦

Reuse existing Qty (4) Centracom Gold Elite Operator Position Equipment/PCs • Upgrade Elite software to ASTRO25 versions Reuse existing Qty(2) Console Electronics Banks (CEB) • Upgrade existing cards to ASTRO25 firmware Reuse of the existing Logging Recorder via LOMI/LORI • City assumed responsible to provide upgrade of existing NICE Detrunked Logging recorder to support ASTRO25 Flexible ATIA stream. Reuse of the existing RACAL Instant recall recorders (1/op) Decommissioning of the existing WWVB Time Sync BIM • City must maintain use of existing Spectra COM NetClock for legal time reference if existing RACAL Logging recorder is maintained. Qty (1) Network Manager Terminal PC (Supervisor) with 21 inch non-touch Black LCD monitor Qty (1) 21” MOSCAD GWS Terminal (Supervisor) with 21 inch non-touch Black LCD monitor Qty (4) XTL5000 Consolettes for back-up • reuse existing Yagi Antennas and transmission lines already under maintenance agreement • Qty (4) MC3000 desktop controllers Qty(1) Embassy/Elite LAN Router Qty(2) Embassy/Elite LAN Switch Reuse of existing CenterCore Dispatch Operator Furniture

Fire Dispatch Center (FAB) ♦

Reuse existing Qty (5) CENTRACOM Gold Elite Touchscreen Operator Position Equipment/PCs • Upgrade Elite software to ASTRO25 versions ♦ Reuse existing Qty(3) Console Electronics Bank (CEB) • 4Upgrade existing cards to ASTRO25 firmware

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-84



Reuse of the existing Logging Recorder via LOMI/LORI • City assumed responsible to provide upgrade of existing NICE Detrunked Logging recorder to support ASTRO25 Flexible ATIA stream. ♦ Replace existing instant recalls with Qty(5) Gold Elite Software-based Dual Instant recall Recorder The Dual Instant Recall Recorder (IRR) software allows users to record two channels of audio radio and/or telephone conversations digitally on the Elite operator PC (the software can also be configured to operate as a single channel IRR). Recording files are stored on the PC’s hard drive. The Instant Recall Recorder keeps a database of all recordings, which allows for convenient "point and click" search and playback of any recordings. IRR functions are controlled through a Graphical User Interface (GUI) icon. In addition, the Instant Retrieval Recorder has numerous special features; such as the ability to attach text documents to recordings, a security system, multiple playback (which allows the user to playback more than one recording at the same time), and real time audio monitor (which allows the user to listen to the last ten minutes of a recording in progress without being required to stop recording to be able to listen). The Instant Retrieval window allows the user to immediately access the recordings. The Instant Retrieval window initially opens on the newest recordings, but allows access to any recordings on the system. The recording can also be saved to the .WAV file that the user specifies. This is useful if the user wants to save a specific recording to a CD or hard disk. ♦

♦ ♦ ♦

♦ ♦ ♦

Decommissioning of the existing WWVB Time Sync BIM • City must maintain use of existing Spectra COM NetClock for legal time reference for any other devices requiring it. Qty (1) Network Manager Terminal PC (Supervisor) with 21 inch non-touch Black LCD monitor Qty (1) SDM3000 MOSCAD NFM with 48 digital inputs, 16 digital outputs and 8 analog inputs Qty (5) XTL5000 Consolettes for back-up • reuse existing Yagi Antennas and transmission lines already under maintenance agreement • Qty (5) MC3000 desktop controllers Qty(1) Embassy/Elite LAN Router Qty(2) Embassy/Elite LAN Switch Reuse the existing CenterCore Dispatch Operator Furniture

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-85

EOC Dispatch, Basement FAB ♦

Reuse existing Qty (1) CENTRACOM Gold Elite Touchscreen Operator Position Equipment/PC • Upgrade Elite software to ASTRO25 versions ♦ Interfaces to existing Fire Console Electronics Bank (CEB) ♦ Qty (19) XTL5000 Consolettes for back-up • reuse existing Yagi Antennas and transmission lines already under maintenance agreement • Qty (19) MC3000 desktop controllers Philadelphia International Airport Dispatch Center ♦ ♦ ♦

♦ ♦

♦ ♦ ♦

♦ ♦ ♦

Reuse existing Qty (5) Centracom Gold Elite Operator Position Equipment/PCs • Upgrade Elite software to ASTRO25 versions Reuse existing Qty(2) Console Electronics Banks (CEB) • Upgrade existing cards to ASTRO25 firmware Reuse of the existing Logging Recorder via LOMI/LORI • City assumed responsible to provide upgrade of existing NICE Detrunked Logging recorder to support ASTRO25 Flexible ATIA stream. Reuse of the existing RACAL Instant recall recorders (1/op) Decommissioning of the existing WWVB Time Sync BIM • City must maintain use of existing Spectra COM NetClock for legal time reference if existing RACAL Logging recorder is maintained. Qty (1) Network Manager Terminal PC (Supervisor) with 21 inch non-touch Black LCD monitor Qty (1) 21” MOSCAD GWS Terminal (Supervisor) with 21 inch non-touch Black LCD monitor Qty (7) XTL5000 Consolettes for back-up • reuse existing Yagi Antennas and transmission lines already under maintenance agreement • Qty (8) MC3000 desktop controllers Qty(1) Embassy/Elite LAN Router Qty(2) Embassy/Elite LAN Switch Reuse of existing CenterCore Dispatch Operator Furniture

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-86

Philadelphia Police HQ Dispatch Center ♦ ♦ ♦

♦ ♦

♦ ♦ ♦

♦ ♦ ♦

Reuse existing Qty (32) Centracom Gold Elite Operator Position Equipment/PCs • Upgrade Elite software to ASTRO25 versions Reuse existing Qty(10) Console Electronics Banks (CEB) • Upgrade existing cards to ASTRO25 firmware Reuse of the existing Logging Recorder via LOMI/LORI • City assumed responsible to provide upgrade of existing NICE Detrunked Logging recorder to support ASTRO25 Flexible ATIA stream. Reuse of the existing Instant recall recorders Decommissioning of the existing WWVB Time Sync BIM • City must maintain use of existing Spectra COM NetClock for legal time reference if existing RACAL Logging recorder is maintained. Qty (1) Network Manager Terminal PC (Supervisor) with 21 inch non-touch Black LCD monitor Qty (1) 21” MOSCAD GWS Terminal (Supervisor) with 21 inch non-touch Black LCD monitor Qty (15) XTL5000 Consolettes for back-up • reuse existing Yagi Antennas and transmission lines already under maintenance agreement • Reuse Qty (15) Comtegra desktop controllers and “Centurion” Console Qty(1) Embassy/Elite LAN Router Qty(2) Embassy/Elite LAN Switch Reuse of existing Dispatch Operator Furniture

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-87

2.4.5 System Connectivity Requirements ASTRO 25 Digital systems and the other related subsystems such as consoles require high performance, high reliability link transport systems for site-to-site communications. The transport system is one of the primary enabling technologies for wide area two-way communications. The performance and reliability of the transport system is key to the overall performance of an ASTRO 25 system. Motorola’s ASTRO 25 network utilizes packet switched IP links to pass voice, data, control and management information between sites. Interface to the packet transport links is done via industry standard routers and packet switching equipment. Motorola’s proposed design and equipment includes these items. This proposal assumes the City is providing all necessary links via leased T1 circuits. However, almost any mix of digital transport technologies such as microwave, leased T-1’s, or fiber can support the proposed ASTRO 25 network as long as these transport links meet the minimum Motorola specifications for Bit Error Rate (BER), timing delays and capacity. Failure to meet these specifications 100% of the time will severely and negatively impact system performance. Based on past performance issues, Motorola strongly recommends the City consider implementing a dedicated site interconnect network such as point to point microwave. There are many issues to be considered when the transport system is designed for an ASTRO 25 system. In order to ensure that all factors are considered, and that the link transport system meets certain minimum requirements, Motorola has established a team of experts to assist customers such as the City of Philadelphia. This group, called the Network Design Service Team (NDST), is a group of subject matter experts that can review transport system designs and make recommendations. Motorola will be pleased to work with the City’s personnel to answer any further questions related link transport requirements.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-88

Motorola T-1 Specifications for Simulcast Prime to Remote Site Links The specifications below are the minimum requirements for a Simulcast Prime to remote Site T-1 link. Line Coding

B8ZS

Framing Format

ESF

Signaling

Clear Channel

Availability Expectation

99.999%

Compression

None

Clocking

Stratum 2 or better

Dry or Wet Line

Dry (i.e. no -48V present)

Bit Error Rate

1 × 10-6

Maximum Delay

5 ms one way

Motorola T-1 Specifications for Simulcast Prime to Zone Master, and ASTRO Site Repeater Remote to Zone Master and Remote Dispatch Locations The specifications below are the minimum requirements for a Simulcast Prime to Master, and ASTRO Site Repeater Remote to Master. Line Coding

B8ZS

Framing Format

ESF

Signaling

Clear Channel

Availability Expectation

99.999%

Compression

None

Clocking

Stratum 2 or better

Dry or Wet Line

Dry (i.e. no -48V present)

Bit Error Rate

1 × 10-6

Maximum Delay

5 ms one way

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-89

2.4.5.1

Inter-site Link Configurations Each RF site in the ASTRO 25 network requires a digital transport connection back to its Prime or Master Site. For planning purposes, we recommend assuming all links be full T-1 (1.544 Mbps) bandwidth apportionment. In addition, any simulcast Prime Sites will also require a T-1 equivalent bandwidth links to the Master Site. In order to minimize impact to the existing radio system during cutover and migration Motorola recommends at a minimum the City implement new T1 circuits as per the table shown on the next page. Circuits shown in blue shading are existing CityNet circuits which could be reused with Motorola performance specification adherence commitments

2.4.6 Subscriber Upgrades The City of Philadelphia’s existing system utilizes XTS 3000 portables and ASTRO SPECTRA Consolettes and Mobiles. Upgrading these subscribers to the latest ASTRO digital technology will require software flash upgrades and in some cases board changes to allow for 9600 baud capability supported in latest ASTRO platform. Motorola will work closely with the City of Philadelphia during the transition from the SmartZone 3.0Z system to the new ASTRO25 system to ensure a smooth upgrade of these units. When the XTS 3000s and ASTRO SPECTRA are upgraded to support the ASTRO 25 9600 baud capability the XTS 3000 will not be capable of supporting advanced features of the ASTRO 25 platform. These features include OTAR, OTAP/POP25 and text messaging. The XTS 3000s will continue to provide the same basic subscriber functionality as exists today with the SMARTZONE 3.0z system and they will operate on both the old and new systems during cutover. The chart below indicates the features lost upgrading the XTS3000s to ASTRO 25 Digital Trunking. What You Gain

ASTRO 25 Digital Trunking

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-90

What You Lose Type IIi Trunking Surveillance Mode Call Alert (Dig Conv) Radio Check (Dig Conv) Remote Monitor (Dig Conv & Type II Trunking) Selective Call (Dig Conv) Status/Message (Dig Conv) Telephone Interconnect (Dig Conv) DTMF (Analog Conv) MDC Features AMSS (Type II Trunking) Dispatch Interrupt Busy Override System Wide Call Voice On Control Dual Mode Scan (Analog/Digital 3600 cc)

Note : Dig Conv – Digital Conventional

The City of Philadelphia may or may not utilize these features, but this is a full disclosure of what features are lost when upgrading the XTS3000s to ASTRO 25 Digital Trunking.

City of Philadelphia ASTRO 25 Upgrade System Description June 13, 2008 2-91

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-92

2.5

Project Schedule

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008

2-93

Project Schedule (continued)

City of Philadelphia ASTRO 25 Upgrade

System Description June 13, 2008 2-94

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Section 3. Statement of Work 3.1

General Information This Statement of Work (SOW) defines the principal activities and responsibilities of all parties for the implementation of the Project 25 800 MHz Project 25 Radio Communications System upgrade for the City of Philadelphia (City). Notwithstanding anything to the contrary in this Section 3 or elsewhere in Amendment No. 3 or Appendices thereto, Motorola shall perform all tasks and activities and provide all Equipment, Documentation, and Software required to deliver the Project Upgrade in accordance with Performance Standards (including, without limitation, Coverage Requirements) and Functional Requirements. The System Description, Section 2 of Appendix A, sets forth the Equipment to be implemented for the Project Upgrade. Deviations from and changes to this SOW are subject to mutual agreement between Motorola and the City and shall require a Change Order pursuant to Article 8 Changes, of the 1999 Contract. In the event any provision of this SOW conflicts with or varies from Amendment No. 3 or the 1999 Agreement, as amended, Amendment No. 3 and the 1999 Agreement, as amended, shall govern.

3.2

Statement of Work Overview The following major subsystems are included as components of the Project Statement of Work:

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-1



Project 25 SmartZone Master Site System ♦ RF Site P25 New GTR8000 Base Radios ♦ Console Dispatch System Upgrades ♦ Subscriber P25 Upgrades ♦ New P25 Subscribers Capitalized terms not otherwise defined in this SOW shall have the meanings provided in the body of Amendment No. 3, and if not there provided, shall have the meanings provided in the 1999 Agreement. Note: Unless otherwise indicated from the context in which it is used, the word “system” or “System” will be used herein to refer to the compilation of the foregoing subsystems, together with all interfaces and ancillary systems that are required for the Upgrade Project to conform to Amendment No. 3 and the 1999 Agreement, as amended.

3.3

System Implementation Overview Motorola shall provide systems integration and implementation services and all other services required to deploy a fully functional communications system in accordance with Amendment No. 3, Appendices thereto, and the 1999 Agreement, as amended. Motorola’s experience as a Systems Integrator, deploying large and complex communication and software systems, will provide a smooth system implementation and cutover to the new communications system. This SOW specifically addresses the implementation of the City’s Project 25 upgrade. Motorola’s local Systems Integration teams are highly skilled at deploying systems of the size and complexity of this communications system. Motorola provides a phased approach to implementation, with the following phases: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Project Initiation and Kick Off Design Review Site Audits and Civil Review Order Processing, Manufacturing & Factory Testing Installation and Upgrades Systems Integration & Optimization Acceptance Testing Training

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-2



Cutover ♦ Project Finalization ♦ Warranty Support Motorola has provided a preliminary design as a part of this proposal, which serves as a baseline for the Design Review. The Design Review encompasses the design finalization of the major subsystems, including but not limited to, finalization of the site space and power requirements, Acceptance Test Plans, and Cutover plan. Motorola will work closely with the City to develop a detailed cutover plan to transition to the new communications system, such plan to be approved by the City in writing prior to installation of the System. At the end of the Design Review phase, detailed Design Documents will be provided to the City. While the Design Review progresses, Motorola will work in parallel to perform site audits, identifying any site issues associated with the implementation of the new system. Motorola will perform upgrades to electrical systems to ensure adequate power to the new and old equipment during the transition to Project 25 operations. Factory staging of the radio infrastructure at Motorola’s Customer Center for Solutions Integration (CCSi) in Schaumburg, Illinois follows equipment manufacturing. Factory staging provides for initial assembly and testing of all Motorola manufactured radio system components. The P25 upgrade is composed of both new and existing equipment. The new components allow the Project 25 Master Site to be staged and tested with equipment from trunked RF sites. This allows the system to be configured as closely as possible to its final configuration during factory staging. Factory staging will allow testing of the functional capabilities of the communications system. This process will allow the City to witness factory testing in a controlled environment, as well as provide a smooth and easy field installation. Except as agreed otherwise by the City in writing, Motorola shall not proceed with System implementation beyond factory staging unless or until the City has accepted and approved, in writing, the configuration of the System implemented in factory staging and all factory test results. Motorola’s local implementation team will install and optimize the communications system at the City sites as staged at CCSi. Motorola’s implementation includes the integration of all proposed subsystems to provide an end-to-end solution. To close the loop between proposed functionality with the deployed system, Motorola will execute Acceptance Testing according to an Acceptance Test Plan (ATP) approved by the City in writing as set forth in Section 3.7.6. Following Functional Acceptance Testing, Motorola and the City will begin the cutover to the new system. Motorola will provide just-in-time training, scheduled in

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-3

coordination with the City and the cutover schedule, to ensure a smooth transition to the communications system. Motorola shall maintain all Operational Communications Functionality of the City’s current 800 MHz Radio System, as it exists at the Effective Date of this Amendment, through the City’s Conditional Acceptance of Project Milestone #19 (Transition SmartZone 3.0 to SmartX and New ASTRO25 Mastersite (3600 A & B Simulcast System – Embassy / Elite console system) as set forth in the Project Schedule attached as Appendix G to Amendment No. 3. After Conditional Acceptance of Project Milestone #19 Motorola shall maintain all such Operational Communication Functionality on the Upgrade System through Final Acceptance and thereafter. Provided, however, that during the Cutover only, communications shall be maintained as provided in accordance with the Cutover Plan developed during the Detailed Design Review and accepted by the City in writing. The final steps to full system implementation are delivery of system documentation, Punchlist resolution, and Final Acceptance. The project team and the post-acceptance service team will work with the City during this phase, to ensure a smooth transition to post acceptance support period.

3.4

Detailed Description of Work The work required by this SOW is divided up into the following tasks: Title, Objective, Task Description, Motorola and the City Responsibilities and Completion Criteria, including project Deliverable(s). Notwithstanding the inclusion of Completion Criteria in this SOW, the Milestones identified in Appendix F (Milestone Payment Schedule ) are subject to Article 7 (Acceptance), as amended. The scheduled dates of tasks are depicted in the Project Schedule.

3.5

General Project Responsibilities The following general project responsibilities, not defined by specific tasks, include:

3.5.1 Motorola Responsibilities Motorola will designate a Project Manager who will direct Motorola’s efforts and serve as the primary point of contact for the City. The Motorola Project Manager will have significant authority to make certain decisions relative to the project, on behalf of Motorola, and will have direct access to Motorola’s executive management for

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-4

resolving problems beyond the Project Manager’s immediate authority. The responsibilities of the Motorola Project Manager include: ♦



♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

♦ ♦



Participate with the City in progress review meetings at least once a month and submit monthly status reports that identify the activities of the previous review period, as well as activities planned for the upcoming review period, including an updated Project Schedule. Maintain project communications with the City Project Manager. If requested by the City, Motorola shall conduct such progress review meetings and submit such status reports more frequently, up to once each week. Maintain project communications with the City Project Manager, and project team members. Motorola will provide a record of correspondence as part of the progress reports provided prior to each progress meeting. Maintain a documentation schedule that identifies and shows the status of documents to be transmitted for review during the next two reporting periods. Participate in weekly or monthly conference calls or face-to-face meetings and issue a mutually agreed upon agenda for each call or meeting. Manage the efforts of Motorola staff and coordinate Motorola activities with the City project team members. Measure, evaluate and report the progress against the Project Schedule. Resolve deviations from the Project Schedule. Monitoring and management of risks via Risk Management Plan. Monitor the project to ensure that support resources are available as scheduled and as identified in the contract. Assume accountability for all Motorola contractor and subcontractor supplied tasks within the Project Schedule. Coordinate and oversee the installation of all licensed Motorola application software. Review and administer change control procedures through the City Project Manager, commonly referenced as a “Project Change Request” (PCR), issued by the Motorola Project Manager. Provide timely responses to issues related to project progress raised by the City Project Manager. Work with the City Project Manager in designing and approving the format of an action item log to be used in conjunction with the Project Schedule. The purpose of the log is to identify outstanding issues, provide continual status updates on specific tasks and to identify responsibilities of the parties. Prepare and submit a monthly status report that identifies the activities and milestones completed in the previous month and activities planned for the current month and the next month, including progress and payment milestones, and an updated Project Schedule.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-5

3.5.2 City Responsibilities The City will designate a Project Manager who will direct the City efforts and serve as the primary point of contact for the City. The City Project Manager will have significant authority to make certain decisions relative to the project, on behalf of the City, and will have direct access to the City executive management for resolving problems beyond the Project Manager’s immediate authority. The responsibilities of the City Project Manager include: ♦ ♦ ♦

♦ ♦ ♦ ♦ ♦ ♦





♦ ♦



Maintain project communications with Motorola’s Project Manager. Identify the efforts required of the City staff to meet the City task requirements and milestones in the Statement of Work and Project Schedule. Review the preliminary Project Schedule with Motorola’s Project Manager and assist Motorola in developing a detailed Project Schedule defining the detailed tasks and a schedule of Motorola and the City responsibilities. Measure and evaluate progress against the Project Schedule. Monitor the project to ensure that support resources are available as scheduled. Participate in weekly or monthly conference calls or meetings. Participate in Progress Reviews every month. Provide timely responses to issues related to project progress raised by Motorola’s Project Manager. Liaison and coordinate with other Local, State, and Federal agencies, other governmental agencies and the City vendors, contractors and common carriers where it is reasonably necessary for the City to perform such liaison and coordination activities. Review and administer change control procedures, hardware and software certification (i.e. Acceptance as provided in the 1999 Agreement, as amended), and all related project tasks in a timely manner. Approve payments in a timely manner, as provided in Amendment No. 3 and the 1999 Agreement, as amended, and subject to delivery and acceptance of project deliverables in accordance with Amendment No. 3 and the 1999 Agreement, as amended. Ensure that all appropriate City personnel attend and actively participate in Progress Reviews, conference calls, and other project meetings. Assign one or more personnel, as reasonably determined by the City, who will work with Motorola staff as needed for the duration of the project, including at least one system administrator. Ensure acceptable Standard Change Request and Approval Letter(s) are approved by authorized signature(s) in accordance with Amendment No. 3 and the 1999 Agreement, as amended.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-6



Work with Motorola personnel in designing and approving the format of an action item log to be used in conjunction with the project schedule. The purpose of the log is to identify outstanding issues, provide continual status updates on specific tasks and to identify responsibilities of the parties.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-7





♦ ♦ ♦ ♦ ♦

3.6

Provide building access to Motorola personnel to all facilities where the system is to be installed during the project, subject to City security regulations and hours of access. Temporary identification cards should be issued to Motorola personnel if required for access to the City facilities. Access must be available after business hours where necessary to perform the work or meet the project schedule. Provide any required parking permits to Motorola personnel for restricted access entry and/or parking where the Department of Public Property has the authority to issue the permits. Provide the appropriate fire inspection and building inspection certificates. Provide adequate space, electrical, HVAC, communications lines and environmental conditions for the Equipment to be installed by Motorola. Provide sites that meet Motorola’s R56 Site Standards. Provide all travel accommodations for visits to Factory Testing. Provided that the City and Motorola agree the Detailed Design Review documentation is satisfactory to both, review and approve or revise delivered design documents within fifteen calendar days of submission.

Contract Initiation - Kickoff Meeting and Initiation Activities The project will be initiated with a Project Kickoff meeting including key the City and Motorola project participants. The objectives of the Kickoff meeting include: ♦ ♦ ♦ ♦ ♦ ♦

Introduce and exchange contact information of all project participants. Review roles of key participants and project review procedures. Establish a clear chain of communication and authority. Review overall project scope and objectives. Review resource and scheduling requirements. Review preliminary project schedule with the City.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-8

During the Project Initiation phase, Motorola will review and work with the City to finalize the following project processes and procedures and shall deliver the following documents for City review by the times specified in Appendix G Preliminary Project Schedule for the Detailed Project Schedule, and for the other documents, by the times specified in the Detailed Project Schedule: ♦

Detailed Project Schedule ♦ Risk Management Plan ♦ Change Control Plan ♦ Issues Document and Action Item Log Motorola shall revise the foregoing documents as reasonably required by the City. Motorola shall not proceed with the Work unless or until the City has approved these documents in writing or agreed otherwise in writing.

3.6.1 Responsibility Matrix Task Initiate the City’s Project 25 upgrade project with a Kick Off Meeting. Begin creating Risk Management Plan Define format of the Issues and Action Item Log. Review change control procedures with the City Project Manager. Work with Motorola personnel in finalizing and approving the Change Control Plan. Provide current system documentation.

Responsibility Motorola and the City

Deliverable Documented project personnel names, responsibilities, contacts, and project review procedures

Motorola

Initial Risk Management Plan

Motorola

Initial Issues and Action Item Log

Motorola

Initial Change Control Plan

City

Initial Change Control Plan as approved by City

Motorola and the City

Existing System Documentation

Completion Criteria This task is considered complete when the Project Kickoff Session has been held with Motorola and the City representatives in attendance and project scope, schedules, procedures, roles and responsibilities are documented and agreed upon within ten (10) calendar days of the Project Kickoff Meeting.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-9

3.7

Design Review The City and Motorola will review the Motorola’s Project 25 upgrade design through analysis of the system functionality, interface requirements, and end-user requirements, all of which shall be subject to the City’s written approval. Motorola will present all design documents to the City for its review. Design Review tasks and responsibilities are described in greater detail in the following sections of this SOW. Draft and Final versions of documents will be provided to the City for review and approval or rejection that will finalize the design review process, with the exception of ATPs, the development of which is governed by Section 3.7.6. Absent the City’s written agreement otherwise, the Work shall not proceed unless or until the City approves the design and Motorola’s documentation of the design (design documents) in writing. Motorola and the City deliverables and responsibilities are defined in the Responsibility Matrix below.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-10

3.7.1 Responsibility Matrix Task Site surveys will be conducted at each site where new or upgraded equipment will be installed. A cutover plan will be developed. The City will provide existing system and user information, such as shift information and specific vehicle information which must be taken in to account to develop a Cutover plan

Responsibility

Deliverable

Motorola and the City

Site Surveys

Motorola and the City

Cutover Plan

Motorola and the City will finalize the project implementation schedule.

Motorola and the City

Project Schedule

The System Acceptance Test Plan will be reviewed.

Motorola

Acceptance Test Plan

Motorola

Equipment List System Description System Drawings Statement of Work Project Schedule Change Orders (as necessary)

Motorola will deliver a Design Document that reflects changes in design and scope, as well as definition of details determined during the Design Review. Motorola will update the equipment list as necessary to accommodate the specifics of the Design Review. Motorola will update the System Description to reflect changes in the system design. Motorola will update the system drawings and documentation to reflect changes in the system design. Motorola will update the SOW to reflect changes in the implementation scope. Motorola and the City will finalize the implementation schedule. Motorola will submit a final Design Document to the City through the change order process. This document will be baselined by the System Description, SOW, Project Schedule, and other documentation provided prior to contract approval.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-11

Task The City will review the work performed by Motorola (i.e. the Motorola deliverables identified above) and provided all deliverables conform to Amendment No. 3 and the 1999 Agreement, as amended, will issue its written notice of acceptance or rejection as set forth in Section 3.4 of the 1999 Agreement, as amended by Section 3.2 of Amendment No. 3, with the exception of ATPs, the development of which is governed by Section 3.7.6.

Responsibility

Deliverable

Approval/Rejection Statement

City

3.7.2 Site Survey/Preparation Site inspections will be conducted during this phase of the project. All equipment locations will be audited for site ready purposes and Motorola will prepare a Site Audit Report for each location. Where Motorola is providing civil work, Motorola will implement facilities that meet the site readiness / R56 requirements. Site surveys are executed as an integral part of installation preparation. This section addresses the facilities where the City is responsible for site readiness. Such City responsibility is subject to the City’s written approval of the applicable Site Audit Report, which approval shall not be unreasonably withheld. Responsibility Matrix Task Site Access: Subject to City security regulations and hours of operation, the City will assure reasonable site access to inspect equipment installation sites, finalize equipment locations and determine if any course of action is necessary to handle installation constraints. The City will provide existing site and system drawings as available. Site Readiness Audits: Motorola will perform a R56 site audit to verify site readiness. Motorola will prepare a report that includes recommendations detailing site preparation required to provide a suitable environment for installation of the equipment. This report will become part of the final system documentation.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-12

Responsibility

Deliverable

City

Reasonable Site Access And Existing System Documentation

Motorola

Site Audit Reports

Task Electrical Upgrades: Motorola will upgrade the existing electrical systems at each site to support the additional equipment operating in parallel with the existing equipment during the cutover period. Floor Loading Motorola will perform a structural analysis on the from in Room 626M to verify that the slab is sufficient to support the weight of the new equipment during cutover. Motorola assumes that the floor can support the load. Subject to Section 3.3 of the 1999 Agreement as amended, the City will prepare all sites for the equipment implementation, based on the recommendations in the Site Walk Reports as approved and agreed to by the City in writing, unless preparation is provided by Motorola as part of this Appendix A. As set forth in Section 3.5 of the 1999 Agreement as amended and with the cooperation of Motorola and subject to the Philadelphia Code and applicable regulations, the City will apply for the necessary FCC license and zoning requirements As set forth in Section 3.5 of the 1999 Agreement as amended, obtain all licenses, permits, and approvals required by any federal, state of local government body (other than zoning or FCC approval) for the performance of the work required for the project.

Responsibility

Deliverable

Motorola

Electrical Upgrades

Motorola

Structural Analysis

City

The City Sites Meeting Site Readiness Conditions

City

Approved FCC Licenses and Zoning permissions

Motorola

All licenses, permits, and approvals

Completion Criteria This phase is considered complete when all necessary site improvements have been implemented by the City and verified as complete.

3.7.3 Develop Cutover Plan The implementation of the Project 25 upgrade will require a detailed cutover plan, which plan will be subject to the City’s review and written approval, for a smooth transition of the existing system components into an integrated network with the new Project 25 equipment. Responsibility Matrix Task

Responsibility

Deliverable

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-13

Task The City of will provide existing system and user information, such as specific vehicle information which must be taken in to account to develop a detailed cutover plan The Project 25 upgrade cutover plan will be developed. It will take in to account the need to minimize the impact to users migrating to the Project 25 upgrade system.

Responsibility

Deliverable

City

Existing System and User Information

Motorola

Cutover Plan

Completion Criteria This task is considered complete upon the City’s written approval of the Project 25 upgrade cutover plan.

3.7.4 Finalize Project Schedule The objective of this task is to finalize the preliminary Project Schedule contained in the initial contract based upon the requirements identified and the associated project objectives, plans, schedules, approvals, priorities and inter-dependencies among tasks. The Project Schedule will be finalized through the change order process and mutually agreed upon between the parties. The resulting document defines the specific project tasks to be completed and documents the final Project Schedule for each subsystem to be implemented.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-14

Responsibility Matrix Task Review with the City personnel the identified implementation tasks, priorities, interdependencies and other requirements needed to establish the final Project Schedule Analyze with Motorola project personnel the identified requirements and make such implementation decisions as are reasonably required to finalize the Project Schedule Prepare the final Project Schedule document and deliver it to the City. Review the Project Schedule with the City personnel and make changes and/or corrections that are mutually agreed upon through the change order process Review the final Project Schedule and identify in writing any specific deficiencies. Maintain the Project Schedule as provided in Section 5.1 of the 1999 Agreement as amended.

Responsibility

Deliverable

Motorola

Project Schedule Review

City

Project Schedule Review

Motorola

Project Schedule Finalization

City

Project Schedule Approval/Rejection

Motorola

Update Project Schedule

Completion Criteria This task is considered complete upon mutual written agreement of the parties to implement in accordance with the final project schedule. This final Project Schedule will become the governing Project Schedule incorporated into the contract, but is subject to change upon mutual written agreement of the parties.

3.7.5

Finalize Hardware and Fixed Equipment Design Requirements Motorola will present design materials and the design approach of the Fixed Equipment during the Design Review. Motorola and the City deliverables and responsibilities are defined in the Responsibility Matrix below. Responsibility Matrix Task Motorola and the City will review the coverage.

Responsibility Motorola and the City

Deliverable Agreement of coverage ATP

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-15

Task Site Acquisition Floor space and Tower space have to be secured for the equipment sites.

As set forth in Section 3.5 of the 1999 Agreement as amended and with the cooperation of Motorola and subject to the Philadelphia Code and applicable regulations, the City will apply for all necessary zoning permits and/or zoning variances. As set forth in Section 3.5 of the 1999 Agreement as amended, obtain all licenses, permits, and approvals required by any federal, state of local government body (other than zoning or FCC approval) to install antennas for equipment sites if required.

Responsibility

City

Deliverable Lease or agreements to use the site and tower. Identification of floor space available and tower space available for the City equipment

City

Zoning Permits or Zoning Variances

Motorola

Permits and guidelines/limitations to install antennas and supporting equipment

3.7.6 Acceptance Test Procedures Motorola will review the Acceptance Test Procedures (ATP) with the City to provide an understanding of procedures used for testing the functionality and performance of the system. The ATP shall be subject to the City’s written acceptance and approval in accordance with Section 7.3 Acceptance Test(s); Test Plan(s) in Amendment 3 and in the 1999 Agreement, as amended. The ATP, as accepted and approved by the City in writing, establishes a framework for the City system acceptance; acceptance shall be governed by Article 7 of the 1999 Agreement, as amended by Section [7] of Amendment No. 3. Subject to this Section 3.7.6, the ATPs will be finalized for the City’s Project 25 upgrade project as a part of the design review process. The ATPs, as approved and accepted by the City in writing, shall include the mutually agreed to acceptance criteria to ensure the equipment operates in accordance with the specifications identified in the contract. Motorola to submit the final ATP document for each test plan to include Fixed Network Equipment Installation Acceptance, Subscriber Equipment Installation/Programming Acceptance, Functional Acceptance Tests (Factory Staging and Field), Coverage Acceptance Tests, and four 30-Day Reliability Tests, in each case sixty days before testing is scheduled to begin. The City will provide its written notice of approval or rejection no less than thirty days before each of these test periods begin.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-16

Responsibility Matrix Task Work with the City in finalizing the ATPs. Review the overall approach to testing including hardware and software. The review will be based on the Acceptance Test Plan included with this proposal. Work with Motorola in finalizing the ATPs, using the ATPs submitted with this proposal as a baseline. Provide related information requested by Motorola to assist Motorola in completing the ATP. Review the baseline ATP document and identify in writing any specific deficiencies.

Responsibility

Deliverable

Motorola

Review ATPs and Methodology

City

Review ATPs, provide written information and feedback

Submit a final ATP document to the City for approval.

Motorola

Final ATPs

Review and approve the final ATP on a test by test basis.

City

Approval of Final ATPs

Completion Criteria: This task is considered complete upon the City’s written acceptance and approval of the ATP.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-17

3.8

Order Processing

3.8.1 Description Motorola will place factory orders for the system hardware that is being purchased for the communications system. Motorola will place orders for required third-party equipment and execute major subcontracts. Responsibility Matrix Task Factory orders placed for all Motorola manufactured equipment Order placed for all third-party equipment Motorola will execute major subcontracts

Responsibility Motorola Motorola Motorola

Deliverable Orders for Motorola manufactured equipment Third-Party Equipment Orders Subcontracts in place

Completion Criteria This phase is considered complete when all equipment orders have been placed.

3.9

Manufacturing and Factory Testing

3.9.1 Description During this phase of the project, all equipment for the City’s Project 25 upgrade is manufactured, the system is Factory Staged, and shipped. Completion Criteria This phase is considered complete when Manufacturing and Development, Template Development, and Factory Staging are complete and approved by the City in writing.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-18

3.9.2 Manufacturing Description The Manufacturing activities commence after order processing. Responsibility Matrix Task Manufacture equipment and track third-party equipment orders.

Responsibility Motorola

Deliverable Communications System Hardware

3.9.3 Template Development Description Equipment programming and configurations are defined during the activity of Template Development. Equipment programming and configurations will be determined as defined in the responsibility matrix below. The City and Motorola will review the City’s Project 25 upgrade operational requirements and the impact of those requirements to various equipment configurations. Responsibility Matrix Task Motorola will provide technical information to the City to aid in determining equipment configurations and programming requirements. The City will finalize the equipment configurations requirements. Motorola will develop templates for the following dispatch system components: ASTRO® 25 Master Site Equipment CENTRACOM Gold Elite System and the subscribers

Responsibility

Deliverable

Motorola

Standard Configuration and Programming Documentation

City

Configuration Requirements

Motorola

Voice Dispatch Templates

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-19

Task Motorola will develop templates for the mobile and portable equipment. Motorola will: Upgrade 800 existing templates prior to the Astro 25 upgrade Downgrade the upgraded 800 existing City of Philadelphia templates after the Astro 25 upgrade. Not own any of the existing or upgraded templates. Motorola will provide and review templates and configuration detail as defined by the City requirements, for the City approval. The City will review the template development work performed by Motorola and provided the work conforms with City requirements and Amendment No. 3, issue its written acceptance or rejection of the work, as well as: --The City will have 800 templates ready to upgrade prior to the ASTRO 25 upgrade. --Motorola and the City agree; (i) that any templates over 800 will be billed at a rate of $150.00 to upgrade and $150.00 to downgrade (as per Contract 07194 800 MHz Radio System Maintenance Services between the City and Motorola, entered into October 1, 2006 (“Maintenance Agreement”) after the ASTRO 25 upgrade; and (ii) that Public Property will approve any and all changes to the existing 800 templates provided they meet City requirements. --The City will retain ownership of all 800 templates prior to, during and after the ASTRO 25 upgrades.

Responsibility

Deliverable

Motorola

Subscriber Programming Templates

Motorola

Template and Configuration Documentation

City

Written Programming Template and Configuration Approval/Rejection Statement

Completion Criteria This task is considered complete when the City has reviewed and approved in writing the template and configuration documents and work described above. City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-20

3.9.4 Factory Testing Description The radio system manufacturing is followed by staging the radio infrastructure at CCSi. Staging includes assembly and testing of all major radio system components. The system will be configured as it will in the field for this Factory Testing, which will exercise the functional capabilities of the communications system. This process will allow the City personnel to witness factory testing in a controlled environment, as well as providing for a smooth and easy installation in the field. Motorola will perform end-to-end system testing, from subscriber units to the dispatch console. Responsibility Matrix Task Functional Performance Testing: Motorola will perform a Functional Performance Test in order to verify the functionality of the communications system. The Functional Performance Test will include the following: Physical inspection; Thorough exercise of the hardware and software; Testing of the voice communications features, to the extent possible with the City purchased equipment; Verification of device and system recovery from failures The City will issue its written notice of acceptance, in accordance with Article [7], Acceptance, of the 1999 Agreement, as amended by Section __ of Amendment No. 3, upon, but only upon, the successful completion of all Factory Acceptance Tests and the Testing Period. Absent the City’s written agreement otherwise, Motorola shall not proceed with installation of the System on site unless or until the City issues such written notice of acceptance for Factory Tests.

Responsibility

Deliverable

Motorola

Functional Performance Tests

City

Written Acceptance of Factory Acceptance Test

Completion Criteria

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-21

This task is considered complete when the City signs a certificate of acceptance of the Factory Acceptance Test.

3.10 Site Preparation Motorola will begin work at the existing sites only after mutual agreement by the City and Motorola that the site is deemed ready. At a minimum, site ready requires a site to have adequate room in an existing building or shelter to accommodate the equipment to be installed, and electrical service and internal distribution in place. In addition, network testing must have been satisfactorily completed. Sites are required to meet or exceed the requirements as defined in the Motorola document “Fixed Network Equipment Installations” (“R56 Standard V2005”). Detailed site ready audits will be performed by Motorola after contract execution. Motorola will provide a detailed site report identifying any site deficiencies. All site upgrades not identified in this document specifically as a Motorola deliverable are the responsibility of the City. The City may, in its sole discretion, elect to contract with Motorola to perform necessary site upgrades, perform the upgrades itself, or utilize the services of a third party subcontractor. Site requirements must be met before Motorola will begin installation of system equipment. The following is a list of some, but not all, of the specific site ready requirements for this project. Motorola shall present all site ready requirements not identified below to the City at least sixty (60) days prior to the date on which the City’s site preparation work is scheduled to begin under the Project Schedule. The City shall not be obligated to make any site conform to any such additional Motorola site ready requirements unless it has approved the requirements in writing.

3.10.1 Single Point Grounding Requirement - The single point ground system is comprised of both internal and external components, which are bonded together, along with all other grounds at the site, to form the overall site grounding system. Internal - The City shall provide a single point ground system to be used on all fixed equipment supplied under this contract. The ground system must include an internal master ground point, and sub-system ground points when applicable, located within (3) feet of the Motorola supplied equipment. City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-22

External - The City shall provide an external grounding electrode system that is designed and installed in accordance to the document “Standards and Guidelines for Communications Sites - R56. The grounding electrode system shall have a design goal of 5 ohms or less and shall be met whenever possible and/or practical. The grounding electrode system shall include an interconnection to all other grounding electrode systems and utility grounds at the site.

3.10.2 Transient Voltage Surge Suppression Requirement - Transient voltage surge suppression for telephone circuits, AC power, radio frequency (RF) cabling, and all other applicable external connections and utilities are required to meet or exceed the Motorola document “Standards and Guidelines for Communications Sites - R56”.

3.10.3 Electrical Requirement – Sites must have electrical service and electrical wiring that meets all applicable city, county, state, and National Electrical Codes (NEC) requirements.

3.10.4 Equipment Space Requirement – Sites must have sufficient floor and desk space for the Motorola supplied equipment as identified in an equipment installation location document submitted by Motorola and approved (in writing) by the City.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-23

3.10.5 Environmental Conditions Requirement – Sites must have adequate environmental controls to meet the heating, ventilation, cooling, and humidity requirements for all equipment that will be installed at the site; provided, the City shall not be obligated to make any site conform to any such environmental controls or requirements unless Motorola has submitted them to the City and the City has approved them in writing.. The sites must be free of hazardous materials such as fuels, asbestos, etc. Contact Motorola to obtain specific equipment specifications required for building environmental control sizing and design.

3.10.6 Site Access Requirement – The City shall provide reasonable site access for scheduled site walks, installation, optimization, system troubleshooting and completion of ATP, subject to City security regulations and operating hours. The City shall exercise commercially reasonable efforts to provide site access including transportation to sites that are not accessible by regular four-wheel drive vehicles. The City shall be responsible for coordinating and scheduling with the Motorola Project Manager access to sites not directly controlled by the City.

3.11 Installation of Fixed Network Equipment (FNE) 3.11.1 Description Installation of the Fixed Network Equipment (FNE) consists of the radio communications infrastructure and computer equipment at the dispatch and control centers. All installations are assumed to be performed during standard business hours, Monday through Friday 8:00 AM – 5:00 PM; such assumption is reflected in the Project Schedule.

3.11.2 Responsibility Matrix Task Site Ready: The City will prepare the site for equipment installations, resolving (subject to the terms of Sections City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-24

Responsibility City

Deliverable Sites Meeting City Approved Site Preparation Requirements for

Task 3.7.2, Site Survey/Preparation and 3.10, Site Preparation) any site deficiencies identified in the Site Audit Reports as approved by the City. Sites will be ready according to the project schedule for equipment installation. General Installation Responsibilities Motorola will install the new system equipment that is provided in the equipment list. Motorola will ground and bond the site equipment to the ground system, in accordance with the R56 site installation standards. Motorola will remove and dispose of any debris that is a result of the project activities from the site. Motorola will create “As Built” documentation of the prime site installation for inclusion in the final project documentation Master Site Installation: Motorola will temporarily locate the existing SmartZone 3.0 Master Site equipment in a location to allow the Project 25 Master Site equipment to be installed in its ultimate location. Motorola will install SmartX, for the duration of the cutover. After which time, it will be removed and shipped back to Motorola. Motorola may re-cable the existing Master Site equipment as necessary to accommodate the new location. Motorola will install the new Master Site in its final location Following cutover, Motorola will remove the SmartZone 3.0 Master site and place it in a City designated location. Prime Sites Motorola will install new Prime Site controllers and comparators at each Prime Site. As required, Motorola will relocate the existing equipment to provide space for the new equipment Motorola will install the new Prime Site equipment in its ultimate location. Motorola may re-cable the existing

Responsibility

Deliverable Installation

Motorola

New Equipment Installations per Motorola’s Site Quality Standards

Motorola

Radio System Installation Audit

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-25

Task Prime Site equipment as necessary to accommodate the new location. Motorola will install the new Prime Site equipment in its final location Following cutover, Motorola will remove the SmartZone 3.0 prime site and place it in a City designated location. RF Sites: Motorola will install new GTR8000 Base Radios for Project 25 operation and install new controllers and routers at each RF site. Motorola will test the existing antenna systems to verify that they are operating correctly Motorola has provided optional pricing to install replacement antenna systems, should it be required. Motorola will upgrade the following existing equipment for Project 25 operation Central Electronics Banks Console Operator Positions

Motorola will remove the existing equipment being removed from service, as defined during the design review and place in the City designated location. Motorola and the City will conduct FNE inspection audit. The City will sign installation acceptance certificates after inspection and check out of FNE on a site-by-site, system-by-system basis. Upon successful installation of the FNE, the City will issue its notice of Conditional Acceptance on a siteby-site, system-by-system basis as provided in Article 7 of the 1999 Agreement, as amended.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-26

Responsibility

Deliverable

Motorola

Radio System Installation Audit

Motorola

Upgrade of existing console system equipment

Motorola

Decommissioned Equipment removals

Motorola and the City

Inspection Audit Report

City

Notices of Conditional Acceptance on a siteby-site, system-bysystem basis

3.11.3 Completion Criteria This task is considered complete when the City reviews FNE installations with Motorola and issues its notice of Conditional Acceptance as provided in Article 7. The installation of each FNE subsystem must be completed for this phase of the project to be considered complete.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-27

3.12 Subscriber Equipment Upgrade 3.12.1 Description Motorola will provide Project 25 software and hardware upgrades to existing portable and mobile radios (Subscriber Equipment), as well as new subscribers per the equipment list, during this phase of the project. The installation Subscriber Equipment in City-designated vehicles will be accomplished in phases, agency by agency, and as determined by the cutover plan described in Section 3.7.3, Develop Cutover Plan, and elsewhere in this SOW. Installation in City vehicles will occur in accordance with the cutover plan in a manner that will minimize impact to the City’s operations. An installation crew of adequate size to complete up to ten vehicle installations per day will be on-site; up to three locations will be used for vehicle installations. The City will provide locations for the vehicle installations. All vehicle installations will occur during normal business hours, Monday – Friday, from 8:00 AM to 5:00 PM. The City will designate a person as point of contact (POC) for each department with vehicle installations. The POC will ensure that the vehicles and portable radios are delivered for the upgrade as agreed upon in the cutover plan. New vehicle equipment will be installed and the installation will receive a postinspection to verify the quality of the installation. This acceptance procedure will be run by the installer and witnessed by Motorola and the City. Upon successful completion of the acceptance test, the vehicle will return to service, considered conditionally accepted. Task

Responsibility

Deliverable

Ten vehicles per day available for pre-installation inspections and equipment installations.

City

Vehicles Available

Installation of new vehicle equipment – equipment for up to 10 vehicles per day to be installed.

Motorola

Installed Mobile Radios

Installation inspections and witness of execution of vehicle ATPs; acceptance or rejection of installations in accordance with applicable ATPs

City

Vehicle Acceptance/ Rejection per ATPs

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-28

Task Motorola: o Will program up to 9,400 City of Philadelphia subscriber radios before ASTRO 25 upgrade. o Will downgrade the upgraded City of Philadelphia subscribers after the ASTRO 25 upgrade. o Agrees to have six two-man teams in place for a four-week period before ASTRO 25 upgrade and six two-man teams in place for a four-week period after the ASTRO 25 upgrade. o Agrees that programming of radios not made available to Motorola for programming during each four-week period will be billed on a per radio basis of $75.00 each to the City (as per the Maintenance Agreement). City of Philadelphia: o Will have up to 9,400 subscribers available to program in a four-week period before the ASTRO 25 upgrade and available to program in a four-week period after the ASTRO 25 upgrade, and work with Motorola with the six two-man teams. o Agrees that programming of radios not made available to Motorola for programming during each four-week period will be billed on a per radio basis of $75.00 each to the City of Philadelphia (as per the Maintenance Agreement). o Agrees that Public Property will be scheduling and contacting all departments to coordinate any and all pickups with Motorola personnel. o Agrees that any and all radios will have proper documentation prior to each re-program including: Alias ID, City ID number, serial number, Template in radio and the End user department. o Agrees that for any radios that do not have basic information, it will be the responsibility of the City to get that information prior to programming. o Will approve all subscriber radios after each reprogram in a timely manner, according to the mutually agreed upon project schedule. o Will retain ownership of all subscriber radios prior to, during and after ASTRO 25 upgrades.

Responsibility

Deliverable

Motorola

Subscribers programmed

City

Identified tasks for programming subscriber radios

3.12.2 Completion Criteria This task is considered complete when the City has reviewed all vehicle installations with Motorola and has approved all installations by signing the installation check City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-29

sheets. The installation and upgrade of subscriber equipment must be completed and accepted by the City in writing for this phase of the project to be considered complete.

3.13 Systems Integration and Optimization 3.13.1 Description During this phase of the project, Motorola will configure, optimize, and program all system equipment. Motorola will integrate all of the Motorola provided subsystems identified in Section 2 (System Description) of this Appendix A, as well as integrate City provided T1 Network, site equipment, 911 recording system, and communications consoles and other City provided systems and equipment that are necessary for the operation of the ASTRO 25 Network. Motorola technologist(s) will be onsite throughout this phase and will prepare the System for acceptance testing.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-30

Motorola technologist(s) will maintain a punch list of items that require resolution. The City will be responsible for directing the activities of non-Motorola subcontractors and supporting City agencies. The City is also responsible to coordinate all on-site integration activities that are the City’s responsibility under this SOW, including assistance to Motorola for system testing requiring participation from City contractors other than Motorola. Motorola and the City will each ensure that their respective subcontractors and contractors perform in accordance with the Project Schedule. Task Provide and install all communication lines and equipment that are not Motorola provided deliverables, as identified in the Detailed Design Review. Provide liaison with agencies and vendors that must support System implementation. Ensure that the necessary technical support is made available for installation and testing requiring third party vendors and interfaces with City systems other than the System Install, integrate and test the hardware, software and interfaces as specified in the contract. Maintain a punch list of items that need resolution Manage the resolution of punch list items.

Responsibility

Deliverable

City

City Provided Equipment and Interfaces with City systems as Required for Integration

Motorola

Installation and Integration of Equipment

Motorola

Punch list Resolution

3.13.2 Completion Criteria This task is considered complete when the system is ready for acceptance testing.

3.14 Acceptance Testing 3.14.1 Description Motorola proposes a multi-level acceptance testing procedure. This process provides multiple checkpoints for the City to oversee the overall progress that is being made as the communications system implementation progresses. The Acceptance Test Plan is composed of Equipment Installation Acceptance, Functional Acceptance Tests City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-31

(Factory Staging and Field), Coverage Acceptance Tests, and a total of 120-Day Reliability Test which is composed of four 30-Day Reliability Tests. Not withstanding anything to the contrary contained in this Appendix A, all testing described herein is subject to Article 7 of the 1999 Agreement as amended by Section 7 of Amendment No. 3.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-32

3.14.2 Equipment Installation Acceptance Description Equipment installations will be inspected to ensure adherence to quality standards as set forth in _R56. Equipment installation acceptance will occur on a site-by-site, system-by-system basis. Responsibility Matrix Task Control Site Installation Inspection

Responsibility Motorola

Fixed Equipment Subsystem Installation Inspections Subscribers

Motorola

Dispatch Site Installation Inspections

Motorola

Issue written notice of approval or rejection of Installation Inspection Audit Reports and Programming Audit Reports on a site-by-site, system-by-system basis

City

Motorola

Deliverable Installation Inspection Audit Report Installation Inspection Audit Report Programming Audit Report Installation Inspection Audit Report Written Notice of Approval or Rejection of Installation Inspection Audit Reports and Programming Audit Reports on a site-by-site, system-by-system basis

Completion Criteria This task is considered complete when the City has issued its written notice of approval or rejection of Installation Inspection Audit Reports and Programming Audit Reports on a site-by-site, system-by-system basis.

3.14.3 Functional Tests Description System Functional Acceptance Tests will be performed when the system optimization is complete. A complete list of Functional Acceptance Tests is included as an appendix to the functional system description. If deficiencies are found during the testing, both the deficiencies and resolutions to the deficiencies shall be documented and agreed upon. Motorola is responsible for the City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-33

resolution of the documented deficiencies using a punch list as a controlling document for resolution planning. Any system testing that the City wants performed that is not specified in the ATP section of this proposal must be reviewed by Motorola for feasibility and acceptability. Any additional tests will represent a change in the project’s scope. Upon completion of the acceptance testing, the City will acknowledge system acceptance by signing the System Acceptance document per the terms of the contract. Responsibility Matrix Task Motorola will perform System Functional Acceptance Tests for the communications system. During each test, test results will be recorded for review and approval of the test. Upon successful completion of each Acceptance test on a site-by-site and system-by-system level, the City and Motorola will sign acceptance certificates documenting acceptance.

Responsibility

Deliverable

Motorola

Execution of Functional Acceptance Testing

City

Written Approval or Rejection of Functional Acceptance Testing

3.14.4 Coverage Acceptance Tests Description Coverage Acceptance Tests will be performed when the RF site and control equipment installations and optimization are complete. A detailed Coverage Acceptance Test Plan (CATP) is included in this proposal and defines the scope of the CATP, subject to revision as set forth in Section 3.7.6. Responsibility Matrix Task Motorola will perform Coverage Acceptance Tests for the City’s Project 25 upgrade. During each test, test results will be recorded for review and approval of the test. Upon successful completion of the coverage acceptance test, the City will issue a notice of Conditional

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-34

Responsibility

Deliverable

Motorola

Execution of Coverage Acceptance Tests

City

Written Approval of Successful Coverage Acceptance Testing

Task Acceptance as set forth in Article 7 of the 1999 Agreement, as amended.

Responsibility

Deliverable

Completion Criteria This task is considered complete when the City has issued a notice of Conditional Acceptance as set forth in Article 7 of the 1999 Agreement, as amended.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-35

3.14.5 Reliability Test Description Four 30 day Reliability Tests will be conducted as set forth in Section 4.9 System Reliability Test. Responsibility Matrix Task Motorola will conduct the first 30 day Reliability Test of the core IP network components of the ASTRO 25 Upgrade Project as set forth in the Final Implementation Schedule. Upon successful completion of the first 30 day Reliability Test, the City will issue a notice of Conditional Acceptance as set forth in Article 7 of the 1999 Agreement, as amended. Motorola will conduct the second 30 day Reliability Test following cutover of the existing 3600 Simulcast Systems A & B to the new ASTRO 25 Master Site via SmartX as set forth in the Final Implementation Schedule. Upon successful completion of the second 30 day reliability test, the City will issue a notice of Conditional Acceptance as set forth in Article 7 of the 1999 Agreement, as amended. Motorola will conduct the third 30 day Reliability Test after migration, during which time the system will be used for its intended purpose as set forth in the Final Implementation Schedule. Upon successful completion of the third 30 day reliability test, the City will issue a notice of Conditional Acceptance as set forth in Article 7 of the 1999 Agreement, as amended. Motorola will conduct the fourth 30

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-36

Responsibility

Deliverable

Motorola

Test Result Report

City

Notice of Conditional Acceptance

Motorola

Test Result Report

City

Notice of Conditional Acceptance

Motorola

Test Result Report

City

Notice of Conditional Acceptance

Motorola

Test Result Report

Task day Reliability Test during which time the system will be used for its intended purpose as set forth in the Final Implementation Schedule. Upon successful completion of the fourth 30 day reliability test, the City will issue a notice of System Acceptance as set forth in Article 7 of the 1999 Agreement, as amended.

Responsibility

City

Deliverable

Notice of System Acceptance

Completion Criteria This task is considered complete when the City has issued its written notice of System Acceptance.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-37

3.15 Training The purpose of the Training Program is to provide the City with a set of training sessions that will ensure the successful integration of the system into daily fleet operations. Upon completion of the training program, the City personnel will be able to operate and manage the system, enabling the City to provide a smoother and more efficient operation of the system. Motorola will conduct their standard training courses, according to the Training Plan, to thoroughly train the City personnel on the use of the systems and the City technical personnel on the operation and support of the system.

3.15.1 Responsibility Matrix Task Motorola will schedule the training classes defined in the training plan with the City personnel and the training provider. The City will provide the facility for all scheduled training classes. The City will provide access to the system equipment required for training, as defined in the Training Plan. Upon approval of Field Performance Tests, Motorola will provide training to designated personnel in accordance with the Training Plan.

Responsibility

Deliverable

Motorola

Scheduled Training Classes

City

Training Facility

City

Equipment for Training

Motorola

Deliver Training

3.15.2 Completion Criteria This task is considered complete when the training has been delivered as described in the Training Plan.

3.16 Cutover to New System Operations 3.16.1 Description Following the successful completion of the Functional Acceptance Tests, Motorola will begin cutover of the remainder of the users to the new communications system. This phase will follow the approved cutover plan. In developing the cutover plan,

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-38

Motorola will develop a transition to the new system that minimizes the operational impact to the City.

3.16.2 Responsibility Matrix Task Motorola will review the communications system acceptance status, cutover plan, and schedule system cutover with the City. The City will confirm the cutover plan and cutover planning for execution of the system cutove r by issuing a written notice of acceptance or rejection of the Completed Cutover Checklist. Motorola and the City will execute the cutover plan. Where an existing system is being taken out of service, Motorola will reconfigure new equipment as necessary to delete access to the old equipment. Motorola will remove equipment being taken out of service.

Responsibility

Deliverable

Motorola

Completed Cutover Checklist

City

Written Notice of Acceptance or Rejection of CutoverChecklist

Motorola and the City

Cutover to New System Operations

Motorola

Post Cutover Reconfiguration

Motorola

Equipment Removal

3.16.3 Completion Criteria This task is considered complete when users are fully cutover to operation on the new system.

3.17 System Documentation Motorola will provide documentation of the system configurations, physical installation, and system testing. Documentation is created and updated during the project. Electronic versions of custom documentation will be provided by Motorola both in a viewable format and in the documents standard format.

3.17.1 Design Documentation Motorola will create or update the following standard documents during the design phase:

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-39

♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

♦ ♦ ♦ ♦ ♦

Documentation Index System description Deliverables list Site Planning and Preparation Manuals Block and level diagrams for system and sites Floor plans Radio Communication System Technical Data Coverage maps • Individual site maps • System composite coverage maps System Administrator Documentation Installation and Cutover Plan Acceptance test procedures Programming parameters Drawings

3.17.2 Factory Staging Documentation Motorola will create or update the following documents of system staging: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Programming templates Interconnection drawings Interconnection charts Manufacturer’s standard operator manuals Re-assembly instructions Interconnection cable description and inventory Printout of equipment parameters Inventory with serial numbers and installation reference Software/firmware version numbers Manufacturer’s standard technical manuals

3.17.3 System Manual - “As-Built” Documentation Motorola will supply “as-built” documentation for the system. The documentation will consist of: City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-40

♦ ♦ ♦ ♦ ♦ ♦ ♦

♦ ♦ ♦ ♦ ♦ ♦

Standard Equipment Manuals System drawings: Fixed Equipment Documentation Plan and elevation views of the equipment installation at the radio site • Equipment inter-cabling diagrams for each site Demarcation wiring lists Programming and level setting data sheets Equipment by site • Key access procedures • Site inventory lists • Remote sign-on procedures and passwords • Software versions and equipment wiring by equipment site Radio Licenses Field ATP test sheets and results R56 site audit Maintenance Records Warranty information Service Provider

3.17.4 Equipment Manuals Motorola will provide equipment manuals covering both standard and optional features. The content of these manuals is standardized and may not be specific to the City, however, manuals will be supplied for all equipment provided for the Upgrade Project. Motorola will provide ten sets of the manuals/documentation, in both hard and soft copies.

3.17.5 Asset Management Motorola will enter asset information about the system and subscriber equipment into the City’s asset management database. Information such as serial number, software version, etc will be collected.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-41

3.18 Project Finalization 3.18.1 Description The finalization phase of the project consists of ensuring that all criteria for Final Project Completion have been met.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-42

3.18.2 Responsibility Matrix Task Motorola will resolve punch list items documented at System Acceptance Motorola will ensure that the criteria defined to transition the project to the Motorola Service Organization has been completed, including the development of a Customer Support Plan with the City. All documents listed in System Manual – “As Built” Documentation Section will be submitted, as they become ready. Final approvals of all System Manual – “As Built” Documents The City will issue a notice of Final Acceptance as provided in Article 7 of the 1999 Agreement, as amended.

Responsibility Motorola

Deliverable Approved Punch list Resolution

Motorola

Service Transition Certificate and Customer Support Plan

Motorola

System Manual – “As Built” Documents

City City

Written Approval Statement(s) Signed Final Acceptance Documents

3.18.3 Completion Criteria This task is considered complete when the City has issued a notice of Final Acceptance as provided in Article 7 of the 1999 Agreement, as amended.

3.19 System Performance System Performance is composed of many elements, including system coverage, system traffic, and equipment performance. Motorola will be responsible for the performance of all equipment as provided by Motorola under this contract. The City will assume responsibility for the performance of all other equipment necessary for completion of this project not provided by Motorola. Motorola’s responsibilities for this project are further defined in the Project Schedule and in the Work Breakdown Structure (depicted in the Responsibility Matrices in this Statement of Work).

3.19.1 Equipment Performance The project implementation requires the integration of existing City equipment with Motorola provided equipment under this contract. Motorola Provided Equipment City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-43

Motorola is responsible for the performance of all Motorola provided equipment either under this Amendment or the existing Maintenance Contract. This hardware must operate functionally as described in the System Description, when operating within environmental specifications and in an RF environment that complies with the Motorola R56 specification as such specification is reasonably agreed to by the City during the Detailed Design Review. When the hardware environment is outside of electromechanical and environmental specifications, performance is no longer guaranteed. City Provided Equipment The City is responsible for the performance of all existing and the City provided hardware that will be interfaced with or integrated into the various subsystem implementations for this project.

City of Philadelphia ASTRO 25 Upgrade

Statement of Work June 13, 2008 as revised on March 10, 2009 3-44

Section 4. Acceptance Test Plan 4.1

Coverage Acceptance Test Plan (CATP) Motorola is proposing to the City of Philadelphia an upgrade of the existing SMARTZONE 3.0z voice radio system to Motorola’s newest digital communications system platform, ASTRO 25. Motorola understands that the City of Philadelphia requires the upgraded system to maintain, at a minimum, the contractual coverage performance of the existing SMARTZONE 3.0z radio system. This Coverage Acceptance Test Plan (CATP) is designed to verify the upgraded ASTRO 25 IP Radio System meets or exceeds the originally contracted portable and mobile coverage reliability within the City of Philadelphia’s service areas (the city boundaries) and outside the City’s boundaries to a distance of three (3) miles (mobile coverage only). The CATP defines the coverage testing methods and procedures, the coverage acceptance criteria, the test documentation, and the responsibilities of both Motorola and the City of Philadelphia.

4.1.1 Development of CATP In general the Coverage Acceptance Test Plan was developed for Motorola customers as a thorough and systematic coverage testing procedure with defined methodologies and procedures. This CATP is closely based on the contractual CATP used to test the original ASTRO-CAI voice radio system. The simulated in-building tests will be performed with portable radios configured with attenuators to simulate the three contractual categories of building attenuation, 30 dB, 20 dB and 12 dB. These portable radios will be outfitted with magnetic mount antennas affixed to the rooftop of the City vehicle used during the tests. It is therefore agreed that a simulated inbuilding CATP will effectively verify the performance of the coverage provided by City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-1

the ASTRO 25 Digital voice radio system. The City will require testing in residential buildings within the City. The scope and price of which will be refined during the Detailed Design Review.

4.1.2 CATP Detailed Description A detailed description of the CATP consists of the following elements: ♦

Definitions Methods Responsibilities and Preparation Procedures Documentation and Acceptance

♦ ♦ ♦ ♦

4.1.2.1

CATP Definitions Several definitions are needed to accurately describe the coverage test method. Where cited, these terms or methods are defined in the Telecommunications Industry Association (TIA) Technical Service Bulletin TSB-88 Version B, titled “Wireless Communications Systems, Performance in Noise- and Interference-Limited Situations, Recommended Methods for Technology-Independent Modeling, Simulation, and Verification Coverage Area The coverage area is the geographical region where communications will be provided, which meets or exceeds the specified Channel Performance Criterion at the specified reliability for the specified equipment configuration(s). Typically radio systems are designed to maximize the coverage area within the customer’s service area (users’ operational area, jurisdictional boundaries, etc.) The predicted coverage area for each equipment configuration for the ASTRO25 IP Radio System is as indicated on Motorola’s coverage map(s) supplied with the original ASTRO-CAI voice radio system contract/Technical Committee Summary Document. Channel Performance Criterion (CPC) The CPC is the specified minimum design performance level for delivered audio quality in a faded channel (Refer to table below). For this system, the CPC is defined by the worst-case audio (“DAQ-3, 3mph”) as presented on the benchmark CompactDisc included as part of the contract. To aid each test team in evaluating the delivered audio quality, Motorola will also provide copies of an analog audio tape containing numerous voice samples recorded from the applicable track on the contract benchmark Compact-Disc that meet the City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-2

definition of minimum designed delivered audio quality for the system. The Compact-Disc will be used prior to test start as part of the Test Readiness Meeting and the audio tapes will be available for use by each test team throughout the test period. Table 4-1: Delivered Audio Quality Definitions DAQ 1 2 3 3.4 4 5

Subjective Performance Description Unusable, speech present but unreadable. Understandable with considerable effort. Frequent repetition due to noise/distortion. Speech understandable with slight effort. Occasional repetition required due to noise/distortion. Speech understandable with repetition only rarely required. Some Noise/Distortion. Speech easily understood. Occasional noise/distortion. Speech easily understood.

Reliability The reliability is the percent of locations within the applicable coverage area(s) which meet or exceed the specified minimum CPC. Motorola’s coverage map(s) indicate the area within which this system is predicted to provide at least 95% (90% where applicable) reliability of meeting or exceeding the minimum CPC.

4.2

Equipment configurations These are the types and configurations of radio network and field unit equipment upon which coverage acceptance testing is based. The CATP applicable Motorola coverage map(s) provided for this system indicate the coverage area for the following equipment configurations and are considered to be representative of the worst-case configuration: ♦

Simulcast coverage and Receiver voting coverage to/from 3 watt ASTRO-CAI (12.5KHz) portables inside buildings; the building loss definitions were provided in Section 3.1.5 of the original ASTRO-CAI radio system contract/Technical Committee Summary Document. The portable with 1/2 wave flex whip antenna will be located at the user’s belt level using a swivel case arrangement for both transmit and receive through the use of a Remote Speaker/Microphone (RSM). The RSM is attached to the user’s clothing at shoulder level.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-3

4.3

In-Building Coverage Motorola’s coverage maps for portable in-building equipment configurations are predictions of coverage inside buildings with up to 30dB loss in the downtown city area and inside buildings with up to 20dB loss elsewhere within the boundary of the City of Philadelphia. Coverage maps have also been provided which indicate portable coverage inside building with up to 12dB loss and “on-street”. The downtown 30dB building loss area is defined as the area bounded by Spring Garden Street in the North, South Street in the South, and the Delaware River in the East and the Schuylkill River in the West. The in-building coverage predictions are based on the maximum building losses specified by The City of Philadelphia in the RFP for buildings located within the boundaries of the City of Philadelphia. Since building loss varies significantly depending on the construction of buildings, Motorola’s coverage maps do not predict coverage within any specific building nor do they reflect 95% coverage of the areas within a building. Rather, the applicable shaded areas on the Motorola supplied coverage map(s) indicate the geographic areas where there exists sufficient fade margin to withstand an additional 30dB/20dB/12dB of building loss and still maintain the minimum CPC at the required reliability level (95%). The in-building coverage maps apply only to the above-ground portions of buildings. The coverage maps do not apply to in-building locations which are shielded from radio penetration, such as elevators, stairwells, basements below ground levels, tunnels, bank vaults, jails, x-ray rooms, nuclear facilities, and other similar locations or locations shielded by metal walls and/or with heavy construction and/or with no windows or doors. If coverage is required in specific buildings, then Motorola must be notified and field surveys may be required to measure the penetration loss of those specific buildings. The results of these surveys must be used to generate the in-building coverage maps. Providing coverage in specific buildings may require additional equipment in the proposal, or a change order to the contract to supply such items as additional radio sites, radiating cable, or bi-directional amplifiers in specific buildings. This additional equipment, if needed, is considered to be the responsibility of the City of Philadelphia.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-4

4.4

CATP Methods The method used to test coverage is statistical sampling of the predicted coverage area to verify the minimum CPC is met or exceeded at the required reliability for each of the defined equipment configurations. It is impossible to verify every point within a coverage area, because there are infinite points; therefore, coverage reliability will be verified by sampling a statistically significant number of randomly selected locations, quasi-uniformly distributed throughout the predicted coverage area. Determine the Required Number of Test Grids in the Coverage Area The predicted coverage service area(s) shown on Motorola’s coverage map(s) system will be divided into evenly sized square grids. A minimum of 1600 test grids will be utilized within the City’s borders for in-building or simulated in-building tests to include the Philadelphia International Airport. A total of 4000 grids are utilized for mobile testing which encompasses the areas within the City limits and 3 miles beyond the City’s borders. Both of these of grid totals exceed the City of Philadelphia’s original RFP requirement for a minimum of 500 test points throughout the City. Constraints on Test Grid Sizes The minimum above ground test grid size is 100 by 100 wavelengths; however, the minimum practical grid size is typically about 400 by 400 meters (about 0.25 by 0.25 miles). The minimum practical grid size for any system is determined by the distance traveled at the speed of the test vehicle while sampling, GPS error margin, and availability of road access within very small grids. A related consideration is the time, resources, and cost involved in testing very large numbers of very small grids. The maximum test grid size is 2 by 2 km (1.25 by 1.25 miles). In some wide-area systems, this constraint on maximum grid size may dictate a greater number of test grids than the minimum number required by the Estimate of Proportions formula. The grid size to be tested in the above ground areas by this CATP is based on an 18 arc-second tile projection and each are approximately 0.26 mi. X 0.35 mi. (W x H). Accessibility to Test Grids Prior to testing (if possible) or during the test, Motorola and the City of Philadelphia will determine if any grids are not accessible for the coverage test (due to lack of roads, restricted land, etc.) Inaccessible grids will be removed from the test and the total number of potential test grids as well as the total number of “passed” grids required for coverage acceptance shall be reduced accordingly.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-5

Coverage Failure Due to Interference If the coverage test or a portion thereof, is suspected to have failed due to external interference, those grids suspected of being affected by an interferer may be re-tested. Motorola may conduct necessary testing to support an inference that the grid(s) failed due to external interference; testing for the presence of interference shall be in accordance with TSB88 Section 7.9 which includes both a signal measurement (RSSI) and Bit Error Rate (BER) test. If this testing demonstrates external interference in excess of the allowable external interference as set forth in 47 CFR 90.672, the City may, in its sole discretion: a) permit Motorola to exclude those grids from the coverage acceptance calculations; or b) attempt, for a period of up to 15 days to correct the interference. If the City attempts to correct the interference, and if this attempt extends the CATP testing, then Motorola will get a day for day extension to the Final Implementation Schedule (Appendix H). Following the City’s efforts, if any, to correct the interference, the City and Motorola will retest the site with the Digital Vehicle Repeater System (DVRS) deployed. If the re-tested grid fails due to external interference, Motorola may exclude those grids from the coverage acceptance calculations. Motorola will document the total grids passed without interference, total grids passed after remediation of interference, total grids passed after deployment of DVRS, total grids failed due to unremediated interference, and total grids failed due to lack of coverage. Motorola is not responsible for external interference. The implementation of any possible solution would be the subject of a project change order. Randomly Select a Test Location Within Each Grid (Portable Testing) The geographic location of the center of the test grid will be determined using GPS. The building to be tested within the grid shall be randomly selected by the test team and shall be as close to the center of the grid under test as possible without going outside of the City of Philadelphia boundary. The actual test location(s) within the selected building of each test grid will be randomly selected by the test team, with a goal of having uniformly distributed test points within the building. As instructed by the City of Philadelphia, in-building tests for residential areas shall be performed by simulating the in-building test using attenuators. Perform Measurements in Each Grid In each test grid, the test team(s) will listen to a number of audio transmissions, and each team will record a subjective pass/fail evaluation of the Delivered Audio Quality (DAQ) for these transmissions based on the minimum CPC requirement. The test teams will also note test as an actual in-building or a simulated in-building test. Determine if Each Grid Pass or Fail the CPC Requirement

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-6

Subjective pass/fail evaluation of the audio transmissions will be based on the team consensus of the test transmissions versus the contract benchmark example CD/tape used during the test team calibration process. Determine the Coverage Area Reliability for Acceptance Above Ground In-building Testing Motorola is proposing to perform a series of portable in-building tests at various levels of maximum building penetration loss (20/30dB, 12dB & 0dB). Assuming no adjustments for inaccessible grids, the sum total of all grids passed will equal at least 1520 which is 95% of the 1600 potential test grids.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-7

First, the 20/30dB building test will be performed as de-tailed in this document. If necessary, tested grids failing the 20/30 dB building test will be re-tested in the same fashion but using a maximum building loss criteria of 12dB. Finally, if required, grids failing the 12dB building test will be re-tested for portable on-street coverage. If during the 20/30dB building test, a given test grid does not contain a testable building, a portable simulated in-building test shall be performed and shall count toward the 20/30dB building test total. Motorola will guaranty that a minimum of 1444 grids will pass the 20/30dB test and that no more than 20 grids will be required to pass on-street testing due to failure of both the 20/30 dB and 12 dB in-building tests. Mobile In-Street Testing for Above Ground Voice System After all accessible grids in the coverage area have been tested, the coverage area reliability (%) will be determined by dividing the number of grids which pass by the total number of valid grids tested as follows: ♦

95% of the grids within the City shown on the coverage maps as having the required reliability (95%) or greater shall pass. ♦ 90% of the grids from the city borders out to 3 miles, shown on the coverage maps as having the required reliability (90%) or greater shall pass. If a grid passed the portable in-building test, it is considered to have passed the mobile test. If a grid failed the portable in-building and/or portable on-street tests, Motorola reserves the right to perform a mobile test for verification of mobile coverage within the grid. IRS rounding rules will be considered to be in effect (i.e. 94.5% = 95%).

4.5

Responsibilities and Preparation This information will help set the expectations of the City of Philadelphia and Motorola regarding requirements for equipment, personnel, and time during the coverage test. Dependent upon the total number of test teams to be utilized, the City of Philadelphia will provide the following for the duration of the coverage test: ♦

Four (4) Portable radio(s) per test team with applicable features and accessories configured for operation on the system as detailed in the Equipment Configuration section of this document. ♦ Access to and use of three (3) existing Elite Console dispatch positions for while the CATP test is conducted.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-8

♦ ♦







Access to and use of ASTRO25 network management suite of applications to monitor system performance. The tests will be recorded on the logging recorder at City Hall supplied with original implementation and a copy of the recording kept with CATP test results report. It is understood that the audio recording of the outbound transmissions does not accurately reflect audio quality heard at the portable or mobile radio. Test vehicle(s). For the above ground voice CATP this vehicle should be clearly marked as an official City vehicle. It is the City’s intent to use marked Police Department vehicles. To accommodate the simulated in-vehicle testing, the marked City vehicles must have unobstructed rooftops. i.e., no light bars or roof racks. At least one City of Philadelphia representative, to drive each test vehicle and/or to be the customer representative(s) for the test team(s). The City of Philadelphia representative is responsible for getting permission and access to locations tested as actual in-building tests. Additional personnel for the test team(s), both at the control point(s) and in the field

Dependent upon the total number of test teams to be utilized, Motorola will provide the following for the duration of the coverage test: ♦ ♦ ♦ ♦ ♦ ♦



At least one Motorola representative, to navigate and to operate GPS mapping/navigation software to the extent which it is required. At least one laptop computer equipped with GPS mapping/navigating software Additional personnel as required for the test team(s), both at the control point(s) and in the field Programming of test radios and Elite Dispatch Talkgroup(s) for testing. Verify the city provided test radios are within specification prior to testing. Provide and setup of attenuators, magnetic mount antennas and all required cables and connectors to achieve simulated in-building attenuation for the three categories of building densities detailed in the original CATP document. Test log forms

Motorola will conduct this test only once. If any portion of the test is determined to be unreliable because of proven equipment malfunctions or failures, Motorola will repeat the portion of the test affected by the equipment malfunction or failure. The City of Philadelphia will have the option to accept the coverage at any time prior to completion of the coverage test.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-9

Before starting the test, the City of Philadelphia and Motorola will agree upon the time frame for Motorola’s submission of a report containing the coverage test results. However, this time frame shall be no sooner than 10 working days after the completion of the primary CATP and/or secondary testing that may be required.

4.6

CATP Procedures

4.6.1 Subjective DAQ Test A subjective listening test will be performed for coverage acceptance testing of grids to verify talk-out and talk-in Delivered Audio Quality (DAQ) performance of the system. ♦

To perform a statistically valid subjective DAQ test, a large group of people is required to ensure high confidence in the results. However, obtaining a large group of people for a subjective listening test is usually impractical; therefore, several (3 to 6) people per team must be used for the test. Since a group this small can not provide statistically significant results, it is very important that the personnel participating in the subjective test be familiar with the sound of radio conversations. Before subjectively testing digital voice systems (ASTRO, SECURENET, etc.), all personnel who will evaluate audio quality must be “calibrated” by listening to a example of audio representative of the minimum CPC (DAQ) level expected from the type of system being tested. ♦ The test participants will be divided into teams, each consisting of personnel from both the City of Philadelphia and Motorola. Each team will have members that operate a portable unit in the field, and members that are stationed at the control point location.

4.6.2 Portable In-building Testing for the ASTRO 25 Digital System ♦

As the field test team(s) drive through the coverage area, the test grid locations will be located by the GPS feature of Voyager however the test locations within each grid will be selected randomly by test team personnel as closely as possible to the geographic center of the grid under test. Voyager is the new tool replacing the old FACTWare tool. ♦ Within each grid location, the test team will randomly select one building location, which will serve as the test location for the grid under test. The team will enter and, as a team, gather five (5) test samples on the first floor of the selected building. Each of the 5 test samples shall be in a different location on the first floor of the building.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-10















The test radios will be portable radios worn at hip level for both transmit and receive through the use of a remote speaker microphone worn at shoulder level. Multiple radios will be used within a given test team for listening to talk-out tests from dispatch. This is to ensure a close user proximity to the Remote Speaker Microphone can be achieved. For simulated in-building tests, the test radio will be portable radios with in-line attenuators using vehicle mounted rooftop mag-mount antenna. One radio for each location test samples will be used for talk-in transmissions; however a different radio can be utilized for test samples at each in-building location. Within the selected building, the field test team will listen to a talk-out audio transmission within each of the five (5) test sample locations, and will record their pass/fail result based on their subjective evaluation of the DAQ for the test sample. Both talk-out and talk-in tests will be performed with the portable test radio in motion and with the user utilizing favorable radio antenna/body etiquette. The user wearing the test radio and their field-testing partner will slowly walk around the general test sample area during the duration of the transmission. The test team shall remain together within the selected test sample area. Team members stationed at the control point will evaluate talk-in audio quality of transmissions from the test field unit in that grid. The exchange used for the voice quality check will be similar to the following: ♦ (Field Team) - “Team # to Dispatcher, location # Testing 1-2-3-4-5, how do you copy?” The fixed team representatives will record the test point number and the pass/fail rating. (This is a talk-back transmission.) ♦ (Fixed End Team) - “Dispatcher to Team # your transmission was received and rated pass/fail. Location #, Testing 1-2-3-4-5, how do you copy?” The field team will record the test point number and the pass/fail rating. (This is a talk-out transmission.) ♦ (Field Team) - “Team # to Dispatcher your transmission was received and rated as pass/fail.” One team member in both the fixed and field teams will maintain a test log to record date, time, and pass/fail evaluation for each test sample within the given grid and then ultimately for each test grid overall. The overall pass/fail evaluation of the grid under test will be based on at least 4 out of the 5 test locations being rated as “passed” by the team consensus of the test sample transmissions versus the benchmark example CD/tape used during the test team calibration process. If the members at each end of the test (Field Team and Fixed End Team), respectively, cannot reach a pass/fail consensus for a given test sample location under test, the Field Test Team will move to another test sample location within

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-11









the same building. The above test will be conducted again. If this second test results in a consensus opinion of equal or better audio quality than the benchmark example comparison CD/tape then this result shall be recorded, and the test sample location / test grid shall be rated as “passed.” If less than 4 of the test locations taken on the first floor are rated as “pass” Motorola reserves the right to perform more extensive subjective voice testing of the selected building. Tests will be performed as described in the above paragraphs. Tests will be performed in a minimum of 10 evenly distributed locations on each above ground floor of the building. This will apply up to a maximum of 100 points per building. For buildings in excess of 10 floors, the 100 test locations will be chosen such that the test locations are evenly distributed throughout all above ground floors of the building. If 95% of the test locations within the building are rated “pass” the building and overall grid location under test will be considered “passed”. For test sample location(s) within a building, which fail the subjective DAQ coverage test, Motorola reserves the right to test the loss of the failed building locations. The failed building locations will be measured to insure that the building loss to each of those points is not greater than the loss used in Motorola’s applicable coverage prediction or CATP. Those points with a penetration loss in excess of 12/20/30 dB will be excluded from the pass/fail scoring for the building and the reliability re-computed. If a majority of the initially tested locations within a building are determined to have a loss greater than was used in the prediction or applicable CATP (12/20/30dB), the building will be declared invalid for coverage acceptance testing. In this case an alternate building will be selected within the center of the test grid as a substitute and the test will be conducted again in accordance with the above paragraphs. If the second building is also declared invalid due to excessive building loss, then the entire grid will be excluded from the coverage acceptance test calculations. Building loss measurements will be performed only after primary testing in all valid test grids throughout the City have been completed and only in the presence of City representatives; should unavailability of City personnel extend CATP testing then Motorola will be granted a day for day extension of the Final Implementation Schedule Appendix H. In the event that excessive background acoustical noise in the field and/or fixed test locations disrupts or renders the reception/transmission of any test message impossible, the test team will repeat the test message once the noise subsides to a level where the test can proceed. The overall test grid pass/fail evaluations will be used to determine the overall coverage area reliability.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-12

4.7

CATP Documentation and Coverage Acceptance During subjective Delivered Audio Quality testing, a test log will be kept by each test team, mobile and at the control point. The pass/fail evaluations for each test grid will be recorded on the test logs. A copy of the test logs will be provided to the City of Philadelphia at the conclusion of the coverage test. Motorola will evaluate the subjective test logs to determine whether the coverage test was passed for the equipment configuration under test. Motorola will submit to the City of Philadelphia a report detailing the coverage test results. This report will include a form, which is to be signed by both the City of Philadelphia and Motorola, indicating the test was performed in accordance with this CATP and the results of the test indicate the acceptance or non-acceptance of the coverage portion of the system. The City of Philadelphia will have the option to accept the coverage at any time prior to completion of the coverage test or documentation process.

4.8

Summary The Coverage Acceptance Test Plan quantifies the coverage area, defines the coverage requirements, explains how the coverage area will be tested, and ensures that all parties understand their responsibilities. It allows the user the peace of mind that the new system will meet or exceed the coverage requirements.

4.9

System Reliability Test

4.9.1 Purpose The purpose of the Reliability Test Plan (RTP) is to verify that the ASTRO25 IP Radio System performs as described in the detailed system design documents. Successful completion of the Reliability Test shall be based upon each tested subsystem meeting the acceptable level of System Availability of 99.995% (“Four nines and a five”) as agreed to by the Technical Committee. This level of System Availability equates to approximately 2 minutes and 10 seconds of system unavailability over each 30 day test segment. System Availability shall be defined by the following equation: System Availability = 100 x (1 - UNAVAILABLE Time / Total Time) Where “UNAVAILABLE Time” is the total time in which the system is UNAVAILABLE as defined by this document. A failure which causes the system to

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-13

be UNAVAILABLE shall be considered a MAJOR failure. A failure which does not affect subsystem availability shall be considered a MINOR failure. “Total Time” shall be equal to the total number of days the test is performed. Motorola proposes the Total Time to be thirty (30) calendar days after installation of new ASTRO25 Mastersite (to include SmartX servers) and core IP networking equipment at sites, thirty (30) calendar days after transition to SmartX operation , and thirty (30) days for each system reliability test conducted post FATP, CATP and user migration. This allows for a portion of the test to be performed with system loading. The City of Philadelphia system has been designed with suitable redundancy in critical subsystems and an adequate number of channels that will ensure continued availability even though certain equipment may fail. A failure of a primary critical component that results in the use of a redundant critical component is a major failure notwithstanding Levels 5 and 6 set forth in Section 4.9.4; System components that constitute critical components will be identified during Detailed Design Review but include Zone Controllers, Prime Site Controllers, Motorola Gold Elite Gateway, Core Routers and/or Trak Units. Failures within critical components that are protected by fault tolerance are considered minor and shall not affect system availability if the overall critical component remains capable of performing its primary function or mission. With the exception of the fourth 30 day reliability period, failure of redundant components shall not be considered major failures During the fourth 30 day reliability period, failure of any component shall constitute a major failure, except for failure of minor components identified during Detailed Design Review and approved by the City. Minor failures will be noted and corrected but not counted against system availability.. The loss of a simulcast sub-site, or reduction in system performance level during system transition due to a site interconnect link failure shall be considered minor. Please reference the “Classification of System Availability/ Unavailability” section for more details regarding system/subsystem availability.

4.9.2 Conditions In order to proceed with the Reliability Test, the following conditions must be satisfied: 1. Installation/Upgrade and optimization of the ASTRO25 IP Radio System, related subsystems (Dispatch, Alarm and Fault Mgt.) must be successfully completed. 2. All functional tests must be successfully completed. 3. Motorola has approved the system for the City of Philadelphia’s use. 4. The System Reliability ATP has been submitted to the City and approved in writing as set forth in Section 3.7.6.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-14

Preventive maintenance and all other infrastructure related installation must be completed or put on hold until after the test period. Motorola shall submit a letter to The City of Philadelphia signifying that the system is ready for test.

4.9.3 Procedure The reliability test will be performed for a total period of one-hundred twenty (120) days, comprised of four thirty (30) continuous day segments. During each thirty (30)day reliability test, all equipment/subsystem(s) installed prior to the commencement of the reliability segment will be subject to the reliability test. Please note that the first 30 day reliability test of the core IP network components of the ASTRO25 upgrade will be consistent with the Final Implementation Schedule (Appendix H). The second 30 day period will occur after the cutover of the existing 3600 simulcast systems A & B to the new ASTRO25 mastersite via SmartX, consistent with the Final Implementation Schedule (Appendix H). The third and fourth 30 day reliability periods will occur after FATP, CATP and cutover/migration of users to the new 9600 ASTRO25 simulcast systems. The third 30 day reliability periods will use backup/redundant major components as defined in the Detailed Design Review. The fourth 30 day reliability period will use the prime critical components to the extent possible with all failures considered MAJOR with the exception of the agreed upon list of minor components defined at the Detailed Design Review. After the each segment, the test will be paused to allow for appropriate and orderly transition to the next project segment and/or test period. During the third and fourth 30 day reliability periods the City of Philadelphia shall utilize the radio system for its intended purpose, and shall test all operational modes and equipment configurations to ensure that all features operate properly, and that all system anomalies have been identified. Representatives from each of the following entities will be involved as required: ♦

City of Philadelphia ♦ RCC ♦ Motorola ♦ CityNet For purposes of the first and second reliability periods, the entire system shall be divided into three distinct subsystems. These are: ♦

ASTRO25 IP Radio Subsystem, including: • 9600 Simulcast Subsystems A and B • ASTRO25 Mastersite • SmartX servers

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-15



Radio Dispatch Console Subsystem including: • Police • Fire/EOC • Municipal • Philadelphia International Airport ♦ Fault Monitoring Subsystems including: ♦

Unified Event Manager



FullVision



MOSCAD

Each subsystem must be designated “Passed” before the overall system reliability test can be considered “Passed.” The following table illustrates a “Passed” reliability test: Subsystem ASTRO Radio Dispatch Console Fault Monitoring

Availability 99.995 % 99.995 % 99.995 %

Result Passed Passed Passed

A MAJOR failure of any subsystem during the first or second reliability period will result in a suspension of the thirty-day reliability test period for that subsystem alone until corrective actions have been successfully completed. During this suspension period, the other subsystem reliability tests will continue. If the accumulated time consumed for corrective action exceeds the acceptable limit of system unavailability (2 minutes and 10 seconds), the 30 day reliability test period for that subsystem will start over. If the accumulated time consumed for corrective action is less than the acceptable limit of system availability, the 30 day reliability test will commence from the point of failure. Motorola reserves the right to continue the 30 day reliability period without stoppage for any subsystem incurring a MINOR failure. However, if the test is stopped due to a MINOR failure, the subsystem’s test will be restarted from the point of failure. The failure of one subsystem test during the first or second 30 day reliability test will not require that the entire reliability test be started over from the beginning. During the third and fourth 30 day reliability test a MAJOR failure to either the AstroRadio subsystem or Dispatch Console subsystem will require that the entire 30 day reliability test be repeated. During the fourth 30 day reliability period, failure of any component shall constitute a major failure, except for failure of minor components identified during Detailed Design Review and approved by the City. Upon successful completion of the System Reliability Test, the City of Philadelphia will provide Motorola with System Acceptance.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-16

4.9.4 Classification of Subsystem Availability/Unavailability Failures effecting availability within each of the four distinct subsystems are defined below. Failures not effecting subsystem availability (MINOR Failures) will be noted and corrected but not counted against overall subsystem availability. Classifications of availability have been modified to reflect severity levels contained on page 3 of the Network Monitoring, OnSite Infrastructure Response and Dispatch Service document being part of Motorola’s Service Agreement S00001007383. ASTRO25 IP Radio System Level Six Five Four Three Two One Zero

SYSTEM OPERATIONAL LEVEL DESCRIPTIONS Operational Mode Notes Wide-Area Normal mode - System fully operational Zone Controller link not caused by T1 link failure at Site Trunking Master Site lost Zone Controller link caused by T1 link failure at Site Trunking Master Site lost Non-trunked Wide-area Comparator In-CabinetWide Area Failsoft Repeat (Simulcast) Standalone ICR Non-Trunked/Non-Simulcast (Not Stand-alone Failsoft available for ASTRO25 simulcast systems) Talk-Around Direct unit to unit communications only Inoperative System totally nonfunctional

The subsystem shall be considered AVAILABLE when operating in level FIVE and above Note that the above ground voice subsystem actually consists of two independent simulcast subsystems (A and B). This provides a higher level of availability in that if one subsystem becomes unavailable, suitably programmed subscribers can migrate onto the other subsystem. Please note that for optimum system performance Motorola highly recommends subscriber templates be reoptimized as part of the ASTRO25 upgrade. This re-optimization should include at a minimum system specific talkgroups by personality. The subsystem shall be considered UNAVAILABLE during the occurrence of anyone of the following events: ♦

Operation below Level 5 for subsystems A or B; ♦ 3 or more of the same sites having both simulcast subsystems (A and B) off the air; ♦ Greater than 4 channel failures system-wide; ♦ During fourth reliability period, any site or channel off the air. Radio Dispatch Console Subsystem

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-17

The Radio Dispatch Console Subsystem shall be considered AVAILABLE except during the occurrence of any one of the following events: ♦

♦ ♦ ♦ ♦

Loss of 2 or more operator positions at Muni; loss of 2 or more operator positions at Fire; loss of 2 or more operator positions at the Airport; or loss of 4 or more at Police Dispatch center; Total loss of a dispatch position due to failure of both the CRT Op AND applicable Control Station unit; Total loss of AEB; Total Zone Controller failure; Total loss of both MGEG units except during the fourth reliability period, during which loss of either MGEG unit shall constitute unavailability.

Failures caused solely by operator position hardware shall not constitute system unavailability. Overall system availability shall not be affected by a failure of the Radio-Dispatch Console Subsystem as long as control station access to subscribers is possible. Fault Monitoring Subsystem The Fault Monitoring Subsystem shall be considered AVAILABLE except during the occurrence of any one of the following events: ♦

Loss of servers associated with FullVision and/or UEM; ♦ Loss of MOSCAD GMC and GWS terminals, or all SmartZone Management Network User Terminals; ♦ This will be tested separately for the third and fourth reliability period.

4.9.5 Failure Reporting All subsystem failures will be reported. MAJOR and MINOR FAILURES will be recorded in a log detailing failure. Information provided will include the amount of time that the subsystem or component operated in a failed condition, as well as corrective measures taken to resolve the failure. Supporting reports will be provided from the UEM, FullVision and MOSCAD, as applicable. Subsystem non-availability start time shall begin either upon notification of the authorized Motorola representative by the City of the actual failure condition or when Motorola becomes aware or when recorded by the monitoring system. Non-availability end time shall be marked when system availability is restored. The authorized Motorola representative will take all reasonable steps to notify the authorized City representative that the failure condition has been corrected.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-18

Time taken by the City in an attempt to diagnose or correct the condition will not be counted towards system or subsystem non-availability. Further system or subsystem complications caused by the City’s attempts to correct the failure condition shall not be counted against system non-availability. Within 48 hours after the restoration of any failure condition, Motorola and the involved subcontractors will meet with the City to explain the failure, corrective actions, and steps taken to prevent similar failures in the future. A Failures Mode and Errors Analysis (FMEA) will be generated each week. This report will track all MAJOR and MINOR FAILURES, as well as the corrective action that was taken to resolve the issue.

4.9.6 Exclusions Failures caused wholly, or in part, by the following conditions shall not adversely impact system/subsystem acceptance associated with the Reliability Test: ♦ ♦ ♦ ♦ ♦ ♦ ♦

Acts of God, such as lightning, flood, fire, or earthquake; Willful abuse or damage caused by any person or group of persons (excluding Motorola); T1 site interconnect failures that result in loss of service or unusable service. Unusable service is service which do not meet Motorola’s T1 specifications; Work stoppage or strike for any reason; Loss of adequate AC power for a period longer than provided for by battery or UPS backup power; Lack of performance of any City of Philadelphia supplied equipment or subsystems; Disruptions caused by normal generator test cycling on power systems provided by the City of Philadelphia.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-19

4.9.7 Final Report Failures detected during the Reliability Test will be reported to the City of Philadelphia. These written reports will include, as a minimum: ♦ ♦ ♦ ♦ ♦ ♦

Model and Serial Number of the equipment affected (Asset number if applicable) Original Complaint Revised Complaint and/or Trouble Found, i.e. Description of Failure Repairs Made and Parts Used Technician Name or Control Number Any recommended improvements to the system/subsystem

A final written report shall be submitted to the City of Philadelphia within thirty (30) days after the successful completion of the Reliability Test. All items on the City’s Punch-list, plus all failures uncovered during this test, will be prioritized, and an Action Plan will be generated which addresses each failure.

4.9.8 Preliminary Punchlist During the Reliability Test period it is anticipated that minor, non-availability affecting problems may be identified. The following table will be completed during the test period to define those mutually agreed to problems requiring future resolution. This preliminary punchlist of items must be corrected within a mutually agreed upon time frame. #

Punch List Item

1 2 3 4 5 6 7 8 9 10 N

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-20

Target Completion Date

Actual Completion Date

Comments

4.10 Sample Functional Acceptance Test Plan This Sample Functional Acceptance Test Plan (ATP) has been developed to demonstrate the functional operation of the ASTRO 25 IP Radio System Upgrade. The final ATP procedures may differ from the detailed procedures outlined in this document. As long as the intent of the test is verified, the test will be considered a pass. The final ATP document will be mutually agreed upon prior to testing. Motorola to submit the final ATP document sixty days before testing begins. The City will provide its written notice of approval or rejection no less than thirty days before testing begins. It is understood that the City requests the following demonstrations/verifications above and beyond the “standard” tests contained herein. Where applicable the standard tests have been modified accordingly: a. Hot Mic- verify proper activation over multiple attempts b. Multiselect- verify maximum users allowed to “tailgate” an active MSEL c. Announcement Group Call- verify users are not allowed to “tailgate” on an active AG call. d. 30 Day GCP “Throttling” monitor test – monitor GCP controller “throttling” events for a 30 day period during normal operations. NOTE: this test to be done as part of 30d reliability e. Functional Digital Vehicular Repeater (DVRs) test for the mobile, portable and the fixed DVRs during the Coverage Acceptance Test. The testing methodology will be developed during the Acceptance Test Plan development.

4.10.1 Test Methodology Both the City of Philadelphia and Motorola will complete each test according to an ATP script with various pass/fail checkpoints and signoff after the tests are completed.

4.10.2 Post ATP Requirements Upon completion of the fixed network ATP, a punch list of issues and timelines will be developed, if necessary.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-21

4.10.3 Wide Area SmartZone Trunking Features

Talkgroup Call 1. DESCRIPTION

2. TEST

The Talkgroup is the primary level of organization for communications on a trunked radio system. Radios with Talkgroup Call capability will be able to communicate with other members of the same Talkgroup. This provides the effect of a private channel down to the Talkgroup level. This test will demonstrate that a Talkgroup transmission initiated by a radio user will only be heard by system users who have the same Talkgroup selected. As with other types of calls, Talkgroup Calls can take place from anywhere in the system.

Step 1. Initiate a wide area call with RADIO-1 in TALKGROUP 1.

SETUP

Step 2. Observe that only RADIO-2 will be able to monitor and respond to the call. Step 3. Initiate a wide area call with RADIO-3 in TALKGROUP 2. Step 4. Observe that only RADIO-4 will be able to monitor and respond to the call.

Pass____ Fail____

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-22

Wide Area SmartZone Trunking Features Secure Operation 1. DESCRIPTION Digital encryption is used to scramble a transmission so only properly equipped radios can monitor the conversation. A "Key" is used to encrypt the transmit audio. Only radios with the same "Key" can decrypt the audio and listen to it.

SETUP RADIO-1 - TALKGROUP 1 (Secure TX Mode) RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 (Secure TX Mode) RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 (Secure TX Mode & No Key) RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 1 (Clear TX Mode) RADIO-4 - SITE - SITE 1

2. TEST Step 1. Initiate a secure wide area call with RADIO1 on TALKGROUP 1. Keep this call in progress until instructed to end the call. Step 2. Observe that RADIO-2 will be able to monitor and respond to the call once the call from RADIO-1 has ended. Step 3. Observe that RADIO-3 does not receive the call. Step 4. Observe that RADIO-4 will also receive the call even with the secure switch set to the non-secure mode of operation. Step 5. End the call from RADIO-1. Step 6. For radios equipped with dual algorithm encryption modules, select a talkgroup using the second algorithm and repeat Steps 1-5.

Pass____ Fail____

Verify the identical secure mode is programmed into RADIO-1, RADIO-2, RADIO-4 and that RADIO-3 has no secure code loaded or has a unique secure code from the other testing radios.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-23

Wide Area SmartZone Trunking Features Multigroup Call in Wait Mode 1. DESCRIPTION This trunking feature allows an equipped radio user to transmit an announcement to several different talkgroups simultaneously. The multigroup (ATG) call can be flagged for Wait Mode in the User Configuration Manager (UCM) database forcing all attached talkgroups to finish calls in progress before the trunked system will process the multigroup call. The system does not permit inactive, attached talkgroups to initiate Talkgroup Calls during the "wait" timeframe. As with other types of calls, multigroup calls can take place from anywhere in the system.

2. TEST Step 1. Verify ATG 1 is set for the Wait mode in the UCM database. Step 2. Using RADIO-1, initiate a call on TALKGROUP 1. Step 3. While RADIO-1 is keyed, attempt to initiate a multigroup call using RADIO-4 on ATG 1. Verify RADIO-4 receives a busy tone because one of the talkgroups attached to ATG 1 is involved in a Talkgroup Call. Step 4. Dekey RADIO-1 and verify RADIO-4 receives a callback. Step 5. Key RADIO-4 and verify both RADIO-1 and RADIO-2 hear the multigroup call while RADIO-3 does not unmute.

SETUP Pass____ Fail____ RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - RANDOM (Not part of MG) RADIO-3 - SITE - SITE 2 RADIO-4 - ATG 1 RADIO-4 - SITE - SITE 2 * TALKGROUP 1, TALKGROUP 2 are members of ATG 1. * RANDOM is any talkgroup not a member of ATG 1. * Multigroups are set up through both the UCM and the Subscriber Programming software.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-24

Wide Area SmartZone Trunking Features Multigroup Call in Interrupt Mode 1. DESCRIPTION

2. TEST Step 1. Verify ATG 1 is set for the Interrupt mode in the UCM database. Step 2. Using RADIO-1, initiate a call on TALKGROUP 1.

This trunking feature allows an equipped radio user to transmit an announcement to several different talkgroups simultaneously. The multigroup (MG) call can be flagged for Interrupt Mode in the User Configuration Manager (UCM) database, this means that the trunked system does not wait for attached talkgroups to finish calls in progress. Upon dekeying, the interrupted radios will join the multigroup call in progress. As with other types of calls, multigroup calls can take place from anywhere in the system.

Step 3. While RADIO-1 is keyed, initiate a multigroup call using RADIO-4 on ATG 1. Verify RADIO-2 receives the call but RADIO-3 does not unmute.

NOTE: A receiver interference failure may appear if RADIO-1 is not immediately dekeyed. This test is not recommended for singe site systems as RF contention will occur.

Step 5

SETUP

Step 4. Dekey RADIO-1 and verify RADIO-1 unmutes and joins the multigroup call in progress. Customer Requested Modification: Attempt to create a “tailgating” condition where a subscriber causes a continuation of the the initial console MG call. Verify that system will not allow this condition.

Pass____ Fail____

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - RANDOM (Not part of MG) RADIO-3 - SITE - SITE 2 RADIO-4 - ATG 1 RADIO-4 - SITE - SITE 2 * TALKGROUP 1, TALKGROUP 2 are members of ATG 1. * RANDOM is any talkgroup not a member of ATG 1. * Multigroups are set up through both the UCM and the Subscriber Programming software.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-25

Wide Area SmartZone Trunking Features Private Call 1. DESCRIPTION Private Call is a selective calling feature that allows a dispatcher or radio user to carry on one-to-one conversation that is only heard by the 2 parties involved. Subscriber units receiving a private call will sound an alert tone. As with other types of calls, Private Calls can take place from anywhere in the system.

2. TEST Step 1. Using RADIO-1, press the Private Call (Call) button. Step 2. Enter the unit ID of RADIO-2 with the keypad, or scroll to the location where this ID is stored. Step 3. Press the PTT to initiate the Private Call (Call). Step 4. Verify that RADIO-2 hears tones and the display indicates that a Private Call (Call) has been received, but RADIO-3 receives no indications.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 3

VERSION #1.02 SPS #7.5

Step 5. Answer the call at RADIO-2 by pressing the Private Call (Call) button. If RADIO-2 has a display, verify it shows the ID number or alias of RADIO-1. Step 6. Press the PTT switch on RADIO-2 and respond to the Private Call (Call). Note that if you do not press the Private Call (Call) button before pressing PTT, your audio will be heard by all members of the talkgroup, and not by the radio initiating the Private Call (Call). Step 7. Verify that RADIO-2 can communicate with RADIO-1. Step 8. Verify that RADIO-3 does not monitor the Private Call (Call). Step 9. End the Private Call (Call) and return to normal talkgroup operation.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-26

Wide Area SmartZone Trunking Features

2. TEST Step 1. Using RADIO-1, press the page button.

Call Alert 1. DESCRIPTION Call Alert is a tone page that allows a user to selectively alert another radio unit. The initiating radio will receive notification from the trunked system as to whether or not the page was received by the target radio. Units receiving a Call Alert will sound an alert tone. As with other types of calls, Call Alerts can take place from anywhere in the system.

Step 2. Enter the unit ID of RADIO-2 with the keypad, or scroll to the location where this ID is stored Step 3. Press the PTT to initiate the call alert (Page). Verify that the RADIO-1 user receives audible indication that the Call Alert (Page) was sent. Step 4. Verify that RADIO-2 user receives an audible indication of an incoming Call Alert (Page) was sent but RADIO-3 does not.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 3 RADIO-3 - SITE - SITE 3

VERSION #1.02 SPS #7.5

Step 5. Verify RADIO-1 gets an audible indication that the Call Alert (Page) was successfully received at the target radio. Step 6. Turn off RADIO-2. Send a Call Alert (Page) from RADIO-1 to RADIO-2. Step 7. Verify that the RADIO-1 user receives audible indication that the Call Alert (Page) was sent. Step 8. Verify RADIO-1 receives a "No Acknowledgement" indication that the Call Alert (Page) was not successfully received at the target radio.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-27

Wide Area SmartZone Trunking Features In Call User Alert (In-Call User Alert disabled)

2. TEST Step 1. In the Unified Network Configurator (UNC), verify that In-Call User Alert is disabled. Verify that RADIO-1 and RADIO2 have Talkgroup Muting (VMUT) disabled (Off) in the radios.

1. DESCRIPTION In-Call User Alert enhances the Call Alert feature to allow Call Alerts to be received by radios that are currently involved in voice and data services. As part of this feature, the radio supports Talkgroup Muting where the radio user can mute all talkgroup voice received by the radio. The Console Dispatcher or another radio user can unmute the radio by sending the radio a Call Alert. Note: Talkgroup Muting is a programmable option in the radio. There are also sub-options which will affect the time and operation of the Talkgroup muting.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 2 CONSOLE-1 - TALKGROUP 1

VERSION #1.05 SPS #7.5

Step 2. Enable Talkgroup Muting (VMUT) (Turn on) on RADIO-1. Step 3. Verify that there is a visual indication on RADIO-1 that Talkgroup Muting is enabled. Step 4. Initiate a talkgroup call on TALKGROUP 1 from CONSOLE-1. Step 5. Verify that no audio is heard by RADIO-1 and that RADIO-1 displays the ID of CONSOLE-1. Step 6. Send a Call Alert to RADIO-1 from Radio 2. Verify that Radio-1 does not receive a Call Alert and that Radio-2 indicates failure of Call Alert. End Console talkgroup call. Step 7. Send a Call Alert to RADIO-1 from CONSOLE-1. Accept the Call Alert at RADIO-1 by pressing the Home key. Step 8. Initiate a talkgroup call on TALKGROUP 1 from CONSOLE-1. Step 9. Verify that audio is now heard by RADIO-1 and that RADIO-1 displays the ID of CONSOLE-1. Step 10. End Console talkgroup call.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-28

Wide Area SmartZone Trunking Features In Call User Alert (In-Call User Alert Enabled)

2. TEST Step 1. In the Unified Network Configurator (UNC), verify that In-Call User Alert is enabled. Verify that RADIO-1 and RADIO2 have Talkgroup Muting (VMUT) disabled in the radios.

1. DESCRIPTION In-Call User Alert enhances the Call Alert feature to allow Call Alerts to be received by radios that are currently involved in voice and data services. As part of this feature, the radio supports Talkgroup Muting where the radio user can mute all talkgroup voice received by the radio. The Console Dispatcher or another radio user can unmute the radio by sending the radio a Call Alert. Note: Talkgroup Muting is a programmable option in the radio. There are also sub-options which will affect the time and operation of the Talkgroup muting.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 2 CONSOLE-1 - TALKGROUP 1

VERSION #1.06 SPS #7.5

Step 2. Enable Talkgroup Muting (VMUT) on RADIO-1. Step 3. Verify that there is a visual indication on RADIO-1 that Talkgroup Muting is enabled. Step 4. Initiate a talkgroup call on TALKGROUP 1 from CONSOLE-1. Step 5. Verify that no audio is heard by RADIO-1 and that RADIO-1 displays the ID of CONSOLE-1. Step 6. Send a Call Alert to RADIO-1 from Radio 2. Verify that Radio-1 receives a Call Alert and that Radio-2 indicates success of Call Alert. Verify that CONSOLE-1 audio is now heard by RADIO-1 Step 7. End Console talkgroup call. Step 8. Acknowledge Call Alert by hitting home key on RADIO-1.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-29

Wide Area SmartZone Trunking Features Emergency Alarm and Call with Top of Queue 1. DESCRIPTION Users in life threatening situations can use the Emergency button on the radio to immediately send a signal to the dispatcher and be assigned the next available voice channel. An Emergency Call can be set to either Top of Queue or Ruthless Preemption operation. To accomplish this test, an Emergency Alarm and Call will be initiated from a portable which will be received by a portable affiliated at any site of any zone in the system.

2. TEST Step 1. The emergency type for TALKGROUP 1's template must be set up through the User Configuration Manager (UCM) as Top of Queue. Step 2. Simulate a busy system by disabling all channels at SITE 1 with the exception of the control channel and one voice channel. Step 3. Press the PTT to initiate a call with RADIO3 and hold the PTT switch until instructed to release. Step 4. Key RADIO-4 and verify the radio receives a busy tone. Release the PTT switch on RADIO-4.

NOTE : If the subscriber does not have the PTT Display option, the Emergency ID will not be displayed.

Step 5. Using RADIO-1 send an Emergency Call by depressing the emergency switch and then the PTT switch.

NOTE: All radios and talkgroups should start with default priorities. Default is 10.

Step 6. Observe that RADIO-1 cannot transmit due to the voice channel being busy.

SETUP

Step 7. Release the PTT switch on RADIO-3.

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 3 RADIO-4 - SITE - SITE 1

Step 8. Observe that RADIO-1 receives the call back before RADIO-4 and is able to proceed with the call.

VERSION #1.03 SPS #7.5

Step 9. **For radios with displays only** Observe that the display on RADIO-2 denotes an emergency and the unit ID of RADIO-1. Step 10. Dekey RADIO-1 and end the Emergency Call by holding down the Emergency button on RADIO-1 until an alert tone sounds. Verify RADIO-1 returns to normal operation and that RADIO-4 receives a callback.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-30

Wide Area SmartZone Trunking Features Emergency Alarm and Call with Ruthless Preemption 1. DESCRIPTION Users in life threatening situations can use the Emergency button on the radio to immediately send a signal to the dispatcher and be assigned the next available voice channel. An Emergency Call can be set to either Top of Queue or Ruthless Preemption operation. To accomplish this test, an Emergency Alarm and Call will be initiated from a portable which will be received by a portable affiliated at any site of any zone in the system. NOTE : If the subscriber does not have the PTT Display option, the Emergency ID will not be displayed. This test is not recommended for singe site systems as RF contention will occur.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2

VERSION #1.03 SPS #7.5

2. TEST Step 1. The emergency type for TALKGROUP 1's template must be set up through the User Configuration Manager (UCM) as Ruthless Preemption. Step 2. Simulate a busy system by disabling all channels at SITE 1 with the exception of the control channel and one voice channel. Step 3. Press the PTT to initiate a call with RADIO4 and hold the PTT switch until instructed to release. Verify RADIO-3 receives the call. Step 4. Key RADIO-1 and verify the radio receives a busy tone. Release the PTT switch on RADIO-1. Step 5. Using RADIO-1 send an Emergency Call by depressing the emergency switch and then the PTT switch. Step 6. Observe that RADIO-1 is granted the channel immediately and the Talkgroup Call is dropped for RADIO-3. An Emergency Alarm is displayed at a console position monitoring TALKGROUP 1. Dekey RADIO-4. Step 7. Key RADIO-3 and verify the radio receives a busy tone. Release the PTT switch on RADIO-3. Step 8. End the Emergency Call by holding down the Emergency button on RADIO-1 until an alert tone sounds. Verify RADIO-1 returns to normal operation and that RADIO-3 receives a callback after the emergency hang time expires. Step 9. Return the emergency type for TALKGROUP 1's template back to Top of Queue.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-31

Wide Area SmartZone Trunking Features Emergency Alarm and Call with Talkgroup Revert 1. DESCRIPTION Users in life threatening situations can use the Emergency button on the radio to immediately send a signal to the dispatcher and be assigned the next available voice channel. An Emergency Call can be set to either Top of Queue or Ruthless Preemption operation. This test verifies the Emergency ID will appear on the display of the subscribers. To accomplish this test, an Emergency Alarm and Call will be initiated from a portable which will be received by a portable affiliated at any site of any zone in the system. A portable has the ability to revert to a specific talkgroup when an emergency is initiated. This is useful when the users have a designated talkgroup for handling emergencies. The revert talkgroup must be set in the portable via software. NOTE : If the subscriber does not have the PTT Display option, the Emergency ID will not be displayed.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - EMERGENCY TG RADIO-3 - SITE - SITE 3 (SITE 2 if only 2 Sites) * EMERGENCY TG is the talkgroup programmed for emergency reverts.

VERSION #1.03 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-32

2. TEST Step 1. Make a Talkgroup Call from RADIO-1 and verify only RADIO-2 can hear the audio. Step 2. Dekey RADIO-1. Step 3. Using RADIO-1 send an Emergency Call by depressing the emergency switch and then the PTT switch. Step 4. **For radios with displays only** Observe the display on RADIO-3 denotes an emergency and the unit ID of the unit sending the emergency and that RADIO-3 can hear RADIO-1's audio. Step 5. In addition observe that RADIO-2 can not hear RADIO-1's audio. Step 6. Release the PTT switch on RADIO-1 and cancel the emergency.

Pass____ Fail____

Wide Area SmartZone Trunking Features

SPS #7.5 2. TEST

Emergency Alarm and Call with Hot Mic 1. DESCRIPTION Users in life threatening situations can use the Emergency button on the radio to immediately send a signal to the dispatcher and be assigned the next available voice channel. An Emergency Call can be set to either Top of Queue or Ruthless Preemption operation. This test verifies the Emergency ID will appear on the display of the subscribers. To accomplish this, an Emergency Alarm and Call will be initiated from a portable which will be received by a portable affiliated at any site of any zone in the system. If the Hot Mic option is chosen, the subscriber will send an emergency and after a voice channel is assigned, the subscriber will automatically transmit for a programmable period of time. Emergency Alarm with Voice to Follow (Hot Mic) is an option in the portable and must be enabled via software. This test case works for all portable radios. For mobile radios, specific mobile microphone models are required.

Step 1. Using RADIO-1 send an Emergency Alarm by depressing the emergency switch. Step 2. **For radios with displays only** Observe the display on RADIO-2 and RADIO-3 denotes an emergency and the unit ID of RADIO-1. Step 3. Observe that RADIO-2 and RADIO-3 can hear any audio from RADIO-1 even though RADIO-1 does not have its PTT switch depressed. Step 4. Observe that RADIO-1 PTT times out and the radio dekeys. Step 5. Cancel the emergency. Customer Requested Modification Step 6

Repeat Steps 1 through 5 for a series of 10 full test cycles and verify proper Hot Mic functionality for each cycle.

Pass____ Fail____

NOTE : If the subscriber does not have the PTT Display option, the Emergency ID will not be displayed.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 3 Make sure that Emergency Alarm w/ Voice Following has been enabled in the subscriber.

VERSION #1.02

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-33

Wide Area SmartZone Trunking Features Busy Queuing and Callback with Ten Talkgroup Priority Levels 1. DESCRIPTION If no voice channel resources are available, radios requesting channels for new conversations are placed in a queue. Users of the same priority will move through the queue in a FIFO (first in, first out) sequence; however, users of higher priority will be inserted ahead of lower priority users in queue. When a voice channel becomes available, the radio at the top of the busy queue gets a channel assignment and generates a callback tone. The callback tone alerts the user that a channel assignment was made and transmitting is now possible on the selected talkgroup. Note that an Emergency Call has the highest priority at level 1. The highest assignable priority is 2 and 10 is the lowest. NOTE: All radios and talkgroups should start with default priorities. Default is 10.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 3 RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-34

2. TEST Step 1. Simulate a busy system by disabling all channels at SITE 1 with the exception of the control channel and one voice channel. Step 2. The priority level for TALKGROUP 2's template must be set up through the User Configuration Manager (UCM) as 9. Step 3. Initiate a Talkgroup Call with RADIO-1. Keep this call in progress until instructed to end the call. Step 4. Key RADIO-3 and observe that the radio receives a busy. Step 5. Key RADIO-2 and observe that the radio receives a busy. Step 6. End the Talkgroup Call established in Step 3. Step 7. Observe RADIO-2 receives the first callback and can now make a call to RADIO-4 upon receipt of the callback indication. Step 8. End the call between RADIO-2 and RADIO-4. Step 9. Observe RADIO-3 now receives a callback and can make a call upon receipt of the callback indication.

Pass____ Fail____

Wide Area SmartZone Trunking Features

2. TEST Step 1. Turn OFF RADIO-1.

Continuous Assignment Updating

Step 2. Initiate a Talkgroup Call using RADIO-2 on the talkgroup.

1. DESCRIPTION When a talkgroup is assigned a voice channel, the site controller continues to transmit the channel assignment on the control channel for the duration of the talkgroup call. Radios coming into use on the system are automatically sent to voice channels with conversations in progress involving their selected talkgroups.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2

Step 3. While the Talkgroup Call is in progress, turn ON RADIO-1. Step 4. Observe that the radio, which was just brought back into service, joins the Talkgroup Call already in progress. Step 5. Switch RADIO-1 to another talkgroup. Step 6. Initiate a Talkgroup Call using RADIO-2 on the original talkgroup. Step 7. While the Talkgroup Call is in progress, set RADIO-1 back to the original talkgroup. Step 8. Observe that RADIO-1 joins the Talkgroup Call already in progress.

VERSION #1.02 SPS #7.5

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-35

Wide Area SmartZone Trunking Features Site Access Control/"Individual Only" Site Access Denial 1. DESCRIPTION The User Configuration Manager (UCM) can be used to limit radio or talkgroup access to selected valid sites. Control can be exercised to restrict radio users or talkgroups to certain sites, or to steer radio activity away from smaller sites in an effort to avoid busies. UCM flags establish which sites are valid for each individual radio user, talkgroup and multigroup. An overall Site Access Denial flag for the system governs how these radio and talkgroup settings affect the affiliation or rejection of radios to individual sites. Once a subscriber unit has been denied at a site it will not attempt to access that site unless power is cycled or the user changes talkgroups. Four possible values for the Site Access Denial flag exist: Individual Only, Talkgroup Only, Either, or Both.

2. TEST Step 1. Set the Site Access Denial Flag to Individual Only via the UCM. Step 2. Cycle power to RADIO-1 and RADIO-2 to force them to affiliate, this will clear any site denials they may hold in memory. Step 3. Initiate a Private Call from RADIO-2 to RADIO-1. Verify that the Private Call occurs since RADIO-2 is valid at SITE 2. End the Private Call. Step 4. Set SITE 2 to be a non-valid site for RADIO-2 through the UCM. Step 5. Initiate a Private Call from RADIO-2 to RADIO-1. Verify that RADIO-2 receives a reject, and roams to a valid site. RADIO-2 is not allowed to make the Private Call from SITE 2 since it is no longer valid at SITE 2.

Pass____ Fail____ "Individual Only" Site Access Denial dictates that a radio will not be allowed to affiliate to a particular site if the radio user does not have access to that site. If the Site Access Denial flag is set to "Individual Only", the talkgroup record for valid sites is not used in the determination of actual site affiliation permissions. NOTE: Site Denial flags are not cleared from the subscriber until the power is cycled or the talkgroup is changed.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-36

Wide Area SmartZone Trunking Features Site Access Control/"Talkgroup Only" Site Access Denial 1. DESCRIPTION The User Configuration Manager (UCM) can be used to limit radio or talkgroup access to selected valid sites. Control can be exercised to restrict radio users or talkgroups to certain sites, or to steer radio activity away from smaller sites in an effort to avoid busies. UCM flags establish which sites are valid for each individual radio user, talkgroup and multigroup. An overall Site Access Denial flag for the system governs how these radio and talkgroup settings affect the affiliation or rejection of radios to individual sites. Four possible values for the Site Access Denial flag exist: Individual Only, Talkgroup Only, Either, or Both. "Talkgroup (TG) Only" Site Access Denial dictates that a radio will not be allowed to affiliate to a particular site if its affiliated talkgroup does not have access to that site. In this case, the individual radio user setting for valid sites is not used in the determination of actual site affiliation permissions. NOTE: Site Denial flags are not cleared from the subscriber until the power is cycled or the talkgroup is changed.

2. TEST Step 1. Set the Site Access Denial Flag to Talkgroup Only via the User Configuration Manager (UCM). Step 2. Set SITE 2 to be a valid site for RADIO-2 through the UCM. Set SITE 2 to be a nonvalid site for TALKGROUP 1 through the UCM. Step 3. Force RADIO-2 to scan to SITE 2. Verify that RADIO-2 cannot affiliate to SITE 2 since TALKGROUP 1 is a non-valid talkgroup for SITE 2. Step 4. Set SITE 2 to be a valid site for TALKGROUP 1 through the UCM. Set SITE 2 to be a non-valid site for RADIO-2 through the UCM. Step 5. Force RADIO-2 to scan to SITE 2. Verify that RADIO-2 is now allowed to affiliate to SITE 2 since the talkgroup record determines site access. Step 6. Initiate a call from RADIO-2. Verify that RADIO-2 is allowed to make the call from SITE 2 since TALKGROUP 1 is valid at SITE 2.

Pass____ Fail____

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-37

Wide Area SmartZone Trunking Features Site Access Control/"Either" Site Access Denial 1. DESCRIPTION

2. TEST Step 1. Set the Site Access Denial Flag to Either via the UCM. Step 2. Cycle power to the radios to force them to affiliate, this will clear any site denials they may hold in memory.

The User Configuration Manager (UCM) can be used to limit radio or talkgroup access to selected valid sites. Control can be exercised to restrict radio users or talkgroups to certain sites, or to steer radio activity away from smaller sites in an effort to avoid busies. UCM flags establish which sites are valid for each individual radio user, talkgroup and multigroup. An overall Site Access Denial flag for the system governs how these radio and talkgroup settings affect the affiliation or rejection of radios to individual sites. Once a subscriber unit has been denied at a site, it will not attempt to access that site unless power is cycled or the user changes talkgroups. Four possible values for the Site Access Denial flag exist: Individual Only, Talkgroup Only, Either, or Both.

Step 3. Initiate a TALKGROUP 1 call from RADIO-2. Verify that RADIO-2 is allowed to make the TALKGROUP 1 call.

"Either" Site Access Denial indicates that a radio will not be allowed to affiliate to a site if either the radio user or affiliated talkgroup does not have access to that site.

Step 7. Initiate a TALKGROUP 2 call from RADIO-3. Verify that RADIO-3 is allowed to make the TALKGROUP 2 call.

NOTE: Site Denial flags are not cleared from the subscriber until the power is cycled or the talkgroup is changed.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 2

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-38

Step 4. Set SITE 2 to be a non-valid site for RADIO-2 through the UCM. Step 5. Initiate a TALKGROUP 1 call from RADIO-2. Verify that RADIO-2 receives a reject, and roams to a valid site. RADIO-2 is not allowed to make the TALKGROUP 1 call from SITE 2 since RADIO-2 is no longer valid at SITE 2. Step 6. Switch RADIO-1 to TALKGROUP 2.

Step 8. Set SITE 2 to be a non-valid site for TALKGROUP 2. Step 9. Initiate a TALKGROUP 2 call from RADIO-3. Verify that RADIO-3 receives a reject, and roams to a valid site. RADIO-3 is not allowed to make the TALKGROUP 2 call from SITE 2 since TALKGROUP 2 is no longer valid at SITE 2.

Pass____ Fail____

Wide Area SmartZone Trunking Features Site Access Control/"Both" Site Access Denial 1. DESCRIPTION

2. TEST Step 1. Set the Site Access Denial Flag to Both via the UCM. Step 2. Cycle power to RADIO-1 and RADIO-2 to force them to affiliate, this will clear any site denials they may hold in memory.

The User Configuration Manager (UCM) can be used to limit radio or talkgroup access to selected valid sites. Control can be exercised to restrict radio users or talkgroups to certain sites, or to steer radio activity away from smaller sites in an effort to avoid busies. UCM flags establish which sites are valid for each individual radio user, talkgroup and multigroup. An overall Site Access Denial flag for the system governs how these radio and talkgroup settings affect the affiliation or rejection of radios to individual sites. Once a subscriber unit has been denied at a site, it will not attempt to access that site unless power is cycled or the user changes talkgroups. Four possible values for the Site Access Denial flag exist: Individual Only, Talkgroup Only, Either, or Both.

Step 3. Initiate a TALKGROUP 1 call from RADIO-2. Verify that RADIO-2 is allowed to make the TALKGROUP 1 call.

"Both" Site Access Denial indicates that a radio will not be allowed to affiliate to a site only if both the radio user and affiliated talkgroup do not have access to the site.

Step 6. Reset all Talkgroup and Radio User flags in the UCM.

Step 4. Set SITE 2 to be a non-valid site for RADIO-2 through the UCM. Set SITE 2 to be a non-valid site for TALKGROUP 1 through the UCM. Step 5. Initiate a TALKGROUP 1 call from RADIO-2. Verify that RADIO-2 receives a reject, and roams to a valid site. RADIO-2 is not allowed to make the TALKGROUP 1 call from SITE 2 since TALKGROUP 1 nor RADIO-2 is no longer valid at SITE 2.

Pass____ Fail____ NOTE: Site Denial flags are not cleared from the subscriber until the power is cycled or the talkgroup is changed.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-39

Wide Area SmartZone Trunking Features All Start Talkgroups 1. DESCRIPTION Talkgroups can be set up as either All Start or Fast Start. "AllStart" is the default Talkgroup Call setup approach that requires that all sites with affiliated talkgroup members and other required resources be available before the call begins. Otherwise, the system returns a busy response to the subscriber who initiated the Talkgroup Call. Once the required resources become available, the call is granted. NOTE: This feature only works on a multi-site system.

2. TEST Step 1. Verify TALKGROUP 1's template is setup as an All Start Talkgroup in the User Configuration Manager (UCM). Step 2. Simulate a busy system by disabling all channels at SITE 1 with the exception of the control channel and one voice channel. Step 3. Key RADIO-3 and busy out the only voice channel available at SITE 1 where RADIO-2 and RADIO-3 are affiliated.. Step 4. Initiate a Talkgroup Call from RADIO-1 and observe a busy indication is received due to no available voice channel at SITE 1 where RADIO-2 is affiliated. Step 5. Dekey RADIO-3. Verify that the call from RADIO-1 is now granted and RADIO-2 can hear the audio.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 2 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 1

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-40

Pass____ Fail____

Wide Area SmartZone Trunking Features Fast Start Talkgroup without Critical Site

2. TEST Step 1. Verify that TALKGROUP 1's template is set up as Fast Start through the User Configuration Manager (UCM) with no critical sites specified.

1. DESCRIPTION Talkgroups can be set up as either All Start or Fast Start. "FastStart" is the Talkgroup Call setup approach that allows a group call setup whether or not all affiliated Talkgroup members are available. This "Automatic Busy Override by Talkgroup" call setup method still requires the participation of all affiliated consoles, LOMIs (i.e. logging recorders) and critical sites before the call can begin. As channels at the affiliated talkgroup members' sites become available, they are added to the call in progress.

Step 2. Simulate a busy system by disabling all channels at SITE 1 with the exception of the control channel and one voice channel. Step 3. Key RADIO-3 and busy out the only voice channel available at SITE 1. Step 4. Initiate a Talkgroup Call from RADIO-1 and observe the call is granted even with no voice channel available at SITE 2 for RADIO-2. Step 5. Dekey RADIO-3. Verify that RADIO-2 can now hear RADIO-1.

NOTE: This feature only works on a multi-site system.

Pass____ Fail____ SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 2 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 1

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-41

Wide Area SmartZone Trunking Features Fast Start Talkgroup with Critical Site

2. TEST Step 1. Verify that TALKGROUP 1's template is set up as Fast Start through the User Configuration Manager (UCM) and specify SITE 1 as a Critical Site.

1. DESCRIPTION Talkgroups can be set up as either All Start or Fast Start. "FastStart" is the Talkgroup Call setup approach that allows a group call setup whether or not all affiliated Talkgroup members are available. This "Automatic Busy Override by Talkgroup" call setup method still requires the participation of all affiliated consoles, LOMIs (i.e. logging recorders) and critical sites before the call can begin. As channels at the affiliated talkgroup members' sites become available, they are added to the call in progress.

Step 2. Simulate a busy system by disabling all channels at SITE 1 with the exception of the control channel and one voice channel. Step 3. Key RADIO-3 and busy out the only voice channel available at SITE 1. Step 4. Initiate a Talkgroup Call from RADIO-1 and observe the call is busied as no voice channel is available at SITE 1 for RADIO-2. Step 5. Dekey RADIO-3. Verify that the call from RADIO-1 is now granted and RADIO-2 can hear the audio.

NOTE: This feature only works on a multi-site system.

Pass____ Fail____ SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 2 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 1

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-42

Wide Area SmartZone Trunking Features Recent User Priority 1. DESCRIPTION This test verifies that a recent user of the channel has priority over other users of equal priority of being assigned a channel when a busy queue exists. The maximum number of consecutive times that a user may be elevated to recent user priority is two.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 3 RADIO-3 - SITE - SITE 1

VERSION #1.02 SPS #7.5

2. TEST Step 1. Ensure that the priority level for all talkgroups is the same. Simulate a busy system by disabling all channels at SITE 1 with the exception of the control channel and one voice channel. Step 2. De-press and hold the PTT switch of RADIO-1. Step 3. De-press and hold the PTT switch on RADIO-2 and then depress and hold the PTT switch on RADIO-3. Verify that both radios receive a busy tone. Step 4. Release the PTT switches on RADIO-2 and RADIO-3. Step 5. Release the PTT switch on RADIO-1. Step 6. As soon as RADIO-2 receives its callback tone, depress and hold its PTT switch. Step 7. Within 2 seconds of callback, re-key RADIO-1. Verify that RADIO-1 receives a busy tone. Release the PTT switch on RADIO-1. Step 8. Release the PTT switch on RADIO-2. Verify that RADIO-1 receives a callback tone before RADIO-3. Step 9. Repeat Steps 2-8. Verify that the priority of RADIO-1 is once more elevated in the busy queue. Step 10. Repeat Steps 2-8 once more. Verify that in Step 9 that RADIO-3 receives the callback tone since RADIO-1 cannot be elevated in the busy queue more than two consecutive times.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-43

Wide Area SmartZone Trunking Features Audio Interrupt/Interrupt Never Mode 1. DESCRIPTION A radio PTT request may be received for a group already active and currently being sourced by another radio unit. The talkgroup can be flagged in the User Configuration Manager (UCM) to either allow or disallow the new PTT. If allowed, the latest PTT request will be granted and become the source of the call. If both Radios are at the same site, RF contention may prevent either call from working.

SETUP

2. TEST Step 1. Set up TALKGROUP 1's template to be Audio Interrupt Never through the UCM. Step 2. Using RADIO-1, initiate a call on TALKGROUP 1. Step 3. Verify both RADIO-2 and RADIO-3 monitor the audio. Step 4. Using RADIO-3, initiate a call on TALKGROUP 1. Step 5. Verify that RADIO-3 receives a reject and that RADIO-2 continues to listen to RADIO-1. Step 6. Dekey both Radios.

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 3 (SITE 2 if only 2 Sites)

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-44

Pass____ Fail____

Wide Area SmartZone Trunking Features Audio Interrupt/Interrupt Always Mode 1. DESCRIPTION

2. TEST Step 1. Set up TALKGROUP 1's template to be Audio Interrupt Always through the UCM. Step 2. Using RADIO-1, initiate a call on TALKGROUP 1.

A radio PTT request may be received for a group already active and currently being sourced by another radio unit. The talkgroup can be flagged in the User Configuration Manager (UCM) to either allow or disallow the new PTT. If allowed, the latest PTT request will be granted and become the source of the call. If both Radios are at the same site, RF contention may prevent either call from working.

Step 3. Verify both RADIO-2 and 3 monitor the audio.

Note: This test is not recommended for singe site systems as RF contention will occur.

Step 6. Dekey both Radios.

SETUP

Step 4. Using RADIO-3, initiate a call on TALKGROUP 1. Step 5. Verify that RADIO-2 now listens to RADIO-3.

Pass____ Fail____

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 3 (SITE 2 if only 2 Sites)

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-45

Wide Area SmartZone Trunking Features Sub-band Restricted Operation 1. DESCRIPTION This feature will allow radios limited to one sub-band to operate at sites set up with resources to handle both sub-band and full band range radios.

2. TEST Step 1. Verify that TALKGROUP 1 is set up in the User Configuration Manager (UCM) to be a sub-band restricted talkgroup. Step 2. Verify TALKGROUP 2 is set up in the UCM to be a non-sub-band restricted talkgroup. Step 3. Using RADIO-1, initiate a call on TALKGROUP 1.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 2 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2 * SITE 1 and SITE 2 should support sub-band channels.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-46

Step 4. Verify that a sub-band restricted channel is granted at both sites and that only RADIO-3 is able to monitor and respond to the call. Step 5. Dekey RADIO-1. Step 6. Using RADIO-2, initiate a call on TALKGROUP 2. Step 7. Verify that a non-sub-band restricted channel is granted at both sites and that only RADIO-4 is able to monitor and respond to the call.

Pass____ Fail____

Wide Area SmartZone Trunking Features

2. TEST

Channel Partitioning Operation

Step 1. While channels on the RF site 1 are idle, initiate a talkgroup call on TG5 from RADIO-2 on SITE 1

1. DESCRIPTION

Step 2. Verify that RADIO-2 is assigned RF5.

This feature provides exclusive use of designated RF channels for high priority groups. This test will demonstrate that the calls belonging to the high priority group is steered to the RF channels that are designated.

Step 3. Release the PTT and wait for the talkgroup call to end. Step 4. Initiate a talkgroup call from RADIO-1 on TALKGROUP 1 at SITE 1. Step 5. Observe that the talkgroup call from RADIO-1 is not assigned RF5.

Create a User Group (UG2) via the User Configuration Manager. Assign the UG2 User Group to the talkgroup TG5 profile. In the Zone Configuration Manager, add UG2 to the RF Channel RF5 at RF Site 1 to be tested. This will ensure that UG2 will have exclusive use of the Channel (RF5).

Pass____ Fail____

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TG5 RADIO-2 - SITE - SITE 1

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-47

Wide Area SmartZone Trunking Features Priority Monitor/Non-Priority Scan 1. DESCRIPTION This test verifies that a subscriber unit can scan a preprogrammed list (in the radio) to find any Priority and Non-priority Talkgroups with assigned voice channels at that site. To accomplish this, a call will be initiated from a portable at a remote site on a talkgroup monitored by a portable at the same site as the scanning radio. The scanning radio will scan from its selected talkgroup to the active talkgroup. The test will be repeated with an additional radio transmitting on the Priority Talkgroup while the scanning radio is scanning. This third radio will be on a remote site with a fourth radio on the Priority Talkgroup at the same site as the scanning radio.

SETUP RADIO-1 - TALKGROUP 1 (SCANNING) RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 3 RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 3 RADIO-4 - SITE - SITE 2 * RADIO-1 needs to be set to a dial position configured to scan.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-48

2. TEST Step 1. Verify that RADIO-1 is set to TALKGROUP 1 and in the scan mode of operation and programmed to scan all TALKGROUP 1, TALKGROUP 2, and TALKGROUP 3. Step 2. Initiate a Talkgroup Call with RADIO-4 and observe that RADIO-1 scans to the talkgroup and receives the call. Keep the call in progress until completion of the following step. Step 3. Initiate a Talkgroup Call with RADIO-2 and observe that RADIO-1 does not receive the call since RADIO-1 is listening to TALKGROUP 3.

Pass____ Fail____

Wide Area SmartZone Trunking Features Priority Monitor/Priority Scan 1. DESCRIPTION This test verifies that a subscriber unit can scan a preprogrammed list (in the radio) to find any Priority and Non-priority Talkgroups with assigned voice channels at that site. To accomplish this, a call will be initiated from a portable at a remote site on a talkgroup monitored by a portable at the same site as the scanning radio. The scanning radio will scan from its selected talkgroup to the active talkgroup. The test will be repeated with an additional radio transmitting on the Priority Talkgroup while the scanning radio is scanning. This third radio will be on a remote site with a fourth radio on the Priority Talkgroup at the same site as the scanning radio.

SETUP RADIO-1 - TALKGROUP 1 (SCANNING) RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 2 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2 RADIO-5 - TALKGROUP 2 RADIO-5 - SITE - SITE 1

2. TEST Step 1. Verify that RADIO-1 is set to TALKGROUP 1 and in the scan mode of operation and programmed to scan TALKGROUP 1 and TALKGROUP 2 with TALKGROUP 1 as its Priority Monitor Talkgroup. Step 2. Verify that in the User Configuration Manager (UCM) under Talkgroup Configuration, Priority Monitor and the Valid Site setting is set to yes for SITE 2. Step 3. Initiate a Talkgroup Call with RADIO-4 and observe that RADIO-1 scans to the talkgroup and receives the call. Keep the call in progress until the completion of the following step. Step 4. Initiate a Talkgroup Call with RADIO-3 and observe that RADIO-1 reverts to the TALKGROUP 1 and receives the call.

Pass____ Fail____

* RADIO-1 needs to be set to a dial position configured to scan.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-49

Wide Area SmartZone Trunking Features Receive Only Radio

2. TEST Step 1. Set RADIO-1's template for "dispatch enabled" equal to false in the Radio User Capabilities Profile. This allows the radio to receive, but not initiate group calls.

1. DESCRIPTION This test verifies that a subscriber can be set up for receive operation only.

Setting a portable for "dispatch enabled" equal to false in the Radio User Capabilities record allows the radio to receive, but not initiate group calls. Setting a portable for "Voice enabled" equal to false in the Radio User profile allows the user to receive dispatch calls, but not originate or receive Unit-toUnit or call alerts.

Step 2. Set RADIO-1 for "Voice enabled" equal to false in the Radio User profile. This allows the user to receive dispatch calls, but not originate or receive Unit-to-Unit or call alerts. Step 3. Verify that the Site Access denial flag is set to either "Both" or "TG Only". Step 4. Make a call from any Console in the system with the Talkgroup. Verify both Radios can hear the audio. Step 5. Make a call from RADIO-2 and verify that both RADIO-1 and the Console hear the call.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2

VERSION #1.02 SPS #7.5

Step 6. Verify that RADIO-1 is not granted a channel when it is keyed up. Step 7. Verify that the Console can not make a Private Call to RADIO-1 but can Private Call RADIO-2. Step 8. Verify that RADIO-2 cannot make a Private Call to RADIO-1 but can Private Call the Console.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-50

4.10.4 Site Trunking Features

Site Trunking Talkgroup Call 1. DESCRIPTION

2. TEST

When a Site goes into Site Trunking, radios with Talkgroup Call capability will be able to communicate with other members of the same talkgroup at that same site. Members of the same talkgroup at other sites will not be able to monitor those conversations.

Step 1. Place SITE 1 into the Site Trunking mode via the Unified Event Manager (UEM).

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 2 RADIO-4 - TALKGROUP 1 RADIO-4 - SITE - SITE 2 * All Radios should be "Site Locked"

Step 2. Initiate a Talkgroup Call with RADIO-1 on TALKGROUP 1 at SITE 1. Step 3. Observe that only RADIO-2 will be able to monitor and respond to the call. Note that RADIO-3 and RADIO-4 are not able this monitor the call since the site is not in wide area operation. Step 4. Initiate a Talkgroup Call with RADIO-3 on TALKGROUP 1 at SITE 2. Step 5. Observe that only RADIO-4 will be able to monitor and respond to the call.

Pass____ Fail____

VERSION #1.03 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-51

Site Trunking Features

2. TEST

Site Trunking Private Call

Step 1. Place SITE 1 into the Site Trunking mode via the Unified Event Manager (UEM).

1. DESCRIPTION

Step 2. Using RADIO-1, press the Private Call button.

Private Calls is a selective calling feature that allows a dispatcher or radio user to carry on one-to-one conversation that is only heard by the 2 parties involved. When a site is in Site Trunking, Radios at the site will only be able to Private Call other radios at the same site.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 1 * All Radios should be "Site Locked"

VERSION #1.03 SPS #7.5

Step 3. Enter the Unit ID of RADIO-2 with the keypad, or scroll to the location where this ID is stored. Step 4. Press the PTT to initiate the call. Step 5. Verify that at RADIO-2 only tones are heard and the display indicates that a call has been received. Step 6. Answer the call at RADIO-2 by pressing the Private Call button. Verify its display shows the ID number of the calling unit. Step 7. Press the PTT switch on RADIO-2 and respond to the call. Note that if you do not press the Private Call button before pressing PTT, your audio will be heard by all members of the talkgroup, and not by the radio initiating the Private Call. Step 8. Verify only RADIO-1 hears the audio from RADIO-2. Step 9. End the Private Call and return to normal talkgroup operation.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-52

Site Trunking Features

2. TEST

Site Trunking Call Alert

Step 1. Place SITE 1 into the Site Trunking mode via the Unified Event Manager (UEM).

1. DESCRIPTION

Step 2. Using RADIO-1, press the page button.

Call Alert is a tone page that allows a user to selectively alert another radio unit. When a site is in Site Trunking, Radios at the site will only be able to Call Alert other radios at the same site. The initiating radio will receive notification from the trunked system as to whether or not the page was received by the target radio.

Step 3. Enter the Unit ID of RADIO-2 with the keypad, or scroll to the location where this ID is stored. Step 4. Press the PTT to initiate the Call Alert. Step 5. Verify that RADIO-2 received the Call Alert.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1

Step 6. Exit the Call Alert mode and return to normal talkgroup mode.

Pass____ Fail____

* All Radios should be "Site Locked"

VERSION #1.03 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-53

Site Trunking Features

2. TEST

Site Trunking Busy Queuing and Callback

Step 1. Place SITE 1 into the Site Trunking mode via the Unified Event Manager (UEM).

1. DESCRIPTION

Step 2. Simulate a busy system by disabling all channels at SITE 1 with the exception of the control channel and one voice channel.

If no voice channel resources are available, radios requesting channels for new conversations are placed in a queue. Users of the same priority will move through the queue in a FIFO (first in, first out) sequence; however, users of higher priority will be inserted ahead of lower priority users in the queue. When a voice channel becomes available, the radio at the top of the busy queue gets a channel assignment and generates a callback tone. The callback alerts the user that a channel assignment was made and transmitting is now possible on the selected talkgroup.

Step 3. Initiate a Talkgroup Call with RADIO-1 and observe that it is received by RADIO-4. Keep this call in progress until instructed to end the call. Step 4. Key RADIO-2 and observe that the radio receives a busy. Step 5. Key RADIO-3 and observe that the radio receives a busy. Step 6. End the Talkgroup Call established in Step 3.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 3 RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 1 RADIO-4 - SITE - SITE 1 * All Radios should be "Site Locked"

VERSION #1.03 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-54

Step 7. Observe that RADIO-2 receives a callback prior to RADIO-3 receiving a callback. Step 8. Return all channels for the site to service.

Pass____ Fail____

Site Trunking Features

2. TEST

Site Trunking Emergency Call and Alarm

Step 1. Place SITE 1 into the Site Trunking mode via the Unified Event Manager (UEM).

1. DESCRIPTION

Step 2. Simulate a busy system by disabling all channels at SITE 1 with the exception of the control channel and one voice channel.

This test verifies that Emergency Alarms and Calls can be initiated by subscribers when the registered site is in Site Trunking. With all portables registered on the Site Trunking site from the previous test, a portable will initiate an Emergency Alarm by pressing the Emergency button. By pressing the PTT, an Emergency Call will be issued and the ID of the initiator will be displayed with an Emergency indication by the other subscribers on the same talkgroup. Note that for site trunking, Emergency Call operation is always Top of Queue.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 3 RADIO-4 - SITE - SITE 1 * All Radios should be "Site Locked"

Step 3. Press the PTT on RADIO-3 and hold the PTT switch until instructed to release. Step 4. Key RADIO-4 and observe that the radio receives a busy. Step 5. Using RADIO-1, initiate an emergency alarm followed by an emergency call. Step 6. Observe that RADIO-1 cannot transmit due to the voice channel being busy. Step 7. Release the PTT switch on RADIO-3. Step 8. Observe that RADIO-1 can now proceed with the call and RADIO-2 receives the call. Also observe that the display on RADIO-2 denotes an emergency and the ID of the unit sending the emergency. Step 9. End the emergency call and verify that RADIO-4 gets a callback. Step 10. Restore all channels to service.

VERSION #1.03 SPS #7.5

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-55

Site Trunking Features

2. TEST

Site Trunking Continuous Assignment Updating

Step 1. Place SITE 1 into the Site Trunking mode via the Unified Event Manager (UEM). Step 2. Turn OFF RADIO-1.

1. DESCRIPTION Step 3. Initiate a Talkgroup Call using RADIO-2. When a talkgroup is assigned a voice channel, the site controller continues to transmit the channel assignment on the control channel for the duration of the Talkgroup Call. Radios coming into use on the system are automatically sent to voice channels with conversations in progress involving their selected talkgroups. This is demonstrated for a site in Site Trunking.

Step 4. While the Talkgroup Call is in progress, turn on RADIO-1. Step 5. Observe that RADIO-1, which was just brought back into service, joins the Talkgroup Call already in progress. Step 6. Release the PTT of RADIO-2.

SETUP Step 7. Switch RADIO-1 to TALKGROUP 2. RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 1 * All Radios should be "Site Locked"

VERSION #1.03 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-56

Step 8. Initiate a Talkgroup Call using RADIO-2. Step 9. While the Talkgroup Call is in progress, turn RADIO-1 back to TALKGROUP 1. Step 10. Observe that RADIO-1, which was just set back to TALKGROUP 1, joins the Talkgroup Call already in progress.

Pass____ Fail____

Site Trunking Features

2. TEST

Site Trunking Indication

Step 1. Place the site in Site Trunking through the Unified Event Manager (UEM).

1. DESCRIPTION

Step 2. Verify that the subscriber radios are displaying the "Site Trunking" indication.

When a remote site loses its link or does not have a link to the Zone Controller, the affected site will enter "Site Trunking" mode of operation. Radios locked onto this site will be serviced locally within this site's coverage area.

Pass____ Fail____

SETUP Lock the subscribers to the site to be tested if more than one site exists on the system.

VERSION #1.03 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-57

Site Trunking Features

2. TEST

Site Trunking Wide Area Recovery

Step 1. From the UEM set the status of SITE 1 to Wide Area and clear any system errors that may have placed SITE 1 into Site Trunking.

1. DESCRIPTION A site in Site Trunking will transition to Wide Area Trunking when all failures have been cleared and when the Unified Event Manager (UEM) has set the sites status to Wide Area. All subscribers should transition from Site Trunking to Wide Area Trunking and continue to process calls.

SETUP

Step 2. Verify that the status of SITE 1 in ZoneWatch and UEM reflect that SITE 1 has transitioned into Wide Area Trunking. Step 3. Verify that RADIO-1 and RADIO-2 no longer display Site Trunking. Step 4. Verify communications between RADIO-1 and RADIO-2. Step 5. Verify that ZoneWatch can now monitor the status of SITE 1.

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 Site needs to be placed in Site Trunking via the UEM * All Radios should be "Site Locked"

VERSION #1.03 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-58

Pass____ Fail____

Site Trunking Features

2. TEST

Site Trunking Roaming to Wide Area Sites

Step 1. Set the Failure Random Holdoff Time (FRHOT) setting for SITE 1 in the Zone Configuration Manager to 1 minute.

1. DESCRIPTION Radios at a site that goes into Site Trunking will attempt to roam to a site in Wide Area Trunking so it is not stranded at a site with limited system resources available. The parameter adjusted in the test is the Failure Random Holdoff Time setting. This timer is used by the subscribers to set a random timer, which delays subscribers from flooding an adjacent site with registration requests. NOTE: This feature only works on a multi-site system.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 *Start up a ZoneWatch session for the site the radios are affiliated in.

Step 2. Initiate a Talkgroup Call between RADIO-1 and RADIO-2. Step 3. Note the site that the radios are affiliated to on the ZoneWatch screen. Step 4. Place the site the radios are affiliated to into Site Trunking. Step 5. After 1 minute, initiate a Talkgroup Call between RADIO-1 and RADIO-2. Step 6. Observe that Radios 1 and 2 have roamed to a wide area site on the Zone Watch screen. Step 7. Reset the FRHOT setting of SITE 1 back to the customer's default. Step 8. Return SITE 1 back to Wide Area.

Pass____ Fail____

*All sites should be in Wide Area at the start of this test. *All radios should NOT be "Site Locked" *The radios should have alternate site control channel frequencies setup in the portable's control channel list. *The portables should not be configured for "Always Preferred" for this site which would prevent the radios from roaming under site trunking conditions.

VERSION #1.01 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-59

4.10.5 Elite Console Features Talkgroup Selection and Call 1. DESCRIPTION

2. TEST

The Talkgroup Call is the primary level of organization for communications on a trunked radio system. Dispatchers with Talkgroup Call capability will be able to communicate with other members of the same talkgroup. This provides the effect of an assigned channel down to the talkgroup level. When a Talkgroup Call is initiated from a subscriber unit, the call is indicated on each dispatch operator position that has a channel control resource associated with the unit's channel/talkgroup.

Step 1. Initiate a wide area call from any operator position on TALKGROUP 1. Step 2. Observe that RADIO-1 and RADIO-3 will be able to monitor the call. Dekey the console and have either radio respond to the call. Step 3. Observe that all Consoles with TALKGROUP 1 can monitor both sides of the conversation.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 2 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2

Step 4. Initiate a wide area call from any operator position on TALKGROUP 2. Step 5. Observe that RADIO-2 and RADIO-4 will be able to monitor the call. Dekey the console and have either radio respond to the call. Step 6. Observe that all Consoles with TALKGROUP 2 can monitor both sides of the conversation.

VERSION #1.02 SPS #7.5 Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-60

Elite Console Features

2. TEST

Console ASTRO Secure Talkgroup Call

Step 1. Initiate a wide area coded call from an operator position on TALKGROUP 1.

1. DESCRIPTION

Step 2. Verify that RADIO-1 and RADIO-3 can monitor and respond to the secure call.

Digital encryption is used to scramble a transmission so only properly equipped radios can monitor the conversation. A "Key" is used to encrypt the transmit audio. Only radios and Consoles/MGEGs with the same "Key" can decrypt the audio and listen to it. The talkgroup to Common Key Reference (CKR) binding is kept in the MGEG and configured in the User Configuration Manager (UCM). The bindings are propagated to the MGEGs, which enable the Console to participate in encrypted calls. The "Key" that corresponds to the CKRs must be loaded into all MGEG Crypto Cards in the Zone.

SETUP Four radios, each capable of performing ASTRO secure calls on secure console Talkgroups, are required to perform this test (RADIO-1, RADIO-2, RADIO-3 and RADIO-4). This test requires RADIO1 and RADIO-2 to be affiliated at one site and RADIO-3 and RADIO-4 to be affiliated at another site. Set all RADIO-1 and RADIO-3 to monitor TALKGROUP 1, and RADIO-2 and RADIO-4 to monitor TALKGROUP 2. The MGEG needs to be equipped with Crypto Cards and radios with Crypto Modules in order to participate in secure calls. TALKGROUP 1 needs to be bound to CKR1, and Talkgroup B needs to be bound to CKR2 in both the UCM and in the Radio programming. RADIO-1, RADIO-2, RADIO-3 should be loaded with the "keys" that correspond to CKR1 and CKR2. RADIO-4 should only have the "key" that corresponds to CKR1. All Radios should be set to transmit in the secure mode.

Step 3. Initiate a wide area coded call from an operator position on TALKGROUP 1. Step 4. Verify that RADIO-2 can monitor and respond to the secure call. Note that RADIO-4 cannot monitor the call because it does not have the "Key" that corresponds to CKR2. Step 5. Change RADIO-2 and RADIO-4 to TALKGROUP 1. Step 6. Initiate a wide area coded call from an operator position on TALKGROUP 1. Step 7. Verify that RADIO-1, RADIO-2, RADIO-3 and RADIO-4 can monitor and respond to the secure call because they all have the "Key" that corresponds to CKR1. Step 8. If the radios equipped with dual algorithm encryption modules, select talkgroups using the second algorithm and repeat steps 1-6.

Pass____ Fail____

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-61

Elite Console Features

2. TEST

Multigroup Call

Step 1. Select the ATG 1 resource, which corresponds to TALKGROUP 1, TALKGROUP 2, and TALKGROUP 3.

1. DESCRIPTION This trunking feature allows an equipped console operator position to transmit an announcement to several different talkgroups simultaneously. As with Talkgroup Calls, multigroup calls operate across sites as well as within the same site.

Step 2. Initiate the Multigroup Call from the operator position. Step 3. Observe that RADIO-1, RADIO-2 and RADIO-3 receive the Multigroup Call. Step 4. Verify that RADIO-4 does not receive the Multigroup Call because it is not a member of ATG 1.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 3 RADIO-3 - SITE - SITE 3 (SITE 1 if only 2 Sites) RADIO-4 - RANDOM RADIO-4 - SITE - SITE 4 (SITE 2 if only 2 Sites) * TALKGROUP 1, TALKGROUP 2, & TALKGROUP 3 are members of ATG 1. * RANDOM is any talkgroup not a member of ATG 1. * Multigroups are set up through both the UCM and the Subscriber Programming software.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-62

Step 5. Answer the Multigroup Call using RADIO-1 and observe the consoles receives the response. Step 6. Verify that if the call is answered within the repeater hang time, the console will receive the call on the ATG 1 resource tile, otherwise the console will receive the call on the TALKGROUP 1 tile. Step 7. Verify that if the call is answered within the repeater hang time, RADIO-2 and RADIO-3 will monitor that call.

Pass____ Fail____

Elite Console Features

2. TEST

Talkgroup Patch

Step 1. Select an operator position for testing which contains TALKGROUP 1 and TALKGROUP 2.

1. DESCRIPTION Talkgroup Patch allows a dispatcher to merge several talkgroups together on one voice channel to participate in a single conversation. This can be used for situations involving two or more channels or talkgroups that need to communicate with each other. Using the Patch feature, the console operator can talk and listen to all of the selected talkgroups grouped; in addition, the members of the individual talkgroups can also talk or listen to members of other talkgroups. Patched talkgroups can communicate with the console dispatcher and other members of different talkgroups because of the "supergroup" nature of the Patch feature. NOTE : If "secure" and "clear" resources are patched together, one repeater for each mode may be assigned per site.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 2 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2

Step 2. At the desired operator position select one of the Patch tabs in the Patch/Multi-Select window. Step 3. Click the button on the patch that allows an operator to setup and edit a patch (note patch window turns blue). Step 4. Add TALKGROUP 1 and TALKGROUP 2 to the patch by selecting each resource tile. Step 5. Once the talkgroups are added, click the patch setup button again to complete the patch setup. Step 6. Initiate several Talkgroup Calls between radios. Step 7. Observe that all radios are able to communicate with one another. Also via Zone Watch observe that only one station is assigned at each of the two sites. Step 8. Initiate a call from the operator position using the Patch Transmit and observe that all radios are able to receive the call and only one station is assigned at each of the two sites. Step 9. Remove TALKGROUP 1 and TALKGROUP 2 from the patch.

* All 4 Radios must have the same home zone.

Pass____ Fail____ VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-63

Elite Console Features

2. TEST

Secure Talkgroup Patch

Step 1. While the system is in wide area operation, verify that all radios are affiliated and selected to a talkgroup as described above.

1. DESCRIPTION This test validates the ability of the console/radio to transmit and to receive secure calls on Patch and patch secure audio from one resource to another.

SETUP Four radios are required to perform this test (Radios 1, 2, 3, 4). This test requires Radios 1 and 2 to be affiliated onto the same site to Talkgroup A and Radio 3 and 4 affiliated to Talkgroup B. Consoles C1 is patching Console with Talkgroup A and B in the same patch. R1 is a clear only radio. The TGA and TGB are nonregroupable and transmit mode set to secure.

Step 2. Select an operator position for testing that contains Talkgroup A and B. Step 3. At the desired operator position, select one of the Patch tabs in the Patch/Multi- Select window. Step 4. Click the button on the patch that allows an operator to setup and edit a patch (note patch window turns blue). Step 5. Add all the talkgroups to the patch that were selected on the radios above in the setup procedure by selecting each resource tile. Step 6. Once all talkgroups are added, click the patch setup button again to complete the patch setup.

VERSION #1.02 SPS #7.5

Step 7. Initiate a talkgroup call on Talkgroup A from R2 in a secure transmit mode. Step 8. Observe that all radios are able to hear R2 except R1 as it is a clear only radio.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-64

Elite Console Features

2. TEST

Multi-Select/APB

Step 1. Select an operator position for testing which contains TALKGROUP 1, TALKGROUP 2, TALKGROUP 3 and TALKGROUP 4.

1. DESCRIPTION A Multi-Select (MSEL) allows a dispatcher to merge several talkgroups together on one voice channel to participate in a single conversation. This can be used for announcements to two or more channels or talkgroups for general broadcast purposes. Using the Multi-Select feature, the console operator can talk and listen to all of the selected talkgroups grouped; however, the members of the individual talkgroups cannot talk or listen to members of other talkgroups. Multi-selected talkgroups still only communicate with the console dispatcher and other members in the same talkgroup. A predefined multiselect configuration can be saved by the console operator as an All Points Bulletin (APB) for quick broadcast-type transmissions by the dispatcher. NOTE : If "secure" and "clear" resources are multiselected, one repeater for each mode may be assigned per site.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 3 RADIO-3 - SITE - SITE 3 RADIO-4 - TALKGROUP 4 RADIO-4 - SITE - SITE 4

VERSION #1.02 SPS #7.5

Step 2. At the desired operator position select one of the Multi-Select tabs in the Patch/MultiSelect window. Step 3. Click the button on the Multi-Select that allows an operator to setup and edit a multiselect (note: MSEL window turns green). Step 4. Add TALKGROUP 1, TALKGROUP 2, TALKGROUP 3 and TALKGROUP 4 to the Multi-Select by selecting each resource tile. Step 5. Once the talkgroups are added click the Multi-Select Setup button again to complete the Multi-Select setup. Step 6. Initiate a call from the operator position using the APB Transmit and observe that all radios are able to receive the call. Also via Zone Watch verify that only one RF resource is assigned at any site where multiple radios are affiliated. Step 7. Remove all talkgroups from the MultiSelect. Customer Requested Modification: Step 8

Step 9

If possible, create a “tailgating” condition where an inbound caller on one of the TGs involved in the MSEL gets repeated on the MSEL. Attempt to create a second “tailgated” call immediately after release of the first “tailgating” call. Verify that system will either not allow any “tailgating” of a MSEL or that a maximum of one (1) “tailgate” call can occur.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-65

Elite Console Features

2. TEST

Console Initiated Private Call

Step 1. Select an operator position for testing.

1. DESCRIPTION Private Conversation is a selective calling feature which allows a dispatcher or radio user to carry on one-to-one conversation that is heard only by the two parties involved. Subscriber units receiving a private call will sound an alert tone. As with other call types, Private Calls operate across sites as well as within the same site.

Step 2. Select the "PRIVATE-CALL" tile. Step 3. Click the button on the tile that provides the Private Call function. Step 4. Select the unit to be Private Called, in this case RADIO-1. Step 5. Click the Send button.

SETUP

Step 6. Answer the Private Call with RADIO-1 and respond to the console.

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1

Step 7. After completing the Private Call, return to the normal talkgroup mode.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-66

Pass____ Fail____

Elite Console Features

2. TEST

Console Initiates/Receives Secure Private Call

Step 1. Select the "PRIVATE-CALL" tile and set to the secure mode at C1.

1. DESCRIPTION Private Conversation is a selective calling feature that allows a dispatcher or radio user to carry on one-toone conversation that is heard only by the two parties involved. The test validates the ability to initiate/receive secure private calls by the Console/Radio.

SETUP

Step 2. Click the button on the tile that provides the Private Call function. Step 3. Select the numeric keypad and using the displayed keypad enter the unit ID for R1. Step 4. Click the Send button. Step 5. Answer the Private Call with the radio as done during the trunking test and respond to the console.

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 CONSOLE-1 (w/Private Call)

Step 6. Verify that audio can be heard on both ends.

VERSION #1.02 SPS #7.5

Step 8. PTT radio R1 to initiate Private Calling (PC) ring sequence to console C1 in secure transmit mode. Answer PC ring on C1 and establish audio conversation between R1 and C1.

Step 7. After completing the Private Call, return to the normal talkgroup mode.

Step 9. Verify that audio can be heard on both ends. Step 10. Exit PC on radio R1 and C1.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-67

Elite Console Features

2. TEST

Emergency Alarm And Call Display

Step 1. Select an operator position in the zone where RADIO-1 is affiliated for the test.

1. DESCRIPTION

Step 2. Initiate an Emergency Alarm from RADIO1.

Users in life threatening situations can use the emergency button on the radio to send an audible alarm and a visual alarm signal to a console operator in order to request immediate system access to a voice channel for an emergency call. An emergency alarm begins after the radio user presses the radio's emergency button. Pressing the emergency button places the radio in "emergency mode". To begin an emergency call, the radio user must press the radio's PTT button while in "emergency mode." The assigned voice channel will be dedicated to the emergency caller's talkgroup for an extended period of time, equal to the Message Hang Time plus the Emergency Hang Time. As with other call types, emergency calls can operate across sites as well as within the same site.

Step 3. Observe the Emergency from RADIO-1 is received at the operator position on TALKGROUP 1. Note that if RADIO-1 is programmed for Emergency Revert, the Emergency will be received on the designated revert talkgroup. Step 4. Acknowledge the Emergency at the operator position. Step 5. Key RADIO-1 to initiate an Emergency call to the operator position and reply to the radio from the operator position. Observe that the call takes place. Step 6. Clear the Emergency from the console on TALKGROUP 1.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1

Step 7. Reset RADIO-1 by holding the Emergency button on the radio.

Pass____ Fail____ VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-68

Elite Console Features

2. TEST

PTT Unit ID/Alias Display

Step 1. Select TALKGROUP 1 on any operator position with that Talkgroup.

1. DESCRIPTION

Step 2. Initiate a call from RADIO-2 and observe that the unit ID is seen at both consoles in the list in the resource window as well as in the Activity Log window.

Console operator positions contain various resources such as talkgroup, multigroup and Private Call which enable the operator to communicate with the subscriber units. If activity occurs on one of these operator position resources, the unit ID or associated alias of the initiating radio appears at the console resource. Default operation for the system is to display unit IDs at the console operator resource, but pre-defined aliases can be substituted for each unit ID.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 Make sure that RADIO-2 does not have an alias in the Console's Alias Database Manager (ADM), delete if necessary. Make sure to give enough time for the alias change to propagate to the console position.

Step 3. Initiate a call from RADIO-1 and observe that the alias of RADIO-1 is seen at both consoles in the list in the resource window as well as in the Activity Log window. Step 4. Update the ADM by downloading the aliases from the UCM. Verify that RADIO-2 now has an entry in the ADM. Make sure to give enough time for the alias change to propagate to the console position. Step 5. Initiate a call from RADIO-2 and observe that now the alias of RADIO-2 is seen at both consoles in the list in the resource window as well as in the Activity Log window.

Pass____ Fail____

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-69

Elite Console Features

2. TEST

Console Initiated Tactical/Normal Priority

Step 1. Simulate a busy system by disabling all channels at SITE 1 with the exception of the control channel and one voice channel.

1. DESCRIPTION The Tactical/Normal Priority feature is initiated at the console operator position and provides the dispatcher with the ability to change the priority for a particular talkgroup. When selected, a higher priority level (level 2) is assigned to the talkgroup. This overrides the priority level set in the UCM. NOTE: All radios and talkgroups should start with default priorities. Default is 10.

Step 2. Enable Tactical Priority for TALKGROUP 3 from any console position with this option. Step 3. Initiate a Talkgroup Call with RADIO-1. Keep this call in progress until instructed to end the call. Step 4. Key RADIO-2 and observe that the radio receives a busy. Step 5. Key RADIO-3 and observe that the radio receives a busy.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 3 RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 3 RADIO-4 - SITE - SITE 2

Step 6. End the Talkgroup Call established in Step 3.

* The priority level for the talkgroups selected should be the same.

Step 8. End the call between RADIO-3 and RADIO-4.

Step 7. Verify RADIO-3 receives the first callback and can communicate with RADIO-4. Note that if TALKGROUP 3 was not set to Tactical, RADIO-2 would receive the first callback.

Step 9. Verify that RADIO-2 receives a call back.

VERSION #1.02 SPS #7.5

Step 10. Disable Tactical Priority for TALKGROUP 3.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-70

Elite Console Features

2. TEST

Alert Tones

Step 1. Select TALKGROUP 1 on any console position.

1. DESCRIPTION

Step 2. Select Alert Tone 1 and depress the Alert Tone button for 5 seconds.

To send alert tones from a console operator position, the dispatcher must depress one of three alert switches which sends an alert tone over a selected channel/talkgroup resource. Three distinct alert tones can be transmitted which might alert members of a talkgroup to a particular event or signify to radio users that special instructions are to follow. The three alert tones available at the console operator position are: Alert 1 - Constant 1 kHz Tone, Alert 2 - Two Alternating Tones and Alert 3 - Chopped 1 kHz Tone.

Step 3. Verify that RADIO-1 and RADIO-2 hear Alert Tone 1. Step 4. Repeat Steps 2-3 for Alert Tone 2 and 3.

Pass____ Fail____

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-71

Elite Console Features

2. TEST

Call Alert Page

Step 1. Select the call alert button in the "Private Call" resource window.

1. DESCRIPTION

Step 2. Enter the ID of RADIO-1.

Call Alert Page allows a dispatcher to selectively alert another radio unit. The initiating radio will receive notification as to whether or not the call alert was received. Units receiving a Call Alert will sound an alert tone and show a visual alert indication. The display will also show the individual ID of the initiating radio unit. After receiving the Call Alert, the radio can respond with either a Private Call or normal talkgroup call.

Step 3. Send the call alert to RADIO-1 by depressing the send button.

This feature is fully supported on all display portables and mobiles.

Step 7. Verify that after trying to page RADIO-1, the console does display "Can not send call alert - target not found" in the summary list.

Step 4. Verify that RADIO-1 receives the alert and that the ID of the console is shown. Step 5. Turn off RADIO-1. Step 6. Send the call alert to RADIO-1 again.

SETUP Pass____ Fail____ RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-72

Elite Console Features

2. TEST

Radio Status (Purchased Option)

Step 1. Initiate a Status transmission from RADIO1.

1. DESCRIPTION

Step 2. Verify that RADIO-1 receives an audible indication that the status has been received at the Master Site.

This optional feature allows the Console to display status information sent in by subscribers. Statuses are used to indicate the Radio operator's operational state (e.g. off duty). The information that will be displayed includes the radio alias, hour and minute time stamp, event state and the customer entered translation for the specific status. Event sorting and filtering for the window can be configured in the Elite Administration application.

Step 3. Verify the Console displays the proper Status text and the operator is audibly alerted to the status (configurable). Step 4. Verify that the Console can respond back to the radio directly by selecting the status and transmitting from the Resource Preview Tile.

SETUP Pass____ Fail____ RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 * Configure the radio user in the Manager to use a particular status set. * Configure Status through the Manager to also be routed to the console.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-73

Elite Console Features

2. TEST

Console Initiated Emergency

Step 1. Click the "Emergency" button on the resource window for TALKGROUP 1 on Console 1 to display the Emergency QuickList and then click on the "Setup" button to initiate a console emergency.

1. DESCRIPTION Emergency Call can be initiated by the console. If the console initiates an emergency call on a Talkgroup, a channel is assigned to that Talkgroup indefinitely. The console initiated emergency call is ended when the call is knocked down, the channel fails, or the last affiliated member in the talkgroup de-affiliates. Any dispatcher may knock down an emergency call, regardless of who initiated it. All the radios in the Talkgroup receive the emergency call. NOTE : If the subscriber does not have the PTT Display option, the Emergency ID will not be displayed.

Step 2. Verify that an emergency indication is shown on Console 2 and on RADIO-1 and RADIO-2 (if they have displays). Step 3. Transmit on TALKGROUP 1 from Console 1. Determine which repeaters are keyed at SITE 1. Step 4. Verify that the individual ID of the TALKGROUP 1 resource on Console 1 is shown on Console 2 and on both Radios (if they have displays) and all hear Console 1's transmit audio.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 * Two console are required for this test.

Step 5. Stop transmitting on TALKGROUP 1 from Console 1. Step 6. Wait a minute and then keyup on RADIO-1. Step 7. Verify both consoles and RADIO-2 hear the audio. Verify the same repeaters as determined in step 3 are keyed.

* The consoles must have TALKGROUP 1. Step 8. Dekey RADIO-1.

VERSION #1.02 SPS #7.5

Step 9. Click the "Emergency" button on the resource window for TALKGROUP 1 on Console 2 to display the Emergency QuickList and then click on the "Knockdown" button. Step 10. Verify the emergency is knocked down and the repeaters previously keyed are no longer assigned.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-74

Elite Console Features

2. TEST

Console Initiated Secure Emergency

Step 1. Click the "Emergency" button on the resource window for Talkgroup A on Console 1 to display the Emergency QuickList and then click on the "Setup" button to initiate a console emergency.

1. DESCRIPTION Emergency Call can be initiated by the console. If the console initiates an emergency call on a Talkgroup, a channel is assigned to that Talkgroup indefinitely. The console initiated emergency call is ended when the call is knocked down, the channel fails, or the last affiliated member in the Talkgroup de-affiliates. Any dispatcher may knock down an emergency call, regardless of who initiated it. All the radios in the Talkgroup receive the emergency call.

SETUP Two radios and 2 consoles are required to perform this test (Radios 1 and 2 and console 1 and 2). The Radios can be affiliated to any site in the system. Set the Radios to Talkgroup A (Secure mode). Both consoles must have Talkgroup A.

Step 2. Verify that an emergency indication is shown on the Console 2 and on both Radios (if they have displays). Step 3. Transmit on Talkgroup A from Console 1. Determine which repeaters are keyed at the sites where Radios 1 and 2 are affiliated. Step 4. Verify that the individual ID of the Talkgroup A resource on Console 1 is shown on Console 2 and on both Radios (if they have displays) and all hear Console 1's transmit audio. Step 5. Stop transmitting on Talkgroup A from Console 1. Step 6. Wait a minute and then keyup on Radio 1.

VERSION #1.02 SPS #7.5

Step 7. Verify both consoles and Radio 2 hear the audio. Step 8. Verify the same repeaters as determined in step 3 are keyed,Unkey Radio 1. Step 9. Click the "Emergency" button on the resource window for Talkgroup A on Console 2 to display the Emergency QuickList and then click on the "Knockdown" button. Step 10. Verify the emergency is knocked down and the repeaters previously keyed are no longer assigned.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-75

Elite Console Features

2. TEST

Console Repeat Disable (Optional)

Step 1. Initiate a wide area call with RADIO-1. Keep this call in progress until instructed to end the call.

1. DESCRIPTION This test verifies that any console operator position with a Repeat Disable control can enable and disable the repeat path for a particular talkgroup. This will be accomplished by changing the Repeat Disable status at various console operator positions scattered throughout the system and showing the effects on a radio call.

Step 2. Verify that the RADIO-1 audio is heard at the other radios and all operator positions with TALKGROUP 1. Step 3. Select the Repeat Disable icon for that talkgroup on any operator position. Step 4. Verify that RADIO-1 audio is still heard at the operator positions but not at any radio.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 1 * Several operator positions with a Repeat Disable control for the selected talkgroup are required. * For multizone systems, the operator positions should be located in different zones.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-76

Step 5. Select the Repeat Enable icon for that talkgroup on any operator position. Step 6. Verify that RADIO-1 audio is heard at the operator positions and at all radios. Step 7. Dekey RADIO-1.

Pass____ Fail____

Elite Console Features

2. TEST

Outbound Telephone Interconnect and Patch

Step 1. Select the Telephone Resource Window. Verify that the Resource Window is highlighted in blue, the On/Off Hook icon displays Off Hook. Verify the dial tone is heard.

1. DESCRIPTION The dispatch console has the capabilities of initiating communication to landline telephone resources. The console can also patch together a telephone communication to a radio resource.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1

Step 2. Choose the keypad icon and enter a local phone number, verify that operator hears a ringing, close the keypad icon Step 3. When the landline answers, verify communication between landline user and operator Step 4. Patch the TALKGROUP 1 Resource to the Telephone Resource.

VERSION #1.02 SPS #7.5

Step 5. Transmit on the RADIO-1, verify communication with landline user. Step 6. Verify that Console Operator receives transmission. Console operator presses patch transmit, verify communication with RADIO-1 and landline user. Step 7. Dissolve the patch.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-77

Elite Console Features

2. TEST

Inbound Telephone Interconnect and Patch

Step 1. From a landline, dial the number connected to the SPI in the CEB.

1. DESCRIPTION

Step 2. Verify that Console 1 displays an incoming call indication.

The dispatch console has the capabilities of answering communication from landline telephone resources. The console can also patch together a telephone communication to a radio resource.

SETUP

Step 3. Answer the incoming call and verify communication between landline user and operator. Step 4. Patch the TALKGROUP 1 Resource to the Telephone Resource.

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1

VERSION #1.02 SPS #7.5

Step 5. Transmit on RADIO-1, verify communication with landline user. Also verify that Console Operator receives transmission. Console Operator presses patch transmit, verify communication with RADIO-1 and landline user. Step 6. Dissolve the patch.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-78

Elite Console Features

2. TEST

Console Priority

Step 1. Initiate a Talkgroup call from RADIO-1 on TALKGROUP 1.

1. DESCRIPTION

Step 2. Observe that RADIO-2 receives the call.

Console Operator Positions have ultimate control of transmitted audio on an assigned voice channel resource. The Console Position has the capability to take control of an assigned voice channel for a talkgroup call so that the operator's audio overrides any subscriber audio. Console priority is a feature that enables dispatchers to gain immediate access to an assigned voice channel so that a central point of audio control exists.

Step 3. While the call is in progress, key up any operator position at the console on TALKGROUP 1.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1

Step 4. Observe that RADIO-2 is now receiving audio from the operator position. Step 5. De-key the Operator Position. Step 6. Verify RADIO-2 now receives RADIO-1 audio.

Pass____ Fail____

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-79

Elite Console Features

2. TEST

Supervisory Control

Step 1. Set up two dispatch positions on the same talkgroup; one must be the Supervisor position.

1. DESCRIPTION

Step 2. Transmit from the non-Supervisor position. The Console Operators may override subscriber audio being transmitted on the system. The Console Supervisor position may override all other console positions.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1

VERSION #1.02 SPS #7.5

Step 3. Verify that RADIO-1 receives the nonSupervisor audio. Step 4. While continuing to transmit at the nonsupervisory position, transmit on the same channel at the Supervisor's position using the Instant Transmit Key. Step 5. Verify that RADIO-1 receives the supervisor audio and that the supervisor audio is heard at non-supervisor position.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-80

Elite Console Features

2. TEST

Conventional Radio Resource (BIM Only)

Step 1. Choose a conventional Radio Resource at the console.

1. DESCRIPTION

Step 2. Connect a transmission test set to the output of the Base Interface Module corresponding to the selected Radio Resource.

A conventional station can be integrated into a trunking system by placing a conventional resource on the Elite consoles. This allows the user to patch the conventional station with the desired talkgroups.

Step 3. Key up the console Radio Resource and verify Transmit audio for the conventional resource.

SETUP Connect a transmission test set to the CEB interface panel port that corresponds to a conventional BIM in the CEB. Each RJ45 receptacle on the CEB interface panel, pins 1 and 2 are for CEB RX audio, and pins 4 and 5 are for CEB TX audio.

VERSION #1.02 SPS #7.5

Step 4. Inject a test tone into the input of the Radio Resource selected. Step 5. Verify the Radio Resource receives the tone in the select speaker. Step 6. Repeat Steps 1-5 for one conventional BIM in each CEB.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-81

Elite Console Features

2. TEST

Alarm Input / Outputs (16 Aux I/O)

Step 1. Using a shorting wire, simulate a relay closure on an input via the punch block for the I/O's to be tested.

1. DESCRIPTION The alarm inputs of the 16 Aux I/O can be connected to almost any device that requires or can detect a relay closure. These signals can be simulated and monitored with simple test equipment such as a multimeter.

Step 2. Verify that the Operator position momentary input displays the icon designated for an ON_STATE. Step 3. Remove the shorting wire and verify that the Operator position displays the icon designated for an OFF_STATE.

SETUP Connect a multi-meter capable of monitoring closures to the proper pins of the punch block cabled to the Aux I/O. Using the Elite Console Database Manager (CDM) and the Elite Admin software, add the aux I/O buttons to the Elite dispatch screen for at least one momentary input and one momentary output. Aux I/O pinout: Aux I/O 1 - pins 26,1 Aux I/O 2 - pins 27,2 Aux I/O 3 - pins 28,3 Aux I/O 4 - pins 29,4

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-82

Step 4. Connect the Multimeter to the pins to monitor a relay output. Step 5. Verify that the meter reads an open circuit. Step 6. Depress the momentary input button on the console to initiate a relay closure. Step 7. Verify that the multimeter displays a closed circuit.

Pass____ Fail____

Elite Console Features

2. TEST

Logging Recorder

Step 1. Identify the pins on the designated LORI punchblock that provide the demarcation for the detrunked logging tracks for TALKGROUP 1 and TALKGROUP 2.

1. DESCRIPTION The Logging Record Interface (LORI) and Logging Recorder/Operator Interface Module (LOMI) in the Central Electronics Bank (CEB) provide an audio source to an external Logging Recorder used to record console dispatch audio. The LOMI card detrunks the talkgroup audio and sources the talkgroup audio to the AEI/LORI boards which connect to the actual Logging Recorder.

Step 2. Connect a transmission test set to monitor the audio across the punchblock demarcation. Step 3. Initiate a Talkgroup Call from the console position. Step 4. Monitor audio traffic between the radio user and the console dispatcher on the test set.

LORI pinouts: Output Pair #1 - pins 26,1 Output Pair #2 - pins 28,3 Output Pair #3 - pins 30,5 Output Pair #4 - pins 32,7 Output Pair #5 - pins 36,11 Output Pair #6 - pins 38,13 Output Pair #7 - pins 40,15 Output Pair #8 - pins 42,17

SETUP

Step 5. Initiate a Talkgroup Call from RADIO-1 on TALKGROUP 1. Step 6. Monitor audio traffic between RADIO-1 and the console dispatcher on the test set. Step 7. Repeat Steps 2-6 for TALKGROUP 2.

Pass____ Fail____

Use the Console Dispatch Manager (CDM) software to configure a LOMI to detrunk TALKGROUP 1 and TALKGROUP 2 in order to test the audio availability at the LORI card. Connect the LORI card that contains the logging tracks for TALKGROUP 1 and TALKGROUP 2 to a punchblock.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-83

Elite Console Features

2. TEST

Intercom Operation (Console to Console)

Step 1. At the console press the "INTERCOM CALL" icon.

1. DESCRIPTION

Step 2. Choose the console to be called and press the SEND button.

The intercom function allows console operators to communicate with other console operator positions without using a radio resource.

Step 3. Answer the call at the destination console by pressing the "INTERCOM CALL" icon and selecting ANSWER.

SETUP * Two consoles are required

VERSION #1.02 SPS #7.5

Step 4. Verify communications between the two consoles. The answering console will have a hot microphone, and the sending console must press the lightning bolt in the Intercom Window to transmit. Step 5. End the intercom call by pressing the HANGUP icon on either console.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-84

Elite Console Features

2. TEST

Console Enable / Disable

Step 1. Verify that Console 1 is set up as a Supervisor.

1. DESCRIPTION

Step 2. Transmit from the Console 2 (nonsupervisory) and verify communication with RADIO-1.

In an Elite Operator configuration, the Supervisory console position may disable the non-supervisory positions. This will disable all transmit capability from the disabled console.

Step 3. Select the "Enable/Disable Op Position" button from the tool bar on the Supervisory console.

SETUP Step 4. Disable Console 2. * Two consoles are required Step 5. Verify that the non-supervisory position is completely disabled from making a call.

VERSION #1.02 SPS #7.5

Step 6. Select the "Enable/Disable Op Position" button from the tool bar on the Supervisory console. Step 7. Enable Console 2. Step 8. Verify that the non-supervisory position is completely enabled.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-85

Elite Console Features

2. TEST

Acoustic Crossmute 1. DESCRIPTION

Step 1. Without an Acoustic Crossmute configured, and the select speakers of each operator position turned to maximum volume, transmit on Console 1.

Acoustic crossmuting means that selected operator positions will not hear outbound transmissions from operator positions they are cross-muted with.

Step 2. Confirm feedback is heard on the operator positions and the portable hears feedback on the talkgroup.

This feature is used when operator positions are located in the same room.

Step 3. With an Acoustic Crossmute configured, and the select speakers of each operator position turned to maximum volume, transmit on Console 1.

The Acoustic Crossmute is configured in the system's Console Database Manager.

Step 4. Verify no feedback is heard at either operator position and that the portable doesn't hear feedback on the talkgroup.

SETUP * Two adjacent console positions monitoring the same talkgroup.

Pass____ Fail____ * Portable monitoring talkgroup

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-86

Elite Console Features

2. TEST

Console Operator Secure / Clear Mode Mismatch Indication

Step 1. PTT radio Radio1. Step 2. Verify that C1 is able to receive audio from R1.

1. DESCRIPTION Step 3. Place radio Radio1 in clear transmit mode. This test validates the ability of the console to show a visual indication of a Secure and Clear mode mismatch during following conditions: Talkgroup on the Console is in secure transmit mode but receiving clear audio. Talkgroup on the Console is in clear transmit mode but receiving secure audio. Note that the secure talkgroup and private call tests would show the alert in a case where the mode mismatch is encountered.

Step 4. PTT radio Radio1. Step 5. Verify that C1 is able to receive audio from Radio1, also displays secure mode mismatch indication. Step 6. Place radio Radio1 in secure transmit mode and place Console C1 in clear transmit mode. Step 7. PTT radio Radio1

SETUP This test requires one Zone, one Trunking site (Site 1), one Console site (Site 2), one console (C1) and one radio Radio1. C1 is affiliated with Talk Group TG_A with transmit mode set to secure. Radio1 is affiliated to TG_A with transmit mode set to secure.

Step 8. Verify that C1 is able to receive audio from Radio1, also displays secure mode mismatch indication.

Pass____ Fail____

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-87

4.10.6 System Management Tests

Unified Event Manager/Ambassador Link Failure 1. DESCRIPTION

2. TEST

This test verifies that the Unified Event Manager (UEM) is able to capture information about various failures at the system and zone level.

Step 1. Remove one of the E1 connections from the MGEG line card.

This test simulates a failure by removing one of the links between the Ambassador and MGEG (Motorola Gold Elite Gateway). The alerts will be monitored at the UEM. *The MCC7500 Console Sub-system does not use AEB, but if the Telephone Interconnect functionality is present then AEB is required regardless of the Console type.

SETUP No setup is required for this test.

VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-88

Step 2. Observe the appropriate alert indicating an Audio Switch link failure appears on the Unified Event Manager (UEM). Step 3. Replace the link removed in Step 1. Step 4. Observe that the alarm clears for the link.

Pass____ Fail____

System Management Tests

2. TEST

Unified Event Manager/InterZone Control Path Failure

Step 1. Initiate a call with RADIO-1. Step 2. Observe that the call is received by both RADIO-2 and RADIO-3.

1. DESCRIPTION This test verifies that the Unified Event Manager (UEM) event browser is able to capture information about various failures at the system and zone level.

Step 3. Disconnect one of the InterZone cables from the CWR panel. Step 4. Observe that an alarm is received indicating a link failure.

This test simulates a failure by removing one of the InterZone links. The alerts will be monitored on the UEM.

Step 5. Initiate a call with RADIO-1.

NOTE: This feature only works on a multi-zone system.

Step 6. Observe that the call is received by RADIO2 and RADIO-3 verifying the system remains in interzone trunking since the interzone control paths are redundant.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE in Zone 2

Step 7. Connect the cable unplugged in the previous step. Step 8. Observe that the alarm clears in the UEM for the InterZone link.

Pass____ Fail____ VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-89

System Management Tests

2. TEST

ZoneWatch

Step 1. Set up the Zone Watch Window Definitions and Watch Profile though the Zone Configuration Manager to allow Multi-Site Scroll and Grid Display.

1. DESCRIPTION ZoneWatch is an administration tool for monitoring radio traffic on a system. A system manager can use ZoneWatch to analyze traffic patterns for load distribution and troubleshoot radio and site problems. ZoneWatch is used to view current radio traffic activity for the system. This activity is displayed in graphical format, color-coded for easy identification of the type of activity occurring on the system.

Step 2. From the PC Application Launcher, select a zone folder. Step 3. From within that zone, select ZoneWatch. Step 4. Select the profile created in the Setup procedure. Step 5. Initiate several calls with the radios and observe that the appropriate channel usage information is displayed.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 3 RADIO-4 - TALKGROUP 1 RADIO-4 - SITE - SITE 4

VERSION #1.03 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-90

Pass____ Fail____

System Management Tests

2. TEST

Configuration Management - Subscriber Capabilities

Step 1. Initiate a Call Alert (PAGE) from RADIO-1 to RADIO-2. Verify that RADIO-2 receives the Call Alert (PAGE).

1. DESCRIPTION

Step 2. Change the Call Alert Enabled flag to NO for RADIO-1 via the UCM.

The User Configuration Manager (UCM) controls the parameters for all radio users and dispatchers on the system. Within the Subscriber section, the Radio User Configuration Window enables the network manager to tailor SmartZone subscribers' capabilities. Multigroup, Secure, Call Alert, Private Call, and Telephone Interconnect are some of the features that can be enabled or disabled. The features that could be unique to the particular user are configured directly in the Radio User Configuration Window. The features that could be configured the same for a group of users are placed into records called profiles. The network manager references the profile which contains the desired setup for these features from the Radio User Configuration Window. Note - A profile must already exist to be referenced through the Radio Configuration Window but can be modified later if needed.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 * Flag both radios to be capable of Call Alert, Private Call, and Dispatch Calls. * Set the "User Enabled" flag to YES for both RADIO-1 and RADIO-2.

Step 3. Initiate a Call Alert (PAGE) from RADIO-2 to RADIO-1. Verify that RADIO-2 receives a reject when attempting to Call Alert (PAGE) RADIO-1. Step 4. Change the Call Alert Enabled flag back to YES for RADIO-1 via the UCM. Step 5. Initiate a Call Alert (PAGE) from RADIO-2 to RADIO-1. Verify that RADIO-1 now receives the Call Alert (PAGE). Step 6. Initiate a Private Call (CALL) from RADIO1 to RADIO-2. Verify that RADIO-2 receives the Private Call (CALL). Step 7. Change the Private Call Enabled flag to NO for RADIO-1 via the UCM. Step 8. Initiate a Private Call (CALL) from RADIO2 to RADIO-1. Verify that RADIO-2 receives a reject when attempting to Private Call (CALL) RADIO-1. Step 9. Change the Private Call Enabled flag back to YES for RADIO-1 via the UCM. Step 10. Initiate a Private Call (CALL) from RADIO2 to RADIO-1. Verify that RADIO-1 now receives the Private Call (CALL).

Pass____ Fail____

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-91

System Management Tests

2. TEST

Configuration Management - Talkgroup Capabilities

Step 1. Initiate a call from RADIO-1 on TALKGROUP 1. Verify that RADIO-2 hears the RADIO-1 audio.

1. DESCRIPTION

Step 2. Change the Talkgroup Enabled flag to NO for TALKGROUP 1 via the UCM.

The User Configuration Manager (UCM) controls the parameters for all radio users and dispatchers on the system. Within the Subscriber section, the Talkgroup Configuration Window enables the network manager to tailor SmartZone Talkgroup Capabilities. Emergency, Secure and Priority Monitor are some of the features that can be enabled or disabled. The features that could be unique to the particular user are configured directly in the Talkgroup Configuration Window. The features that could be configured the same for a group of users are placed into records called profiles. The network manager references the profile which contains the desired setup for these features from the Talkgroup Configuration Window. NOTE: A profile must already exist to be referenced through the Talkgroup Configuration Window but can be modified later if needed.

Step 3. Initiate a call from RADIO-1 or RADIO-2 on TALKGROUP 1. Verify that neither radio can initiate a call because of the change in status of the Group Enabled Flag of TALKGROUP 1. Step 4. Initiate an Emergency call from RADIO-1. Verify that both the console (if present) and RADIO-2 can hear the transmission. Step 5. Dekey RADIO-1. Step 6. Change the Talkgroup Enabled flag back to YES for TALKGROUP 1 via the UCM. Step 7. Initiate a call from RADIO-1 on TALKGROUP 1. Verify that both the console (if present) and RADIO-2 hear RADIO-1.

SETUP Pass____ Fail____ RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 * Set the "Talkgroup Enabled" flag to YES for TALKGROUP 1 in the UCM.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-92

System Management Tests

2. TEST

Configuration Management - Console Talkgroup

Step 1. Initiate an Emergency on TALKGROUP 1. Verify that Console User1 is able to "Ack" the Emergency.

1. DESCRIPTION

Step 2. Change the "End Emergency" flag to NO in the console talkgroup capability profile for TALKGROUP 1.

The User Configuration Manager (UCM) controls the parameters for all radio users and dispatchers on the system. Within the Subscriber section, the Console Talkgroup Capability profile enables the network manager to tailor a Console's Talkgroup capabilities.

Step 3. Verify that an indication is provided via the console's Elite GUI status bar indicating to the dispatcher that new configuration information is available.

SETUP Console User1 is logged on, is affiliated to TALKGROUP 1, and has the "Emergency Acknowledge" set to YES in the Console Talkgroup Capability Profile for TALKGROUP 1.

Step 4. Verify that after the database update indication is received, the Console User1 is not able to "Ack" an Emergency.

Pass____ Fail____ VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-93

System Management Tests

2. TEST

Configuration Management - Access Permissions

Step 1. Delete the database record for RADIO-1 in both the Radio and Radio User Configuration Windows so that the SmartZone system does not have any knowledge of RADIO-1.

1. DESCRIPTION The Radio System Infrastructure Configuration Management section of the Zone Configuration Manager (ZCM) application sets the parameters for each of the system devices in the SmartZone system. Configuration parameters such as Individual and Talkgroup Default Access Permission, and Site Access Denial Type can be manipulated from the Zone Configuration Window.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1

VERSION #1.02 SPS #7.5

Step 2. Set the "Individual Default Access Permission" flag to NO in the Zone Configuration Window. Step 3. Initiate a call from RADIO-1 on TALKGROUP 1. Verify that the SmartZone system rejects the RADIO-1 call request because RADIO-1 has not been defined in the SmartZone Radio User database. Step 4. Change the Individual Default Access Permission flag to YES via the SmartZone Manager. Step 5. Initiate a call from RADIO-1. Verify that the SmartZone system permits the RADIO-1 call request because the system grants radio access using default settings. Step 6. Configure the RADIO-1 records that were automatically created in the Radio and Radio User Configuration Windows as a result of the radio's PTT. Step 7. Reset the "Individual Default Access Permission" flag to NO in the Zone Configuration Window. Step 8. Initiate a call from RADIO-1. Verify that the SmartZone system permits the RADIO-1 call request because the RADIO-1 is now a valid user.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-94

System Management Tests

2. TEST

Configuration Management - General Timeout Parameters

Step 1. Initiate a TALKGROUP 1 call from RADIO-1. Verify that the SmartZone system permits the RADIO-1 call request.

1. DESCRIPTION

Step 2. In the UCM, in the System object, configure the "Maximum Private Call Duration" to 1 minute and apply.

The Radio System Infrastructure Configuration Management section of the Zone Configuration Manager (ZCM) application sets the parameters for each of the system devices in the SmartZone system. Within the Radio System Infrastructure section, the Zone Configuration Window enables the network manager to tailor the general timeout and call parameters for each zone in the SmartZone system. Configuration parameters such as Individual/Talkgroup Default Access Permission, and Site Access Denial Type can be manipulated from the Zone Configuration Window. System and call timeout parameters such as Carrier, Message Trunk, Fade, Dispatch Call, and Emergency Call can also be manipulated from the Zone Configuration Window.

Step 3. Initiate a Private Call from RADIO-1 to RADIO-2. Keep the Private Call active until the system disconnects the channel assigned for the Private Call. Step 4. Verify that after one minute elapses, the system disconnects the Private Call because the maximum call duration has been exceeded*. Step 5. Reset the Private Call Maximum Call Duration setting to be 10 minutes (default).

Pass____ Fail____

*Note: After 1 minute the system will start to Transmission Trunk, so the call could possibly last longer than 1 minute.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1

VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-95

System Management Tests

2. TEST

Affiliation Display

Step 1. Add RADIO-1,RADIO-2,RADIO-3, and RADIO-4 to the Affiliation Display.

1. DESCRIPTION

Step 2. Verify that RADIO-1 and RADIO-2 show they are affiliated to SITE 1 and TALKGROUP 1.

Affiliation Display is a Private Radio Network Management (PRNM) Suite application that monitors the mobility of radios for a particular zone. Mobility describes how radio users travel between different sites in a zone and how they communicate with other members of their assigned talkgroup or even with members outside of their talkgroup. You can view a radio in more than one zone. As a radio roams from one site to another or changes talkgroups, Affiliation Display updates and displays the affiliation and de-affiliation information for a monitored radio. This information can be useful for the troubleshooting and tracking of radios in the system and for monitoring the movement of traffic within a zone. The Affiliation Display is divided into three sections: Site Viewer, Talkgroup Viewer, and Radio Viewer. - The Site Viewer displays the number of talkgroups and number of radios affiliated to that site. - The Talkgroup Viewer displays how many radios are affiliated to that talkgroup and the number of sites at which the talkgroup has radios affiliated. - The Radio Viewer window displays affiliation information for a custom list of radios.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 2 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-96

Step 3. Verify that RADIO-3 and RADIO-4 show they are affiliated to SITE 2 and TALKGROUP 2. Step 4. Change the talkgroup of RADIO-1 and RADIO-2 to TALKGROUP 2. Step 5. Verify that RADIO-1 and RADIO-2's affiliated talkgroup changes to TALKGROUP 2 on the Affiliation Display. Step 6. Change the site of RADIO-3 and RADIO-4 to SITE 1. Step 7. Verify that RADIO-3 and RADIO-4's affiliated site changes to SITE 1 on the Affiliation Display.

Pass____ Fail____

System Management Tests

2. TEST

InfoVista

Step 1. Double-click on the IVReports Icon on the desktop and login using the proper username and password.

1. DESCRIPTION

Step 2. Choose the Reports tab. InfoVista is a network performance management tool that provides individual and group reports, including CPU utilization, data memory utilization, buffer memory utilization, interface errors and discards, port bandwidth utilization, port errors and discards. Each report type has four templates to provide daily, weekly, monthly, and yearly reports. The InfoVista client application is used to access the server software. It provides an online connection to the server to perform administrative tasks, such as starting and stopping existing reports, adding an instance, or creating new reports. InfoVista reports can be used for proactive network performance management, troubleshooting, and network capacity planning.

Step 3. From the treeview in the left pane, select Report Folders, Systems, and then Site Routers. Step 4. In the right pane, double-click on the Site Routers (MNR Group Top 10 Performance Daily) report. Step 5. Verify a graphical report is displayed that includes: CPU Utilization, Data Memory Utilization, Buffer Memory Utilization, Interface Errors and Interface Discards. Step 6. Use the Time Reference Slider to change the reporting day.

SETUP InfoVista must be properly configured to display reports. No radios are required for this test.

VERSION #1.02 SPS #7.5

Step 7. Repeat steps 4-6 to generate a weekly, monthly and yearly report Site Router (MNR Group Top 10 Performance) Step 8. Generate a daily, weekly, monthly and yearly report for Site Switches (HP LAN Switch Group Top 10 Port Performance). Verify that a graphical report is displayed that includes: Port Bandwidth Utilization, Port Errors and Port Discards. Step 9. Generate daily, weekly, monthly and yearly reports for the Core Routers and Exit Routers.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-97

System Management Tests

2. TEST

Zone Controller Database Backup

Step 1. Login onto the Zone Controller admin menu via the NM Client.

1. DESCRIPTION

Step 2. Select "Backup Database" from the menu.

This is a feature that allows the infrastructure database to be stored onto a CD for backup. The database can be backed up or restored without affecting system operation.

Step 3. Read the prompts and enter the required information to backup database onto a CD. Step 4. Verify the successful completion of the database backup from the menu.

SETUP No setup required.

VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-98

Pass____ Fail____

System Management Tests

2. TEST

UNC Device Management - Site Parameter

Step 1. Using the UNC Wizard , select an RF site to update.

1. DESCRIPTION

Step 2. Change the Site Alias parameter to a new value and click the Submit button.

The Unified Network Configurator (UNC) allows users to perform various functions to managed devices on the system. This test will cover the modification of a parameter at a site. For this test, the Site Alias parameter will be modified on all radio system devices at the site.

SETUP If the UNC is not open, double-click the UNC shortcut (UNC) on the desktop, and a Voyence Control client session will launch. When prompted, use the Login dialog box to login to the UNC using the appropriate username and password. If the UNC Wizard is not open, double-click the UNC Wizard (UNCW) shortcut on the desktop, and a UNC Wizard client session will launch. When prompted, use the Login dialog box to login to the UNC Wizard using the appropriate username and password.

Step 3. From the tools menu of the UNC client session, open the Schedule Manager. Configuration remedy jobs are immediately added to the Schedule Manager with a status of Pending for all affected target devices. Step 4. Highlight the pending Remedy jobs and approve them in the Schedule Manager. The remedy jobs are approved and indicate a status of running in the Schedule Manager. Step 5. Refresh the Schedule Manager view until the jobs are completed. Step 6. Once the jobs are performed successfully, perform a pull on all site devices Step 7. View the current configuration information for the devices at the site, and verify that the Site Alias has been updated in the devices current configuration Step 8. Return the site alias to the correct value.

VERSION #1.04 SPS #7.5

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-99

System Management Tests

2. TEST

UNC Device Management - Channel Parameter

Step 1. Using the UNC Wizard , select a channel from a Repeater Site to update.

1. DESCRIPTION The Unified Network Configurator (UNC) allows users to perform various functions on the system. This test will cover the modification of a parameter on a device. For this test, the control channel capability for a channel will be modified. It is important to note that this change will impact the control channel capability for the site only when it is operating in Site Trunking. In order to modify the operation for Wide Area, the change will need to be made in the Zone Configuration Manager (ZCM). It is recommended that the change be made in both the User Configuration Manager (UCM)/ZCM and UNC for live systems.

Step 2. From the wizard, change the Home / Control Channel Capable parameter for the channel, and submit the change. Step 3. Start a UNC client session and open the Schedule Manager. Configuration remedy jobs are immediately added to the Schedule Manager with a status of Pending for all affected target devices. Step 4. Highlight the pending jobs related to this update, and approve the remedy jobs in the Schedule Manager. The remedy jobs are approved and indicate a status of running in the Schedule Manager. Refresh the Schedule Manager view until the jobs are completed. Step 5. Once the jobs are performed successfully, perform a pull for the current configuration information from the channel.

SETUP If the UNC is not open, double-click the UNC shortcut (UNC) on the desktop, and a Voyence Control client session will launch. When prompted, use the Login dialog box to login to the UNC using the appropriate username and password. If the UNC Wizard is not open, double-click the UNC Wizard (UNCW) shortcut on the desktop, and a UNC Wizard client session will launch. When prompted, use the Login dialog box to login to the UNC Wizard using the appropriate username and password.

VERSION #1.05 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-100

Step 6. View the configuration data for the device and verify that the Home / Control Channel Capability has been updated in the devices current configuration. Step 7. Change the Home / Control Channel Capability parameter for the channel back to the initial value.

Pass____ Fail____

System Management Tests

2. TEST

UNC Device Compliance Testing

Step 1. From the Voyence Control Network View, select a Site Controller to modify.

1. DESCRIPTION

Step 2. Change the SITE ID for the Site Controller to a different value.

The Unified Network Configurator (UNC) allows users to perform various functions on managed devices on the system. The purpose of this test is to validate system parameter compliance testing by the UNC. The UNC has the capability to detect errors in configuration data before the change is sent to device(s), immediately after a change has been sent to a device, or on a configuration poll. For this test, the error in the configuration data will be detected before the change is sent to the device. The configuration error can be detected by performing an audit check in either the channel configuration screen, or through the approval process. This test covers detecting the configuration error from the channel configuration screen.

SETUP If the UNC is not open, double-click the UNC shortcut (UNC) on the desktop, and a Voyence Control client session will launch. When prompted, use the Login dialog box to login to the UNC using the appropriate username and password. If the UNC Wizard is not open, double-click the UNC Wizard (UNCW) shortcut on the desktop, and a UNC Wizard client session will launch. When prompted, use the Login dialog box to login to the UNC Wizard using the appropriate username and password.

VERSION #1.04 SPS #7.5

Step 3. Perform an audit on the configuration change by selecting the audit button. When the audit dialogue box opens, select Site Controller and select Audit. When the Select Item dialogue box for the system opens, select the correct Zone in which the Site Controller to be audited resides. When the Select Item dialogue box for the Zone opens, select the correct Site in which the Site Controller to be audited resides. When the Select Item dialogue box for the Site opens, select the Site Controller that was modified, and select the item. Step 4. Verify that the Audit Results indicate the device is non compliant. Step 5. Select the item in the non compliant window and select Preview. A remedy is displayed indicating which parameters need to be changed for the device to be compliant. Step 6. Return the device to compliance by scheduling the remedy task. Select Schedule, when the Schedule Push Job dialogue box give the job a name and select Approve and Submit. Step 7. In the Schedule Manager, press the refresh button to verify that the job is running, and to obtain the current status. The job is done when the status indicates complete. Step 8. In the Network View, open the Site Controller that was previously modified and verify that the Site ID is set to the correct value. Step 9. In the Network View tab double click the Site Controller that was previously modified. In the configuration window select Audit. Follow the dialogue boxes (as in step 3) to perform the audit and verify the device is compliant.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-101

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-102

System Management Tests

2. TEST

UNC Device Compliance Testing (2)

Step 1. From the Voyence Control Network View, select a Channel that is currently Control Channel Capable to update.

1. DESCRIPTION The Unified Network Configurator (UNC) allows users to perform various functions on managed devices on the system. The purpose of this test is to validate system parameter compliance testing by the UNC. The UNC has the capability to detect errors in configuration data before the change is sent to device(s), immediately after a change has been sent to a device, or on a configuration poll. For this test, the error in the configuration data will be detected by the UNC after a change has been sent to a device.

SETUP If the UNC is not currently open, double-click the UNC shortcut (UNC) on the desktop, and a Voyence Control client session will launch. When prompted, use the Login dialog box to login to the UNC using the appropriate username and password. If the UNC Wizard is not currently open, doubleclick the UNC Wizard (UNCW) shortcut on the desktop, and a UNC Wizard client session will launch. When prompted, use the Login dialog box to login to the UNC Wizard using the appropriate username and password.

VERSION #1.03 SPS #7.5

Step 2. Double click the channel to open the Configuration window. Edit the configuration to change "Dynamic Frequency Blocking Capability = Disable" to "Dynamic Frequency Blocking Capability = Enable". Step 3. Select the Schedule button, and in the Schedule Dialogue Box select schedule. When the Schedule Job Dialogue box opens, give the job a name and select Approve and Submit. Step 4. From the Schedule Manager, verify that the configuration change job is listed with a status of Running. Press the refresh button to verify that the job is running, and to obtain the current status. The job is done when the status indicates complete. Step 5. Once the job is successfully completed, the UNC will automatically pull and validate the configuration data from the device that was modified. The UNC will detect the error, and indicate the device is non compliant. In the Network View, press the refresh button until the state icon for the channel indicates that the device is not compliant. Step 6. The UNC will generate a remedy that indicates which parameter(s) need to be changed for the device to be compliant. Step 7. Approve the remedy from the Schedule Manager to return the channel to compliance.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-103

System Management Tests

2. TEST

UEM Fault Management/Station Power Amp Failure

Step 1. Verify that the power amp of the station to be tested has no active alarms against it.

1. DESCRIPTION This test verifies that the Unified Event Manager (UEM) alarms view is able to capture information about various failures at the system and zone level. A station will be keyed while the output is unloaded to simulate a power amp failure. The failures will be monitored on the UEM. Note: For safety, either power down the station or TX Inhibit it before disconnecting or re-connecting the dummy load to prevent accidental keying of the station. Note: This test should be done on a site with more than 2 channels. Failsoft will occur if the test is done on a 2 channel site.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 NMclient01 - UEM session up and running. * All Radios should be "Site Locked"

VERSION #1.06 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-104

Step 2. Disconnect the dummy load/antenna from the station. Step 3. Make several talkgroup calls using Radio-1 until the test station has been keyed. Step 4. Observe that an alarm indicating a Power Amp failure appears on the UEM alarms view. Step 5. Reconnect the dummy load/antenna disconnected in Step 3. Step 6. In approximately 5 minutes, observe that changes to the alarm on the UEM, indicating the module is restored to service.

Pass____ Fail____

System Management Tests

2. TEST

UEM Fault Management/Site Path Failure

Step 1. Remove the T1 cable(s) to the site router(s) at the site where Radio 1 is affiliated. Be certain to remove the T1 cable from both routers if redundant site links are being utilized.

1. DESCRIPTION This test verifies that the Unified Event Manager (UEM) alarms view is able to capture information about various failures at the system and zone level. This test simulates a microwave failure by removing a customer selected site data link and monitoring the alerts.

Step 2. Observe the UEM reports CommFailure alarms for the devices at the affected site. Step 3. In addition, observe that the site is now in the Site Trunking mode. Step 4. Reconnect the T1 cable(s) disconnected in Step 1.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 NMclient01 - UEM session up and running.

Step 5. Observe the site returns to the Wide Area Trunking mode. Step 6. Observe the topology and alarms that appear on the UEM.

* RADIO-1 should be "Site Locked"

Pass____ Fail____ VERSION #1.08 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-105

System Management Tests

2. TEST

UEM Fault Management/Site Trunking

Step 1. Disable the site instance from the UEM by selecting a site in the Network Devices tab. Right click and select SNMP Node then Issue Command. Put the site in Site Trunking.

1. DESCRIPTION Through the Unified Event Manager (UEM), the system user can run diagnostics that change the "Trunking State" of a site. The effect of the diagnostic is displayed on the UEM.

SETUP NMclient01 - UEM session up and running in the alarms view.

Step 2. Observe that the UEM alarms view shows that the site is now in Site Trunking and is User Requested. Step 3. Place the site back into Wide Area Trunking using the "Issue command" feature from UEM. Step 4. Observe updates to the UEM alarms view.

VERSION #1.08 SPS #7.5

Step 5. Close the open windows.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-106

System Management Tests

2. TEST

UEM Fault Management/Core Router Failure

Step 1. Verify that the Core Router to be tested shows up without failures (normal) on UEM. The core router is contained in the specific subnet that it is physically located in the network.

1. DESCRIPTION This test verifies that the Unified Event Manager (UEM) alarms view is able to capture information about various failures at the system and zone level. A Core Router will be turned off to simulate a failure. The system health will be monitored on UEM.

Step 2. Power down the Core Router. Step 3. Observe that an alarm indicating a Core Router failure appears on the UEM alarms view. Step 4. Restore power to the Core Router.

NMclient01 - UEM session up and running.

Step 5. Observe that the changes to the alarm in UEM, indicating the Core Router is Enabling.

VERSION #1.04 SPS #7.5

Step 6. Observe that alarm view updates in the UEM, indicating the Core Router is Enabled.

SETUP

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-107

System Management Tests

2. TEST

UEM - Diagnostics - RF Site

Step 1. From the UEM, right click on an ASTRO Repeater Site managed resource and select the Command option.

1. DESCRIPTION The purpose of this test is to confirm diagnostic commands are sent to an RF site and the proper status is reported at the Unified Event Manager (UEM). All commands are initiated from the UEM.

Step 2. The command window opens for the ASTRO repeater Site managed resource with the following commands available: Site Trunking, Site Off, Wide Trunking, and Site Failsoft. Step 3. Select Site Trunking and click the Apply button.

Standalone and MultiSite configurations are tested.

SETUP NMclient01 - UEM session up and running in the Network Database view.

VERSION #1.07 SPS #7.5

Step 4. The command execution status is displayed in the command window. After the command is executed, the site enters site trunking mode. The event is displayed in the Network Events Browser. An alarm is displayed in the Alarms Browser. Step 5. Select Site Off and click the Apply button. Step 6. The command execution status is displayed in the command window. After the command is executed, the site enters site off mode. The event is displayed in the Network Events Browser. An alarm is displayed in the Alarms Browser. Step 7. Select Wide Trunking and click the Apply button. Step 8. The command execution status is displayed in the command window. After the command is executed, the site enters wide trunking mode. The event is displayed in the Network Events Browser. Step 9. For a MultiSite Site, repeat step 1 except right click on a MultiSite Site managed resource. Step 10. Repeat steps 2-8. Verify the same results occur.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-108

System Management Tests

2. TEST

UEM - Views

Step 1. The first view is the Active Alarms. In the navigation pane expand Fault Management and select Alarms.

1. DESCRIPTION The Unified Event Manager (UEM) provides three different views. The purpose of this test is to validate the views available from the UEM.

SETUP

Step 2. Customize the Active Alarms display by selecting the Edit option from the menu bar, then select Search. Step 3. Perform a Managed Resource search for channels, site controllers and routers by entering "Starts with" and ch, sc, and z00 respectively in the search fields to perform the three separate searches.

NMclient01 - UEM session up and running.

VERSION #1.07 SPS #7.5

Step 4. For each of the three searches a filtered alarm view is displayed that contains alarms for the appropriate device in the search. Step 5. The second view is the Physical Summary view. In the navigation pane, expand Zone Maps and select Physical Summary. The Physical Summary View provides an aggregated alarm severity status of the devices located at all subnets in the Zone. Step 6. The third view is the Service Summary. In the navigation pane, under Zone Maps select Service Summary. The Service Summary View provides a site alarm severity status of the devices located at all sites including the Master Site. Step 7. In the main UEM window is an Alarm Summary View pane. In the Alarm Summary View, select the format for the desired view, pie, tabular or bar.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-109

System Management Tests

2. TEST

UEM - Manual Synchronization - IVD Site Controller

Step 1. On a UEM client session, click on the Network Database node tree in the navigation window.

1. DESCRIPTION

Step 2. Right click on an IVD Site Controller, select SNMP-Node, and then select Synchronize.

The purpose of this test is to manually synchronize state with agents within the system using the Unified Event Manager (UEM). Manual synchronization provides a fallback to obtain object status after a network interruption.

SETUP NMclient01 - UEM session up and running.

VERSION #1.1 SPS #7.5

Step 3. The Synchronization Job Status window appears with the Job Status ID. Step 4. Click on the View Job Status button. Step 5. The Job Status View window opens providing the Job ID, Status, Owner, Type, Target, Submit Time, End Time, and Additional Information for all the jobs. Step 6. Locate the Synchronization job initiated in step 2 and click on the job. Verify the Synchronization job is listed with a status of Success. Step 7. Click on the View Log button. A summary of the Synchronization job details is provided in the job log. Step 8. Locate the IVD Site Controller in the Network Database View. The correct Severity property of the device is displayed.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-110

System Management Tests

2. TEST

UEM - Manual Synchronization - Core Router

Step 1. On a UEM client session, click on the Network Database node tree in the navigation window.

1. DESCRIPTION

Step 2. Right click on a Core Router, select SNMPNode, and then select Synchronize.

The purpose of this test is to manually synchronize state with agents within the system using the Unified Event Manager (UEM). Manual synchronization provides a fallback to obtain object status after a network interruption.

SETUP

Step 3. The Synchronization Job Status window appears with the Job Status ID. Step 4. Click on the View Job Status button. Step 5. The Job Status View window opens providing the Job ID, Status, Owner, Type, Target, Submit Time, End Time, and Additional Info for all the jobs.

NMclient01 - UEM session up and running.

VERSION #1.09 SPS #7.5

Step 6. Locate the Synchronization job initiated in step 2 and click on the job. Verify the Synchronization job is listed with a status of Success. Step 7. Click on the View Log button. A summary of the Synchronization job details is provided in the job log. Step 8. Locate the Core Router in the Network Database View. The correct Severity property of the device is displayed.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-111

System Management Tests

2. TEST

UEM - UEM User actions are logged 1. DESCRIPTION

Step 1. On a UEM client session, select Tools from the menu bar and then System Administration. The Administration Menu window opens up.

This test validates that Unified Event Manager (UEM) user actions are logged by the system.

Step 2. In the System Administration window, click on Audit Trails.

SETUP

Step 3. Verify the Authentication Audit Log is displayed. The following information is displayed for each entry: User Name, Operation, Audit Time, Severity, Category, and Audited Object. User actions recorded include: Login, Logout, Discovery, Synchronization, Device Deletion, Diagnostics, Telnet, and Manage/Unmanage. (Note: If the Authentication Audit Log has been cleared there will only be the event to clear the log.)

NMclient 01 - UEM client session active.

VERSION #1.05 SPS #7.5

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-112

4.10.7 Radio Control Manager (RCM) Features

Emergency Alarm Display 1. DESCRIPTION

2. TEST

The emergency call information that is displayed on the SmartZone RCM includes the radio alias of the radio that initiated the Emergency Alarm, the talkgroup that the radio was affiliated to at the time the alarm was sent, and the time the alarm was received.

Step 1. Open the Radio Control Manager (RCM) windows and verify that the Emergency Alarm window is visible. If it is not, go the View menu and select it bringing it into the RCM viewable area.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 One RCM is required which has TALKGROUP 1 attached to it.

VERSION #1.02 SPS #7.5

Step 2. Initiate an Emergency Alarm from RADIO1. Step 3. Observe that the RCM receives the Emergency Alarm. Step 4. Acknowledge the Emergency by selecting the Emergency in the window and clicking on the Respond button. Step 5. Verify the window displays the radio alias, the talkgroup, and the time the alarm was received. Step 6. Again, select the displayed Emergency and click the Delete button to clear the emergency. Step 7. Reset the radio by holding the Emergency button until the radio clears. Step 8. Repeat Steps 1-7 using RADIO-2.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-113

Radio Control Manager (RCM) Features

2. TEST

Dynamic Regrouping

Step 1. With the RCM open from the Commands menu item select the Radio Commands item to open the command window. Choose Regroup.

1. DESCRIPTION Dynamic Regrouping allows the RCM to assign individual radios operating in different talkgroups to a temporary talkgroup via the Regroup command. Network managers or supervisors can override individual radio talkgroup selections by steering regrouped subscribers to a new talkgroup containing users which need to communicate on a temporary basis. After receiving a Regroup command, a radio will ignore the current setting of the talkgroup selector and move to the target talkgroup specified in the Regroup command. Unless the supervisor issues a LOCK command, the radio user can deselect the target talkgroup by selecting another talkgroup using the radio selector. A unique location on the radio selector is reserved for the target talkgroup following a Regroup command.

Step 2. Enter TALKGROUP 3 in the target field. Step 3. Enter the IDs or aliases of RADIO-1, RADIO-2, RADIO-3 and RADIO-4. Step 4. Once all desired radio information is entered and appears in the command window click the Regroup button to initiate the command. Step 5. Observe all radios are regrouped and are able to communicate on TALKGROUP 3. Step 6. Switch the Subscriber to the Dynamic Regroup channel to acknowledge the group request.

Dynamic Regrouping assignments can be initiated rapidly, but not instantaneously. Regrouping is best suited for planned activities or occasional changes from normal routines. It is not intended for immediate responses such as high speed chases or for a rapid deployment on a per incident basis.

Step 7. Observe that the radios are able to select different talkgroups and are not locked onto the regrouped mode. Note- The Talkgroup selector knob has to be set to the dynamic regroup position before switching to any other talkgroup.

Regrouped radios receiving a second Regroup command will move to the new target talkgroup specified in the second command. When a regrouped radio receives a Regroup command, all information pertaining to the previous Regroup command is lost. A Cancel Regroup command or a Revert returns an individual radio to its normal operation.

Step 8. Observe that the Regroup task appears in the Command Monitor window.

Note - RCM user must be attached to primary and target talkgroup. SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 3 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 4

VERSION #1.02 SPS #7.5 City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-114

Step 9. Issue a Selector Lock command all four radios and verify their selectors have been locked. Step 10. Revert both commands and verify the radios have returned to normal operation.

Pass____ Fail____

Radio Control Manager (RCM) Features

2. TEST

Storm Plans

Step 1. With the RCM open from the Commands menu item select the Storm Plan item to open the Storm Plan Window.

1. DESCRIPTION

Step 2. Select the Storm Plan. Storm Plans represent any number of preprogrammed Dynamic Regrouping combinations constructed in advance to anticipate a unique need, such as a disaster, or to make a needed adjustment for an infrequent yet repeated event, like a parade or election. When implemented, a Storm Plan will automatically assign individual radios operating in different talkgroups to a temporary talkgroup, containing the radios specified by the stored Dynamic Regrouping command. Storm Plans are deactivated by selecting the revert option in the Command window. Note - Radios are not required to be locked to a specific site for this test.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 3 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 4

Step 3. Click on OK or Apply to invoke the Storm Plan. Step 4. Observe that the Storm Plan appears in the Command Monitor window. Step 5. Observe RADIO-1 and RADIO-2 are regrouped. Step 6. Initiate a call from RADIO-1. Step 7. Observe that RADIO-2. RADIO-3 and RADIO-4 are able to communicate with one another. Step 8. Un-regroup the radios by selecting the task in the Command Monitor window and clicking on the Revert button to submit the task. Step 9. Observe that the regrouping of the radios is now dissolved.

Pass____ Fail____

Create a storm plan in the UCM that regroups RADIO-1 and RADIO-2 to TALKGROUP 2.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-115

Radio Control Manager (RCM) Features

2. TEST

Selective Radio Inhibit

Step 1. Select the Commands menu and then select the Radio Commands item in the menu to open the Command Window. Choose Selective Inhibit.

1. DESCRIPTION The INHIBIT command issued by the RCM disables a radio, preventing it from transmitting or receiving any audio. All of the radio's functionality ceases while a radio is inhibited by the SmartZone RCM. Once inhibited, the radio cannot be used to monitor voice channels or for any other radio user initiated activity. Note that an inhibited radio still monitors the control channel so that it can be re-enabled with the Cancel Inhibit command. Upon receiving the Cancel Inhibit command from the SZ RCM, the radio returns to its normal operation.

Step 2. Enter the IDs or alias of RADIO-1.

SETUP

Step 6. Cancel the Inhibit by selecting the task in the Command Monitor window and clicking the Revert button to submit the task.

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1

VERSION #1.02 SPS #7.5

Step 3. Once all desired radio information is entered and appears in the command window click the Submit button to initiate the command. Step 4. Observe RADIO-1 is inhibited and appears to be dead. Step 5. Observe that the Inhibit task appears in the Command Monitor window.

Step 7. Observe that the Cancel Inhibit task appears in the Command Monitor window and that RADIO-1 is returned to normal operation.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-116

Radio Control Manager (RCM) Features

2. TEST

Radio Check

Step 1. Select the Command menu and then select the Radio Check item to open the Radio Check window.

1. DESCRIPTION Radio Check is a RCM command used to verify that a radio is active in the trunking system. The Radio Check command causes the Zone Controller to poll for the radio requesting that the radio re-affiliate. When the radio re-affiliates, the RCM then has the knowledge that the radio is powered on and within system range. If the radio is involved in a conversation, whether group or interconnect, the RCM application displays a message to that effect. The information displayed by the RCM in response to the Radio Check command is: current talkgroup affiliation, the multigroup that the talkgroup is attached to (assuming the talkgroup belongs to a multigroup), and the site where the radio is affiliated. If the radio does not respond to the Radio Check command, a message to that effect displays.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2

Step 2. Enter the IDs or aliases of RADIO-2 into the entry box and click the Apply button. Step 3. Observe the radio is polled and the current radio information is displayed on the RCM. Step 4. Turn off RADIO-1. Step 5. Enter the ID or alias of the RADIO-1 into the entry box and click the Apply button. Step 6. Observe that the RCM displays "Radio Not Found." Step 7. Depress and hold the PTT button of RADIO-2 until instructed to release. Step 8. Enter the ID or alias of RADIO-2 into the entry box and click the Apply button. Observe that a busy for the radio is displayed on the RCM. Step 9. Release the PTT button on RADIO-2. Step 10. Observe the radio is polled and the current radio information is displayed on the RCM.

Pass____ Fail____ VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-117

Radio Control Manager (RCM) Features

2. TEST

Radio Snapshot

Step 1. Submit a Dynamic Regroup command for RADIO-1 and RADIO-3 to be regrouped to TALKGROUP 3.

1. DESCRIPTION Snapshot is a RCM command used to retrieve information about an individual radio. Information provided by the RCM application in response to the Snapshot command includes: the serial number of the radio, current talkgroup/multigroup and site affiliations; the Regroup, Inhibit, and Selector Lock state of the radio. Snapshot information is taken from the system databases. The Snapshot command does not initiate any communication with the target radio. Note - Radios are not required to be locked to a specific site for this test.

Step 2. At the RCM, initiate the Snapshot command for RADIO-1. Step 3. Verify that the RCM shows RADIO-1 affiliated to SITE 1 and that its current Regroup state is "Regroup." Step 4. At the RCM, revert the dynamic regrouping on RADIO-1 and RADIO-3. Step 5. Initiate the Snapshot command for RADIO1. Step 6. Verify RADIO-1 shows an affiliation to SITE 1 and that its current Regroup state is "Cancel Regroup."

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 3 * RADIO-1 and RADIO-3 must be programmed with Dynamic Regrouping capability.

Step 7. At the RCM, inhibit RADIO-2 and then initiate the Snapshot command for RADIO2. Step 8. Verify RADIO-2 shows an affiliation to SITE 2 and that its current Inhibit state is "Selective Inhibit."

*Make sure Radio Users are configured with a "Radio Primary Talkgroup Assignment" in the UCM.

Step 9. At the RCM, revert RADIO-2 and then initiate the Snapshot command for RADIO2.

VERSION #1.03 SPS #7.5

Step 10. Verify RADIO-2 shows an affiliation to SITE 2 and that its current Inhibit state is "Cancel Inhibit."

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-118

Radio Control Manager (RCM) Features

2. TEST

Radio Status

Step 1. Initiate a Status transmission from RADIO1.

1. DESCRIPTION

Step 2. Verify the RCM displays the proper Status text.

This optional feature allows the Radio Console Manager to view status information sent in by subscribers. Statuses are used to indicate the Radio operator's operational state (e.g. off duty). The information that will be displayed includes the radio alias, talkgroup alias, hour and minute time stamp, status number or message number, and the customer entered translation for the specific status. Status input is displayed in chronological order, independent of the type of status number.

Pass____ Fail____

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 * Configure RADIO-1 in the manager to use a particular status set. * Configure the assigned status set (via the status set manager configuration objects) to include text translations for a few different statuses. * The RCM user needs to be assigned the dispatch attachment group that matches the radio user's assigned dispatch attachment group.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-119

4.10.8 Report Generation Tests

User Configuration Subsystem (UCM) Reports 1. DESCRIPTION

2. TEST

The User Configuration Manager report window allows the user to generate data summaries to view information from the database in a Web browser or to export the information as a file. The User Configuration Manager report window shows the users all of the fields that can be included in the report. By selecting which fields are wanted in the report and entering selection criteria for each field, the user can restrict the data that is retrieved.

Step 1. From the PC Application Launcher, select User Configuration Manager.

SETUP No prior setup is required for this test.

VERSION #1.02 SPS #7.5

Step 2. Click on the appropriate folder to list its contents if it is not already open. Step 3. Select the object for which a report is to be generated. Step 4. Under the toolbar FILE pull down menu, select Reports. Step 5. Observe a window opens allowing a user to create a report. Step 6. Enter all sorting data for the report and click Generate Report. Step 7. Observe a window appears showing the requested report. Step 8. Close the report window. Step 9. Reports available to an operator under the UCM User Configuration Reports section are arranged in three categories: Subscribers, Security and System Configuration. Run the following reports : Under Subscribers folder, select Radio User; Under Security, select User; Under System Configuration , select System.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-120

Report Generation Tests

2. TEST

Historical Reports

Step 1. From the PC Application Launcher, select a zone.

1. DESCRIPTION

Step 2. From that zone's menu, choose Zone Historical Reports.

Performance reports can be created automatically for dynamic statistical information about the air traffic activity on the system. These reports provide assistance with system management, resource planning, usage allocation, and monitoring. All reports are preformatted and summarize air traffic activity for a configured time span.

SETUP

Step 3. From the Historical Reports Player window that opens, select a report. Step 4. Using the left mouse button, click on the view button. Step 5. Observe a window opens allowing a user enter report parameters.

No prior setup is required for this test.

Step 6. Enter all desired data for the report and Generate Report.

VERSION #1.02 SPS #7.5

Step 7. Observe a window appears showing the requested report. Step 8. Close the report window. Step 9. Run the following reports during testing: Talkgroup at Zone Summary; User at Zone Summary; Site Summary.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-121

Report Generation Tests

2. TEST

Zone Configuration Manager Reports: Infrastructure

Step 1. From the PC Application Launcher, select a zone.

1. DESCRIPTION

Step 2. From that zone's menu, select Zone Configuration Manager.

The Zone Configuration Manager report window allows the user to generate data summaries to view information from the database in a Web browser or to export the information as a file. The Zone Configuration Manager report window shows the users all of the fields that can be included in the report. By selecting which fields are wanted in the report and entering selection criteria for each field, the user can restrict the data that is retrieved.

Step 3. Navigate through the folders on the left side to the object for which a report is to be generated.

Note: It is important to note that the configuration data for Site Controllers, Base Stations, and transport devices are contained in the Unified Network Configurator (UNC). The configuration data for the devices managed in the UNC must be taken into account to obtain a complete view of the configuration data for devices in the system.

Step 6. Enter sorting data for the report and click Generate Report.

SETUP

Step 9. Run the following reports during testing: MGEG Application; Zone Controller; Core RP (Rendezvous Point) Router.

No prior setup is required for this test.

VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-122

Step 4. Under the toolbar FILE pull down menu, select Reports. Step 5. Observe a window opens allowing a user to create a report.

Step 7. Observe a window appears showing the requested report. Step 8. Close the report window.

Pass____ Fail____

Report Generation Tests

2. TEST

UNC Reports - Device Configuration

Step 1. From the UNC launch page menu bar select the Tools menu and choose Report Manager

1. DESCRIPTION The Unified Network Configurator (UNC) reports allow the user to generate data summaries to view information from the UNC database. Once the report is run, the results can be viewed, printed, and exported. This test will run a report that provides the configuration data for a specific device.

SETUP If the UNC is not open, double-click the UNC shortcut (UNC) on the desktop, and a VoyenceControl client session will launch. When prompted, use the Login dialog box to login to the UNC using the appropriate username and password.

Step 2. From the Report Manager screen, select the "DeviceReport - ASTRO 25 Radio Network" report and click Edit. Step 3. When the Edit Existing Report Criteria window opens, the report name, description and the desired output format of the report can be modified. Once this is done click Next. Step 4. Navigate through the Available Resources until the desired device is located, select the device and add it to the Selected Resources list. Remove the ASTRO 25 Radio Network from the Selected Resources list and click Next.

Note: The output format for the report will default to PDF. If a PDF viewer is not loaded on the workstation, a different output format for the report will need to be selected.

Step 5. For the Next two screens, select the information to be included in the report and click Next.

VERSION #1.04 SPS #7.5

Step 6. Once the report has been successfully created select the Run Now option and click OK. Click Yes to continue. Step 7. View the generated report

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-123

Report Generation Tests

2. TEST

UNC Reports - Device Change Report

Step 1. From the UNC launch page menu bar select the Tools menu and choose Report Manager.

1. DESCRIPTION

Step 2. From the Report Manager screen, select New to generate a new report. When the Choose Your Report Type window opens, select Device Change and click OK.

The UNC reports allow the user to generate data summaries to view information from the UNC database. Once the report is run, the results can be viewed, printed, and exported. This test will run a report that provides a list of changes that have been made to an RF site.

SETUP

Step 3. When the Create New Report Criteria window opens, the report name, description and the desired output format of the report can be modified. Once this is done, click Next.

If the UNC is not open, double-click the UNC shortcut (UNC) on the desktop, and a Voyence Control client session will launch. When prompted, use the Login dialog box to login to the UNC using the appropriate username and password.

Step 4. Navigate through the Available Resources until the desired device is located. For this test select an RF site. When the site is located, select the Site object and add it to the Selected Resources list and click Next.

Note: The output format for the report will default to PDF. If a PDF viewer is not loaded on the workstation, a different output format for the report will need to be selected.

Step 5. Use the Output view Options to select the Data Range Criteria for the report. Once this is complete, click Next. When the screen has updated select the desired Data Type and Device Change Criteria for the report and click Next.

VERSION #1.03 SPS #7.5

Step 6. Select the information to be included in the report and click Next. Once the report has been successfully created select the Run Now option and click OK. Select Yes to continue. Step 7. The report is generated showing configuration changes for devices at the RF site. The results appear in a new window.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-124

4.10.9 System Reliability Features

AEB to CEB Redundant Link Failure (CentraCom Gold Elite Only) 1. DESCRIPTION

2. TEST

Communication between the AEB (Ambassador Electronics Bank) and each CEB (Central Electronics Bank) can take place over dedicated redundant links. The two links between the AEB and a CEB operate in a hot/standby mode. The system will continue uninterrupted if the main link fails.

Step 1. Initiate a Talkgroup Call with RADIO-1 on TALKGROUP 1.

SETUP

Step 3. Remove the RJ45 AIMI (Ambassador Interface- Mux Interface) link connection between the AEB and the CEB.

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 * Select a CEB with redundant links to the AEB.

Step 2. Observe that RADIO-2 and the selected console are able to monitor and respond to the call.

Step 4. Initiate a Talkgroup Call with RADIO-1 on TALKGROUP 1. Step 5. Observe that RADIO-2 and the selected console are able to monitor and respond to the call.

* The CEB must have at least one console operator position capable of monitoring the selected TALKGROUP 1.

Step 6. Replace the link connection previously removed in Step 3.

* The CEB must have at least one console operator position capable of monitoring TALKGROUP 1.

Step 7. Repeat the above steps for the other AEB to CEB redundant link.

VERSION #1.02 SPS #7.5

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-125

System Reliability Features

2. TEST

AEB to Zone Controller Redundant Link Failure (CentraCom Gold Elite Only)

Step 1. Initiate a Talkgroup Call with RADIO-1 on TALKGROUP 1.

1. DESCRIPTION This test verifies that the two communication paths between the Zone Controller and audio switch are hot standby and the system will continue uninterrupted if the main path fails. To accomplish this, each ZAMBI (Zone Ambassador) link in the AEB Ambassador Electronics Bank) will be disconnected individually while verifying that the system remains operational.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 2 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 3

VERSION #1.02 SPS #7.5

Step 2. Observe that only RADIO-2 and the console will be able to monitor and respond to the call. Step 3. Initiate a Talkgroup Call with RADIO-3 on TALKGROUP 2. Step 4. Observe that only RADIO-4 and the console will be able to monitor and respond to the call. Step 5. Remove one of the active ZAMBI cards from the AEB, this will simulate a Zone Controller to AEB Link failure. Step 6. Initiate a Talkgroup Call with RADIO-1 on TALKGROUP 1. Step 7. Observe that only RADIO-2 and the console will again be able to monitor and respond to the call. Step 8. Initiate a Talkgroup Call with RADIO-3 in TALKGROUP 2. Step 9. Observe that only RADIO-4 and the console will again be able to monitor and respond to the call. Step 10. Replace the ZAMBI card removed previously in Step 5. Repeat the above steps for the other Zone Controller to AEB link.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-126

System Reliability Features

2. TEST

Simulcast Essential Subsite Operation

Step 1. Using CSS read the Site Controller and bring up the Site Controller Status Panel service screen.

1. DESCRIPTION This test verifies the essential site operation within a simulcast system. An essential simulcast remote site is one that must have at least one control channel and one traffic channel for the simulcast subsystem to remain trunking mode. If all control channels or all traffic channels have experienced faults at an essential simulcast remote site, then the entire simulcast subsystem is put into failsoft mode to ensure communication can continue in the area covered by the essential simulcast remote site. When all of the wide area failsoft channels at an essential simulcast remote site have experienced faults, the essential simulcast remote site is malfunctioned.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - (SIMULCAST SITE) RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - (SIMULCAST SITE) RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 1 * At least one of the remote simulcast sites must be designated an essential site (availability number is set to 100%) and one must be designated a non-essential site. * CSS (Configuration Service Software) must be running on a laptop computer (provided by CCSI) and plugged into the Simulcast Site Controller.

Step 2. Power down one of the control channel capable stations at the non-essential site and note that the CSS shows the channel is disabled at all the other sites. Step 3. Repeat Step 1 for each of the other control channel capable stations or until 50% or more of the stations have been malfunctioned. Step 4. Verify that the CSS shows that the disabled channels have been enabled at all other sites in the simulcast subsystem and that RADIO1 can communicate with RADIO-3. Step 5. Re-power all of the control channel capable stations at the non-essential site. Step 6. Power down all of the control channel capable stations at the essential site. Step 7. Verify that the simulcast subsystem is now in the failsoft mode. Step 8. Re-power all of the control channel capable stations at the essential site and verify the simulcast subsystem is back in wide-area trunking.

Pass____ Fail____

* This test assumes that the availability number for the non-essential site is set to the default of 50%.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-127

System Reliability Features

2. TEST

Multiple Control Channels

Step 1. Initiate a Talkgroup Call with RADIO-1 on TALKGROUP 1.

1. DESCRIPTION

Step 2. Observe that only RADIO-2 will be able to monitor and respond to the call.

A maximum of four channels are eligible for assignment as control channel in each site. In the event that the assigned control channel fails at any remote site, the Zone Controller automatically selects one of the other control capable channels as the active control channel for that site. A Control Channel Preference Level can be used to rank the control capable channels where 1 is the highest ranking and 4 is the lowest.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2

Step 3. Initiate a Talkgroup Call with RADIO-3 on TALKGROUP 2. Step 4. Observe that only RADIO-4 will be able to monitor and respond to the call. Step 5. Disable the current control channel at SITE 1. Step 6. Observe that the control channel rotates to the next available channel capable of acting as a control channel. Step 7. Initiate a Talkgroup Call with RADIO-1 on TALKGROUP 1. Step 8. Observe that only RADIO-2 will be able to monitor and respond to the call. Step 9. Initiate a Talkgroup Call with RADIO-3 on TALKGROUP 2.

VERSION #1.03 SPS #7.5

Step 10. Observe that only RADIO-4 will be able to monitor and respond to the call. Enable the channel previously disabled in Step 5.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-128

System Reliability Features

2. TEST

Site Failsoft

Step 1. Using the Unified Event Manager (UEM), place the subsystem into failsoft mode.

1. DESCRIPTION

Step 2. Verify that the Radios emits a failsoft tone approximately once every ten seconds.

Failure of all control channels, failure of all voice channels, or failure of the site controller will cause a site (RF Subsystem) to enter failsoft operation. Subscribers can be programmed to operate in failsoft by talkgroup; to search its list of control channel frequencies in failsoft; or to disable failsoft altogether. When a site enters failsoft, a radio programmed for failsoft by talkgroup will first look for a specific failsoft channel dictated by the selected talkgroup. Since many systems have different frequencies across sites, if the radio is unable to find the talkgroup's failsoft channel the radio will instead operate in the control channel search failsoft mode. A radio programmed or needing to search control channels for failsoft frequencies will lock onto the first control channel in its control channel list. Note that radios should not be site locked when in failsoft mode as the radio will not check the full list of 64 control channels programmed into the radio's code plug. All radios should be programmed to have the same sequence of control channel frequencies. *Note: The subscribers MUST be SmartZone capable.

Step 3. Initiate a Talkgroup Call from RADIO-1 while in failsoft mode. Step 4. Verify that only RADIO-2 can hear RADIO1. Step 5. Dekey RADIO-1 and power down the failsoft channel associated with TALKGROUP 1. Step 6. Key RADIO-1 and verify RADIO-2 can still monitor the call but the other radios cannot. * Step 7. Dekey RADIO-1 and initiate a Talkgroup Call from RADIO-3. Step 8. Verify that only RADIO-4 can hear RADIO3.*

Pass____ Fail____

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 2 RADIO-3 - SITE - SITE 1 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 1 * Program the Radios for failsoft operation by talkgroup. TALKGROUP 1 should use a different channel for failsoft than TALKGROUP 2 and neither should be a control channel. * Turn off all subsystems except the subsystem under test.

VERSION #1.05 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-129

System Reliability Features

2. TEST

Base Station Identification

Step 1. Choose one site to test for Base Station Identification.

1. DESCRIPTION

Step 2. Setup the service monitor to receive the frequency of the BSI channel for the particular site.

This test verifies that the repeaters programmed for BSI operation at every site broadcasts the FCC Base Station Identification (BSI) every 30 minutes. To accomplish this, a service monitor will be set up to monitor the BSI channel of a random site and note that the Morse Code is heard.

Step 3. Monitor the service monitor until the system ID is broadcast.

Pass____ Fail____

SETUP A service monitor will be required to perform this test.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-130

System Reliability Features

2. TEST

Redundant Zone Controller Switching/User Initiated Switchover

Step 1. Verify in the Zone Configuration Manager (ZCM) that the switchover mode is userinitiated.

1. DESCRIPTION

Step 2. Verify in the ZCM under Zone object that the Standby Zone Controller is in "Synchronization Complete" state prior to switching.

The Zone Controller subsystem uses two Zone Controllers in a redundant configuration. The backup Zone Controller is made active either upon the loss of the active ZC or upon a user-initiated command from the Zone Configuration Manager.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - Site in Another Zone

VERSION #1.02 SPS #7.5

Step 3. Switch the Zone Controllers from the ZCM. Step 4. Verify that the backup Zone Controller becomes active and brings all sites back wide. Wait for the Radios to settle out the site affiliations. Step 5. Key RADIO-1 and verify that RADIO-2 and RADIO-3 hear the audio. Step 6. End the call from RADIO-1.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-131

System Reliability Features

2. TEST

Redundant Zone Controller Switching/Automatic Switchover

Step 1. Set the switchover mode to automatic through the ZCM.

1. DESCRIPTION The Zone Controller subsystem uses two Zone Controllers in a redundant configuration. The backup Zone Controller is made active either upon the loss of the active ZC or upon a user-initiated command from the Zone Configuration Manager.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - Site in Another Zone

Step 2. Verify in the ZCM that the idle Zone Controller is in "Standby" state prior to switching. Step 3. Disable the active Zone Controller via the ZCM diagnostic. Step 4. Verify that the backup Zone Controller becomes active and brings all sites back wide. Wait for the Radios to settle out the site affiliations. Step 5. Key RADIO-1 and verifying that RADIO-2 and RADIO-3 hear the audio. Step 6. End the call from RADIO-1. Step 7. Enable the Zone Controller disabled in step 3.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-132

Pass____ Fail____

System Reliability Features

2. TEST

Redundant Site Link Failure

Step 1. Initiate a Talkgroup Call with RADIO-1 on TALKGROUP 1.

1. DESCRIPTION

Step 2. Observe that RADIO-2 is able to monitor and respond to the call.

Communication between the Master Site and the Remote Site can take place over dedicated redundant links. The two links between the Master Site and the Remote Site operate in a hot/standby mode. The system will switch to the backup link if the main LAN or WAN link fails. Note that the Primary Site Router, if functional, will always be the active router. The Secondary Site Router will only take over when the Primary Site Router is malfunctioning.

Step 3. Remove the WAN link from the active router at the Remote Site. Step 4. Initiate a Talkgroup Call with RADIO-1 on TALKGROUP 1. Step 5. Observe that RADIO-2 is able to monitor and respond to the call. Step 6. Replace the WAN link connection that was removed in Step 3.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1

Pass____ Fail____

* SITE 1 should have redundant links to the Master Site.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-133

System Reliability Features

2. TEST

Redundant MGEG* (CENTRACOM Gold Elite only)

Step 1. Process several calls between the console, RADIO-1 and RADIO-2 on TALKGROUP 1.

1. DESCRIPTION

Step 2. Using the ZoneWatch Raw display, monitor the MGEG and Tline ID being used for each new call. Note that these calls are distributed between the active MGEGs links.

The Motorola Gold Elite Gateway (MGEG) is an interface device that allows an existing circuitswitched CENTRACOM Elite™ system to communicate over an IP or packet-based system. The MGEG provides two additional services: - Encryption/decryption capability to and from the console operator position or client. - Audio connectivity and encryption/decryption capability for telephone interconnect in ASTRO 25 systems that include the telephone interconnect option. The system utilizes two MGEGs to process audio to the console. Each MGEG has a line card with four E1 connections to the AEB. The system distributes calls between the two MGEGs and their E1 resources. If a failure occurs in the MGEG or in any of the links, the system will continue to process calls on the remaining available MGEG resources. *The MCC7500 Console Sub-system does not use MGEG, but if the Telephone Interconnect functionality is present then MGEG is required regardless of the Console type and test will be applicable.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 This test also requires a console position capable of communicating on TALKGROUP 1. The ZoneWatch Raw display must be available to monitor the MGEG link being utilized for each call.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-134

Step 3. Remove the LAN connection to MGEG 1. This failure will cause MGEG 1 to stop processing calls. Step 4. Verify communications between the console, RADIO-1 and RADIO-2. Step 5. Using the ZoneWatch Raw display, monitor the MGEG and Tline ID being used for each new call. Verify that calls are now exclusively being handled by MGEG 2 and that there is no disruption of inbound or outbound console audio. Step 6. Replace the LAN connection removed in Step 3. Step 7. Using the ZoneWatch Raw display, verify that after the MGEG becomes operational, it is again included in the distribution of calls.

Pass____ Fail____

System Reliability Features

2. TEST

Station Failure

Step 1. Power down a voice repeater for any voice channel at one remote site.

1. DESCRIPTION

Step 2. Press PTT on a radio several times to step through all available voice channels.

When a base station repeater at one site fails due to hardware problems, the pending call is lost and the trunking controllers removes the channel from service system wide. This failure can be created by powering down one base station repeater.

Step 3. Verify that the disabled channel is not used.

Pass____ Fail____

SETUP No set up required.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-135

System Reliability Features

2. TEST

Redundant Site Controller Switching/User Initiated Switchover

Step 1. Using CSS, connect to the ACTIVE site controller, and read the configuration data.

1. DESCRIPTION The Simulcast subsystem uses two Site Controllers in a redundant configuration. The backup Site Controller is made active either upon the loss of the active Site Controller or upon a user-initiated command from the Configuration Service Software.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1

VERSION #1.02 SPS #7.5

Step 2. Select the "Status Panel Screen" from the Service Pull-Down Menu. Step 3. Initiate a Talkgroup Call with RADIO-1 and observe that it is received by RADIO-2. Keep this call in progress until instructed to end the call. Step 4. Disable the ACTIVE site controller by placing it into the "USER DISABLED" state. This will force the INACTIVE site controller to become ACTIVE and take over control of the system. Step 5. Notice that the call set-up in Step 3 is unaffected by the site controller switchover. Step 6. End the call started in Step 3, and initiate a new call with RADIO-2. Step 7. Notice that the call is granted, and that RADIO-1 receives the new transmission.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-136

System Reliability Features

2. TEST

Receiver Interference Shutdown

Step 1. Using a service monitor, transmit a 1 kHz tone at the receive frequency of any repeater.

1. DESCRIPTION Receiver interference occurs when a repeater receives an unauthorized signal. In order to prevent a disruption of communications, the affected channel will be disabled and removed from the system's pool of available channel resources when the undesired carrier is detected for longer than the time-out period. Once the interfering carrier disappears, the channel is returned to service within approximately 5 minutes. The channel is then enabled. Note: The default Carrier Malfunction Timeout is 50 seconds. If the default value is to be modified, the change will need to be made in the Unified Network Configurator (UNC) for the channel(s) to be modified.

Step 2. Continue to transmit the 1 kHz tone until the controller removes the channel from service. Step 3. Verify the channel is removed from the selection/assignment process. Step 4. From the Unified Event Manager (UEM), verify channel malfunction due to interfering carrier is indicated Step 5. Remove the interfering signal. Verify the Channel is returned to service within five minutes and that UEM indicates that the channel is now enabled.

Pass____ Fail____ SETUP Service Monitor to transmit a signal at the receive frequency of a chosen channel.

VERSION #1.07 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-137

System Reliability Features

2. TEST

Transmitter Power Failure Shutdown

Step 1. Disconnect the transmit antenna connection to a trunked repeater. (This will cause a high VSWR condition)

1. DESCRIPTION The repeaters can detect a loss or decrease in transmitter output power of all trunked repeaters connected to it. Each trunked repeater contains an internal wattmeter element. Once the forward power has decreased past the threshold set, the repeater instructs the Zone Controller to take the channel out of service. If reflected power increases past the threshold set, the repeater will also instruct the Zone Controller to take the channel out of service. Note: This test should be done on a site with more than 2 channels. Failsoft will occur if the test is done on a 2 channel site. UEM - Unified Event Manager

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1

VERSION #1.06 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-138

Step 2. Key RADIO-1 so that the selected channel is assigned, and verify that the channel disables. Verify that this alarm is reported at the UEM. Step 3. Restore the transmit antenna connection to the trunked repeater. Step 4. Verify that the channel is put back into service by the UEM within five minutes.

Pass____ Fail____

4.10.10

Agency Partitioning Tests

Channel Partitioning Operation 1. DESCRIPTION

2. TEST

This feature provides exclusive use of designated RF channels for high priority groups. This test will demonstrate that the calls belonging to the high priority group is steered to the RF channels that are designated.

Step 1. While channels on the RF site 1 are idle, initiate a talkgroup call on TG5 from RADIO-2 on SITE 1 Step 2. Verify that RADIO-2 is assigned RF5. Step 3. Release the PTT and wait for the talkgroup call to end.

Create a User Group (UG2) via the User Configuration Manager. Assign the UG2 User Group to the talkgroup TG5 profile. In the Zone Configuration Manager, add UG2 to the RF Channel RF5 at RF Site 1 to be tested. This will ensure that UG2 will have exclusive use of the Channel (RF5).

SETUP

Step 4. Initiate a talkgroup call from RADIO-1 on TALKGROUP 1 at SITE 1. Step 5. Observe that the talkgroup call from RADIO-1 is not assigned RF5.

Pass____ Fail____

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TG5 RADIO-2 - SITE - SITE 1

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-139

Agency Partitioning Tests

2. TEST

Console Monitoring Permission Granted Channels

Step 1. Initiate a Talkgroup Call from console C1. Step 2. Verify that RADIO-1, RADIO-2 and C2 can hear the audio.

1. DESCRIPTION This is to demonstrate that the Consoles cannot monitor channels they have not been granted permission via security groups. Agency Partitioning is implemented through Security Groups. The dispatchers can only retrieve resource info for their respective agencies. Note: Once a Security Group is created in the User Configuration Manager (UCM) it cannot be deleted.

Step 3. Remove the security group SG_A from user CU1 via the User Configuration Manager (UCM) Step 4. log off user CU1 and then log CU1 user back into console Step 5. Verify that C1 does not have TALKGROUP 1 on the screen Step 6. Initiate a Talkgroup Call from console C2 Step 7. Verify that no audio is received at console C1.

SETUP RADIO-1 TALKGROUP 1 RADIO-2 TALKGROUP 1 C1 TALKGROUP 1 C2 TALKGROUP 2 TG_A is assigned to security group SG_A and console users CU1 and CU2 are assigned to SG_A. The users CU1 and CU2 are logged into C1 and C2 respectively. Note: The user will need to quit the UCM application when a new Security Group is created or after users are assigned to a new Security Group.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-140

Pass____ Fail____

Agency Partitioning Tests

2. TEST

AIS Logs only Permission Granted Channels

Step 1. Initiate a TalkGroup Call from console C1. Step 2. Verify that RADIO-1, RADIO-2, C2 and AIS can hear the audio.

1. DESCRIPTION This test will demonstrate the Archiving Interface Server (AIS) can be used to log trunking talkgroup call audio/events on a given Talkgroup for multiple agencies authorized to use TalkGroup channels. Each logging sub-system placed on the radio system infrastructure is granted access to some subset of the resources in the radio system. This is done in the radio system's network manager by specifying the rights of the login account used by the AIS. This restricts the logging recorders in one agency from recording information that pertains to another agency's traffic Note 1: The logging recorder that can be used with AIS is required to execute this test.

Step 3. Verify that CU1 can log the TALKGROUP 1 audio / events via logging recorder. Step 4. Verify that CU2 can not log TALKGROUP 1 audio / events via logging recorder. Step 5. Remove the right of login account of CU1 in AIS via UCM. Step 6. Verify that CU1 can no longer log TALKGROUP 1 audio / events via logging recorder

Pass____ Fail____

Note 2: Make sure to quit the UCM application when new security groups are created also after the users are assigned to new security groups.

SETUP The AIS is at MCC7500 Console site affiliated to TALKGROUP 1. RADIO-1 TALKGROUP 1 RADIO-2 TALKGROUP 1 C1 TALKGROUP 1 C2 TALKGROUP 2 TG_A is assigned to security group SG_A and console users CU1 and CU2 are assigned to SG_A. The users CU1 and CU2 are logged into C1 and C2 respectively. And CU1 has right of login account in AIS, CU2 does not have right of login account in AIS.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-141

Agency Partitioning Tests

2. TEST

Recorder Replays only Permission Granted Channels

Step 1. Configure playback station with user account (UA) to access TALKGROUP 1 and TALKGROUP 2 recordings.

1. DESCRIPTION

Step 2. Verify that TALKGROUP 1 and TALKGROUP 2 recorded audio / events can be replayed by logging in with UA

This test will demonstrate the playback station can be used to replay trunking talkgroup call audio/events on a given Talkgroup for multiple agencies authorized to use TalkGroup channels. Replay stations require the user to log in with an account name and password. These account names and passwords are different than and separate from any account names and passwords created on the radio system's network management sub-system. The replay user accounts can be configured with access rights to the radio resources being recorded by the recorders. This allows the various agencies to control which replay users can access which recordings Note: The playback equipment that can be used with AIS is required to execute this test.

SETUP The NICE play back station connected to AIS via the site LAN switch. AIS with prerecorded audio / events in TALKGROUP 1and TALKGROUP 2 is required.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-142

Step 3. Change playback station user account UA to remove access to TALKGROUP 1 Step 4. Verify that user with account UA can no longer replay the recorded audio / events in TALKGROUP 1 Step 5. Verify that UA account user can still access the recorded audio / events in TALKGROUP 2

Pass____ Fail____

4.10.11

Integrated Voice and Data (IV & D)

Context Activation 1. DESCRIPTION

2. TEST

Context Activation covers the process a Radio uses to register for packet data service on the trunked system. For this test, the Radio is configured to initiate a context request with the system upon establishment of the PPP link with the mobile computer (NAT Enabled). Note: The following test requires the user to be on a non-OTAR, but data capable mode in the radio

Step 1. Verify that the "PPP Link Establishment icon" and the "Packet Data IP icon" RADIO-1 are not displayed. This indicates that RADIO-1 is not currently context activated with the system.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 Note: RADIO-1 must be a XTS 5000. and must have data capabilities enabled in the network manager. SITE 1 must be operating in wide area trunking, capable of supporting data service.

VERSION #1.02 SPS #7.5

Step 2. Verify that the DLM icon on the PC connected to RADIO-1 is red in the System Status area of the Taskbar (Windows System Tray). This indicates that a PPP link between the PC and the Radio is not present. Step 3. Connect the PC to the Radio via the interface cable. Step 4. Initiate a Context Activation Request from the Radio by attempting to send a data message. Note: the data application must use the PPP link assigned to the data service network connection from the PC. Step 5. Verify that the context request for the Radio is successful. Step 6. Verify that the "PPP Link Establishment icon" and the "Packet Data IP icon" are visible on the Radio display. This indicates that the Radio is context activated with the system. Step 7. Verify that the DLM icon on the PC is displayed in the System Status area of the Taskbar. This indicates that a PPP link between the PC and the Radio is present.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-143

Integrated Voice and Data (IV & D)

2. TEST

Context Reject - Radio Not Enabled for Data Service

Step 1. Open the Radio User record for the radio that will be used for this test. Verify that the radio record indicates that it is not enabled for data service.

1. DESCRIPTION If a Radio is not enabled for data service in the SmartZone Manager, a Context Activation request from that Radio will be rejected. This test will demonstrate that a Radio that is not enabled for data service will not be allowed to register with the data system.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 Note: SITE 1 must be operating in wide area trunking, capable of supporting data service.

VERSION #1.02 SPS #7.5

Step 2. Verify that the "PPP Link Establishment icon" and the "Packet Data IP icon" on the Radio are not displayed. This indicates that the RADIO is not currently context activated with the system. Step 3. Verify that the DLM Icon on the PC is red on the System Status area of the Taskbar. This indicates that a PPP link between the PC and the Radio is not present. Step 4. Initiate a Context Activation Request from the Radio by starting the PPP link assigned to the data service network connection from the PC. Step 5. Verify that the context request for the Radio is unsuccessful. Step 6. Verify that the "PPP Link Establishment icon" is visible and the "Packet Data IP icon" is not visible on the Radio display. Step 7. Verify that the DLM Icon on the PC is yellow in the System Status area of the Taskbar.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-144

Integrated Voice and Data (IV & D)

2. TEST

Context Deactivation - Initiated from the Network Manager

Step 1. Verify that the "PPP Link Establishment icon" and the "Packet Data IP icon" on the Radio are visible. This indicates that the RADIO is currently context activated with the system.

1. DESCRIPTION Context deactivation covers the process used to cancel a currently active context. Context deactivation can be initiated either at the Radio or at the network manager. For this test, the context will be deactivated from the Network Manager. Once context deactivated, the Radio will be unable to use the packet data service. This test will be performed from a fixed location.

Step 2. Verify that the DLM icon on the PC is displayed in the System Status area of the Taskbar. This indicates that a PPP link between the PC and the Radio is present. Step 3. From the Network Manager, open the Radio User record for the Radio that will be used for this test and change the "Data Enabled" parameter for the Radio to "No".

SETUP Step 4. Verify that the Radio is context deactivated. RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 Note: RADIO-1 must be affiliated to the system and be context activated. SITE 1 must be operating in wide area trunking, capable of supporting data service.

VERSION #1.02 SPS #7.5

Step 5. Verify that the "PPP Link Establishment icon" is visible and the "Packet Data IP icon" on the Radio display is turned off. Step 6. Verify that the DLM Icon on the PC is now yellow in the System Status area of the Taskbar.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-145

Integrated Voice and Data (IV & D)

2. TEST

Inbound Data Transfer - Project 25 Data

Step 1. From a data terminal attached to RADIO-1, generate an inbound message to a Host computer on the network, using the ping command from the MSDOS prompt: ping -w 4000

1. DESCRIPTION This test will demonstrate the transfer of a short message from the mobile user terminal to a host computer on the CEN. For the purposes of this test, a short message is defined as between 50 to 200 bytes.

Step 2. Verify that the data terminal attached to RADIO-1 receives a response from the Host computer.

SETUP Pass____ Fail____ RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 Host computer - Connected Note: RADIO-1 must be affiliated to the system and have a data terminal connected. SITE 1 must be operating in wide area trunking, capable of supporting data service. For this test, RADIO-1 will be context activated for data service.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-146

Integrated Voice and Data (IV & D)

2. TEST

Outbound Confirmed Data Transfer

Step 1. From a Host computer on the Customer Enterprise Network (CEN), generate an outbound message to a data terminal attached to RADIO-1, using the ping command from the MS-DOS prompt: ping w 4000

1. DESCRIPTION This test will demonstrate the transfer of a short message from the host computer on the CEN to a mobile user terminal.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 Host computer - Connected Note: RADIO-1 must be affiliated to the system and have a data terminal connected. SITE 1 must be operating in wide area trunking, capable of supporting data service. For this test, RADIO-1 will be context activated for data service. This test will be performed from a fixed location.

Step 2. Verify that the Host computer receives a response from the data terminal attached to RADIO-1.

Pass____ Fail____

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-147

Integrated Voice and Data (IV & D)

2. TEST

Over the Air Programming (PoP25)

Step 1. Locate IP address for Radio-1

1. DESCRIPTION The feature Programming Over P25 (POP25) allows a user to configure a radio remotely from the enterprise network by sending a sequence of commands over-the-air via the ASTRO 25® IV&D system. It is expected that the POP25 will significantly reduce the operational costs of IV&D radios by configuring personalities, talkgroups, channels, sites, etc in a radio without physically touching the radio. This test will demonstrate the ability to perform a subscriber update using CPS over the air.

Step 2. From the CPS computer on the Customer Enterprise Network (CEN), connect to RADIO-1 over the network and read the subscriber. Step 3. Make a change to the archived program file and write to RADIO-1. Step 4. Once the new archive is received at RADIO1 the radio user will have to approve the new configuration. Step 5. Once the new configuration has been received and the load is complete, verify the configuration change has been implemented.

NOTE: There are subscriber programming options that will affect the test. The subscriber can be programmed to Approve the update, implement the update on next power cycle or disregard the update.

Step 6. On the CPS PC return the archive feature to the original state.

SETUP

Step 7. Begin a talkgroup call by keying RADIO-2. Verify RADIO-1 hears the audio.

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 1 RADIO-2 - SITE - SITE 1 PC loaded with Customer Programming Software (CPS) and the System Key Dongle. The PC must be connected to the ASTRO 25® network via the CEN. RADIO-1 must be data capable and context activated for data service.

VERSION #1.05 SPS #7.5

Step 8. While the call is in progress send the program update to RADIO-1. Verify that the radio continues to hear the audio. Dekey and key RADIO-2 several times with various pauses to interrupt the data transfer to RADIO-1. Step 9. Dekey RADIO-2 and verify the data transfer completes. Once the programming update has completed accept the configuration change on RADIO-1. Step 10. Verify RADIO-1 configuration has returned to its original state.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-148

4.10.12

MOSCAD Fault Management System 2. TEST

Screen Navigation 1. DESCRIPTION MOSCAD alarming tests shall be conducted from the MOSCAD server and clients if applicable. The alarms demonstrated are to be made on the actual equipment or punch block interface, with an exception made for cases where it is not practical to create an actual alarm. The following will provide a brief introduction and description of the main display screens encountered when navigating the MOSCAD GUI (Graphic User Interface).

VERSION #1.03 SPS #7.5

Step 1. Login and Password Screen This is the first screen displayed after a system startup. It allows a user with the proper login and password to access the MOSCAD alarm system. Login to MOSCAD using the appropriate user name and password. Step 2. System Overview Screen The "System Overview" screen contains site names adjacent to color status pushpins. Details of a particular site can be viewed by selecting the site name pushpin of interest. Depending on alarm status, the color bullet will flash accordingly. Step 3. Alarm Summary Screen Proceed to the "Alarm Summary" screen from the "System Overview" screen. The "Alarm Summary" screen provides a text display of all alarms currently in the system. On this screen, you can choose between alarm summary and alarm history by selecting the "Alarm Summary / Alarm History" button. Also, the display can be filtered to show alarms based on site name or acknowledgement status. Step 4. Comm Screen From the "Alarm Summary" screen access the "Site Comm" screen. The "Site Comm" screen displays a combined communication status for each site. To view all the SDM3000s within a site, select the icon next to the site comm. Should the communications path between the IP Gateway and any SDM3000 in the system be interrupted, it will be indicated by an alarm present on this screen. Step 5. Device Monitoring From the "System Overview" screen, navigate to each site monitored by MOSCAD in the system. Once a particular site pushpin has been selected, a site overview screen will appear that indicates the types and quantities of devices monitored by MOSCAD at that site.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-149

MOSCAD Fault Management System

2. TEST

InTouch Alarm Processing - Acknowledged Alarm

Step 1. Create an alarm condition by simulating an alarm on a device in the system or shorting/opening a status input to any MOSCAD status input module in the system. Navigate to the lowest level screen that depicts the highest degree of alarm detail.

1. DESCRIPTION This segment of the test verifies that the bi-state site alarms are processed and communicated to the MOSCAD Server. The alarms can originate from a device with "hard wired" physical dry contact interfacing or from a device connected to the MOSCAD SDM3000 by means of an RS232 or Ethernet protocol interface. This test will also show the equal display and acknowledging capabilities of both MOSCAD Server and Client(s).

Step 2. Verify that the colored status bullet for the associated alarm on the server is blinking red and for RS232 interfaces, that the "state" text is red and is displayed for the correct alarm point and site. Step 3. If speakers are present, verify that an audible indication is heard at the server. Step 4. Verify that the alarm displays in red text on the pop-up Alarm Summary window. Step 5. Click with the mouse on the "acknowledge" button. Verify that the audible indication is silenced.

VERSION #1.02 SPS #7.5

Step 6. Verify that the text on the alarm summary window of the server changes from red (unacknowledged alarm) to black (acknowledged alarm). Step 7. Verify that the colored status bullet for the associated alarm on the server remains red but stops blinking. Step 8. Return the alarm point to the normal condition. Verify that the colored status bullet for the associated alarm returns to green. Step 9. Verify that the text is removed from the alarm summary window. Step 10. These steps should be performed once again to verify the functionality of the MOSCAD client(s).

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-150

MOSCAD Fault Management System

2. TEST

InTouch Alarm Processing Unacknowledged Alarm

Step 1. Create an alarm condition by simulating an alarm on a device in the system or shorting/opening a status input to any MOSCAD status input module in the system. Navigate to the lowest level screen that depicts the highest degree of alarm detail.

1. DESCRIPTION This segment of the test verifies that the bi-state site alarms are processed and communicated to the MOSCAD Server. The alarms can originate from a device with "hard wired" physical dry contact interfacing or from a device connected to the MOSCAD SDM3000 by means of an RS232 or Ethernet protocol interface. This test will also show the equal display and acknowledging capabilities of both MOSCAD Server and Client(s).

Step 2. Verify that the colored status bullet for the associated alarm on the server is blinking red and for RS232 interfaces, that the "state" text is red and is displayed for the correct alarm point and site. Step 3. If speakers are present, verify that an audible indication is heard at the Server. Step 4. Without acknowledging the alarm, return the alarm point to its normal condition.

VERSION #1.02 SPS #7.5

Step 5. Verify the text on the alarm summary window of the server has changed from red to blue indicating the alarm that has returned to normal but remains unacknowledged. Step 6. Verify that the associated alarm bullet is blinking green and yellow, indicating an unacknowledged alarm that has returned to normal. An audible alert will persist until the alarm is acknowledged. Step 7. These steps should be performed once again to verify the functionality of the MOSCAD client(s).

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-151

MOSCAD Fault Management System

2. TEST

Physical Inputs/Outputs - Digital Inputs

Step 1. Select a site at to perform the test.

1. DESCRIPTION

Step 2. Short/Open the input point and verify that an alarm indication is received at the InTouch Server and/or client(s).

The purpose of this section is to verify that the physical inputs and outputs that interface to the MOSCAD I/O module(s) are properly processed by the MOSCAD system. All alarms demonstrated are to be made on the punch block. Proper processing can be verified by observing I/O module LED indications for DI's.

Step 3. Verify the active alarm is displayed in the UEM. (Make sure the show all button has been selected.) Step 4. Return the input to its normal condition. Verify that the alarm indication changes in the UEM active alarms view.

DI - Digital Inputs UEM - Unified Event Manager

Pass____ Fail____

SETUP NMclient01 - UEM session up and running.

VERSION #1.05 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-152

MOSCAD Fault Management System

2. TEST

Physical Inputs/Outputs - Digital Outputs

Step 1. Select a site to perform the test.

1. DESCRIPTION The purpose of this section is to verify that the physical inputs and outputs that interface to the MOSCAD I/O modules are properly processed by the MOSCAD system. Proper processing can be verified in two ways. First, a witness can observe the I/O module LED indications for DO's by changes on the SDM3000 panel. Second, a witness can observe the DO back indication on the InTouch "Digital Output" screen. Note that digital outputs cannot be initiated from the FullVision Client.

Step 2. Trigger a latched state of the output point by selecting the "On" button from the appropriate site's digital output screen, confirming that the screen indication changes from "Off" to "On" for that point. Step 3. Verify a change of state by observing the LED on the MOSCAD DO module and by observing the control back indication on the InTouch client or server. Step 4. Return the output to its "Off" condition. Verify that the "On" indication on the InTouch server returns to "Off" in addition to confirming a change of state of the MOSCAD LED.

Digital Outputs

Pass____ Fail____

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-153

MOSCAD Fault Management System

2. TEST

Physical Inputs/Outputs - Analog Inputs

Step 1. Choose the site to perform the test.

1. DESCRIPTION

Step 2. At the MOSCAD server or client, select the Analog Input icon from the testing site overview screen.

The purpose of this section is to verify that the physical inputs and outputs that interface to the MOSCAD I/O modules are properly processed by the MOSCAD system. Analog inputs can be tested by comparing GUI needle deflection on-screen (full scale, half scale, 2/3 scale, etc)

Step 3. Using a MOSCAD test board, manipulate the analog input voltage by moving the potentiometer to ¼, ½, or ¾ of the full range.

Analog values can only been seen on the MOSCAD alarm server and clients.

Step 4. Verify that the needle deflection of the MOSCAD alarm manager matches, with reasonable accuracy, to that of the potentiometer.

Analog Inputs

Pass____ Fail____

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-154

MOSCAD Fault Management System

2. TEST

TRAK GPS - Communication Status Fault

Step 1. Choose the site to perform the test.

1. DESCRIPTION

Step 2. Verify there are no current alarms for the chosen TRAK GPS on the InTouch and FullVision Alarm Managers.

The MOSCAD system connects to a TRAK 9100 GPS Standard via the RS-232 port 9 pin D connector. This interface requires a dedicated MOSCAD SDM3000 RS-232 port. The MOSCAD will periodically solicit the TRAK for its status and response messages are sent back to the MOSCAD SDM3000. New alarm messages, with respect to the last received status held in the SDM3000, are then converted to native MOSCAD data format for transmission to the MOSCAD alarm Server. Alarm messages are also sent as SNMP traps from the SDM3000's IP Interface to the FullVision Server.

Step 3. Disconnect the RJ45 communication cable (which ultimately connects to the TRAK 9100 RS232 port) from the rear of the GPS.. Step 4. Verify that the TRAK 9100 communication alarm is received at the MOSCAD server and FullVision alarm managers. Step 5. Acknowledge the alarm on either the MOSCAD server or client. Step 6. Reconnect the communication cable to the TRAK 9100 GPS..

VERSION #1.02 SPS #7.5

Step 7. Verify that the GPS communication status returns to normal on the alarm managers.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-155

MOSCAD Fault Management System

2. TEST

TeNSr Channel Bank - Configuration

Step 1. At the server, open the terminal application (VT100 mode) by selecting the configure button on the TeNSr display screen.

1. DESCRIPTION The MOSCAD system will connect to each TeNSr channel bank's terminal port. This specifically is the RJ45 "TERM" port found on the back of the channel bank on the INF (Interface) module. This interface takes place through a MOSCAD MUX port (port 1, 2, 3 or 4). This connection, made using the TeNSr term port, is used solely for the VT-100 configuration interface. This connection is manually initiated and used for configuration. This interface should not be confused with the channel bank's alarm port.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-156

Step 2. A HyperTerminal display will show the channel bank that corresponds to the current site and margin tab. Step 3. Verify connection by validating channel bank name. Step 4. Close the HyperTerminal display.

Pass____ Fail____

MOSCAD Fault Management System

2. TEST

RSBR(Repeater Site Base Radio) / MSBR(Multisite Base Radio) Diagnostics Reset Station

Step 1. Choose the channel and site to perform test. Step 2. Verify that there are no current alarms for the chosen base radio on MOSCAD server and client(s).

1. DESCRIPTION Step 3. Select "Station Reset". The MOSCAD system will connect to each repeater site base radio (RSBR) or a multisite base radio (MSBR) using the site's Ethernet switch(es). The MOSCAD will receive SNMP traps from the base radio (BR) as well as solicit the BR for status. The MOSCAD will continuously poll for any alarm messages present in the BR. New alarm messages, with respect to the last received status held in the SDM3000, are then converted to native MOSCAD data format for transmission to the MOSCAD alarm Server.

Step 4. Verify that the station is reset by observing the LED's on the face of the respective base radio.

Pass____ Fail____

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-157

MOSCAD Fault Management System

2. TEST

RSBR(Repeater Site Base Radio) / MSBR(Multisite Base Radio) GTR8000 Diagnostics-Ext. Ref. Status

Step 1. Choose the channel and site to perform test. Step 2. Verify that there are no current alarms for the chosen GTR8000 on the MOSCAD Server.

1. DESCRIPTION The MOSCAD system will connect to each repeater site base radio (RSBR) or a multisite base radio (MSBR) using the site's Ethernet switch(es). The MOSCAD will receive SNMP traps from the base radio (BR) as well as solicit the BR for status. The MOSCAD will continuously poll for any alarm messages present in the BR. New alarm messages, with respect to the last received status held in the SDM3000, are then converted to native MOSCAD data format for transmission to the MOSCAD alarm Server. Note - this test only applies for Base Radios that use an external frequency reference

Step 3. Disconnect the external standard frequency reference cable found in the rear of the chosen station. Step 4. Verify that the alarm is received at the MOSCAD server and clients. Step 5. Acknowledge the alarm on MOSCAD server or clients. Step 6. Reconnect the cable at the station. Step 7. Verify that the station returns to normal.

Pass____ Fail____ VERSION #1.1 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-158

MOSCAD Fault Management System

2. TEST

GCP Site Controller - Simulcast Site Failsoft

Step 1. Choose the site to perform test.

1. DESCRIPTION

Step 2. Verify that there are no current alarms for the chosen GCP Site Controller on the MOSCAD server and client(s).

The MOSCAD system will interface to the GCP Site Controller via the network hub or switch. Select alarm messages are then converted to native MOSCAD data format for transmission to the MOSCAD alarm Server.

Step 3. From the Zone Configuration Manager, select the Simulcast site to be tested, right click the site and select Diagnostics, set the Site to "Site Failsoft" Step 4. Verify that a site failsoft alarm is received at the MOSCAD server and clients.

VERSION #1.02 SPS #7.5

Step 5. Acknowledge the alarm on either the MOSCAD server or client. Step 6. Return the site from failsoft. Step 7. Verify that the site controller returns to normal.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-159

MOSCAD Fault Management System

2. TEST

Report Generator

Step 1. Minimize the Wonderware Intouch software and select the Report Generator icon from the Windows NT desktop.

1. DESCRIPTION The Report Generator is used as a stand-alone or a networked application to log and report alarms that are generated within the Wonderware Intouch database. Alarms and Acknowledgements can be logged and stored according to the time, site, or equipment at which the alarm originated, and the detailed summary of filtered events can then be forwarded to a printer. Report Generator is capable of Auto Archiving on a monthly basis or at every 150,000 events, whichever occurs first, and it includes utilities to both compact and repair the alarm database.

Step 2. Select the "Show Report" button shown in the application. Step 3. Verify that the present date is displayed as well as any past alarms for which the Report Generator id configured. Step 4. Crate several alarm conditions (typically 2 or 3) by simulating alarms on devices in the system or by shorting/opening a status input to any MOSCAD status input module in the system. Step 5. Verify that the alarms are displayed on the Wonderware Intouch alarm summary screen.

VERSION #1.02 SPS #7.5

Step 6. Verify that the alarms are displayed on the Report Generator alarm history report.

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-160

MOSCAD Fault Management System

2. TEST

UEM MOSCAD Management

Step 1. Navigate through the UEM application to view a site with the MOSCAD SDM3000.

1. DESCRIPTION

Step 2. Verify all MOSCAD devices for the specific site have been discovered and indicative of any failures that they have in the active alarms view.

MOSCAD SDM3000s report alarms to the Unified Event Manager (UEM) via SNMP traps. The purpose of this test is to verify that all MOSCAD site objects are being managed effectively from UEM.

SETUP

Pass____ Fail____

NMClient01 - UEM client session running

VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-161

MOSCAD Fault Management System

2. TEST

TRAK GPS - GPS Fault

Step 1. Choose the site to perform the test.

1. DESCRIPTION

Step 2. Verify there are no current alarms for the chosen TRAK GPS on the MOSCAD server and UEM active alarms view.

The MOSCAD system connects to a TRAK 9100 GPS Standard via the RS-232 port 9 pin D connector. This interface requires a dedicated MOSCAD RS232 port. The MOSCAD will periodically solicit the TRAK for its status and response messages are sent back to the MOSCAD SDM3000. New alarm messages, with respect to the last received status held in the SDM3000, are then converted to native MOSCAD data format for transmission to the MOSCAD Server. Alarm messages are also sent as SNMP traps from the SDM3000's IP Interface to the Unified Event Manager (UEM) application.

SETUP

Step 3. Disconnect the antenna cable from the TRAK GPS. Step 4. Verify that the alarm is received at the MOSCAD server and/or client. Step 5. Acknowledge the alarm on either the MOSCAD server or client. Step 6. Reconnect the antenna cable to the TRAK GPS standard. Step 7. Verify that the TRAK GPS status returns to normal.

NMclient01 - UEM session up and running.

Pass____ Fail____ VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-162

MOSCAD Fault Management System

2. TEST

TeNSr Channel Bank - T1 No Signal (NOS)

Step 1. Choose the site to perform test.

1. DESCRIPTION

Step 2. Verify that there are no current alarms for the chosen channel bank on the MOSCAD and UEM active alarms view.

The MOSCAD system will connect to each TeNSr channel bank's computer port 9 pin D connector. This port is found in the rear of the channel bank on the INF (Interface) module. TeNSr monitoring requires a dedicated MOSCAD SDM3000 RS-232 port. The MOSCAD receives alarms from the channel bank but cannot solicit status from the channel bank. New alarm messages, with respect to the last received status held in the SDM3000, are then converted to native MOSCAD data format for transmission to the MOSCAD alarm Server. Alarm messages are also sent as SNMP traps from the SDM3000's IP Interface to the Unified Event Manager (UEM) application. The channel bank can have up to 28 modular circuits monitored, though in most cases it will be a subset of this maximum.

SETUP

Step 3. Disconnect the T1 Link. Step 4. Verify that the alarm is received on the MOSCAD and changes are seen on the UEM active alarms view. Step 5. Acknowledge the alarm on either the MOSCAD server or client. Step 6. Reconnect the T1 Link. Step 7. Verify that the TeNSr status returns to normal.

Pass____ Fail____

NMclient01 - UEM session up and running.

VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-163

MOSCAD Fault Management System

2. TEST

TeNSr Channel Bank - Power Supply Fail

Step 1. Choose the TeNSr channel bank with dual power supplies to perform test.

1. DESCRIPTION

Step 2. Verify that there are no current alarms for the chosen channel bank on the MOSCAD and UEM active alarms view.

The MOSCAD system will connect to each TeNSr channel bank's computer port 9 pin D connector. This port is found in the rear of the channel bank on the INF (Interface) module. TeNSr monitoring requires a dedicated MOSCAD SDM3000 RS-232 port. The MOSCAD receives alarms from the channel bank but cannot solicit status from the channel bank. New alarm messages, with respect to the last received status held in the SDM3000, are then converted to native MOSCAD data format for transmission to the MOSCAD alarm Server. Alarm messages are also sent as SNMP traps from the SDM3000's IP Interface to the Unified Event Manager (UEM) application. The channel bank can have up to 28 modular circuits monitored, though in most cases it will be a subset of this maximum Note that this test requires the channel bank to be configured with dual power supplies. This test may not be run on a single power supply channel bank.

SETUP NMclient01 - UEM session up and running.

VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-164

Step 3. Remove one of the power supplies and verify it is no longer powered. Step 4. Verify that the alarm is received on the MOSCAD and alarms are also received in the active alarms view of UEM. Step 5. Acknowledge the alarm on either the MOSCAD server or the MOSCAD client. Step 6. Reinsert the power supply. Step 7. Verify that the TeNSr status returns to normal.

Pass____ Fail____

MOSCAD Fault Management System

2. TEST

TeNSr Channel Bank - User Card Alarm (OOS)

Step 1. Choose the site to perform test.

1. DESCRIPTION The MOSCAD system will connect to each TeNSr channel bank's computer port 9 pin D connector. This port is found in the rear of the channel bank on the INF (Interface) module. TeNSr monitoring requires a dedicated MOSCAD SDM3000 RS-232 port. The MOSCAD receives alarms from the channel bank but cannot solicit status from the channel bank. New alarm messages, with respect to the last received status held in the SDM3000, are then converted to native MOSCAD data format for transmission to the MOSCAD alarm Server. Alarm messages are also sent as SNMP traps from the SDM3000's IP Interface to the Unified Event Manager (UEM) application. The channel bank can have up to 28 modular circuits monitored, though in most cases it will be a subset of this maximum.

Step 2. Verify that there are no current alarms for the chosen channel bank on the MOSCAD and UEM active alarms view. Step 3. Pull a user card other than the INTF card from the rear of the TeNSr. Step 4. Verify that the alarm is received on the MOSCAD and alarms are also received in the active alarms view of the UEM. Step 5. Acknowledge the alarm on either the MOSCAD server or client. Step 6. Reinsert the card. Step 7. Verify that the TeNSr status returns to normal.

Pass____ Fail____ SETUP NMclient01 - UEM session up and running.

VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-165

MOSCAD Fault Management System

2. TEST

TRAK GPS - Power Supply Fault

Step 1. Choose the site to perform the test.

1. DESCRIPTION

Step 2. Verify there are no current alarms for the chosen TRAK GPS on the InTouch and UEM active alarms view.

The MOSCAD system connects to a TRAK 9100 GPS Standard via the RS-232 port 9 pin D connector. This interface requires a dedicated MOSCAD SDM3000 RS-232 port. The MOSCAD will periodically solicit the TRAK for its status and response messages are sent back to the MOSCAD SDM3000. New alarm messages, with respect to the last received status held in the SDM3000, are then converted to native MOSCAD data format for transmission to the MOSCAD alarm Server. Alarm messages are also sent as SNMP traps from the SDM3000's IP Interface to the Unified Event Manager (UEM) application.

Step 3. Disconnect one of the power supply cables from the rear of the TRAK GPS Step 4. Verify that the alarm is received on the alarm managers. Step 5. Acknowledge the alarm on the MOSCAD server or client. Step 6. Reconnect the power supply cable to the rear of the TRAK GPS. Step 7. Verify that the TRAK GPS power status returns to normal.

SETUP NMclient01 - UEM session up and running.

Pass____ Fail____ VERSION #1.04 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-166

4.11 Signoff Certificate By their signatures below, the following witnesses certify they have observed the In-Field System Acceptance Test Procedures.

Signatures

WITNESS:

___________________________________Date: _______

Please Print Name: ________________________________________

________ Initials

WITNESS:

___________________________________Date: _______

Please Print Name: ________________________________________

________ Initials

City of Philadelphia ASTRO 25 Upgrade

Acceptance Test Plan June 13, 2008 4-167

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade Acceptance Test Plan June 13, 2008 4-168

Section 5. Cutover Plan 5.1

General Within the telecommunications industry, cutover is a logical, well-documented process designed to activate new communications systems while minimizing disruption to user groups. Motorola’s cutover strategy as it relates to implementing the system will vary from project to project based on numerous factors including type of system being installed or upgraded. A cutover plan will require a closely coordinated planning effort incorporating inputs of City of Philadelphia staff, and all affected City of Philadelphia user groups. The Motorola team has extensive experience planning for and implementing transitions from existing to new public safety communications systems. The most critical requirement in any communication system cutover plan is the ability to maintain integrity throughout the cutover process, thus minimizing interruption to service during the transition period. The steps taken prior to system cutover will facilitate the actual cutover period. Motorola understands that a portion of the existing system in service supporting the various City of Philadelphia user groups need to remain operational during the cutover period. The final cutover details will be developed jointly between Motorola and the City of Philadelphia, to ensure that an effective and efficient transition occurs from the old radio system to the new system. The cutover plan will also detail how communications will occur for each department during the transition process. A cutover plan timetable listing the chronological orders and time frames will also be developed.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Cutover Plan June 13, 2008 5-1

The intent of this document is to address the cutover for the major system elements that construct the overall system design. This preliminary document addresses the new ASTRO 25 IP Radio System, assumes new GTR8000BR stations using IP Simulcast, the use of SmartX technology and subscriber, and consoles upgrades.

5.2

ASTRO 25 System Upgrade Prior to on-site implementation of the new ASTRO 25 system infrastructure, Motorola will stage the new site equipment at our Customer Center for System Integration (CCSI) factory floor. The primary function of CCSI staging is to assemble all new equipment in racks according to the actual site layouts, software loads, and internal system verification testing prior to field shipment for an ease of implementation and installation. Motorola will stage the following system components: ♦ ♦ ♦ ♦ ♦ ♦ ♦

5.3

Master Site Infrastructure Network Management Equipment Motorola Gold Elite Gateways SmartX Servers Prime Site Infrastructures IP Simulcast Network Equipment GTR8000BR IP Simulcast Base Stations

SmartX versus Console Patching The SmartX capability provides an advanced network interconnectivity solution based on the ASTRO 25 IP core network. The existing 3600 SmartZone 3.0 simulcast cells shall be tied directly into the ASTRO 25 IP core network through the deployment of 3600 site IP gateways located at the zone master site. Additionally, the Gold Elite console subsystem will be upgraded and connected into the ASTRO 25 network via a Motorola Gold Elite (IP) Gateway (MGEG). After these upgrades are complete, the ASTRO 25 IP Radio System Master Site equipment performs the call processing and network management functions for the combined 3600/9600 system. Thus, the overall network is simplified by eliminating the SmartZone 3.0 Master Site Zone Controllers and Network Management hardware and software. From an operational perspective, the City of Philadelphia users will not notice any difference in the operation or coverage of their radios or performance of their Gold

City of Philadelphia ASTRO 25 Upgrade

Cutover Plan June 13, 2008 5-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Elite dispatch consoles. All operational aspects of the system remain unchanged, removing any need for additional user or dispatcher training. The diagram below, Figure 5-1, shows the System-A and System-B simulcast cells linked to the ASTRO 25 Master Site via the SmartX converter. The SmartX converters will be located at the Master Site providing emulation between 3600 SmartZone and 9600 ASTRO25 based site control protocols. The diagram shows that system during the cutover period, where there is a partial build out of the Project 25 RF cells, with some of the channels still operating with the 3600 control channel. Figure 5-1: System A and System B Simulcast Cells

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Cutover Plan June 13, 2008 5-3

MIGRATION USING SMARTX Install new Project 25 Master Site and keep 3600 RF sites and 3600 radios operational during migration Decommission SmartZone 3.0 Master Site Migrate dispatch to P25 Master Site by installing the MGEG Migrate users by user groups Existing 3600 users can be supported during migration period and gradually transitioned to P25 Single Network Management Subsystem – Centralized management for 3600 and 9600 radios / sites – Advanced ASTRO 25 network management applications One System / One Master Site to Manage & Service – Single ASTRO 25 Master Site requires less space, maintenance New ASTRO 25 features, in parallel with existing 3600 operation during cutover: Maintain System Features throughout the cutover: – Talkgroup / Announcement Group Calls Integrated call management w/A25 Zone Controller – not a “patch”, throughout the cutover period – Emergency Call, Emergency Alarm – PTT-ID to Dispatchers and equipped Radio Users – Private Call II Enhanced – Call Alert – AllStart / FastStart Talkgroup Call Setup – Busy Callback – Console Trunked Talkgroup Patch – Multi-Select – Console Priority

City of Philadelphia ASTRO 25 Upgrade

Cutover Plan June 13, 2008 5-4

MIGRATION WITHOUT THE USE OF SMARTX Install new Project 25 Master Site Migration driven by dispatch, migrate CEB by CEB Migrate users associated with dispatchers Migrate appropriate number of channels to P25 to support users Patch together talkgroups between the 3600 and 9600 baud system Upgrade mobiles and portables together with dispatchers and RF channels Existing 3600 users will be supported during migration via the use of dual system and patching Dual Network Management Subsystems – Dual management for 3600 and 9600 radios / sites – Advanced ASTRO 25 network management only for the Departments migrated to P25 Two Systems Two Master Sites to Manage & Service during the migration – Two Master Sites require more space & maintenance for duration of the complete cutover New ASTRO 25 features available only for users on P25 system, in parallel with existing 3600 operation during cutover, ONLY for the Departments cutover: Operability among 3600 radios, 9600 radios and dispatch consoles, will be accomplished via patching Maintain System Features only for the Departments cutover: – Talkgroup / Announcement Group Calls Call management with P25 Zone Controller using "patch", during the cutover, among Departments not cutover – No Emergency Call, Emergency Alarm signaling across the 3600/9600 systems - Emergency Call, Emergency Alarm to for each system to dispatchers on that system – No PTT-ID to Dispatchers and equipped Radio Users across the 3600/9600 systems – No Private Call II Enhanced across the 3600/9600 systems – No Call Alert across the 3600/9600 systems – No AllStart / FastStart Talkgroup Call Set-up across the 3600/9600 systems No Busy Callback across the 3600/9600 systems In the event of a busy on one side of the system, the busy tone will be pushed out as a talkgroup call on the other system – Console Trunked Talkgroup Patch – Multi-Select – Console Priority

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

MIGRATION USING SMARTX

MIGRATION WITHOUT THE USE OF SMARTX

– Alert Tones – Dynamic Regrouping Graceful migration from circuit-switched to packet switched P25 network – Common Fleetmap – Common Network Management Continue use of analog infrastructure in one integrated network

– No Alert Tones across the 3600/9600 systems – No Dynamic Regrouping across the 3600/9600 systems Migration must be well planned and managed for the duration of the cutover – Common Fleetmap – Separate Network Management

Consoles talk on both systems

Dual use infrastructure in place for the duration of the cutover Consoles talk on single system wireline and to the other via control stations

5.3.1 3600 Baud Throttling: Migration Using SmartX versus Console Patching In certain system loading conditions, the City of Philadelphia currently experiences simulcast prime controller “throttling” due to the capacity constraints of the 3600 baud control channel on the existing SmartZone 3.0 system. This issue causes busies on the SmartZone3.0 system. Regardless of the migration, SmartX or via Console Patching, the 3600 baud SmartZone system’s performance will continue to be determined by the loading and traffic. A cutover goal should be to minimize the number of user groups that are split between the two systems. SmartX will significantly enhance the ability to cut over users by user group or by multiple user groups. This is possible because with SmartX, the cutover does not need to be driven on a CEB by CEB basis. With either approach, when talkgroups have users on both systems, traffic will appear on both systems. With either approach, if the 3600 baud legacy control channel’s capacity is exceeded, system controller “throttling” may still occur.

5.4

Subscriber Upgrade Prior to the system upgrade, Motorola will make an effort to upgrade all existing XTS 5000, XTS 3000 and XTS 2500 Portables and ASTRO Spectra Mobiles. Motorola would like to set up different depot locations and times as agreed upon by Motorola and the City of Philadelphia to make it logistically easy for all users to bring in radios to be upgraded with the latest hardware and software. This upgrade will allow the subscribers the necessary hardware and software to support the ASTRO 25 system platform and the existing SMARTZONE 3.0z system platform. Having both systems programmed into the radio will allow the user to operate on the existing system and when their department is ready for cutover to the new system it can be as easy as switching to a new location within their radio. Depending upon the number of

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Cutover Plan June 13, 2008 5-5

Talkgroups (fleet structure) programmed in the radio, Motorola will program those same talkgroups in a different position in the radio. Outline below are the steps for the subscriber cutover: 1. The City of Philadelphia will decide on a department to transition first to the new ASTRO 25 infrastructure. Motorola recommends that the City of Philadelphia consider a department that is the least risky (i.e. Public Works) than your public safety departments. In fact Motorola recommends that those departments be migrated to the new system last. 2. The City of Philadelphia subscriber user will bring in their radio at the appropriate time and location. 3. The radio will be upgraded with the appropriate hardware, software and tested. 4. Once the department transition to the new system is complete, Motorola will begin the XTS3000 and ASTRO SPECTRA software and hardware upgrade. 5. Motorola will perform the above steps 1-3 for Simulcast System A until all stations have been moved to the new ASTRO 25 system. 6. Motorola will perform the above steps 1-3 for Simulcast System B until all station have been moved to the new ASTRO 25 system. 7. ALL subscribers must be made available for programming within a four-week window. Otherwise, a different (higher) pricing model will need to be applied. Should this not be the optimal approach for transitioning the users over to the new system, Motorola would explore other approaches during the Contract Design Review (CDR).

5.5

Conceptual Cutover Plan The following conceptual cutover plan was originally agreed to at the May 22, 2008 Radio System Technical Committee meeting. It is presented here in its original form for clarity. Please note that the plan is not necessarily shown in complete chronological order. Motorola will be pleased to work with the City during the Detailed Design Phase of the project to develop final and fully detailed Upgrade/Cutover Upgrade Implementation Plan (UIP) / Implementation Time Line (ITL) ♦

Install new T1 circuits • Master to Primes • Primes to Remotes ♦ Install ASTRO25 Master Site at City Hall RM626m • Install SmartX servers (not yet connected to SZ3.0)

City of Philadelphia ASTRO 25 Upgrade

Cutover Plan June 13, 2008 5-6

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page



♦ ♦



♦ ♦ ♦

♦ ♦

Upgrade Embassy network to ASTRO25 compatible code (while still connected to SZ3.0) • AEB cards • CEB cards • Elite Ops ‚ new PCs recommended for given project implementation timeframe ‚ new PCs not included in this proposal at the direction of the City Conduct first 30 day Reliability Test Install ASTRO25 IP Network Equipment at Primes & Remotes • A&B Site Routers (connected to new T1s) • A&B Site Switches • Prime Simulcast Controllers • Prime Site Comparators Transition sz3.0 to SmartX & New ASTRO25 Mastersite • 3600 A&B Simulcast Systems • Embassy / Elite console system Perform 2nd 30 day Reliability Test? Start upgrading fleet to 9600 code at this point but still using SZ3.0? • Perhaps a rotational group of radios is better? Decommission 6 Channels from SZ3.0 System (3 from Sys A, 3 from Sys B) • Provides 1 CC & 2 VC per system ‚ Should NOT be an active CC on 3.0 system • Re-commission on ASTRO25 system for ATP purposes ‚ Upgrade these 6 stations at all sites — QTAR upgrades or GTR replaces ‚ perform FATP & CATP Proceed to Sys-A User migrations Begin Migration of System-A Users • Determine traffic load for 1st user group to migrate • Decommission appropriate number of traffic channels from existing 3.0 • Re-commission same channels on ASTRO25 system ‚ Upgrade these stations at all sites — QTAR upgrades or GTR replaces • Basic testing to ensure channels ready to take traffic

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Cutover Plan June 13, 2008 5-7



Migrate chosen user group over to new system • Repeat process until all Sys-A channels & users are migrated ♦ Migration of System-B Users using same process ♦ Complete 3rd & 4th 30 day Reliability Tests ♦ Retouch fleet to remove any migration templates as necessary

City of Philadelphia ASTRO 25 Upgrade

Cutover Plan June 13, 2008 5-8

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Section 6. Training Plan 6.1

Overview Motorola’s Learning Services organization dedicates itself exclusively to offering the most comprehensive training available for Motorola’s advanced equipment to fully realize the equipment’s potential. From sophisticated training needs analysis to ongoing training throughout the lifecycle of your product or system, we can help ensure that your investment in training today is an investment for your future. Our training methodology includes knowledgeable instructors, well-designed courseware, lab activities, and system hardware and software that closely parallel your operating environment and that is integrated with proper system documentation. This methodology is based upon several key criteria: ♦

Course design is driven by an analysis of learner needs and focuses on how-to rather than theory. ♦ Learning objectives are based upon what learners need to accomplish on the job and focus on specific applications. ♦ Hands-on lab opportunities using customer-specific job aids are incorporated into training to maximize the transfer of skills to the job and the retention/reuse of information. Motorola offers both train-the-trainer and end-user training, and the training plan we have designed for the City of Philadelphia utilizes both methodologies. As an example, every police officer or other individual who will utilize a portable or mobile radio will be trained at the Police Academy or other designated location. This will involve approximately 7,000 individuals, and is a prime example of Motorola’s dedication to getting the proper training delivered to everyone that needs to be trained. In conjunction with or in addition to instructor-led training, we can provide Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-1

self-study/e-learning programs in which students follow a computer-based training module on CD-ROM or other media. Motorola utilizes the Interactive End User Tool Kit (iEUTK) to supplement instructor led for field end user training. The IEUTK is a revolutionary knowledge transfer tool designed to accelerate learning. It provides an excellent graphic, audio and visual learning experience. City personnel will learn to operate mobiles, portables, or console positions faster and with increased retention over paper based alternatives. WLS trainers use the iEUTK to tailor operator training materials to match unique button and feature programming. Each iEUTK is user friendly and menu driven. This allows City trainers to update training materials on an as-needed basis to depict new features, functionality, Standard Operating Guidelines and post on intranet sites for review by City personnel. The iEUTK could also be utilized if the City moves forward with the plans for the “Channel 1” cable TV initiative.

6.1.1 Courses Proposed In the process of assessing your training needs, Motorola has identified the following course(s) that are necessary to achieve your training goals. Course description files for your review or printing are in section 6.1.2. System Management Course

Target Audience

No. of Sessions

Duration (days)

Location

Date

No. of Attendees

ASTRO 25 7.x System System Managers Philadelphia, Post Networking 1 5 12 and IT PA Installation (Instructor Technicians Led) Course Synopsis: This course provides the technician with the necessary networking information required for understanding the Network Transport subsystem components installed in an ASTRO 25 Release 6.x/7.x communications system. The course includes familiarization with basic networking concepts and the networking components deployed throughout the system. See page 6-10 for course description. ASTRO 25 7.x System System Managers Overview Philadelphia, Prior to 1 1 12 and PA Part 2 Part 1 of 3 (Per Request Technicians Instructor Led) Course Synopsis: The ASTRO 25 Integrated Voice and Data System Overview course is intended to provide an overview of the ASTRO 25 System in order to familiarize the various audiences with the overall system capabilities, components, features, and benefits. See page 6-12 for course description.

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

System Management ASTRO 25 7.x Introduction to System System Managers Management Philadelphia, Prior to 1 2 12 Applications and PA Part 3 Part 2 of 3 Technicians (Per Request Instructor Led) Course Synopsis: This course provides an introduction to the Motorola Radio System Management Applications. This course is a Prerequisite to Radio System Management. See page 6-14 for course description. ASTRO 25 7.x Radio System System Philadelphia, Prior to Management 1 5 12 Managers PA Managing Part 3 of 3 (Instructor-led) Course Synopsis: This workshop covers management functions for an ASTRO 25 Integrated Voice and Data (IV&D) System. Learning activities in this document-based training course focus on how to use the different ASTRO 25 IV&D System Management applications. Participants will be provided with an opportunity to discuss how to structure their organization and personnel for optimal ASTRO 25 IV&D system use. See page 6-16 for course description. ASTRO 25 Secure System Communicatio Managers Philadelphia, Post 1 5 6 ns (OTAR) and All PA Installation Workshop Technicians (Instructor Led) Course Synopsis: This workshop describes planning, installation, configuration, operations, and troubleshooting of Secure Communications within the ASTRO 25 Integrated Voice and Data (IV&D) System. See page 6-18 for course description. ASTRO 25 System Online Post Mutual Aid Managers N/A 4 hours Philadelphia, 12 (Self-Paced and Installation PA Online) Technicians Course Synopsis: This workshop describes the functionality of – and the hardware and software associated with – using Mutual Aid in the ASTRO 25 Integrated Voice & Data (IV&D) System. See page 6-20 for course description. System 1 MOSCAD Philadelphia, Post Managers 1 (6 to 8 6 Operator and PA Installation hours) Operators

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-3

System Management Course Synopsis: This course provides System Designers, Technicians and System Managers focused skill and development and the practical experience to operate and navigate the Graphic Master Computer (GMC) used in MOSCAD systems. This class will be provided using the customers installed system and fully functional GMC computer(s). An operator manual is provided and will be supplied to each participant. See page 6-22 for course description. WLS # 080207

Technician Training Course

Target Audience

No. of Sessions

Duration (days)

Location

Date

No. of Attendees

CPS Radio Radio Prior to Philadelphia, Programming Programmers 1 1 Program6 / System PA (Per Request ming Managers Instructor Led) Course Synopsis: This course may be modified and tailored to the customer’s features. It will introduce the student to CPS installation, assembling hardware, CPS menu structure, Software configuration, and normal features used in Analog Conventional and Trunked systems. Tutorials will guide the student through the CPS menus and screens. Adequate time will be available for hands-on practice using a variety of scenarios. It will also demonstrate how to create templates used to program subscribers in a system. See page 6-24 for course description. MOSCAD Technical Philadelphia, Prior to Maintenance System 1 3 6 PA Cutover (Instructor Managers Led) Course Synopsis: MOSCAD systems are used to monitor and control Motorola and third party products. The end goal is to alert and identify problems before they happen or as soon as they happen. There are multiple hardware and software pieces that makeup the MOSCAD sub-system solution. The training will include on site visits to a prime site and a local RF site if location permits. This will allow the students to observe operation and testing of their own system. Note – There will be no downloads of programs during this time, no disruption of the customer system will occur. See page 6-26 for course description. Optional MOSCAD Programming (Maintenance Philadelphia, Prior to Technicians 1 2 6 is a PA Cutover Prerequisite) (Instructor Led)

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Technician Training Course Synopsis: This course is designed to teach the ability to edit Environmental Digital inputs using Site Builder, use of IMASB for creating tags in Graphic Master Central (GMC), editing Environmental Digital Outputs and Analog Inputs in .CSV files, adding and deleting devices to sites (Quantar, TeNSr, CEBs, etc.), creating new sites in Site Builder and implementing in GMC database and obtain the necessary skills for creating Custom Map Displays in GMC. See page 6-29 for course description.

It is recommended that the students bring their laptop computers for all System Manager and Technician classes. For ASTRO 25 IV&D classes, one set of hard copy manuals will be provided for the class. Students will receive their manuals in CD-ROM format. Students will also receive hard copy participant guides. To order self-study CD ROM based materials visit us online at http://www.motorolawls.com/Dynamic/region.asp CENTRACOM Console End User Training Course CENTRACOM Gold Elite Console ADMIN, Alias Database Manager (ADM) and Operator 4 training consoles (2x1 Ratio) CENTRACOM Gold Elite Console ADMIN, Alias Database Manager (ADM) and Operator Train-theTrainers 5 training consoles (2x1 Ratio)

Target Audience

No. of Sessions

Duration (days)

Police Dispatchers

25 (4-hour sessions)

13

Philadelphia, PA

Prior to Cutover

Fire Dispatch Trainers

2 (8-hour sessions)

2

Philadelphia, PA

Prior to Cutover

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Location

No. of Attendees

Date

200 (8 per session)

20 (10 per session)

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-5

CENTRACOM Console End User Training CENTRACOM Gold Elite Console ADMIN, Alias Database 10 Manager EOC 1 (10 per Philadelphia, Prior to Dispatch (8-hour 1 (ADM) and PA Cutover session) Operator Trainers session) Train-theTrainers 5 training consoles (2x1 Ratio) CENTRACOM Gold Elite Console ADMIN, Alias Database 10 Manager Other 1 (10 per Philadelphia, Prior to Dispatch (8-hour 1 (ADM) and PA Cutover session) Operator Trainers session) Train-theTrainers 5 training consoles (2x1 Ratio) Course Synopsis: This course will provide Dispatch Supervisors with an introduction to the special operation of the supervisory console. In addition, the operation of the Alias Database Manager (ADM) Applications Program will be discussed and demonstrated with facilitation and hands-on activities. It will also include the Operator training listed below. See pages 6-30 and 6-32 for course descriptions. Course Synopsis: This course provides Dispatch Console Operators with an introduction to the dispatch console, its basic operation and to the tailored job aids available for assistance in operation. The learning experience is a mix of video, instructor led facilitation and hands – on activities to help console operators perform common tasks associated with their console’s operation. Practical exercises will be used to reinforce the skills needed to train Operators across the State. Students will also receive training on proper use and customization of the iEUTK (Interactive End User Toolkit). See page 6-33 for course description. WLS # 080207

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-6

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

MCC7500 Console End User Training Course

Target Audience

No. of Session s

Duration (days)

Location

No. of Attendees

Date

MCC7500 Console Supervisors 7 50 and Operator Prison Philadelphia, Prior to 4 (4-hour (8 per (Instructor-led) Dispatchers PA Cutover sessions) session) 4 training consoles (2x1 Ratio) Course Synopsis: This course provides participants with the knowledge and skills to manage and utilize the MCC 7500 console administrator functions. Through facilitation and hands-on activities, the participant learns how to customize the console screens. This session also includes the Operator course below. See page 6-36 for course description. Course Synopsis: This course provides participants with an introduction to the dispatch console, its basic operation and tailored job aids which will be available for assistance in operation. Through facilitation and hands-on activities, the user learns how to perform common tasks associated with the console operation. See page 6-37 for course description. WLS # 080207

Mobile and Portable Training Course ASTRO 25 Mobile and Portable Operator Training End Users (2 Trainers for 30 days each to cover 2 shifts) ASTRO 25 Mobile and Portable Operator Training End Users ASTRO 25 Mobile and Portable Operator Training Train-theTrainers

Target Audience

No. of Sessions

Duration (days)

Police Users

480 (2-hour sessions)

60

Philadelphia, PA

Prior to Cutover

7,000 (15 per session)

Prison Users

50 (2-hour sessions)

13

Philadelphia, PA

Prior to Cutover

700 (15 per session)

Fire Trainers

3 (1-day sessions)

3

Philadelphia, PA

Prior to Cutover

30 (10 per session)

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Location

No. of Attendees

Date

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-7

Mobile and Portable Training ASTRO 25 Mobile and Portable 3 30 Other Philadelphia, Prior to (1 day 3 (10 per Operator Trainers PA Cut-over Training sessions) session) Train-theTrainers Course Description: These courses are designed to teach the customer how to operate the ASTRO 25 radios with the features programmed. In addition, the customer will be taught how to use Motorola Interactive End User Toolkits (iEUTK) to customize their end user training presentations for individual agencies. Segmentation between user groups (i.e. Police, Fire/EMS, Public Service) is encouraged to help focus instruction on the specific operational issues of the individual user group. (Note: Similar course descriptions will be used for additional models.) See pages 6-37, 639, and 6-40 for course descriptions. WLS # 080207

Refresher Training Course

Target Audience

Refresher ASTRO 25 Mobile and Portable Operator Training Train-theTrainers

Radio Trainers

No. of Sessions

Duration (days)

1 (1-day session)

1

Location

Philadelphia, PA

Date

Prior to Cutover

No. of Attendees

10 (10 per session)

WLS # 080207

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-8

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

6.1.1.1

iEUTK The Interactive End User Tool Kit (iEUTK) is a revolutionary knowledge transfer tool designed to accelerate learning. Using the iEUTK allows trainers to customize operator training to match unique button, feature programming, and displays provided in the system. Each iEUTK is user friendly and menu driven. The home page in every iEUTK provides excellent navigation to the multiple areas of interest for the specific communication device. Operators select “Getting Started” to view a highly informative video overview that helps build solid foundational knowledge and quickly brings users up to speed on the operational theory of their specific device. The tailored materials are developed on-site using tool kits that allow users to modify training materials when radio or console features change. Personnel are taught how to maneuver through and tailor the iEUTK screens. The tailored selections are saved to an electronic file that the Motorola training team sends to the printer to develop the training materials. The trainers use the iEUTK to generate their instructor guides, incorporating standard operating procedures, notes, and reminders. This dynamic tool allows the customer to generate training materials on an as-needed basis depicting current features and functionality.

NYSWN-T323A

Figure 6-1: We use our iEUTK to produce PowerPoint™ presentations so that students can have self-paced training on any PC with Microsoft Office™. Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-9

6.1.2 Course Descriptions 6.1.2.1

ASTRO 25 Release 6.x/7.x System Networking Course Length 4.5 Days Resident 4.5 Days Field (requires access to customer 6.x/7.x system) Target Audience Technical system managers, technicians, engineers Course Description This course provides the technician with the necessary networking information required for understanding the Network Transport subsystem components installed in an ASTRO 25 Release 6.x/7.x communications system. The course includes familiarization with basic networking concepts and the networking components deployed throughout the system. Required Pre-Work ♦

None

Recommended Prerequisites ♦

None

Course Objectives Upon Completion, the Participant will be able to: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Understand basic networking concepts Describe the various Transport network subsystem components Define the LAN topologies for each system Define the WAN topologies for each system Identify the expanse of Network Management across each system Explain SNMP deployment throughout the systems Discuss HP Switch, and Motorola Series Router configurations Describe backup procedures for the HP Switch, Motorola Series Routers, and the Nortel Passport Switch in the ASTRO 25 system Perform Backups and Restoration of HP Switches and Motorola Routers

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-10

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Course Outline 1. Review Basic Networking Concepts a. Terminology and Acronyms b. LANS and WANS c. Protocols 2. ASTRO 25 Network Transport Subsystem a. Call Processing i. Block diagram description of how a call travels through the system ii. Identification and isolation of the network components b. Network Components i. HP Switches—description and location in the network ii. Nortel Passport—description and location in the network iii. Motorola Series Routers—description and location in the network Command Line Interface Configuration Menu-Driven Configuration Web-Based Configuration iv. Network Management Console—location and application identification v. Router manage -- location and application identification c. Network Concepts i. Identify the LAN portion(s) of the network ii. Identify the LAN Protocol and trace where it’s present in the network iii. Identify the WAN portion(s) of the network iv. Identify the WAN Protocols and trace where they’re present in the network v. Identify the expanse of the Network Management Console vi. Explain SNMP deployment throughout this network d. Hands-On Practice i. Back up and Restore HP Switch Configurations ii. Back up and Restore Motorola Series Router Configurations

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-11

6.1.2.2

ASTRO 25 Integrated Voice and Data System Releases 6/7/7.0 System Overview Duration 12 hours Target Audience System Managers, Technical System Managers, System Technicians, and other Application Users Course Description The ASTRO 25 Integrated Voice and Data System Overview course is intended to provide an overview of the ASTRO 25 System in order to familiarize the various audiences with the overall system capabilities, components, features, and benefits. Prerequisites Completion of the following courses or equivalent experience: ♦

ACT100 – Bridging the Knowledge Gap ♦ NST762 – Networking Essentials in Communication Equipment ♦ NWT003 – Advanced Networking in Motorola Communications Equipment Course Objectives After completing this course, the student will be able to do the following: ♦ ♦ ♦ ♦ ♦

Explain the purpose of the ASTRO 25 IV&D System. List and describe the ASTRO 25 system features and capabilities. Describe the ASTRO 25 system subsystems and their respective functions. List the system and software tools. Identify ASTRO 25 system compatible end-user devices.

Benefits to You ♦

Provides base knowledge about the ASTRO 25 Integrated Voice and Data System that is necessary to continue with the specific System Management and Technician required courses.

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-12

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Course Outline 1. Multiple Zone Trunking Systems a. Definitions b. Site Statuses c. Information Types d. A25 Repeater Site e. GTR8000 Site f. Simulcast Site g. Master Site 2. Voice Processing a. Turning on the radio b. Making a call c. Information paths 3. Data Processing a. 9600 BPS b. High Performance Data 4. Mobility Management a. Affiliation Registration Details b. Roaming c. Out of Range d. Scan in Multiple Zone Trunking Systems 5. Servers and Databases a. Servers b. Databases c. Backups Next Steps System Managers: ♦

ASTRO Integrated Voice and Data System Release 6.7/7.0 - Introduction to System Manager Applications (ACS651-V)

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-13

Technicians – One of the following: ♦

ASTRO 25 Integrated Voice and Data System Release 6.7 - Master Site Workshop (ACS653) ♦ ASTRO 25 Integrated Voice and Data System Release 7.0 – Master Site Workshop (ACS673) ♦ ASTRO 25 Integrated Voice and Data System- Release 6.7/7.0 - Digital Simulcast Workshop (ACS654) ♦ ASTRO 25 Integrated Voice and Data System Release 6.7/7.0 - ASTRO 25 Repeater Site Workshop (ACS655)

6.1.2.3

ASTRO 25 Integrated Voice and Data System Release 6.7/7.0 Introduction to Radio System Management Applications Duration (5) 2-hour Sessions Target Audience System Managers, Technical System Managers, System Technicians, and other Application Users Course Description This course provides an introduction to the Motorola Radio System Management Applications. Prerequisites Completion of the following courses or equivalent experience: ♦ ACT100 – Bridging the Knowledge Gap ♦ NST762 – Networking Essentials in Communication Equipment ♦ NWT003 – Advanced Networking in Motorola Communications Equipment Completion of ACS650-E: ASTRO Integrated Voice and Data System Overview and passing score on post-test. Benefits to You ♦

Ability to see and ask questions about the common operations allowed by the radio network management applications. ♦ Acquire base knowledge of the overall system management functions, their purposes, and an introduction to basic navigation and use of the applications.

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-14

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Course Objectives After completing this course, the student will be familiar with the following ASTRO 25 IV&D system management applications: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

User Configuration Manager (UCM) Zone Watch ATIA Log Viewer Affiliation Display Radio Control Manager (RCM) Historical Reports Dynamic Reports RCM Reports System Profile Zone Profile Zone Configuration Manager (ZCM) Customer Service Software (CSS) Router Manager

Course Outline 1. Introduction 2. User Configuration Manager (UCM) 3. Zone Watch – Default Profile 4. ATIA Log Viewer 5. Affiliation Display 6. RCM Basics 7. Reports 8. System Profile 9. Zone Profile 10. Zone Configuration Manager 11. Customer Service Software (CSS) 12. Introduction to Router Manager 13. Introduction to FullVision

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-15

Next Steps ♦

ASTRO 25 Integrated Voice and Data System Release 6.7 - Radio System Management Workshop Course - No. ACS652 OR



6.1.2.4

ASTRO 25 Integrated Voice and Data System Release 7.0 - Radio System Management Workshop Course - No. ACS672

ASTRO 25 Integrated Voice and Data System Release 7.0 Radio System Management Workshop Duration 5 days Target Audience System Managers, Technical System Managers, System Technicians, and other Application Users Course Description This workshop covers management functions for an ASTRO 25 Integrated Voice and Data (IV&D) System. Learning activities in this document-based training course focus on how to use the different ASTRO 25 IV&D System Management applications. Participants will be provided with an opportunity to discuss how to structure their organization and personnel for optimal ASTRO 25 IV&D system use. Prerequisites Completion of the following courses or equivalent experience: ♦

ACT100 – Bridging the Knowledge Gap ♦ NST762 – Networking Essentials in Communication Equipment ♦ NWT003 – Advanced Networking in Motorola Communications Equipment Completion of ACS650-E: ASTRO Integrated Voice and Data System Overview and passing score on post-test. Completion of ACS651-V: ASTRO Integrated Voice and Data System Introduction to System Manager Applications.

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-16

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Course Objectives ♦

List the network management tools applicable at each phase of the system life cycle. ♦ Identify the advantages and disadvantages of options available for the configuration of system infrastructure and user parameters. ♦ Use the report and real-time data to monitor performance and make adjustments necessary to maintain acceptable system performance levels. ♦ Describe the relationship between radio programming, console administration and system management, and the impact of this relationship on system planning. Benefits to You ♦

Provides the knowledge necessary to self manage and control the resources of your ASTRO IV&D System. ♦ Maintain optimal system efficiency by utilizing and interpreting the PRNM application suite. ♦ Plan all aspects of your system’s capacity, usage, maintenance, security, and implementation. Course Outline 1. Planning a. Factors that Impact Communications System Planning b. Fleetmapping 2. Configuration a. Configuration Process and Tools b. User Configuration Manager (UCM) c. Zone Configuration Manager (ZCM) d. Configuration Service Software (CSS) 3. Opeation and Optimization a. Live Monitoring of the System b. Report Generation c. License Sharing d. Performance Management Next Steps None required. Student may register for any of the optional courses in the ASTRO 7.0 curriculum.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-17

6.1.2.5

ASTRO 25 Integrated Voice and Data System Release 6.8/7.1 Secure Communications Workshop Duration 5 days Target Audience System Managers, Technical System Managers, System Technicians, and other Application Users Course Description This workshop describes planning, installation, configuration, operations, and troubleshooting of Secure Communications within the ASTRO 25 Integrated Voice and Data (IV&D) System. Prerequisites Completion of the following courses or equivalent experience: ♦

ACT100 – Bridging the Knowledge Gap ♦ NST762 – Networking Essentials in Communication Equipment Completion of ACS71200-E: ASTRO Integrated Voice and Data System Overview, and a passing score on the post-test Course Objectives ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Describe the implementation of Secure Communications in the ASTRO 25 IV&D system. List the purpose and function of the encryption keys. Describe how supported calls are transmitted in a secure mode. List the security precautions that must be considered for all Secure Communications devices. Describe the role of the Key Management Facility (KMF) Client. Describe the use of management windows in configuring the KMF. Describe how to perform administration procedures within the KMF submenus. Describe the role of the Key Variable Loader (KVL). Discuss the different diagnostic and troubleshooting tools and how to use them.

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-18

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Benefits to You ♦

Be able to implement secure communications in an ASTRO 25 IV&D system. ♦ Increase efficiency by using the different diagnostic and troubleshooting tools. Course Outline 1. System Overview a. Secure Communications Concepts b. Secure Equipment c. Secure Communications on a Trunked System d. Secure Communications on a Conventional System 2. Planning and Organizing a. Communication Patterns b. Initial Configuration Management 3. Installation a. Installing the KMF Hardware and Software b. Installing the MGEG Components for a Trunked System c. Installing the Components for a Conventional System 4. Configuration a. Configuring a Trunked System b. Configuring a Conventional System c. Configuring the Key Management Facility (KMF) d. Configuring the Radio e. Configuring the Console f. Configuring the Key Variable Loader (KVL) 5. Over the Air Rekeying (OTAR) a. Managing Currency b. OTAR Commands 6. Administering and Monitoring a. Security Management b. Overview of Performance Management Tools c. Performance Management for Trunked Systems d. Performance Management for Conventional Systems e. Administering the KMF Server

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-19

7. Fault Management and Troubleshooting a. Fault Management b. Diagnostic and Troubleshooting Tools c. Troubleshooting the KMF Server d. Troubleshooting the KMF Client e. Troubleshooting the KMF Database f. Troubleshooting Radio Unit Problems 8. MCC 7500 a. Secure Voice with the MCC 7500 Console b. Secure Card Overview c. Installation of the Secure Card at the MCC 7500 Console and MCC 7500 AIS d. Configuration of the Secure Card at the MCC 7500 Console and MCC7500 AIS e. Operations on a Secure MCC 7500 Console and MCC 7500 AIS f. Troubleshooting a Secure MCC 7500 Console and MCC 7500 AIS Next Steps None required. Student may register for any of the optional courses in the ASTRO 6.8/7.1 curriculum.

6.1.2.6

ASTRO 25 Integrated Voice and Data System Release 6.8/7.1 Mutual Aid Duration 4 Hours Target Audience System Technicians, System Managers Course Description This workshop describes the functionality of – and the hardware and software associated with – using Mutual Aid in the ASTRO 25 Integrated Voice & Data (IV&D) System.

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-20

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Prerequisites Completion of the following courses or equivalent experience: ♦

ACT100 – Bridging the Knowledge Gap ♦ NST762 – Networking Essentials in Communication Equipment ♦ NWT003 – Advanced Networking in Motorola Communications Equipment Completion of ACS71200-E: ASTRO Integrated Voice and Data System Overview and passing score on post-test. Course Objectives ♦ ♦ ♦ ♦ ♦

Describe the Mutual Aid feature. Describe the configurations available for mutual aid in an ASTRO 25 IV&D system. List and describe the components for use with Digital Mutual Aid and Analog Mutual Aid in the ASTRO 25 IV&D system. Configure Digital Mutual Aid and Analog Mutual Aid in the ASTRO 25 IV&D system. Maintain and troubleshoot Digital Mutual Aid and Analog Mutual Aid in the ASTRO 25 IV&D system.

Benefits to You ♦

Helps implement Mutual Aid in ASTRO 25 IV&D System. ♦ Increase efficiencies in troubleshooting problems with Mutual Aid. Course Outline 1. Mutual Aid Overview a. General definition b. Digital mutual aid c. Analog mutual aid 2. Digital Mutual Aid a. Description b. Components c. Configuration d. Maintenance and Troubleshooting

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-21

3. Analog Mutual Aid a. Description b. Components c. Configuration d. Maintenance and Troubleshooting Next Steps None required. Student may register for any of the optional courses in the ASTRO 6.8/7.1 curriculum.

6.1.2.7

MOSCAD Operator Training Target Audience System Operators and Managers Course Length If standalone, up to 8 hours If maintenance training was offered first, up to 4 hours Course Description This course provides System Designers, Technicians and System Managers focused skill and development and the practical experience to operate and navigate the GMC (Graphic Master Computer) used in MOSCAD systems. This class will be provided using the customers installed system and fully functional GMC computer(s). An operator manual is provided and will be supplied to each participant. Note: Course given as customer specific will cover options pertinent to customer equipment.

Recommended Prerequisites ♦

A basic understanding of Windows 2000 and XP desktop navigation.

Course Objectives ♦

Develop the knowledge and experience needed to operate and navigate the GMC used in MOSCAD systems. ♦ Obtain the necessary skills to access and understand the information in order to diagnose system problems.

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-22

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Course Outline 1. 2. 3. 4. 5.

System Overview Introduction to the MOSCAD System MOSCAD Hardware System Functionality Getting Started a. Log In / Log Off b. First Display c. System Title Window d. Help Windows 6. System Security 7. System Operations a. Screen Navigation b. Maps 8. Alarm Processing a. Alarm States b. Unacknowledged c. Acknowledged d. Return to normal 9. Site Interrogation a. Manual Interrogation b. Auto Interrogation 10. Alarm History a. Alarm Summary b. Alarm History c. Alarm History File Archiving 11. Report Printer Operation (optional) 12. Report Generator (Optional) a. Site Specific Reporting b. Equipment Specifying c. Alarm Status Reporting d. Displaying, Printing, and Exporting

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-23

6.1.2.8

Radio Programming and Template Building Target Audience System Managers and Technicians. Course Length 3 Days Course Description This course provides communications management personnel and technicians with the knowledge and tools needed to program the radio units in the most efficient way depending on the system, features and options they require. The parameters and exercises shown in the class apply to a wide number of portable and mobile radios, including XTS3000, MTS2000, MCS2000, the SPECTRA family and the Professional Series. Recommended Prerequisites Knowledge of the basic features and options of two-way radios, and the basic concepts of trunking. Course Objectives ♦

Program the basic parameters of any radio using the Customer Programming Software (CPS) ♦ Program the specific parameters of any radio related with the system where the user is going to work: conventional, single-site trunking, Simulcast, AMSS or SmartZone ♦ Demonstrate knowledge of the options and features that can be programmed in a radio ♦ Create templates for the programming of subscribers in a system Course Outline 1. Introduction/Course Outline a. Personal Introduction b. Course Objectives c. Review Student Guide d. Attendance

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-24

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

2. Set up and Data Transfer a. Read/Write/Open/Save the codeplug of a radio b. User Settings 3. Conventional Personalities a. Repeater/Talkaround b. Coded squelch (PL, DPL) c. Unmute conditions d. Monitor types e. Time out timer f. Smart PTT g. Signaling 4. Conventional Scan Lists a. Scan b. Scanning features c. Priority levels d. Breaking the circle 5. Trunking Systems a. Basic parameters of a Trunking System i. System ID ii. Individual ID iii. Control channels iv. Connect Tone v. Status/Messages b. More parameters i. Affiliation type ii. Coverage type c. Channel assignment type i. Domestic ii. International d. Splinter channels 6. Trunking Personalities a. Types of calls b. What is a trunking personality? c. Parameters of a trunking personality Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-25

d. The programming of the radio vs. the management of the system e. Scan lists for trunking personalities f. Emergency Data configuration g. Failsoft parameters h. Types of trunking i. The logic of the programming in a trunking system 7. Special system environments a. VHF/UHF Trunking systems b. SmartZone systems 8. CPS Features 9. Radio Wide Options a. Indications and Tones b. Buttons, switches and menu c. Display options 10. Programming Practice

6.1.2.9

MOSCAD NFM Maintenance Training Target Audience Motorola STs, Motorola Service Center and End-User Maintenance Personnel Course Length 3 days Course Description This course provides System Designers, Technicians and System Managers general knowledge, troubleshooting, programming, and development skills of MOSCAD (Network Fault Management) systems. Required Pre-work ♦

None Required

Recommended Prerequisites ♦

A basic understanding of Windows 2000 and XP desktop navigation. ♦ Laptop Computer with XP Professional Operating System (recommended)

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-26

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Course Objectives: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

General knowledge of NFM system software and their use in programming and troubleshooting NFM hardware. Ability to edit Environmental Digital inputs using Site Builder and SDM Builder Use of MASB for creating tags in Graphic Master Central (GMC) Editing Environmental Digital Outputs and Analog Inputs in .CSV files Adding and deleting devices to sites (QUANTARS, TeNSr, CEBs, etc.) Creating new sites in Site Builder and implementing in GMC database Obtain the necessary skills for creating Custom Map Displays in GMC Benefits To You: Perform first echelon troubleshooting of Motorola Network Fault Management (NFM) System Knowledge of System Software Components and their use in NFM systems Ability to use the tools necessary for programming Graphic Master Central (GMC) custom map screen and environmental I/Os Program the addition of a new site or adding/deleting equipment being monitored from an existing site

Course Overview: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

NFM System Overview MOSCAD NFM System Hardware Overview SDM3000 System Hardware Overview Third Party Hardware and Software Motorola Software Making Changes to Environmental I/Os Create Custom Maps Add/Delete Devices from Sites Creating New Sites in Site Builder Using MASB for importing Site Builder and SDM Builder Data to GMC Backing up Project Files

Note: This course is geared towards the NFM-XC and SDM3000 based RTUs.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-27

Course Outline 1. NFM System Overview a. Serial Infrastructure b. Ethernet and Serial/Ethernet Hybrid Infrastructure c. Ethernet Radio Infrastructure d. Serial Infrastructure with Moscad Classic EP/RTUs 2. MOSCAD System Hardware Overview a. NFM RTUs b. NFM XC (Enhanced Communication) RTUs c. ‘Classic’ MOSCAD RTU d. IP Interface e. RS232 MUX f. R-MUX 3. Third Party Hardware a. GMC NFM Server b. GWS NFM Client c. Terminal Server (Router) 4. Motorola Software a. Toolbox b. Toolbox IP Option c. IP Toolbox d. IMASB/MASB e. Fault Management Site Builder f. Report Generator 5. Third Party Software a. Intouch b. Intouch Motorola MDLC Gateway Driver c. Win-911 d. SCADA Alarm

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-28

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

6.1.2.10 MOSCAD Network Fault Management Programming and Configuration Training Target Audience Motorola STs, Motorola Service Center, and End-User Maintenance Personnel Course Length 2 days Course Description This course provides System Designers, Technicians and System Managers general programming and development skills of MOSCAD (Network Fault Management) systems. This class will be provided using Instructor Provided NFM-XC. A Training manual is provided and will be supplied to each participant. Recommended Prerequisites ♦

MOSCAD NFM Maintenance Training (3-day Course) ♦ Laptop Computer with XP Professional Operating System (recommended) Course Objectives ♦ ♦ ♦ ♦ ♦ ♦

Ability to edit Environmental Digital inputs using Site Builder. Use of IMASB for creating tags in Graphic Master Central (GMC). Editing Environmental Digital Outputs and Analog Inputs in .CSV files. Adding and deleting devices to sites (QUANTARS, TeNSr, CEBs, etc.) Creating new sites in Site Builder and implementing in GMC database. Obtain the necessary skills for creating Custom Map Displays in GMC.

Course Outline 1. Introduction to Site Builder 2. Making changes to Environmental I/Os a. Digital Inputs b. Digital Outputs c. Analog Inputs 3. Creating Custom Maps in CMC computer 4. Adding and Deleting Devices from Sites (QUANTAR, GPS, CEBS etc.) 5. Creating new sites in Site Builder project

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-29

6. Introduction to IMASB 7. Using IMASB for Intouch GMC tag development. 8. Introduction to GMC Intouch Window Maker Program 9. Creating graphics In Intouch Windowmaker Program 10. Creating Custom Map Displays in GMC 11. Backing up Project Files a. Site Builder b. MOSCAD Programming Toolbox c. Intouch

6.1.2.11 CENTRACOM Gold Elite Admin End User Training Target Audience System Administrators and System Managers Course Description The Elite ADMIN End User Training provides participants with the knowledge and skills to manage and utilize the Elite Admin application. Through facilitation and hands on activities the participant learns how to customize the console screens Required Pre-work ♦

None

Recommended Prerequisites ♦

Basic Understanding of the Elite console’s operational characteristics

Course Objectives ♦

Understand the relationship of CDM/ADM Databases to the ADMIN program ♦ Understand the menu items and tool bar icons ♦ Edit folders, multiselect/patch groups, auxiliary input output groups, windows and toolbars ♦ Add/delete folders Course Outline 1. Discuss relationship of CDM/ADM Database to ADMIN 2. Starting the ADMIN

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-30

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

3. Creating a new configuration 4. Discuss ADMIN screen and menu items at top of screen 5. Editing resources a. Viewing a resource b. Setting up resource headers c. Setting up features and modifying icons d. Setting up audio features 6. Editing Folders a. Selecting folders b. Adding resources to folders 7. Edit Multiselect/patch initial setup 8. Editing auxio groups a. Creating group b. Modifying a group 9. Editing auxio floating windows a. Establishing a floating window b. Adding a group to a floating window 10. Editing tool base a. Setting up 1 or 2 tool bars b. Assigning tool to toolbars c. Enable/disable clock display d. Editing preferences e. Setting up activity log f. Building customer alias list g. Building custom speed dial phone list h. Editing dispatcher menu items i. Building custom page list 11. Adding folders 12. Deleting folders a. Customizing folders b. Naming folders c. Naming Multiselect/patches d. Reordering folders 13. Changing folder tab widths Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-31

6.1.2.12 Alias Database Manager (ADM) Applications Program Target Audience Dispatch console supervisors or System Administrators. Course Description This course will provide an introduction to the special operation of the supervisory console. In addition, the operation of the Alias Database Manager (ADM) Applications Program will be discussed and demonstrated with facilitation and handson activities. Required Pre-Work None Recommended Prerequisites None Course Objectives The participant will be able understand and perform the functions required in the operation of the ADM program. Computer Requirements The ADM software application loaded on training consoles to facilitate hands-on activities Course Outline 1. 2. 3. 4. 5. 6. 7.

Overview Scenario Specifications and Prerequisites Starting the ADM Menu items, Tool Bar Icons, Systems Selection Creating and Alias Book Creating Alias Entries a. Selecting the Alias length b. Discussing and Demonstrating Adding a Unit c. Discussing and Demonstrating Adding Individual Pages (Elite)*** d. Discussing and Demonstrating Adding Page Groups (Elite)***

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-32

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

e. Discussing and Demonstrating Adding Dialing (Elite)*** f. Discussing and Demonstrating Adding Messages*** g. Discussing and Demonstrating Adding PCII and PCIIe Aliases*** h. Modifying Individual Page Membership (Elite)*** i. Discussing and Demonstrating Adding Status*** j. Deleting an Alias k. Finding an Alias 8. Sorting the Alias Entry List 9. Printing the Alias Entry List 10. Importing and Exporting as Alias Book 11. Backing up the ADM 12. Restoring the ADM 13. Exiting the ADM ***Items May Not Apply To All Customers

6.1.2.13 CENTRACOM Gold Elite Console Training Target Audience Dispatch console operators, supervisors and support personnel Course Description This course provides Dispatch Console Operators with an introduction to the dispatch console, its basic operation and to the tailored job aids available for assistance in operation. The learning experience is a mix of video, instructor led facilitation and hands – on activities to help console operators perform common tasks associated with their console’s operation. Required Pre-work ♦

None

Recommended Prerequisites ♦

None

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-33

Course Objectives ♦ ♦ ♦ ♦ ♦ ♦

Perform basic operational tasks of the dispatch console Utilize the provided job aids to perform specific tasks associated with the console Understand a high level view of the system configuration High-level overview of the customer system configuration General console operation Proper operating procedures for specific customer features

Course Outline 1. Basics a. Explain component parts of Console b. CPU c. Interface with volume controls i. Mic (condenser and boom)/Headset jack ii. Main volume control iii. Radio to phone control iv. Telephone to radio control d. Mouse i. Choose/APB ii. General transmit iii. Instant transmit e. Monitor i. Radio Work Area (RWA) ii. Summary Area iii. Status Box Mode State Line General Status Line Link State Line Error Line Clock Line iv. Menu Key Line f. Colors of Text and Icons on screen i. Green Background—the talkgroup is selected ii. Red (flashing) Background—an emergency call is in progress City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-34

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

iii. Red Letters—incoming call iv. Dark Blue Background—patch indication v. Black letters—audio is muted vi. White letters—audio is not muted vii. Red Letters—incoming call viii. Gold Letters—channel busy ix. Blue Letters—channel patch is busy x. Yellow Letters—private call received xi. Gray Color—not available at this time g. Border colors i. Selectable except Red, reserved for emergency 2. Features a. Multiselect i. APB ii. Instant transmit b. Patch i. Active ii. Idle iii. Empty c. Paging i. Manual ii. Alphabetic iii. Numeric d. Signal i. P/C ii. Call alert e. Display i. Leave Windows ii. Move windows iii. Show Hide f. Special i. Intercom ii. Supervisor iii. Diagnostic Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-35

iv. Public Address v. Emergency Setup vi. Emergency reset vii. All mute viii. Channel Marker (for conventional Mode only) g. Monitor h. Help

6.1.2.14 MCC7500 Dispatch Console Administrator Training Duration 4 hours Target Audience Dispatch Supervisors, System Administrators Course Description This course provides participants with the knowledge and skills to manage and utilize the MCC 7500 console administrator functions. Through facilitation and hands-on activities, the participant learns how to customize the console screens. Recommended Prerequisites ♦

None

Key Topics ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Introduction Configurations Folders and Resource Setup Customizing Folders Auto Starting the MCC 7500 Dispatch Console Editing Preferences Configuring the Toolbar Setting Up Aux IOs Resource Groups

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-36

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

6.1.2.15 MCC7500 Dispatch Console Operator Training Duration 4 hours Target Audience Dispatch Console Operators, Supervisors, System Administrators, and Support Personnel Course Description This course provides participants with an introduction to the dispatch console, its basic operation and tailored job aids which will be available for assistance in operation. Through facilitation and hands-on activities, the user learns how to perform common tasks associated with the console operation. Recommended Prerequisites ♦

None

Key Topics 1. 2. 3. 4. 5. 6. 7.

Overview Communicating with Radios Advanced Signaling Features Resource Groups Working with Configurations Working with Aux IOs Troubleshooting

6.1.2.16 XTS5000 Portable End User Target Audience Portable radio users, supervisors and support personnel. Course Description This course provides portable radio users with an introduction to their radio, its basic operation and tailored job aids available for assistance in operation. The learning experience is a mix of video, facilitation and hands-on activities to help users perform common tasks associated with their radio operation.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-37

Required Pre-Work ♦

None

Recommended Prerequisites ♦

None

Course Objectives ♦ ♦ ♦ ♦ ♦ ♦

High-level overview of the customer system configuration General portable radio operation Proper operating procedures for specific customer features Perform basic operational tasks of the portable radio Utilize the provided job aids to perform specific tasks associated with the portable radio Understand high-level view of the system configuration

Course Outline 1. Basics a. Volume/on–off b. Zone up and down keys c. Home key d. Display with all its icons e. Push to talk or PTT found on the microphone f. Hub, hang up box 2. Features a. Mute tone of keypad b. Changing Talkgroups c. Changing zones or personalities d. Differences of Talkgroups call and Private call i. Call list program e. Phone Interconnect i. Phone list program f. Scan i. Scan program

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-38

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

g. Direct h. Display light i. Failsoft definition

6.1.2.17 XTL5000 Mobile Radio Train-the-Trainer Target Audience Mobile radio users, supervisors and support personnel Course Description This course provides mobile radio users with an introduction to their radio, its basic operation and tailored job aids available for assistance in operation. The learning experience is a mix of video, facilitation and hands-on activities to help users perform common tasks associated with their radio operation. Required Pre-Work ♦

None

Recommended Prerequisites ♦

None

Course Objectives ♦ ♦ ♦ ♦ ♦ ♦

High-level overview of the customer system configuration General mobile radio operation Proper operating procedures for specific customer features Perform basic operational tasks of the mobile radio Utilize the provided job aids to perform specific tasks associated with the mobile radio Understand high-level view of the system configuration

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-39

Course Outline 1. Basics a. Volume/on-off b. Zone up and down keys c. Home key d. Display with all its icons e. Push to talk or PTT found on the microphone f. Hub, hang up box 2. Features a. Mute tone of keypad b. Changing Talkgroups c. Changing zones or personalities d. Differences of Talkgroups call and Private call i. Call list program e. Phone Interconnect i. Phone list program f. Scan i. Scan program g. Direct h. Display light i. Failsoft definition

6.1.2.18 Train-the-Trainer – iEUTK Product/Presentation Duration 1 Day Target Audience This one-day course is geared for customers who have an experienced dedicated training staff in their organization. This course concentrates on specific product features and how it relates to the training process. Course Description This one-day course provides the customer’s identified training personnel with the knowledge and practice applying training techniques that will enable them to successfully train their students. Trainers will use video, facilitation and hands-on City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-40

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

activities to facilitate learning events supported by tailored or customized training materials and job aides. They will become proficient in discussing common tasks associated with the operation of the customer’s radios as identified by the Customer’s Training Needs Analysis (CTNA). Note: This course is presented as customer specific and will cover pertinent to customer equipment.

Prerequisites ♦

Previous training experience and radio system knowledge is a must.

Course Objectives The participant will be able to employ the toolkit resource needed to facilitate learning events supported by the Interactive Toolkit. Train-the-Trainer sessions for radio user/operations will typically consist of a training event following the basic outline: 1. 2. 3. 4. 5. 6.

Discuss high-level overview of the customer’s system configuration. Present a Trunking Overview is applicable. Cover the Instructor Guide provided for group and product being covered. Present Interactive End User Toolkit (iEUTK) training philosophy/methodology. Review Interactive End User Toolkit (iEUTK) controls. Demonstrate techniques for training using the Interactive End User Toolkit (iEUTK) materials. 7. Discuss the difference between ASTRO and Analog audio quality if applicable to the customer’s system. 8. Discuss proper radio techniques. 9. Conduct practice sessions with trainers. (depends on size and protocol of audience.) Note: The Toolkit can refer to the Interactive Toolkit or configurations supplied by the customer.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-41

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade

Training Plan June 13, 2008 6-42

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Section 7. Implementation Schedule Following is the Implementation Schedule

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Implementation Schedule June 13, 2008 7-1

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade

Implementation Schedule June 13, 2008 7-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Implementation Schedule June 13, 2008 7-3

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade

Implementation Schedule June 13, 2008 7-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

ID Task Name 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Duration

Start

Finish

CITY OF PHILADELPHIA ASTRO 25 SYSTEM UPGRADE PRELIMINARY PROJECT SCHEDULE

457 days 3/26/09 12/24/10 Contract execution 0 days 3/26/09 3/26/09 Payment Schedule: 10% upon Contract Execution (Effective Date) 0 days 3/26/09 3/26/09 Contract Administration/Project Kick-off Process 15 days 4/2/09 4/22/09 Contract Design Review (CDR) 45 days 4/23/09 6/24/09 Payment Schedule: 5% upon completion and City’s written approval of Detailed Design Review 0 days 6/24/09 6/24/09 Site Surveys 25 days 4/9/09 5/13/09 Site Preparation 150 days 5/14/09 12/9/09 Order Processing 20 days 6/25/09 7/22/09 Fleetmapping/Template Development 100 days 7/23/09 12/9/09 Manufacturing 45 days 7/23/09 9/23/09 Staging 60 days 9/24/09 12/16/09 Payment Schedule: 25% upon Shipment of FNE equipment from CCSI 0 days 12/16/09 12/16/09 Installation/Optimization/Cutover 249 days 11/19/09 11/2/10 City installs new T1 circuits (Master to Primes and Primes to Remotes) Complete Link Testing Install/Optimize ASTRO25 Master Site at City Hall RM626m ( Install SmartX servers - not yet connected to SZ3.0) Upgrade Embassy network to ASTRO25 compatible code (while still connected to SZ3.0) (AEB cards, CEB cards and Elite Ops) Program all subscribers * Conduct first 30-day Reliability Test Install/Optimize ASTRO25 IP Network Equipment at Primes & Remotes (A&B Site Routers (connected to new T1s) - A&B Site Switches - Prime Simulcast Controllers - Prime Site Comparators) Transition sz3.0 to SmartX & New ASTRO25 Mastersite (3600 A&B Simulcast Systems - Embassy / Elite console system) Perform 2nd 30-day Reliability Test

0 days 20 days 15 days

11/19/09 11/19/09 12/17/09

11/19/09 12/16/09 1/6/10

10 days

1/7/10

1/20/10

20 days 23 days 20 days

12/10/09 1/21/10 2/23/10

1/6/10 2/22/10 3/22/10

10 days

3/23/10

4/5/10

22 days

4/6/10

5/5/10

24

Payment Schedule: 10% upon completion and City’s Conditional Acceptance; of 2nd Reliability Test

0 days

5/5/10

5/5/10

25

Start upgrading fleet to 9600 code at this point but still using SZ3.0 (Decommission 6 Channels from SZ3.0 System - 3 from Sys A, 3 from Sys B), Re-commission on ASTRO25 system for ATP purposes, Upgrade these 6 stations at all sites

15 days

5/6/10

5/26/10

26

Payment Schedule: 10% upon Installation and the City’s Conditional Acceptance of FNE equipment on a site by site, system by system basis

0 days

5/26/10

5/26/10

15 16 17 18 19 20 21

22 23

27

Perform FATP & CATP

60 days

5/27/10

8/18/10

28

Payment Schedule: 15% upon completion and City’s Conditional Acceptance of Coverage Acceptance Test in accordance with Coverage Acceptance Test

0 days

8/18/10

8/18/10

29

Complete System-A User migrations Conditional Acceptance System-A Complete migration of System-B Users Conditional Acceptance System-B Complete 3rd & 4th 30 day Reliability Tests Conditional Acceptance-Installation/Optimization/Cutover Complete

5 days 0 days 5 days 0 days 44 days 0 days

8/19/10 8/18/10 8/26/10 9/1/10 9/2/10 11/2/10

8/25/10 8/18/10 9/1/10 9/1/10 11/2/10 11/2/10

30 31 32 33 34

Legend: Red Text: Critical Path/Tasks Blue Text: Milestone

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q J F M A M J J A S O N D J F M A M J J A S O N D J 3/26

March 11, 2009 Page 1

ID Task Name 35 36 37 38 39 40 41 42

Training Final Reprogramming of all subscribers System Acceptance - Warranty Commences Payment Schedule: 20% upon System Acceptance Project Finalization Final Acceptance Payment Schedule: 5% upon Final Acceptance * Subscriber Equipment will be invoiced 100% upon delivery and inventory

Legend: Red Text: Critical Path/Tasks Blue Text: Milestone

Duration

80 days 20 days 0 days 0 days 18 days 0 days 0 days 0 days

Start

2/4/10 11/3/10 11/30/10 11/30/10 12/1/10 12/24/10 12/24/10 1/6/10

Finish

5/26/10 11/30/10 11/30/10 11/30/10 12/24/10 12/24/10 12/24/10 1/6/10

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q J F M A M J J A S O N D J F M A M J J A S O N D J

12/24

March 11, 2009 Page 2

Date: 3/11/09

Task

Summary

Rolled Up Progress

Group By SummTask

Critical Task

Rolled Up Task

Split

Critical Task

Progress

Rolled Up Critical Task

External Tasks

Milestone

Rolled Up Milestone

Project Summary

Legend: Red Text: Critical Path/Tasks Blue Text: Milestone

March 11, 2009 Page 3

Section 8. Warranty and Maintenance 8.1

Overview Motorola is the world leader in mission critical system support. By remotely monitoring and managing critical customer information, we can identify potential problems and typically resolve them before they cause critical outages. This means maximum uptime for the City of Philadelphia’s communications system. For nearly 60 years, Motorola has been building a unique service team, national in scope, but local in its ability to respond to our customers’ needs through a nationwide network of independently owned and authorized Motorola Service Stations (MSS). There are presently over 900 service centers strategically located throughout the continental U.S. Specifically for the City of Philadelphia there will continue to be a dedicated Motorola technical team having maximum system uptime goals. The City of Philadelphia can be assured that your communications system will be there for your public safety responders when it is needed most. This type of service structure is unrivaled within the electronic communications industry today and has been instrumental in implementing Motorola’s cutting-edge technologies and supporting our extensive customer base. Motorola will provide a one-year warranty on the upgraded equipment as part of this proposal. Through ongoing service agreements, Motorola will continue providing full maintenance services for the City’s communications system throughout the post-warranty period.

City of Philadelphia ASTRO 25 Upgrade

Warranty and Maintenance June 13, 2008 8-1

The following services will be provided during the Warranty period and will continue if the City elects the same coverage during the Maintenance periods.

8.2

Warranty and Maintenance Program Motorola has the most comprehensive warranty and maintenance program in the Land Mobile Industry with a wealth of experience and expertise in maintaining network radio systems. Motorola will provide the City with the following services during the warranty period: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

8.3

One-year Parts and Labor warranty Remote Network and Security Monitoring Service Pre-Tested Software Subscription (PTSS) Dispatch Service Technical Support Continued support from your current System Manager Infrastructure Board Repair with Advance Replacement Network Preventative Maintenance Subscriber Radio Repair Optional Software Subscription Agreement (SSA) Optional System Audit Optional Software Upgrade Design Optional Infrastructure Software Installation

Warranty and Maintenance Services Detail One-Year Parts and Labor Warranty Motorola warrants that the equipment under normal use and service will be free from defects in both materials and workmanship for a period of one year from beneficial use or system acceptance, which ever occurs first.

City of Philadelphia ASTRO 25 Upgrade

Warranty and Maintenance June 13, 2008 8-2

Remote Network Monitoring Service Motorola will remotely monitor all sites in the City’s system from Schaumburg, Illinois at the Motorola System Support Center (SSC). Today, Motorola monitors over 600 customer networks at the SSC. Here, highly trained technologists electronically observe network performance and stability continuously 24 hours a day, 7 days a week. With all network variations either expected or unexpected, Motorola’s technologist take appropriate action to maximize network uptime and overall preparedness. There are times when Motorola may intervene remotely and correct the problem before users know it exists. When the SSC detects an event, trained technologists acknowledge the event, run remote diagnostic routines, and initiate an appropriate response. Appropriate responses may include, but are not limited to, continued monitoring of the event for further development, attempts to restore the system remotely, or opening a “case” (an electronic service request) for dispatch of a local service technician. The SSC maintains regular contact with the on-site technician until the system is restored and the case is closed. Through extensive case management, the SSC continuously tracks and manages case activity from open to close through an automated case tracking process. This case management allows Motorola to ensure timely resolution and provides a mechanism for performance and activity reports. Network Security Services Motorola provides a suite of network security products and services in order to fulfill customer needs to prevent, detect, and respond to security incidents. These include Pre-Tested Anti-Virus Subscription, and 24 x 7 Security Management Services such as Anti-Virus Management, and Network Barrier Management.

City of Philadelphia ASTRO 25 Upgrade

Warranty and Maintenance June 13, 2008 8-3

Security Management Services • Planning & Integration • Anti-virus pre-test • 24x7 Security Management • Emergency Response

Customer Networks

Remote Technician

Service Interface Barrier • Authenticate service users

Radio Network

Internet

Anti-Virus

Security Manager

Network Interface Barrier: • Enforce Boundary • Detect Attacks Network Anti-Virus: • Protect “Windows” nodes

Security Manager: • Enable Central Security Management

Figure 8-1: Radio Network Security Services

Network Security Monitoring The goal of network security monitoring is to maintain the integrity, availability, and accessibility of the City’s communication network. The combination of Network Monitoring and Security Monitoring provides the best protection for meeting that goal. The combined service provides all of the essential elements for rapid detection of security events, timely responses, and quick recovery. In the event of a security incident that threatens the radio network, the Network Operations Center (NOC) and Security Operations Center (SOC) teams working together can quickly identify the security issue, engage the world's security community if need be, work to contain the threat, and quickly begin remediation. Our NOC and SOC are collocated, having visibility to the same case data and access to each other’s escalation tiers with the ability to instantly share information to quickly identify and resolve issues. Additionally, Motorola’s NOC and SOC teams have visibility to hundreds of systems worldwide as well as part of the world’s security community. The combination gives a view greater than the sum of the individual views. The combined network and security monitoring service leverages that combined view and brings radio network

City of Philadelphia ASTRO 25 Upgrade

Warranty and Maintenance June 13, 2008 8-4

expertise and security expertise to bear. This tight coupling of NOC and SOC capabilities and expertise ensures rapid event detection and incident response. Motorola’s Network Security Monitoring Service provides security assurance by proactively managing the security elements present on the system to mitigate risk from viruses, worms, or attacks whether deliberate or inadvertent. This may include periodically deploying the latest release of pre-tested anti-virus definitions to the antivirus management server and/or updating the intrusion detection sensor signature files on the network barrier. Motorola will also modify intrusion sensor settings and update firewall settings as determined by Motorola. Motorola’s ASTRO Network Security Monitoring is more than just ordinary Security Monitoring. While other security vendors can monitor firewalls and intrusion detection sensors, Motorola’s ASTRO Network Security Monitoring goes further. Mission Critical systems need to be protected with a mission critical mentality and Motorola’s service does that. We pre-test and certify security updates for anti-virus definitions and intrusion detection signature files before pushing them onto your system. We pretest and certify operating system patches so you can be assured that they are safe for deploying them on your network. We also monitor your system’s Core Security Management Server, which logs systems events and your authentication application to give us a more complete view into your system. No other security vendor can do that. Specifically, Network Security Monitoring Service provides: ♦ ♦ ♦ ♦ ♦

24 x 7 x 365 real-time monitoring of security elements Data collection, event analysis, and incident response Pre-testing, certification, and deployment of anti-virus definitions and intrusion detection sensor signatures Routine and urgent updates/notifications Reporting

Pre-Tested Software Subscription (PTSS) With PTSS service, Motorola pretests the updated commercial anti-virus definitions for the Microsoft Windows®-based boxes on a system. This service will also include pre-testing operating system software patches and signature files on the intrusion detection sensors. Motorola will receive and test anti-virus definitions for the Microsoft Windows boxes, intrusion detection sensor signatures, and operating system patches from commercial suppliers selected by Motorola. PTSS includes: ♦

Pre-tested weekly updates, or within 24 hours on urgent updates. Motorola tests, addresses issues, and releases updates weekly; within 24 hours if urgent City of Philadelphia ASTRO 25 Upgrade

Warranty and Maintenance June 13, 2008 8-5

♦ ♦ ♦ ♦ ♦ ♦

Motorola IT expertise, radio expertise, security expertise. Multi-million dollar test facility for pre-testing. Heads-up, head start. Motorola receives updates from vendors in advance, before they are released to general public. Weekly notifications of security updates or within 24 hours if urgent. Motorola manages license renewal of customer subscription with Symantec/ISS. Prevents license lapse from preventing an update. Support for current release of system software and two releases back.

Dispatch Service Motorola’s SSC Call Center Operations (CCO) is the central point of contact for all service issues. When an issue is detected locally, a phone call to this operation’s tollfree phone number initiates a case and begins the service response process to the appropriate degree required. The CCO’s function is to manage all calls so that the request case will be tracked and monitored from beginning to end and ensure the appropriate action is taken to resolve the issue in a timely manner. With detailed accounts of thousands of customer systems at our fingertips, Customer Support Representatives are trained to understand the situation and determine the next steps to be taken. The team tracks the status of the case and ensures that all personnel involved have access to customer’s information. Motorola uses stringent inbound-call management and case-management standards recognized as industry best in class. Technical Support In addition to the system being continuously monitored remotely, Technical Support is available by telephone 24 hours a day, 7 days a week for service issues detected locally in the field. Our Technical Support Staff provides telephone support for technical issues requiring a high level of communications network expertise and troubleshooting. The Technical Support Center is staffed with highly trained technologist specializing in the diagnosis and resolution of network performance issues. Each technologist has been trained to analyze, isolate, and work virtually any scenario to a swift resolution. The Technical Support technologist may remotely access the system to more clearly define a problem and determine the area of failure in order to decide on the most suitable action plan. If the problem is beyond the scope of the SSC’s support staff, they will contact key personnel who are involved with the design, development, and manufacture of the system components for resolution.

City of Philadelphia ASTRO 25 Upgrade

Warranty and Maintenance June 13, 2008 8-6

Response Times In the event of major system equipment failure: ♦

Motorola will respond by phone within one (1) hour hours (24 hours a day, 7 days a week) after notification and will be on-site within 1.5 hours Monday – Friday 8:00 AM – 4:30 PM and on-site within 2 hours all other times.

In the event of minor system equipment failure: ♦

Motorola will respond and be on-site within four (4) hours (during standard business hours) after notification.

For non-emergency issues, Motorola will respond within 24 hours. Please refer to the following tables for details regarding response times. Table 8-1: Response Time Severity Level

Regular Response Time

Severity 1

Within 1 hour by phone for Technical Support 24 hours a day, 7 days a week from receipt of Notification. On-site within 1.5 hours Monday – Friday 8:00 AM – 4:30 PM and within 2 hours all other times. Support is continuous (24x7) until resolved.

Severity 2

Within 4 hours from receipt of Notification - Standard Business Day

Severity 3

Within 24 hours from receipt of Notification - Standard Business Day

City of Philadelphia ASTRO 25 Upgrade

Warranty and Maintenance June 13, 2008 8-7

Table 8-2: Severity Definitions Severity Level

Severity 1

Severity 2

Severity 3

Problem Types Response is provided continuously Major System failure 33% of System down 33% of Site channels down Site Environment alarms (smoke, access, temperature, AC power. This level is meant to represent a major issue that results in an unusable system, sub-system, Product, or critical features from the Customer’s perspective. No Work-around or immediate solution is available. Response during Standard Business Day Significant System Impairment not to exceed 33% of system down System problems presently being monitored This level is meant to represent a moderate issue that limits a Customer's normal use of the system, sub-system, product, or major non-critical features from a Customer’s perspective Response during Standard Business Day Intermittent system issues Information questions (General End User Help Desk) Upgrades/preventative maintenance This level is meant to represent a minor issue that does not preclude use of the system, sub-system, product, or critical features from a Customer's perspective. It may also represent a cosmetic issue, including documentation errors, general usage questions, recommendations for product enhancements or modifications, and scheduled events such as preventative maintenance or product/system upgrades.

Infrastructure Board Repair In the event a malfunctioning board/unit is discovered at the site location, the local technician will contact the SSC's Call Center to request a return authorization (RA) number. They will remove the malfunctioning board/unit and ship it to the SSC for repair. Upon receipt of malfunctioning equipment, the SSC will fully system test and repair malfunctioning Motorola manufactured boards/units down to the component level utilizing automated test equipment. A system test is performed to ensure that all software and hardware is set to current customer configuration. If Motorola does not manufacture the unit, it may be returned to the Original Equipment Manufacturer (OEM) for repair. Once the equipment is received from the SSC, the local servicing technician will either re-install the equipment or return it to the City’s spare inventory.

City of Philadelphia ASTRO 25 Upgrade

Warranty and Maintenance June 13, 2008 8-8

Network Preventative Maintenance Preventive Maintenance of the Network is an important part of any maintenance program as it detects potential problems before they develop. This reduces the possibility of system failures, while helping to prolong the life of and maximizing the performance of the City’s communications system. Because experience dictates that these objectives require a regular regimen, our local technician visits are scheduled and managed through the SSC’s Call Center, on an automatic pre-determined schedule. Reviews include pro-active checks on equipment based on a customized checklist for your equipment. Subscriber Radio Repair End users may utilize our local Motorola MSS network for first echelon repair service to subscriber equipment during the warranty period. Motorola’s Radio Repair Depot will provide component level repair of all Motorola manufactured portable and mobile radio communications equipment at a central Motorola facility in the event of more serious repair requirements. The repair center tests and repairs malfunctioning radios down to the component level utilizing state-of-the-art test equipment. Upon completion of the repair, the Motorola repair facility will return ship the radio for reinstallation by the local technician. Continued Support from your Assigned System Manager The heart of Motorola’s support program for the City is the System Management team designed to provide management and operational activities necessary to ensure performance, availability, and utilization of system resources. Your local Motorola System Manager will be the single point of contact in the field, responsible for coordinating system maintenance efforts and ensuring optimal performance and utilization of the City’s communications system equipment and software. The System Manager will work closely with the City to customize the deliverables from the team, examples of which are: ♦

Provide reports of the system performance, use, operational and maintenance activities. ♦ Standard reports include device availability and system performance, repair activity, response and restoration cycle time and open/closed cases for tracking issue resolution. ♦ Identify system capacities pertaining to the system. ♦ Identify other technologies that may be implemented in the system and their benefits.

City of Philadelphia ASTRO 25 Upgrade

Warranty and Maintenance June 13, 2008 8-9



Analyze the data on a monthly basis, and provide recommendations for improvement. ♦ Perform annual Technology Refresh reviews with the City and determine any modifications necessary to the existing scope of services provided. ♦ Track Motorola service suppliers. Optional Software Subscription Agreement (SSA) The SSA provides notification of periodic Motorola Software System Releases and Core Releases for use with upgrade-capable Motorola equipment covered under the contract. Motorola will provide bulletins to the City announcing System Releases and Core Releases. Software releases announced in the bulletins are available upon request. Optional System Audit A System Audit provides the technical resources to gather system configuration information. Depending on the specific requirements for the audit, information such as software versions, hardware versions, model and serial numbers, equipment distribution and system layout/architecture is gathered and retained by Motorola. Motorola will provide a copy of the audit data to the City. Optional Software Upgrade Design Software Upgrade Design includes design services for System Releases. Motorola will review system audit data along with an equipment list to ensure there will be no software incompatibilities between equipment that is not being upgraded versus equipment that is being upgraded with a System Release. Motorola will identify additional equipment and engineering that is required as a result of the upgrade and will recommend a plan for installation. Optional Infrastructure Software Installation Infrastructure Software Installation provides the technical resources to install and activate one (1) software System Release per year. These resources generally include the expertise of our System Technologists (ST) who are also accompanied by the local technicians supporting the system.

8.4

Post Warranty Maintenance Period During the post warranty period, Motorola can continue to provide full maintenance services for the City’s radio network as provided during the warranty period.

City of Philadelphia ASTRO 25 Upgrade

Warranty and Maintenance June 13, 2008 8-10

Section 9. Equipment List 9.1

Master Site Equipment

System 626mAnnex

Site MASTER

Sys Seg DACS

Line # 1-63

Qty 1

Model # DSACDXMOTO004

626mAnnex

MASTER

TENSR

1-65

1

DSPREM891830

626mAnnex

MASTER

TENSR

1-66

2

DSPREM8901

626mAnnex

MASTER

TENSR

1-67

2

DSPREM880160

626mAnnex

MASTER

TENSR

1-68

1

DSPREM892060

626mAnnex 626mAnnex

MASTER MASTER

TENSR TENSR

1-69 1-70

1 1

DSPREM801065 DSPREM801460

626mAnnex 626mAnnex

MASTER MASTER

TENSR TENSR

1-71 1-72

4 1

DSPREM81230 DSPREM811960

626mAnnex

MASTER

NM_NETWORK

1-19

3

ST2500

626mAnnex

MASTER

NM_NETWORK

1-20

3

ST2512

626mAnnex

MASTER

NM_NETWORK

1-22

1

ST2500

626mAnnex

MASTER

NM_NETWORK

1-23

1

ST2512

626mAnnex

MASTER

CNI

1-50

1

ST6000

626mAnnex

MASTER

CNI

1-51

1

ST6000

626mAnnex

MASTER

SRC

1-62

1

ST6200

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Description 16 PORT DS1 DIGITAL XCONN SWITCH 1 UNIVERSAL ENCLOSURE TENSR 800 AC POWER SUPPLY 110/220VAC CPU 8 T1 E1 CROSS CONNT 8T1 E1 IF CARD 32K WITH MODEM DUAL T1 E1 WAN CARD DUAL T1E1 WAN W/ RELAYS 1:N REDUNDA CSU PLUG IN MODULE 8 PORT 4W E M TO EXT RANGE CRD S2500 MULTIPROTOCOL WAN ROUTER S2500 ROUTER T1/E1 DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 ROUTER T1/E1 DAUGHTER BOARD S6000 MNR MULTIPROTOCOL ROUTER S6000 MNR MULTIPROTOCOL ROUTER ASTRO SWITCHINGROUTING CENTER

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-1

System 626mAnnex

Site MASTER

Sys Seg SRC

Line # 1-62a

Qty 1

Model # CA01053AA

626mAnnex

MASTER

AEB

1-64a

1

K762BD

626mAnnex 626mAnnex 626mAnnex 626mAnnex

MASTER MASTER MASTER MASTER

KVLPLUS KVLPLUS KVLPLUS KVLPLUS

1-88 1-88a 1-88b 1-88c

2 2 2 2

T6717 U239AC X795AH X423AE

626mAnnex

MASTER

KVLPLUS

1-88d

2

CA00182AA

626mAnnex

MASTER

KVLPLUS

1-88e

2

C543

626mAnnex 626mAnnex

MASTER MASTER

KVLPLUS KVLPLUS

1-88f 1-88g

2 2

C724 C954

626mAnnex 626mAnnex

MASTER MASTER

KVLPLUS GPS

1-92 1-58

2 1

6881132E29 DSTRAK91008

626mAnnex

MASTER

GPS

1-59

2

DSTRAK91111

626mAnnex

MASTER

GPS

1-60

300

L1700

626mAnnex

MASTER

GPS

1-61

4

TDN9714

626mAnnex

MASTER

MGEG

1-79

1

DS11487719

626mAnnex

MASTER

RACK

1-80

3

DS46053701

626mAnnex

MASTER

RACK

1-81

3

DS46053701

626mAnnex

MASTER

RACK

1-82

3

DS46053701

626mAnnex

MASTER

RACK

1-83

2

DSCAB003150

626mAnnex

MASTER

SURGE

1-84

9

DSOP820B

626mAnnex

MASTER

SURGE

1-85

9

DS1101378

626mAnnex 626mAnnex

MASTER MASTER

SURGE KVM

1-86 1-87

3 3

DSMPS32T1 DDN8325

626mAnnex

MASTER

NM_CLIENT

1-10

1

DLN6545

626mAnnex

MASTER

AEB

1-64

1

B1842BB

626mAnnex

MASTER

AEB

1-64b

1

X758AA

626mAnnex

MASTER

AEB

1-64c

2

K994AJ

626mAnnex

MASTER

AEB

1-64d

1

X762AB

626mAnnex

MASTER

AEB

1-64e

1

CA00126AA

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-2

Description ADD: DUAL SITE LINK CAPABILITY EHN: EXTENDED WARRANTY, 2 CARD CAGE KVL 3000 PLUS HARDWARE ADD: ASTRO 25 MODE ADD: ASN MODE ADD: DES/DES-XL/DES-OFB ENCRYPTION ADD: AES ENCRYPTION SOFTWARE ADD: CABLE FOR RNC, DIU, MGEG CABLE, KEYLOAD ADD: CABLE FOR SPECTRA/SPECTRO KVL3000 PLUS USER GUIDE PRIME/MASTER SITE CONFIG AC POWER FOUR PORT T1 FRAMED AND CLOCK TELEC 1/4" SUPERFLEX POLY JKT PER FOOT 1/4" CONN N MALE S FLEX PLTD CPU SHELF WITH SG KEYBOARD 19 INCH 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 43U X 600W X 800D UNIVERSAL EURORAC POWER DIST. UNIT SURGE PROTECT RACK MOUNTING PLATE ADAPTER , DSOP8 32 T1 PROTECTOR 17" LCD DRAWER W/ KEYBOARD & MOUSE, HP CP3505N COLOR LASER PRINTER 110V CENTRACOM GOLD AMBASSADOR ELECTRONI ADD: SPARES, AMBASSADOR ELECTRONICS ADD: MODULE, AMBASSADOR ADD: INTERFACE, ZONE CONTROLLER (TW ADD: SOFTWARE LICENSE, ASTRO 25 TRU

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

System 626mAnnex

Site MASTER

Sys Seg MGEG

Line # 1-73

Qty 2

Model # B1896

626mAnnex

MASTER

MGEG

1-73a

2

CA00169AA

626mAnnex

MASTER

MGEG

1-73b

2

CA00147AC

626mAnnex 626mAnnex 626mAnnex 626mAnnex 626mAnnex 626mAnnex

MASTER MASTER MASTER MASTER MASTER MASTER

MGEG MGEG MGEG MGEG KVLPLUS KVLPLUS

1-73c 1-73d 1-73e 1-73f 1-89 1-91

2 2 2 2 2 2

CA00143AC CA00145AC CA00182AB CA00245AA NTN7395BR HKN6182

626mAnnex

MASTER

NMS/ZC

1-2

1

DS301100111G

626mAnnex

MASTER

NMS/ZC

1-3

1

L3174

626mAnnex

MASTER

NMS/ZC

1-4

1

DSZ1Z1118560

626mAnnex

MASTER

NTMS_DC

1-5

4

L3539

626mAnnex

MASTER

NTMS

1-6

1

T7121C

626mAnnex

MASTER

NMS/ZC

1-7

1

L3225A

626mAnnex

MASTER

NMS/ZC

1-8

1

L3226A

626mAnnex

MASTER

NMS/ZC

1-9

1

DS213BLK

626mAnnex

MASTER

NM_CLIENT

1-11

3

DDN9162

626mAnnex 626mAnnex

MASTER MASTER

NM_CLIENT NM_CLIENT

1-12 1-14

3 2

DDN8673 DS213BLK

626mAnnex

MASTER

NM_CLIENT

1-15

3

DDN9162

626mAnnex 626mAnnex

MASTER MASTER

NM_CLIENT NM_CLIENT

1-16 1-18

3 3

DDN8673 DS213BLK

626mAnnex

MASTER

NM_NETWORK

1-21

3

DSJ4900B

626mAnnex

MASTER

OBM_SERVER

1-24

1

TT1491

626mAnnex

MASTER

OBM_SERVER

1-25

1

L3174

626mAnnex

MASTER

OBM_SERVER

1-26

1

DSZ1Z1118567

626mAnnex

MASTER

CSMS

1-27

1

DDN9182

626mAnnex

MASTER

CSMS

1-28

1

T7401

626mAnnex

MASTER

ANTI_VIRUS

1-29

15

DDN9454

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Description MGEG WITH CPU, 120 CLEAR CALL CAPAB ADD: ASTRO 25 IMBE CAPABILITY ADD: SECURE CAPABILITY & SECURE SOF ADD: DES-OFB ALGORITHM ADD: DVI-XL ALGORITHM ADD: AES ALGORITHM ADD: ADP ALGORITHM 1200MAH HICAP BATT KEYLOADING CABLE ADAPTER (GCAI) USB TO DB 9 PIN SERIAL ADAPTOR 3810 PLUS MODEM S/A V.34 PROTOCOL RM001 W/SPECIAL FACEPLATE W/1 CUTOU CERTIFIED DOMAIN CONTROLLER / NTMS DCD/NTMS/DC CONFIGURATION SW FOR A6 CERTIFIED KEYBOARD FOR RSD SERVERS CERTIFIED OPTICAL WHEEL MOUSE FOR R 21.3" MVA 4:3 LCD, BLACK, NON-TOUCH CERTIFIED 6.9 /7.0 ASTRO PRIVATE NE CRYSTAL REPORTS 11.0 21.3" MVA 4:3 LCD, BLACK, NON-TOUCH CERTIFIED 6.9 /7.0 ASTRO PRIVATE NE CRYSTAL REPORTS 11.0 21.3" MVA 4:3 LCD, BLACK, NON-TOUCH HP PROCURVE SWITCH 2626B LX TERMINAL SERVER 48 PORTS WITH MO 3810 PLUS MODEM S/A V.34 PROTOCOL RM001 WITH SPECIAL FACEPLATE WITH 2 CERTIFIED CORE SECURITY MANAGEMENT CSMS SUPPLEMENTARY DISK A7.1.1 SYMANTEC ANTI VIRUS 10.1.5 CORP ED

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-3

System 626mAnnex

Site MASTER

Sys Seg AUTHEN

Line # 1-30

Qty 1

Model # TT1969

626mAnnex

MASTER

AUTHEN

1-30a

1

TT04523AA

626mAnnex 626mAnnex

MASTER MASTER

AUTHEN CSMS

1-31 1-32

5 1

DDN8653 DS213BLK

626mAnnex

MASTER

IBS CNI_SV

1-33

1

DSWQ4798653

626mAnnex

MASTER

IBS

1-34

1

DSWQ4800408

626mAnnex

MASTER

IBS

1-35

1

DS1161857

626mAnnex

MASTER

IBS

1-36

3

DS1818265

626mAnnex 626mAnnex

MASTER MASTER

IBS NM Site IB

1-37 1-38

1 3

DDN9178 L3504

626mAnnex 626mAnnex 626mAnnex

MASTER MASTER MASTER

NM Site IB NM Site IB CNI

1-39 1-40 1-41

3 3 1

T7402 DDN9178 TT1931

626mAnnex

MASTER

CNI

1-42

1

TT1949

626mAnnex

MASTER

CNI

1-43

1

T7399

626mAnnex

MASTER

CNI

1-44

1

L3510

626mAnnex 626mAnnex

MASTER MASTER

CNI CNI

1-45 1-46

1 1

T7328 DSJ4900B

626mAnnex

MASTER

DCD

1-47

1

DDN9184

626mAnnex

MASTER

DCD

1-48

1

T7121C

626mAnnex

MASTER

DCD

1-49

1

L3536

626mAnnex

MASTER

MGEG

1-74

1

L3225A

626mAnnex

MASTER

MGEG

1-75

1

L3226A

626mAnnex

MASTER

MGEG

1-76

1

DS213BLK

626mAnnex

MASTER

MGEG

1-77

1

DSF1DZ104T

626mAnnex

MASTER

MGEG

1-78

2

DSF3X110506

626mAnnex

MASTER

NMS/ZC

1-1n

1

ZA00103AA

626mAnnex 626mAnnex

MASTER MASTER

KVLPLUS NMS/ZC

1-90 1-1

2 1

HKTN4004B SQM01SUM0184

626mAnnex 626mAnnex

MASTER MASTER

NMS/ZC NMS/ZC

1-1a 1-1b

1 22

QA01205AA CA01209AB

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-4

Description RSA AUTH. MGMT V. 6.1 WITH 25 CLIEN ADD: RSA ACE SERVER MAINTENANCE FOR RSA 5 YEAR HARD TOKEN 21.3" MVA 4:3 LCD, BLACK, NON-TOUCH VIRTUAL SERVER HARDWARE AND LINUX M VMWARE INFRA STR LIC & GOLD SUPPORT WINDOWS SERVER STD 2003 R2A WITH 5 RED HAT ENT LINUX ES BASIC LICENSE SNAP SERVER 110 500 GB CERTIFIED SYSLOG SERVER IBS SUPPLEMENTARY DISK SNAP SERVER 110 500 GB SSG520 FIREWALL W/ 2 YEARS SUPPORT NETSCREEN-SECURITY MGR W/ 10 DEVICE FMS SUPPLEMENTARY DISK A7.1.1 PROVENTIA G SERIES COMPLETE SYSTEM IDS SUPPLEMENTARY CD HP PROCURVE SWITCH 2626B CERTIFIED DCD SERVER FOR 6.9/7.2 DCD/NTMS/DC CONFIGURATION SW FOR A6 DCD CONSOLE V 4.0 W/2 YEARS MNT CERTIFIED KEYBOARD FOR RSD SERVERS CERTIFIED OPTICAL WHEEL MOUSE FOR R 21.3" MVA 4:3 LCD, BLACK, NON-TOUCH 4 PORT BELKIN KVM SWITCH SE SERIES PS/2 KVM 6FT ALL IN ONE CABLE SET ENH: TECHNICAL ASSISTANCE, TEN HOUR VISAR / KVL CHGR KIT 110V MASTER SITE CONFIGURATION ENH: ASTRO 25 IV&D ENH: ASTRO 25 IV&D SITE

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

System 626mAnnex

Site MASTER

Sys Seg NMS/ZC

Line # 1-1c

Qty 20

Model # CA01208AA

626mAnnex

MASTER

NMS/ZC

1-1d

1

CA01257AA

626mAnnex

MASTER

NMS/ZC

1-1e

1

CA01235AA

626mAnnex

MASTER

NMS/ZC

1-1f

5

CA01224AB

626mAnnex

MASTER

NMS/ZC

1-1g

5

Z13AG

626mAnnex

MASTER

NMS/ZC

1-1h

5

Z802AF

626mAnnex

MASTER

NMS/ZC

1-1j

1

D999AL

626mAnnex

MASTER

NMS/ZC

1-1l

1

D41AF

626mAnnex

MASTER

NMS/ZC

1-1m

1

CA00966AA

626mAnnex

MASTER

NMS/ZC

1-1o

1

CA00965AA

626mAnnex

MASTER

NMS/ZC

1-1p

5

DA00148AG

626mAnnex

MASTER

NMS/ZC

1-1r

5

Z801AM

626mAnnex 626mAnnex

MASTER MASTER

NMS/ZC NMS/ZC

1-1s 1-1t

5 5

D52AJ ZA00151AG

626mAnnex

MASTER

NMS/ZC

1-1u

1

Z07AA

626mAnnex

MASTER

NMS/ZC

1-1v

1

CA01237AA

626mAnnex

MASTER

NMS/ZC

1-1w

1

ZA00272AA

626mAnnex 626mAnnex

MASTER MASTER

NMS/ZC NM_CLIENT

1-1x 1-13

1 3

ZA00149AD T7420

626mAnnex

MASTER

NM_CLIENT

1-17

3

T7420

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Description ENH: 500 RADIO USER LICENSES ENH: ZONE CONTROLLER/NETWORK MANAGE ENH: USER CONFIGURATION SERVER (UCS ENH: UNIFIED EVENT MANAGER (UEM) ENH: UNIFIED NETWORK CONFIGURATOR ( ENH: USER CONFIGURATION MANAGER (UC ENH: SECURITY PARTITIONING ENH: DYNAMIC SHARED SERVICES ENH: FLEXIBLE AIR TRAFFIC INFORMATI ENH: CHANNEL PARTITIONING ENH: ZONE HISTORICAL REPORTS ENH: RADIO CONTROL MANAGER ENH: ZONEWATCH ENH: AFFILIATION USER REPORTS ENH: ALPHANUMERIC PAGING ENH: NORTHBOUND INTERFACE ENH: SNMP TRAP FORWARDING ENH: DYNAMIC REPORTS ASTRO 7.4 CLIENT APPLICATION SOFTWA ASTRO 7.4 CLIENT APPLICATION SOFTWA

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-5

9.2

Fixed Equipment Upgrade

System RM626M

Site MUNI

Sys Seg ELITEUPGRD

Line # 1-448

Qty 1

Model No. ST2500

RM626M

MUNI

ELITEUPGRD

1-449

1

ST2510

PAB

POLICE

ELITEUPGRD

1-451

1

ST2500

PAB

POLICE

ELITEUPGRD

1-452

1

ST2510

FAB

FIRE

ELITEUPGRD

1-454

1

ST2500

FAB

FIRE

ELITEUPGRD

1-455

1

ST2510

PIA

AIRPORT

ELITEUPGRD

1-457

1

ST2500

PIA

AIRPORT

ELITEUPGRD

1-458

1

ST2510

RM626M 10thFLOOR DOMINO FORD&BLMNT

MASTER PRIME PRIME A&B-RMT

SURGE SURGE SURGE SURGE

1-137 1-138 1-139 1-140

2 2 2 1

DSMPS32T1 DSMPS32T1 DSMPS32T1 DSPBM6607

31st&GRAYS

A&B-RMT

SURGE

1-141

1

DSPBM6607

VICTRYGNDS

A&B-RMT

SURGE

1-142

1

DSPBM6607

SOUTHMPTN

A&B-RMT

SURGE

1-143

1

DSPBM6607

ENGINE9

A&B-RMT

SURGE

1-144

1

DSPBM6607

POLACAD

A&B-RMT

SURGE

1-145

1

DSPBM6607

BSLTN&HOFF

A&B-RMT

SURGE

1-146

1

DSPBM6607

STRTS&HYWY

A&B-RMT

SURGE

1-147

1

DSPBM6607

RM626M

MASTER

CPS

1-464

5

RKN4106

RM626M RM626M

MASTER MASTER

CPS QTARUPGRD

1-465 1-445

5 1

RKN4105 RVN5002

RM626M

MASTER

CPS

1-462

5

RVN4186AA

10thFLOOR

A&B-RMT

QTARUPGRD

1-435

1

SQM01SUM0130

10thFLOOR

A&B-RMT

QTARUPGRD

1-435a

36

CA00134AA

10thFLOOR

A&B-RMT

QTARUPGRD

1-435b

36

CA00137AA

10thFLOOR

A&B-RMT

QTARUPGRD

1-435c

36

CA00025AE

10thFLOOR

A&B-RMT

QTARUPGRD

1-435d

36

CA00255AA

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-6

Description S2500 MULTIPROTOCOL WAN ROUTER S2500 10 BASE-T DAUGTHER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 10 BASE-T DAUGTHER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 10 BASE-T DAUGTHER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 10 BASE-T DAUGTHER BOARD 32 T1 PROTECTOR 32 T1 PROTECTOR 32 T1 PROTECTOR PUNCH DOWN FOR M66 BLOCK. PAIR PROT PUNCH DOWN FOR M66 BLOCK. PAIR PROT PUNCH DOWN FOR M66 BLOCK. PAIR PROT PUNCH DOWN FOR M66 BLOCK. PAIR PROT PUNCH DOWN FOR M66 BLOCK. PAIR PROT PUNCH DOWN FOR M66 BLOCK. PAIR PROT PUNCH DOWN FOR M66 BLOCK. PAIR PROT PUNCH DOWN FOR M66 BLOCK. PAIR PROT CABLE- PROGRAMMING, RS232 CABLE- PROGRAMMING USB RSS QUANTAR QUANTRO RECEIVER CPS R10.00.00 ASTRO 25 PORT/MOBILE SOFTWARE & HARDWARE UPGRADE KIT ENH: 6809 TRUNKED UPGRADE ENH: PRE 5.0 TO P25 UPGRADE ADD: 6.X MULTI SITE UPGRADE ADD: EPIC IV CONTROL BOARD

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

10thFLOOR

A&B-RMT

QTARUPGRD

1-435e

36

CA00257AA

10thFLOOR

A&B-RMT

QTARUPGRD

1-435f

36

X793

DOMINO

A&B-RMT

QTARUPGRD

1-436

1

SQM01SUM0130

DOMINO

A&B-RMT

QTARUPGRD

1-436a

37

CA00134AA

DOMINO

A&B-RMT

QTARUPGRD

1-436b

37

CA00137AA

DOMINO

A&B-RMT

QTARUPGRD

1-436c

37

CA00025AE

DOMINO

A&B-RMT

QTARUPGRD

1-436d

37

CA00255AA

DOMINO

A&B-RMT

QTARUPGRD

1-436e

37

CA00257AA

DOMINO

A&B-RMT

QTARUPGRD

1-436f

37

X793

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-437

1

SQM01SUM0130

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-437a

37

CA00134AA

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-437b

37

CA00137AA

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-437c

37

CA00025AE

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-437d

37

CA00255AA

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-437e

37

CA00257AA

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-437f

37

X793

ENGINE9

A&B-RMT

QTARUPGRD

1-438

1

SQM01SUM0130

ENGINE9

A&B-RMT

QTARUPGRD

1-438a

36

CA00134AA

ENGINE9

A&B-RMT

QTARUPGRD

1-438b

36

CA00137AA

ENGINE9

A&B-RMT

QTARUPGRD

1-438c

36

CA00025AE

ENGINE9

A&B-RMT

QTARUPGRD

1-438d

36

CA00255AA

ENGINE9

A&B-RMT

QTARUPGRD

1-438e

36

CA00257AA

ENGINE9

A&B-RMT

QTARUPGRD

1-438f

36

X793

FORD&BLMNT

A&B-RMT

QTARUPGRD

1-439

1

SQM01SUM0130

FORD&BLMNT

A&B-RMT

QTARUPGRD

1-439a

36

CA00134AA

FORD&BLMNT

A&B-RMT

QTARUPGRD

1-439b

36

CA00137AA

FORD&BLMNT

A&B-RMT

QTARUPGRD

1-439c

36

CA00025AE

FORD&BLMNT

A&B-RMT

QTARUPGRD

1-439d

36

CA00255AA

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

ADD: EXCITER EPROM UPGRADE ENH: EPIC BOARD ALREADY IN USE SOFTWARE & HARDWARE UPGRADE KIT ENH: 6809 TRUNKED UPGRADE ENH: PRE 5.0 TO P25 UPGRADE ADD: 6.X MULTI SITE UPGRADE ADD: EPIC IV CONTROL BOARD ADD: EXCITER EPROM UPGRADE ENH: EPIC BOARD ALREADY IN USE SOFTWARE & HARDWARE UPGRADE KIT ENH: 6809 TRUNKED UPGRADE ENH: PRE 5.0 TO P25 UPGRADE ADD: 6.X MULTI SITE UPGRADE ADD: EPIC IV CONTROL BOARD ADD: EXCITER EPROM UPGRADE ENH: EPIC BOARD ALREADY IN USE SOFTWARE & HARDWARE UPGRADE KIT ENH: 6809 TRUNKED UPGRADE ENH: PRE 5.0 TO P25 UPGRADE ADD: 6.X MULTI SITE UPGRADE ADD: EPIC IV CONTROL BOARD ADD: EXCITER EPROM UPGRADE ENH: EPIC BOARD ALREADY IN USE SOFTWARE & HARDWARE UPGRADE KIT ENH: 6809 TRUNKED UPGRADE ENH: PRE 5.0 TO P25 UPGRADE ADD: 6.X MULTI SITE UPGRADE ADD: EPIC IV CONTROL BOARD

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-7

FORD&BLMNT

A&B-RMT

QTARUPGRD

1-439e

36

CA00257AA

FORD&BLMNT

A&B-RMT

QTARUPGRD

1-439f

36

X793

VICTRYGNDS

A&B-RMT

QTARUPGRD

1-440

1

SQM01SUM0130

VICTRYGNDS

A&B-RMT

QTARUPGRD

1-440a

36

CA00134AA

VICTRYGNDS

A&B-RMT

QTARUPGRD

1-440b

36

CA00137AA

VICTRYGNDS

A&B-RMT

QTARUPGRD

1-440c

36

CA00025AE

VICTRYGNDS

A&B-RMT

QTARUPGRD

1-440d

36

CA00255AA

VICTRYGNDS

A&B-RMT

QTARUPGRD

1-440e

36

CA00257AA

VICTRYGNDS

A&B-RMT

QTARUPGRD

1-440f

36

X793

31st&GRAYS

A&B-RMT

QTARUPGRD

1-441

1

SQM01SUM0130

31st&GRAYS

A&B-RMT

QTARUPGRD

1-441a

36

CA00134AA

31st&GRAYS

A&B-RMT

QTARUPGRD

1-441b

36

CA00137AA

31st&GRAYS

A&B-RMT

QTARUPGRD

1-441c

36

CA00025AE

31st&GRAYS

A&B-RMT

QTARUPGRD

1-441d

36

CA00255AA

31st&GRAYS

A&B-RMT

QTARUPGRD

1-441e

36

CA00257AA

31st&GRAYS

A&B-RMT

QTARUPGRD

1-441f

36

X793

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-442

1

SQM01SUM0130

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-442a

36

CA00134AA

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-442b

36

CA00137AA

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-442c

36

CA00025AE

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-442d

36

CA00255AA

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-442e

36

CA00257AA

SOUTHMPTN

A&B-RMT

QTARUPGRD

1-442f

36

X793

POLACAD

A&B-RMT

QTARUPGRD

1-443

1

SQM01SUM0130

POLACAD

A&B-RMT

QTARUPGRD

1-443a

36

CA00134AA

POLACAD

A&B-RMT

QTARUPGRD

1-443b

36

CA00137AA

POLACAD

A&B-RMT

QTARUPGRD

1-443c

36

CA00025AE

POLACAD

A&B-RMT

QTARUPGRD

1-443d

36

CA00255AA

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-8

ADD: EXCITER EPROM UPGRADE ENH: EPIC BOARD ALREADY IN USE SOFTWARE & HARDWARE UPGRADE KIT ENH: 6809 TRUNKED UPGRADE ENH: PRE 5.0 TO P25 UPGRADE ADD: 6.X MULTI SITE UPGRADE ADD: EPIC IV CONTROL BOARD ADD: EXCITER EPROM UPGRADE ENH: EPIC BOARD ALREADY IN USE SOFTWARE & HARDWARE UPGRADE KIT ENH: 6809 TRUNKED UPGRADE ENH: PRE 5.0 TO P25 UPGRADE ADD: 6.X MULTI SITE UPGRADE ADD: EPIC IV CONTROL BOARD ADD: EXCITER EPROM UPGRADE ENH: EPIC BOARD ALREADY IN USE SOFTWARE & HARDWARE UPGRADE KIT ENH: 6809 TRUNKED UPGRADE ENH: PRE 5.0 TO P25 UPGRADE ADD: 6.X MULTI SITE UPGRADE ADD: EPIC IV CONTROL BOARD ADD: EXCITER EPROM UPGRADE ENH: EPIC BOARD ALREADY IN USE SOFTWARE & HARDWARE UPGRADE KIT ENH: 6809 TRUNKED UPGRADE ENH: PRE 5.0 TO P25 UPGRADE ADD: 6.X MULTI SITE UPGRADE ADD: EPIC IV CONTROL BOARD

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

POLACAD

A&B-RMT

QTARUPGRD

1-443e

36

CA00257AA

POLACAD

A&B-RMT

QTARUPGRD

1-443f

36

X793

BSLTN&HOFF

A&B-RMT

QTARUPGRD

1-444

1

SQM01SUM0130

BSLTN&HOFF

A&B-RMT

QTARUPGRD

1-444a

36

CA00134AA

BSLTN&HOFF

A&B-RMT

QTARUPGRD

1-444b

36

CA00137AA

BSLTN&HOFF

A&B-RMT

QTARUPGRD

1-444c

36

CA00025AE

BSLTN&HOFF

A&B-RMT

QTARUPGRD

1-444d

36

CA00255AA

BSLTN&HOFF

A&B-RMT

QTARUPGRD

1-444e

36

CA00257AA

BSLTN&HOFF

A&B-RMT

QTARUPGRD

1-444f

36

X793

RM626M

MASTER

PAK

1-461

1

CVN6143

RM626M

MUNI

ELITEUPGRD

1-450

2

DSJ4900B

PAB

POLICE

ELITEUPGRD

1-453

4

DSJ4900B

FAB

FIRE

ELITEUPGRD

1-456

2

DSJ4900B

PIA

AIRPORT

ELITEUPGRD

1-459

2

DSJ4900B

RM626M

MASTER

CPS

1-463

5

HKN6155

RM626M

MASTER

QTARUPGRD

1-446

1

DLN6455

RM626M

MASTER

ELITEUPGRD

1-460

1

B1879

RM626M

MASTER

ELITEUPGRD

1-460a

73

X69

RM626M

MASTER

ELITEUPGRD

1-460b

53

X03

RM626M

MASTER

ELITEUPGRD

1-460c

65

X49

RM626M

MASTER

ELITEUPGRD

1-460d

42

X80

RM626M

MASTER

ELITEUPGRD

1-460e

87

X60

RM626M

MASTER

ELITEUPGRD

1-460f

3

X77

RM626M

MASTER

ELITEUPGRD

1-460g

34

X79

10thFLOOR 10thFLOOR

PRIME PRIME

PRMCTRL PRMCTRL

1-1 1-1a

2 2

T7038 X153AW

10thFLOOR

PRIME

PRMCTRL

1-1b

2

CA00303AB

10thFLOOR

PRIME

PRMCTRL

1-1c

2

CA00025AG

DOMINO

PRIME

PRMCTRL

1-21

2

T7038

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

ADD: EXCITER EPROM UPGRADE ENH: EPIC BOARD ALREADY IN USE SOFTWARE & HARDWARE UPGRADE KIT ENH: 6809 TRUNKED UPGRADE ENH: PRE 5.0 TO P25 UPGRADE ADD: 6.X MULTI SITE UPGRADE ADD: EPIC IV CONTROL BOARD ADD: EXCITER EPROM UPGRADE ENH: EPIC BOARD ALREADY IN USE PROGAMMING ACCESS KEY (PAK) 3.5" ME HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B PROGRAMMING/FLASH CABLE, ASTRO SPEC CONFIGURATION/SERVICE SOFTWARE CENTRACOM GOLD SOFTWARE REFRESH PAC ADD: SOFTWARE REFRESH, COIM OR LOMI ADD: SOFTWARE REFRESH, ELITE/ADMI0D ADD: SOFTWARE REFRESH, BIM ADD: SOFTWARE REFRESH, AMBASSADOR ADD: SOFTWARE REFRESH, SPI ADD: SOFTWARE REFRESH, 16 I/O OR CO ADD: SOFTWARE REFRESH, AIMI GCP 8000 SITE CONTROLLER ADD: RACK MOUNT HARDWARE ADD: QTY (1) SITE CONTROLLER ADD: CIRCUIT BASED MULTISITE SITE C GCP 8000 SITE CONTROLLER

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-9

DOMINO

PRIME

PRMCTRL

1-21a

2

X153AW

DOMINO

PRIME

PRMCTRL

1-21b

2

CA00303AB

DOMINO

PRIME

PRMCTRL

1-21c

2

CA00025AG

10thFLOOR

A&B-RMT

HSU

1-51

2

DSPREM821260

10thFLOOR

A&B-RMT

HSU

1-52

4

DSPREM1203F

DOMINO

A&B-RMT

HSU

1-60

2

DSPREM821260

DOMINO

A&B-RMT

HSU

1-61

4

DSPREM1203F

FORD&BLMNT

A&B-RMT

HSU

1-69

1

DSPREM821260

FORD&BLMNT

A&B-RMT

HSU

1-70

2

DSPREM1203F

31st&GRAYS

A&B-RMT

HSU

1-78

1

DSPREM821260

31st&GRAYS

A&B-RMT

HSU

1-79

2

DSPREM1203F

VICTRYGNDS

A&B-RMT

HSU

1-87

1

DSPREM821260

VICTRYGNDS

A&B-RMT

HSU

1-88

2

DSPREM1203F

SOUTHMPTN

A&B-RMT

HSU

1-96

1

DSPREM821260

SOUTHMPTN

A&B-RMT

HSU

1-97

2

DSPREM1203F

ENGINE9

A&B-RMT

HSU

1-107

1

DSPREM821260

ENGINE9

A&B-RMT

HSU

1-108

2

DSPREM1203F

POLACAD

A&B-RMT

HSU

1-116

1

DSPREM821260

POLACAD

A&B-RMT

HSU

1-117

2

DSPREM1203F

BSLTN&HOFF

A&B-RMT

HSU

1-125

1

DSPREM821260

BSLTN&HOFF

A&B-RMT

HSU

1-126

2

DSPREM1203F

STRTS&HYWY

A&B-RMT

HSU

1-134

1

DSPREM821260

STRTS&HYWY

A&B-RMT

HSU

1-135

2

DSPREM1203F

10thFLOOR

PRIME

PRMRTR

1-17

2

ST6000

10thFLOOR

PRIME

PRMRTR

1-18

2

ST6010

DOMINO

PRIME

PRMRTR

1-42

2

ST6000

DOMINO

PRIME

PRMRTR

1-43

2

ST6010

10thFLOOR

A-RMT

PRMRTR

1-45

2

ST6000

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-10

ADD: RACK MOUNT HARDWARE ADD: QTY (1) SITE CONTROLLER ADD: CIRCUIT BASED MULTISITE SITE C 2 PORT V 35 HSU CARD WITH DB25F CABLE 5FT DB25M TO V.35F STRAIGHT 2 PORT V 35 HSU CARD WITH DB25F CABLE 5FT DB25M TO V.35F STRAIGHT 2 PORT V 35 HSU CARD WITH DB25F CABLE 5FT DB25M TO V.35F STRAIGHT 2 PORT V 35 HSU CARD WITH DB25F CABLE 5FT DB25M TO V.35F STRAIGHT 2 PORT V 35 HSU CARD WITH DB25F CABLE 5FT DB25M TO V.35F STRAIGHT 2 PORT V 35 HSU CARD WITH DB25F CABLE 5FT DB25M TO V.35F STRAIGHT 2 PORT V 35 HSU CARD WITH DB25F CABLE 5FT DB25M TO V.35F STRAIGHT 2 PORT V 35 HSU CARD WITH DB25F CABLE 5FT DB25M TO V.35F STRAIGHT 2 PORT V 35 HSU CARD WITH DB25F CABLE 5FT DB25M TO V.35F STRAIGHT 2 PORT V 35 HSU CARD WITH DB25F CABLE 5FT DB25M TO V.35F STRAIGHT S6000 MNR MULTIPROTOCOL ROUTER S6000 4-PORT ULTRAWAN MODULE S6000 MNR MULTIPROTOCOL ROUTER S6000 4-PORT ULTRAWAN MODULE S6000 MNR MULTIPROTOCOL ROUTER

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

10thFLOOR

A-RMT

PRMRTR

1-46

2

ST6010

10thFLOOR

B-RMT

SITERTR

1-48

1

ST2500

10thFLOOR

B-RMT

SITERTR

1-49

1

ST2511

DOMINO

A-RMT

SITERTR

1-54

1

ST2500

DOMINO

A-RMT

SITERTR

1-55

1

ST2511

DOMINO

B-RMT

PRMRTR

1-57

2

ST6000

DOMINO

B-RMT

PRMRTR

1-58

2

ST6010

FORD&BLMNT

A-RMT

SITERTR

1-63

1

ST2500

FORD&BLMNT

A-RMT

SITERTR

1-64

1

ST2511

FORD&BLMNT

B-RMT

SITERTR

1-66

1

ST2500

FORD&BLMNT

B-RMT

SITERTR

1-67

1

ST2511

31st&GRAYS

A-RMT

SITERTR

1-72

1

ST2500

31st&GRAYS

A-RMT

SITERTR

1-73

1

ST2511

31st&GRAYS

B-RMT

SITERTR

1-75

1

ST2500

31st&GRAYS

B-RMT

SITERTR

1-76

1

ST2511

VICTRYGNDS

A-RMT

SITERTR

1-81

1

ST2500

VICTRYGNDS

A-RMT

SITERTR

1-82

1

ST2511

VICTRYGNDS

B-RMT

SITERTR

1-84

1

ST2500

VICTRYGNDS

B-RMT

SITERTR

1-85

1

ST2511

SOUTHMPTN

A-RMT

SITERTR

1-90

1

ST2500

SOUTHMPTN

A-RMT

SITERTR

1-91

1

ST2511

SOUTHMPTN

B-RMT

SITERTR

1-93

1

ST2500

SOUTHMPTN

B-RMT

SITERTR

1-94

1

ST2511

ENGINE9

A-RMT

SITERTR

1-101

1

ST2500

ENGINE9

A-RMT

SITERTR

1-102

1

ST2511

ENGINE9

B-RMT

SITERTR

1-104

1

ST2500

ENGINE9

B-RMT

SITERTR

1-105

1

ST2511

POLACAD

A-RMT

SITERTR

1-110

1

ST2500

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

S6000 4-PORT ULTRAWAN MODULE S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S6000 MNR MULTIPROTOCOL ROUTER S6000 4-PORT ULTRAWAN MODULE S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-11

POLACAD

A-RMT

SITERTR

1-111

1

ST2511

POLACAD

B-RMT

SITERTR

1-113

1

ST2500

POLACAD

B-RMT

SITERTR

1-114

1

ST2511

BSLTN&HOFF

A-RMT

SITERTR

1-119

1

ST2500

BSLTN&HOFF

A-RMT

SITERTR

1-120

1

ST2511

BSLTN&HOFF

A&B-RMT

SITERTR

1-122

1

ST2500

BSLTN&HOFF

A&B-RMT

SITERTR

1-123

1

ST2511

STRTS&HYWY

A-RMT

SITERTR

1-128

1

ST2500

STRTS&HYWY

A-RMT

SITERTR

1-129

1

ST2511

STRTS&HYWY

B-RMT

SITERTR

1-131

1

ST2500

STRTS&HYWY

B-RMT

SITERTR

1-132

1

ST2511

10thFLOOR

PRIME

RACK

1-20

6

DS46053701

10thFLOOR

A&B-RMT

RACK

1-53

1

DS46053701

DOMINO

A&B-RMT

RACK

1-62

1

DS46053701

FORD&BLMNT

A&B-RMT

RACK

1-71

1

DS46053701

31st&GRAYS

A&B-RMT

RACK

1-80

1

DS46053701

VICTRYGNDS

A&B-RMT

RACK

1-89

1

DS46053701

SOUTHMPTN

A&B-RMT

RACK

1-100

1

DS46053701

ENGINE9

A&B-RMT

RACK

1-109

1

DS46053701

POLACAD

A&B-RMT

RACK

1-118

1

DS46053701

BSLTN&HOFF

A&B-RMT

RACK

1-127

1

DS46053701

STRTS&HYWY

A&B-RMT

RACK

1-136

1

DS46053701

RM626M

MASTER

MAINTOP

1-468

1

DS40108719

RM626M RM626M

MASTER MASTER

MAINTOP MAINTOP

1-469 1-470

1 1

DS12193101 DSJNSB59619B

RM626M

MASTER

MAINTOP

1-447

1

B1822B

RM626M RM626M

MASTER MASTER

MAINTOP MAINTOP

1-447a 1-447b

1 1

K572AF K704AA

RM626M

MASTER

MAINTOP

1-447c

1

K570

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-12

S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 FLEXWAN DAUGHTER BOARD 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI 6 FT UNIVERSAL RACK BLACK 19 IN WI DOUBLE SIDED 19 INCH RACK KEYBOARD 19 SHELF. B-LINE SAME AS 40622 NEW CENTRACOM GOLD ELITE INTERFACE ELEC ADD: FOOTSWITCH ADD: HEADSET JACK, #2 W/6 FOOT CABL ADD: HEADSET JACK, W/5 FOOT CABLE (

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

RM626M

MASTER

MAINTOP

1-447d

1

K703

10thFLOOR

PRIME

ATAC9600

1-2

1

T6507

10thFLOOR

PRIME

ATAC9600

1-2a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-2b 1-2c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-3

1

T6507

10thFLOOR

PRIME

ATAC9600

1-3a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-3b 1-3c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-4

1

T6507

10thFLOOR

PRIME

ATAC9600

1-4a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-4b 1-4c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-5

1

T6507

10thFLOOR

PRIME

ATAC9600

1-5a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-5b 1-5c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-6

1

T6507

10thFLOOR

PRIME

ATAC9600

1-6a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-6b 1-6c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-7

1

T6507

10thFLOOR

PRIME

ATAC9600

1-7a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-7b 1-7c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-8

1

T6507

10thFLOOR

PRIME

ATAC9600

1-8a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-8b 1-8c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-9

1

T6507

10thFLOOR

PRIME

ATAC9600

1-9a

1

CA00091AA

10thFLOOR

PRIME

ATAC9600

1-9b

1

X230AJ

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

ADD: MICROPHONE, GOOSENECK, 9 INCH ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-13

10thFLOOR

PRIME

ATAC9600

1-9c

1

X153

10thFLOOR

PRIME

ATAC9600

1-10

1

T6507

10thFLOOR

PRIME

ATAC9600

1-10a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-10b 1-10c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-11

1

T6507

10thFLOOR

PRIME

ATAC9600

1-11a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-11b 1-11c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-12

1

T6507

10thFLOOR

PRIME

ATAC9600

1-12a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-12b 1-12c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-13

1

T6507

10thFLOOR

PRIME

ATAC9600

1-13a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-13b 1-13c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-14

1

T6507

10thFLOOR

PRIME

ATAC9600

1-14a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-14b 1-14c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-15

1

T6507

10thFLOOR

PRIME

ATAC9600

1-15a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-15b 1-15c

1 1

X230AJ X153

10thFLOOR

PRIME

ATAC9600

1-16

1

T6507

10thFLOOR

PRIME

ATAC9600

1-16a

1

CA00091AA

10thFLOOR 10thFLOOR

PRIME PRIME

ATAC9600 ATAC9600

1-16b 1-16c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-22

1

T6507

DOMINO

PRIME

ATAC9600

1-22a

1

CA00091AA

DOMINO

PRIME

ATAC9600

1-22b

1

X230AJ

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-14

ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

DOMINO

PRIME

ATAC9600

1-22c

1

X153

DOMINO

PRIME

ATAC9600

1-23

1

T6507

DOMINO

PRIME

ATAC9600

1-23a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-23b 1-23c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-24

1

T6507

DOMINO

PRIME

ATAC9600

1-24a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-24b 1-24c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-25

1

T6507

DOMINO

PRIME

ATAC9600

1-25a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-25b 1-25c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-26

1

T6507

DOMINO

PRIME

ATAC9600

1-26a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-26b 1-26c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-27

1

T6507

DOMINO

PRIME

ATAC9600

1-27a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-27b 1-27c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-28

1

T6507

DOMINO

PRIME

ATAC9600

1-28a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-28b 1-28c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-29

1

T6507

DOMINO

PRIME

ATAC9600

1-29a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-29b 1-29c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-30

1

T6507

DOMINO

PRIME

ATAC9600

1-30a

1

CA00091AA

DOMINO

PRIME

ATAC9600

1-30b

1

X230AJ

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-15

DOMINO

PRIME

ATAC9600

1-30c

1

X153

DOMINO

PRIME

ATAC9600

1-31

1

T6507

DOMINO

PRIME

ATAC9600

1-31a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-31b 1-31c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-32

1

T6507

DOMINO

PRIME

ATAC9600

1-32a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-32b 1-32c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-33

1

T6507

DOMINO

PRIME

ATAC9600

1-33a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-33b 1-33c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-34

1

T6507

DOMINO

PRIME

ATAC9600

1-34a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-34b 1-34c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-35

1

T6507

DOMINO

PRIME

ATAC9600

1-35a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-35b 1-35c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-36

1

T6507

DOMINO

PRIME

ATAC9600

1-36a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-36b 1-36c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-37

1

T6507

DOMINO

PRIME

ATAC9600

1-37a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-37b 1-37c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-38

1

T6507

DOMINO

PRIME

ATAC9600

1-38a

1

CA00091AA

DOMINO

PRIME

ATAC9600

1-38b

1

X230AJ

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-16

ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

DOMINO

PRIME

ATAC9600

1-38c

1

X153

DOMINO

PRIME

ATAC9600

1-39

1

T6507

DOMINO

PRIME

ATAC9600

1-39a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-39b 1-39c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-40

1

T6507

DOMINO

PRIME

ATAC9600

1-40a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-40b 1-40c

1 1

X230AJ X153

DOMINO

PRIME

ATAC9600

1-41

1

T6507

DOMINO

PRIME

ATAC9600

1-41a

1

CA00091AA

DOMINO DOMINO

PRIME PRIME

ATAC9600 ATAC9600

1-41b 1-41c

1 1

X230AJ X153

10thFLOOR

PRIME

PRMSWCH

1-19

2

DSJ4900B

DOMINO

PRIME

PRMSWCH

1-44

2

DSJ4900B

10thFLOOR

A-RMT

SITESWCH

1-47

2

DSJ4900B

10thFLOOR

B-RMT

SITESWCH

1-50

2

DSJ4900B

DOMINO

A-RMT

SITESWCH

1-56

2

DSJ4900B

DOMINO

B-RMT

SITESWCH

1-59

2

DSJ4900B

FORD&BLMNT

A-RMT

SITESWCH

1-65

2

DSJ4900B

FORD&BLMNT

B-RMT

SITESWCH

1-68

2

DSJ4900B

31st&GRAYS

A-RMT

SITESWCH

1-74

2

DSJ4900B

31st&GRAYS

B-RMT

SITESWCH

1-77

2

DSJ4900B

VICTRYGNDS

A-RMT

SITESWCH

1-83

2

DSJ4900B

VICTRYGNDS

B-RMT

SITESWCH

1-86

2

DSJ4900B

SOUTHMPTN

A-RMT

SITESWCH

1-92

2

DSJ4900B

SOUTHMPTN

B-RMT

SITESWCH

1-95

2

DSJ4900B

ENGINE9

A-RMT

SITESWCH

1-103

2

DSJ4900B

ENGINE9

B-RMT

SITESWCH

1-106

2

DSJ4900B

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT ASTRO-TAC 9600 COMPARATOR ENH: ASTRO 25 SIMULCAST TRUNKING OP ADD: 16 I/O PORTS ADD: HARDWARE, RACKMOUNT HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-17

POLACAD

A-RMT

SITESWCH

1-112

2

DSJ4900B

POLACAD

B-RMT

SITESWCH

1-115

2

DSJ4900B

BSLTN&HOFF

A-RMT

SITESWCH

1-121

2

DSJ4900B

BSLTN&HOFF

A&B-RMT

SITESWCH

1-124

2

DSJ4900B

STRTS&HYWY

A-RMT

SITESWCH

1-130

2

DSJ4900B

STRTS&HYWY

B-RMT

SITESWCH

1-133

2

DSJ4900B

RM626M

MASTER

MAINTOP

1-466

1

L3531

RM626M

MASTER

MAINTOP

1-467

1

DS019BLK

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-18

HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B HP PROCURVE SWITCH 2626B CERTIFIED GOLD ELITE WORKSTATION 19" LCD, BLACK, NO-TOUCH

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

9.3

MOSCAD Equipment

System RM714

Site MOSCAD

Sys Seg MOSCADGMC

Line # Qty 1-1 1

Model No. DDN9172

RM714

MOSCAD

MOSCADGMC

1-4

1

T5807

RM714

MOSCAD

MOSCADGMC

1-6

1

DDN9047

RM714

MOSCAD

MOSCADGMC

1-7

1

DDN9048

RM714

MOSCAD

MSCPGNG

1-8

1

T6772

RM714

MOSCAD

MOSCADGMC

1-11

1

DDN9172

RM714

MOSCAD

MOSCADGMC

1-14

1

T5807

RM714

MOSCAD

MOSCADGMC

1-16

1

DDN9047

RM714

MOSCAD

MOSCADGMC

1-17

1

DDN9048

RM714

MOSCAD

MOSCAD

1-18

2

T6772

RM714

MOSCAD

MOSCADGWS

1-21

1

DDN9158

RM714

MOSCAD

MOSCADGWS

1-23

1

T5739

RM714

MOSCAD

MOSCADGWS

1-24

1

DDN9047

RM714

MOSCAD

MOSCADGWS

1-25

1

DDN9048

RMTS&MSTR

MOSCAD

DIALMODEMS

1-87

13

DSJNSB59619B

RM714

MOSCAD

MSCPGNG

1-9

1

F4300

RM714

MOSCAD

MSCPGNG

1-9a

1

V345

RM714

MOSCAD

MSCPGNG

1-9b

1

V051

RM714

MOSCAD

MOSCAD

1-19

2

F4300

RM714

MOSCAD

MOSCAD

1-19a

2

V345

RM714

MOSCAD

MOSCAD

1-19b

2

V051

RMTS&MSTR

MOSCAD

DIALMODEMS

1-88

13

FLN6458

RM714

MOSCAD

MOSCADGMC

1-5

1

F4537

RM714

MOSCAD

GMCLICS

1-10

1

F4538

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Description HP MOSCAD SERVER WITH WINDOWS 2003 INTOUCH DEVELOPMENT 60K V8.0 TAG HYPERACCESS FOR WINDOWS 95/98/2000/ SERIAL/ IP 1 PORT SEAT LICENSE SCADALARM PAGING WITH MODEM V5.0 HP MOSCAD SERVER WITH WINDOWS 2003 INTOUCH DEVELOPMENT 60K V8.0 TAG HYPERACCESS FOR WINDOWS 95/98/2000/ SERIAL/ IP 1 PORT SEAT LICENSE SCADALARM PAGING WITH MODEM V5.0 CERTIFIED MOSCAD WORKSTATION WITH X INTOUCH RUNTIME W/O I/O V8.0 SW HYPERACCESS FOR WINDOWS 95/98/2000/ SERIAL/ IP 1 PORT SEAT LICENSE 19 SHELF. B-LINE SAME AS 40622 NEW IP GATEWAY LESS RADIO ADD: ASYNC RS232 VIA PORT 3 ALT: IP GATEWAY RACKMOUNT IP GATEWAY LESS RADIO ADD: ASYNC RS232 VIA PORT 3 ALT: IP GATEWAY RACKMOUNT CABLE, MODEM 3M W/ADAPTER SDM3000 BUILDER V1.30.31 FOR A6.9/7 MOSCAD GMC/GWS, SERVICE PACK 1

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-19

RM714

MOSCAD

MOSCADGMC

1-15

1

F4537

RM714

MOSCAD

GMCLICS

1-20

1

F4538

RM714

MOSCAD

GMCLICS

1-20a

17

V809

MASTER

MOSCAD

RTULICS

1-28

1

F2463

MASTER

MOSCAD

RTULICS

1-28a

3

V833

MASTER

MOSCAD

RTULICS

1-28b

3

V834

MASTER

MOSCAD

RTULICS

1-28c

2

V837

MASTER

MOSCAD

RTULICS

1-28d

1

V838

MASTER

MOSCAD

RTULICS

1-28e

2

V839

31st&GRAYS

MOSCAD

RTULICS

1-34

1

F2463

31st&GRAYS

MOSCAD

RTULICS

1-34a

45

V844

31st&GRAYS

MOSCAD

RTULICS

1-34b

45

V845

31st&GRAYS

MOSCAD

RTULICS

1-34c

1

V833

31st&GRAYS

MOSCAD

RTULICS

1-34d

1

V834

31st&GRAYS

MOSCAD

RTULICS

1-34e

1

V838

31st&GRAYS

MOSCAD

RTULICS

1-34f

1

V839

BSLTN&HOFF

MOSCAD

RTULICS

1-39

1

F2463

BSLTN&HOFF

MOSCAD

RTULICS

1-39a

45

V844

BSLTN&HOFF

MOSCAD

RTULICS

1-39b

45

V845

BSLTN&HOFF

MOSCAD

RTULICS

1-39c

1

V833

BSLTN&HOFF

MOSCAD

RTULICS

1-39d

1

V834

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-20

SDM3000 BUILDER V1.30.31 FOR A6.9/7 MOSCAD GMC/GWS, SERVICE PACK 1 SW,S/W LIC. FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C ADD:RTU SFWR LICENSE FOR DIU ALARMS ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

BSLTN&HOFF

MOSCAD

RTULICS

1-39e

1

V838

BSLTN&HOFF

MOSCAD

RTULICS

1-39f

1

V839

ENGINE9

MOSCAD

RTULICS

1-44

1

F2463

ENGINE9

MOSCAD

RTULICS

1-44a

45

V844

ENGINE9

MOSCAD

RTULICS

1-44b

45

V845

ENGINE9

MOSCAD

RTULICS

1-44c

1

V833

ENGINE9

MOSCAD

RTULICS

1-44d

1

V834

ENGINE9

MOSCAD

RTULICS

1-44e

1

V838

ENGINE9

MOSCAD

RTULICS

1-44f

1

V839

FORD&BLMN T FORD&BLMN T

MOSCAD

RTULICS

1-49

1

F2463

MOSCAD

RTULICS

1-49a

45

V844

FORD&BLMN T FORD&BLMN T

MOSCAD

RTULICS

1-49b

45

V845

MOSCAD

RTULICS

1-49c

1

V833

FORD&BLMN T

MOSCAD

RTULICS

1-49d

1

V834

FORD&BLMN T

MOSCAD

RTULICS

1-49e

1

V838

FORD&BLMN T

MOSCAD

RTULICS

1-49f

1

V839

POLACAD

MOSCAD

RTULICS

1-54

1

F2463

POLACAD

MOSCAD

RTULICS

1-54a

45

V844

POLACAD

MOSCAD

RTULICS

1-54b

45

V845

POLACAD

MOSCAD

RTULICS

1-54c

1

V833

POLACAD

MOSCAD

RTULICS

1-54d

1

V834

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-21

POLACAD

MOSCAD

RTULICS

1-54e

1

V838

POLACAD

MOSCAD

RTULICS

1-54f

1

V839

SOUTHMPTN

MOSCAD

RTULICS

1-59

1

F2463

SOUTHMPTN

MOSCAD

RTULICS

1-59a

45

V844

SOUTHMPTN

MOSCAD

RTULICS

1-59b

45

V845

SOUTHMPTN

MOSCAD

RTULICS

1-59c

1

V833

SOUTHMPTN

MOSCAD

RTULICS

1-59d

1

V834

SOUTHMPTN

MOSCAD

RTULICS

1-59e

1

V838

SOUTHMPTN

MOSCAD

RTULICS

1-59f

1

V839

STRTS&HYW Y STRTS&HYW Y

MOSCAD

RTULICS

1-64

1

F2463

MOSCAD

RTULICS

1-64a

45

V844

STRTS&HYW Y STRTS&HYW Y

MOSCAD

RTULICS

1-64b

45

V845

MOSCAD

RTULICS

1-64c

1

V833

STRTS&HYW Y

MOSCAD

RTULICS

1-64d

1

V834

STRTS&HYW Y

MOSCAD

RTULICS

1-64e

1

V838

STRTS&HYW Y

MOSCAD

RTULICS

1-64f

1

V839

VICTRYGNDS

MOSCAD

RTULICS

1-68

1

F2463

VICTRYGNDS

MOSCAD

RTULICS

1-68a

45

V844

VICTRYGNDS

MOSCAD

RTULICS

1-68b

45

V845

VICTRYGNDS

MOSCAD

RTULICS

1-68c

1

V833

VICTRYGNDS

MOSCAD

RTULICS

1-68d

1

V834

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-22

ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

VICTRYGNDS

MOSCAD

RTULICS

1-68e

1

V838

VICTRYGNDS

MOSCAD

RTULICS

1-68f

1

V839

Domino

MOSCAD

RTULICS

1-73

1

F2463

Domino

MOSCAD

RTULICS

1-73a

5

V832

Domino

MOSCAD

RTULICS

1-73b

5

V831

Domino

MOSCAD

RTULICS

1-73c

45

V844

Domino

MOSCAD

RTULICS

1-73d

45

V845

Domino

MOSCAD

RTULICS

1-73e

7

V833

Domino

MOSCAD

RTULICS

1-73f

7

V834

Domino

MOSCAD

RTULICS

1-73g

27

V846

Domino

MOSCAD

RTULICS

1-73h

1

V838

Domino

MOSCAD

RTULICS

1-73i

1

V839

10thFlr

MOSCAD

RTULICS

1-77

1

F2463

10thFlr

MOSCAD

RTULICS

1-77a

45

V844

10thFlr

MOSCAD

RTULICS

1-77b

45

V845

10thFlr

MOSCAD

RTULICS

1-77c

6

V833

10thFlr

MOSCAD

RTULICS

1-77d

6

V834

10thFlr

MOSCAD

RTULICS

1-77e

22

V846

10thFlr

MOSCAD

RTULICS

1-77f

1

V838

10thFlr

MOSCAD

RTULICS

1-77g

1

V839

PAB

MOSCAD

RTULICS

1-80

1

F2463

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR QUANTAR AL ADD: RTU SOFTWARE LICENSE FOR QUANT ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C ADD:RTU SFWR LICENSE FOR ASTROTAC 9 ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C ADD:RTU SFWR LICENSE FOR ASTROTAC 9 ADD:RTU SFWR LICENSE FOR EFRATOM GP ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-23

PAB

MOSCAD

RTULICS

1-80a

11

V837

PAB

MOSCAD

RTULICS

1-80b

1

V839

FAB

MOSCAD

RTULICS

1-82

1

F2463

FAB

MOSCAD

RTULICS

1-82a

3

V837

FAB

MOSCAD

RTULICS

1-82b

1

V839

PIA

MOSCAD

RTULICS

1-83

1

F2463

PIA

MOSCAD

RTULICS

1-83a

2

V837

PIA

MOSCAD

RTULICS

1-83b

1

V839

MASTER

MOSCAD

MOSCADRTU

1-26

2

F4544

MASTER

MOSCAD

MOSCADRTU

1-26a

2

V266

MASTER

MOSCAD

MOSCADRTU

1-26b

2

V803

MASTER

MOSCAD

MOSCADRTU

1-26c

6

V592

MASTER MASTER MASTER

MOSCAD MOSCAD MOSCAD

MOSCADRTU MOSCADRTU MOSCADRTU

1-27 1-29 1-29a

1 8 8

F4568 F4543 V266

MASTER

MOSCAD

MOSCADRTU

1-29b

8

V803

31st&GRAYS

MOSCAD

MOSCADRTU

1-30

1

F4544

31st&GRAYS

MOSCAD

MOSCADRTU

1-30a

1

V260

31st&GRAYS

MOSCAD

MOSCADRTU

1-30b

1

V803

31st&GRAYS

MOSCAD

MOSCADRTU

1-30c

3

V592

31st&GRAYS

MOSCAD

MOSCADRTU

1-31

1

F4547

31st&GRAYS

MOSCAD

MOSCADRTU

1-31a

1

V260

31st&GRAYS

MOSCAD

MOSCADRTU

1-31b

3

V592

31st&GRAYS

MOSCAD

MOSCADRTU

1-32

1

F4548

31st&GRAYS

MOSCAD

MOSCADRTU

1-32b

1

V260

31st&GRAYS

MOSCAD

MOSCADRTU

1-33

1

F4568

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-24

ADD:RTU SFWR LICENSE FOR DIU ALARMS ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR DIU ALARMS ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR DIU ALARMS ADD:RTU SFWR LICENSE FOR MOSCAD I/O SITE MANAGER ADVANCED ADD: 90VAC TO 260VAC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI R-MUX 1004 SITE MANAGER BASIC ADD: 90VAC TO 260VAC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION BASIC ADD: 48 VDC PS TO SM AAD TERM BLCK & CONN WI SM IO EXPANSION ADVANCED ADD: 48 VDC PS TO SM R-MUX 1004

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

BSLTN&HOFF

MOSCAD

MOSCADRTU

1-35

1

F4544

BSLTN&HOFF

MOSCAD

MOSCADRTU

1-35a

1

V260

BSLTN&HOFF

MOSCAD

MOSCADRTU

1-35b

1

V803

BSLTN&HOFF

MOSCAD

MOSCADRTU

1-35c

3

V592

BSLTN&HOFF

MOSCAD

MOSCADRTU

1-36

1

F4548

BSLTN&HOFF

MOSCAD

MOSCADRTU

1-36a

1

V260

BSLTN&HOFF

MOSCAD

MOSCADRTU

1-37

1

F4547

BSLTN&HOFF

MOSCAD

MOSCADRTU

1-37a

1

V260

BSLTN&HOFF

MOSCAD

MOSCADRTU

1-37b

3

V592

BSLTN&HOFF ENGINE9

MOSCAD MOSCAD

MOSCADRTU MOSCADRTU

1-38 1-40

1 1

F4568 F4544

ENGINE9

MOSCAD

MOSCADRTU

1-40a

1

V260

ENGINE9

MOSCAD

MOSCADRTU

1-40b

1

V803

ENGINE9

MOSCAD

MOSCADRTU

1-40c

3

V592

ENGINE9

MOSCAD

MOSCADRTU

1-41

1

F4547

ENGINE9

MOSCAD

MOSCADRTU

1-41a

1

V260

ENGINE9

MOSCAD

MOSCADRTU

1-41b

3

V592

ENGINE9 ENGINE9

MOSCAD MOSCAD

MOSCADRTU MOSCADRTU

1-42 1-43

1 1

F4568 F4548

ENGINE9

MOSCAD

MOSCADRTU

1-43a

1

V260

FORD&BLMN T FORD&BLMN T FORD&BLMN T FORD&BLMN T FORD&BLMN T FORD&BLMN T FORD&BLMN T FORD&BLMN T FORD&BLMN T

MOSCAD

MOSCADRTU

1-45

1

F4544

MOSCAD

MOSCADRTU

1-45a

1

V260

MOSCAD

MOSCADRTU

1-45b

1

V803

MOSCAD

MOSCADRTU

1-45c

3

V592

MOSCAD

MOSCADRTU

1-46

1

F4547

MOSCAD

MOSCADRTU

1-46a

1

V260

MOSCAD

MOSCADRTU

1-46b

3

V592

MOSCAD

MOSCADRTU

1-47

1

F4548

MOSCAD

MOSCADRTU

1-47a

1

V260

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION ADVANCED ADD: 48 VDC PS TO SM SM IO EXPANSION BASIC ADD: 48 VDC PS TO SM AAD TERM BLCK & CONN WI R-MUX 1004 SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION BASIC ADD: 48 VDC PS TO SM AAD TERM BLCK & CONN WI R-MUX 1004 SM IO EXPANSION ADVANCED ADD: 48 VDC PS TO SM SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION BASIC ADD: 48 VDC PS TO SM AAD TERM BLCK & CONN WI SM IO EXPANSION ADVANCED ADD: 48 VDC PS TO SM

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-25

FORD&BLMN T POLACAD

MOSCAD

MOSCADRTU

1-48

1

F4568

R-MUX 1004

MOSCAD

MOSCADRTU

1-50

1

F4544

POLACAD

MOSCAD

MOSCADRTU

1-50a

1

V260

POLACAD

MOSCAD

MOSCADRTU

1-50b

1

V803

POLACAD

MOSCAD

MOSCADRTU

1-50c

3

V592

POLACAD

MOSCAD

MOSCADRTU

1-51

1

F4548

POLACAD

MOSCAD

MOSCADRTU

1-51a

1

V260

POLACAD

MOSCAD

MOSCADRTU

1-52

1

F4547

POLACAD

MOSCAD

MOSCADRTU

1-52a

1

V260

POLACAD

MOSCAD

MOSCADRTU

1-52b

3

V592

POLACAD SOUTHMPTN

MOSCAD MOSCAD

MOSCADRTU MOSCADRTU

1-53 1-55

1 1

F4568 F4548

SOUTHMPTN

MOSCAD

MOSCADRTU

1-55a

1

V260

SOUTHMPTN

MOSCAD

MOSCADRTU

1-56

1

F4544

SOUTHMPTN

MOSCAD

MOSCADRTU

1-56a

1

V260

SOUTHMPTN

MOSCAD

MOSCADRTU

1-56b

1

V803

SOUTHMPTN

MOSCAD

MOSCADRTU

1-56c

3

V592

SOUTHMPTN

MOSCAD

MOSCADRTU

1-57

1

F4547

SOUTHMPTN

MOSCAD

MOSCADRTU

1-57a

1

V260

SOUTHMPTN

MOSCAD

MOSCADRTU

1-57b

3

V592

SOUTHMPTN STRTS&HYW Y STRTS&HYW Y STRTS&HYW Y STRTS&HYW Y STRTS&HYW Y STRTS&HYW Y STRTS&HYW Y STRTS&HYW Y

MOSCAD MOSCAD

MOSCADRTU MOSCADRTU

1-58 1-60

1 1

F4568 F4544

MOSCAD

MOSCADRTU

1-60a

1

V260

MOSCAD

MOSCADRTU

1-60b

1

V803

MOSCAD

MOSCADRTU

1-60c

3

V592

MOSCAD

MOSCADRTU

1-61

1

F4547

MOSCAD

MOSCADRTU

1-61a

1

V260

MOSCAD

MOSCADRTU

1-61b

3

V592

MOSCAD

MOSCADRTU

1-62

1

F4568

SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION ADVANCED ADD: 48 VDC PS TO SM SM IO EXPANSION BASIC ADD: 48 VDC PS TO SM AAD TERM BLCK & CONN WI R-MUX 1004 SM IO EXPANSION ADVANCED ADD: 48 VDC PS TO SM SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION BASIC ADD: 48 VDC PS TO SM AAD TERM BLCK & CONN WI R-MUX 1004 SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION BASIC ADD: 48 VDC PS TO SM AAD TERM BLCK & CONN WI R-MUX 1004

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-26

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

STRTS&HYW Y STRTS&HYW Y VICTRYGNDS

MOSCAD

MOSCADRTU

1-63

1

F4548

MOSCAD

MOSCADRTU

1-63a

1

V260

MOSCAD

MOSCADRTU

1-65

1

F4544

VICTRYGNDS

MOSCAD

MOSCADRTU

1-65a

1

V260

VICTRYGNDS

MOSCAD

MOSCADRTU

1-65b

1

V803

VICTRYGNDS

MOSCAD

MOSCADRTU

1-65c

3

V592

VICTRYGNDS

MOSCAD

MOSCADRTU

1-66

1

F4547

VICTRYGNDS

MOSCAD

MOSCADRTU

1-66a

1

V260

VICTRYGNDS

MOSCAD

MOSCADRTU

1-66b

3

V592

VICTRYGNDS VICTRYGNDS

MOSCAD MOSCAD

MOSCADRTU MOSCADRTU

1-67 1-69

1 1

F4568 F4548

VICTRYGNDS

MOSCAD

MOSCADRTU

1-69a

1

V260

Domino

MOSCAD

MOSCADRTU

1-70

1

F4544

Domino

MOSCAD

MOSCADRTU

1-70a

1

V260

Domino

MOSCAD

MOSCADRTU

1-70b

1

V803

Domino

MOSCAD

MOSCADRTU

1-70c

3

V592

Domino

MOSCAD

MOSCADRTU

1-71

1

F4547

Domino

MOSCAD

MOSCADRTU

1-71a

1

V260

Domino

MOSCAD

MOSCADRTU

1-71b

3

V592

Domino Domino Domino

MOSCAD MOSCAD MOSCAD

MOSCADRTU MOSCADRTU MOSCADRTU

1-72 1-72a 1-72b

1 2 1

F4568 V582 V527

10thFlr

MOSCAD

MOSCADRTU

1-74

1

F4544

10thFlr

MOSCAD

MOSCADRTU

1-74a

1

V260

10thFlr

MOSCAD

MOSCADRTU

1-74b

1

V803

10thFlr

MOSCAD

MOSCADRTU

1-74c

3

V592

10thFlr

MOSCAD

MOSCADRTU

1-75

1

F4547

10thFlr

MOSCAD

MOSCADRTU

1-75a

1

V260

10thFlr

MOSCAD

MOSCADRTU

1-75b

3

V592

10thFlr

MOSCAD

MOSCADRTU

1-76

1

F4568

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

SM IO EXPANSION ADVANCED ADD: 48 VDC PS TO SM SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION BASIC ADD: 48 VDC PS TO SM AAD TERM BLCK & CONN WI R-MUX 1004 SM IO EXPANSION ADVANCED ADD: 48 VDC PS TO SM SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION BASIC ADD: 48 VDC PS TO SM AAD TERM BLCK & CONN WI R-MUX 1004 ADD : 4OUT TO R-MUX ADD : IP INTERFACE TO R-MUX SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION BASIC ADD: 48 VDC PS TO SM AAD TERM BLCK & CONN WI R-MUX 1004

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-27

PAB

MOSCAD

MOSCADRTU

1-78

1

F4544

PAB

MOSCAD

MOSCADRTU

1-78a

1

V266

PAB

MOSCAD

MOSCADRTU

1-78b

1

V803

PAB

MOSCAD

MOSCADRTU

1-78c

3

V592

PAB PAB

MOSCAD MOSCAD

MOSCADRTU MOSCADRTU

1-79 1-79a

3 3

F4543 V266

PAB

MOSCAD

MOSCADRTU

1-79b

3

V803

PAB

MOSCAD

MOSCADRTU

1-79c

9

V592

FAB

MOSCAD

MOSCADRTU

1-81

1

F4544

FAB

MOSCAD

MOSCADRTU

1-81a

1

V266

FAB

MOSCAD

MOSCADRTU

1-81b

1

V803

FAB

MOSCAD

MOSCADRTU

1-81c

3

V592

PIA

MOSCAD

MOSCADRTU

1-84

1

F4544

PIA

MOSCAD

MOSCADRTU

1-84a

1

V266

PIA

MOSCAD

MOSCADRTU

1-84b

1

V803

PIA

MOSCAD

MOSCADRTU

1-84c

3

V592

10thFlr

MOSCAD

MOSCADRTU

1-85

1

F4548

10thFlr

MOSCAD

MOSCADRTU

1-85a

1

V260

RM714

MOSCAD

MOSCADGMC

1-2

1

DS019BLK

RM714

MOSCAD

MOSCADGMC

1-3

1

DDN9043

RM714

MOSCAD

MOSCADGMC

1-12

1

DS019BLK

RM714

MOSCAD

MOSCADGMC

1-13

1

DDN9043

RM714

MOSCAD

MOSCADGWS

1-22

1

DS019BLK

RMTS&MSTR

MOSCAD

DIALMODEMS

1-86

13

CDN1542

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-28

SITE MANAGER ADVANCED ADD: 90VAC TO 260VAC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SITE MANAGER BASIC ADD: 90VAC TO 260VAC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SITE MANAGER ADVANCED ADD: 90VAC TO 260VAC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SITE MANAGER ADVANCED ADD: 90VAC TO 260VAC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI SM IO EXPANSION ADVANCED ADD: 48 VDC PS TO SM 19" LCD, BLACK, NOTOUCH MICROSOFT SELECT SQL SERVER 2000 LI 19" LCD, BLACK, NOTOUCH MICROSOFT SELECT SQL SERVER 2000 LI 19" LCD, BLACK, NOTOUCH US ROBOTICS 56K V.90 EXT 14K FAX

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

9.4

Spare Equipment

System ----

Site MASTER MASTER MASTER

SysSeg SPARES SPARES SPARES

Line No. 1-1 1-12 1-13

Qty 1 1 1

Model No. DLN6569 DLN1338A DSPREM8901

--

MASTER

SPARES

1-14

1

DSPREM892060

--

MASTER

SPARES

1-15

1

DSPREM880160

--

MASTER

SPARES

1-16

1

DSPREM880460

--

MASTER

SPARES

1-17

1

DSPREM801460

---

MASTER MASTER

SPARES SPARES

1-18 1-19

2 1

DSPREM81230 DSPREM811960

--

MASTER

SPARES

1-23

1

ST2500

--

MASTER

SPARES

1-25

1

ST2512

--

MASTER

SPARES

1-29

1

ST6000

--

MASTER

SPARES

1-30

1

ST6010

---

MASTER MASTER

SPARES SPARES

1-32 1-20

1 1

CLN8356 DSTRAK91008DC

--

MASTER

SPARES

1-21

1

DSTRAK91111

------

MASTER MASTER MASTER MASTER MASTER

SPARES SPARES SPARES SPARES SPARES

1-7 1-8 1-9 1-10 1-11

1 1 1 1 1

DLN1333 DLN1334 DLN1335 DLN1336 DLN1337

--

MASTER

SPARES

1-48

1

DDN9349

---

MASTER MASTER

SPARES SPARES

1-49 1-50

1 1

DDN9350 DDN9351

--

MASTER

SPARES

1-51

1

DDN9352

--

MASTER

SPARES

1-52

1

DDN9353

--

MASTER

SPARES

1-53

1

DDN9357

--

MASTER

SPARES

1-41

1

BLN1273

--

MASTER

SPARES

1-33

1

RLN5340

--

MASTER

SPARES

1-34

1

RLN5342

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Description FRU: GCP 8000/GCM 8000 FAN MODULE AC POWER SUPPLY 110/220VAC 8T1 E1 IF CARD 32K WITH MODEM CPU 8 T1 E1 CROSS CONNT CPU 2T1 E1 RCON BUSCONNECT DUAL T1E1 WAN W/ RELAYS 1:N REDUNDA CSU PLUG IN MODULE 8 PORT 4W E M TO EXT RANGE CRD S2500 MULTIPROTOCOL WAN ROUTER S2500 ROUTER T1/E1 DAUGHTER BOARD S6000 MNR MULTIPROTOCOL ROUTER S6000 4-PORT ULTRAWAN MODULE SRC SPARE KIT PRIME/MASTER SITE CONFIG DC POWER FOUR PORT T1 FRAMED AND CLOCK TELEC HARD DISK 146GB DVD-RW DRIVE POWER SUPPLY SUN NETRA 240 EXTERNAL TAPE DRIVE (NM ONLY) FRU 6020 AC DISTRIBUTION PANEL FRU 6020 ALARM PANEL FRU 6020 UNIVERSAL BRIDGE BOARD FRU 80GB 3.5IN EIDE DRIVE FRU: 6020 DVD CD-ROM KIT FRU - 6020 BLANK PANEL (FOR OPEN CH VC/SC TRANSITION CARD FRU (POST A6. I/O CABLE KIT, 0113990B04 DRIIVE RAILS, 0113990B06

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-29

System --

Site MASTER

SysSeg SPARES

Line No. 1-35

Qty 1

Model No. RLN5343A

--

MASTER

SPARES

1-36

1

RLN5344

--

MASTER

SPARES

1-37

1

RLN5345

--

MASTER

SPARES

1-38

1

RLN5346

--

MASTER

SPARES

1-39

1

RLN5347

---

MASTER MASTER

SPARES SPARES

1-40 1-22

1 1

RLN5354 F4544

--

MASTER

SPARES

1-22a

1

VA00150

----

MASTER MASTER MASTER

SPARES SPARES SPARES

1-22b 1-24 1-24a

1 1 1

V260 F4568 V534

----

MASTER MASTER MASTER

SPARES SPARES SPARES

1-26 1-26a 1-26b

1 1 1

F4543 V260 VA00150

--

MASTER

SPARES

1-42

1

DDN9175

---

MASTER MASTER

SPARES SPARES

1-43 1-44

1 1

DDN9176 DDN9344

--

MASTER

SPARES

1-45

1

DDN9345

--

MASTER

SPARES

1-46

1

DDN9346

--

MASTER

SPARES

1-47

1

DDN9348

--

MASTER

SPARES

1-2

1

CCN1009

---

MASTER MASTER

SPARES SPARES

1-3 1-4

1 1

CLN1163 CLN1488

--

MASTER

SPARES

1-5

1

DLN6463

--

MASTER

SPARES

1-6

1

TLN3328

--

MASTER

SPARES

1-27

1

TT1491

--

MASTER

SPARES

1-28

1

DSJ4900B

--

MASTER

SPARES

1-31

1

L3415

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-30

Description AC POWER SUPPLY, 0113990B07 DUAL IDE CABLW, 0113990B08 FILLER PANEL, 0113990B09 256MB SDRAM MEMORY (IDIMM) 011 3.5" 1.44 MB FLOPPY CHASS MTD 01139 TRANSITION MODULE SITE MANAGER ADVANCED SDM3000 ASTRO F/W FOR A6.10/7.4 ADD: 48 VDC PS TO SM R-MUX 1004 ADD: SITE NOT WIDE DRIVER SITE MANAGER BASIC ADD: 48 VDC PS TO SM SDM3000 ASTRO F/W FOR A6.10/7.4 EIDE DVD-ROM DRIVE W/SCSI ADAPTER EIDE TO SCSI ADAPTER FRU AC POWER SUPPLY SLED WITH FAN FRU FAN SLED WITHOUT POWER SUPPLY FRU 6020 DUAL IDE CABLE R/W FRU 6020 EIDE DEVICE REMOVABLE CARR FRU CNTRL BD ASTROTAC 9600 W/10BT FRU V 24 WITH RJ48 FRU 265 WATT AC POWER SUPPLY FRU WIRELINE COMPARATOR FC 5V EXPANSION POWER SUPPLY LX TERMINAL SERVER 48 PORTS WITH MO HP PROCURVE SWITCH 2626B ENTERPRISE LAN SWITCH

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

9.5

Test Equipment

SYSTEM MASTER MASTER MASTER MASTER

SITE TEST TEST TEST TEST

SYS SEG TESTEQ TESTEQ TESTEQ TESTEQ

LINE # 1-14 1-8 1-1 1-2

QTY 1 1 1 1

MODEL # 0180305F46 T1013A R1770 R1542

MASTER MASTER MASTER

TEST TEST TEST

TESTEQ TESTEQ TESTEQ

1-3 1-4 1-7

1 1 1

R1415 R1414 R1418

MASTER MASTER

TEST TEST

TESTEQ TESTEQ

1-9 1-10

1 1

R1612 R1718

MASTER MASTER MASTER MASTER MASTER MASTER

TEST TEST TEST TEST TEST TEST

TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ

1-12 1-13 1-15 1-16 1-17 1-18

1 1 1 1 1 1

0180305F49 0180305F47 R1441 RLN5119 R1510 R1732

MASTER

TEST

TESTEQ

1-32

1

RLN4604B

MASTER MASTER MASTER MASTER MASTER MASTER MASTER MASTER MASTER MASTER MASTER MASTER MASTER MASTER MASTER

TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST

TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ

1-11 1-19 1-20 1-21 1-22 1-23 1-24 1-25 1-26 1-27 1-28 1-29 1-30 1-31 1-33

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

0180305F50 R1775 R1776 R1777 R1778 R1780 R1781 R1782 R1783 R1784 R1785 R1786 R1788 R2032 R1787

MASTER

TEST

TESTEQ

1-34

1

R1792

MASTER MASTER MASTER MASTER MASTER

TEST TEST TEST TEST TEST

TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ

1-35 1-36 1-37 1-38 1-39

1 1 1 1 1

R1793 R1795 R1796 R1797 R1798

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

DESCRIPTION 400-1000MHZ, 5W ELEMENT RF LOAD RES ATS2 AUDIO TEST SET EARTH GROUND RESISTANCE TESTER PC CABLE AND WIRING TESTER PHONE LINE CONTINUITY TESTER ANTENNA TESTER 80MHZ TO 520MHZ 100MHZ, 4 CHANNEL OSCOPE, AGIL N2610A-903 HANDHELD NETWORK ANALYZE 400-1000MHZ, 50W ELEMENT 400-1000MHZ, 10W ELEMENT DIGITAL/ANALOG WATTMETER/N(F) POWER SENSOR, 10MHZ - 18GHZ, 2 SINGLE CHANNEL POWER METER E4407B 9KHZ-26.5 GHZ SPECTRUM ANALY FLUKE ES-LAN ETHERSCOPE LAN ANALYZE 400-1000MHZ, 100W ELEMENT 2975 P25 RADIO TEST SET AEROFLEX OPT#3 FOR 2975 P25 TRUNKING 800MHZ OPT#4 2975 CC LOGGER-OPT#6 2975 AUTOTEST 1-OPT#9 -2975 AES-OPT#10-2975 P25 PHASE2 & LSM-OPT#11-2975 KVL KEYLOAD OPT#12-2975 LSM ADV/P25-2 ADV-OPT#13- 2975 P25 TRUNKING VHF/UHF/700MHZ AUDIO ANALYZER OPT#15 2975 RX BER OPT#17-2975 2975OPT20-KVL ASN MODE ANLOG SIMULCAST ALIGN OPT#162975 2975 OPERATION MANUAL - CD ROM MICROPHONE/AUDIO ADAPTER CASE, SOFT PADDED CARRYING KIT, 10/20 DB PADS, TNC SCOPE PROBE KIT UHF ANTENNA (STANDARD) City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-31

SYSTEM MASTER MASTER MASTER MASTER MASTER MASTER MASTER MASTER

9.6

SITE TEST TEST TEST TEST TEST TEST TEST TEST

SYS SEG TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ TESTEQ

LINE # 1-40 1-41 1-42 1-43 1-44 1-45 1-5 1-6

QTY 1 1 1 1 1 1 1 1

MODEL # R1799 R1801 R1802 R1803 R1804 R1808 8183069X01 REX4430

DESCRIPTION FRONT/REAR COVER RF CABLE TNC TO BNC ADAPTER ACCESSORY POUCH DC TO AC CONVERTOR CALIBRATION CERTIFICATE TESTER TELCO CABLE 8 POS PC ETHERNET SERVICE KIT

Subscriber Upgrades

SYSTEM Subscriber

SITE XTS3000

SYS SEG Upgrade

LINE # 1-1

QTY 1

MODEL # T5781

Subscriber

XTS3000

Upgrade

1-1a

5200

Q173AH

Subscriber

XTS3000

Upgrade

1-1b

5200

Q361AE

Mobile Mobile

ALL CNTRL

W9/W5/CONSL JBOX

1-1 1-9

854 78

M20XXSP001 L3208

Mobile

CNTRL

JBOX

1-9a

78

ZA00225AA

Mobile

CNTRL

MC3000

1-10

78

L3223

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-32

DESCRIPTION DIGITAL SMARTZONE XTS3000 UPGRADE ADD: ENHANCED SMARTZONE OMNILINK OP ENH: ASTRO PROJ 25 TRK XTS3000 MOBILE UPGRADE KIT DIGITAL JUNCTION BOX MCS2000 & AS ADD: CABLE, JUNCTION BOX, ASTRO CON MC3000 DIGITAL DESKSET

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

This page left intentionally blank.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Equipment List June 13, 2008 9-33

Options Pricing 10 Channel Expansion Equipment

$ 2,898,322.00

Services

$ 1,059,245.00

Total Equipment and Services

$ 3,957,245.00

Note: Equipment is priced per the City of Philadelphia and Motorola contract.

5 Channel Expansion Equipment

$ 1,665,822.00

Services

$ 989,245.00

Total Equipment and Services

$ 2,655,067.00

Note: Equipment is priced per the City of Philadelphia and Motorola contract.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Options Pricing June 13, 2008 1

Addition of 11th Simulcast Site Equipment

$ 1,734,141.00

Services

$ 1,878,156.00

Total Equipment and Services

$ 3,612,297.00

Note: Equipment is priced per the City of Philadelphia and Motorola contract. Motorola has made assumptions for the transmitter site supporting structures. Once the City specifies a specific location and approved tower height Motorola will requite option

Prisons and Training Consoles Equipment

$ 788,471.00

Services

$ 321,956.00

Total Equipment and Services

$1,110,427.00

. Note: Equipment is priced per the City of Philadelphia and Motorola Contract.

Replace GTR Station with Quantar Upgrade Equipment and Services

$-5,666,135.00

Note: Equipment is priced per the City of Philadelphia and Motorola Contract.

City of Philadelphia ASTRO 25 Upgrade Options Pricing June 13, 2008 2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 1. System Description/Technical Overview 10 Channel Expansion 1.1

Project Scope Motorola is proposing a 10 channel system expansion. These 10 channels will utilize the Philadelphia School District frequencies. Motorola is proposing the use of the GTR 8000BR, the newest technology in station design. This option assumes Motorola’s new GTR stations will operate in IP Simulcast mode to be consistent with the new baseline system configuration of GTR8000BR stations and IP Simulcast. This document is intended to provide a general overview of the 10 Channel Expansion System for the City of Philadelphia. Included is the City of Philadelphia project overview, system architecture and design details.

1.2

Project Overview This system expansion will add 5 channels to System A and 5 channels System B. System A will have a total of 20 channels and System B a total of 25 channels. The new 10 channels will utilize the GTR 8000s. The existing multi-coupler has sufficient port capability to handle the additional channels, thus no expansion or additional equipment is required. The existing combining system will be utilized along with expansion of the existing 5 channel combiner to support the addition of the channels. Motorola has determined the existing Power and HVAC at the shelter is sufficient for the addition of this equipment. Intermodulation studies were performed to ensure the 10 PSD channels in question will properly integrate into the existing antenna systems with the City currently licensed 800MHz channels (pre-rebanding).

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade System Description / Technical Overview June 13, 2008 Option 1-1

Motorola has taken great care to propose an offering that will provide a cost-effective way for the City of Philadelphia to expand the proposed ASTRO 25 system by 10 channels.

1.3

System Architecture

1.3.1 ASTRO 25 Simulcast Prime Site Overview 1.3.1.1

Prime Site The 10 channel expansion will have impact to the prime sites for both systems. System A prime site and System B prime site will each receive an additional Ethernet Switch, GCM8000 Comparators and expansion of the existing TRAK9100 Global Positioning System (GPS) time and frequency reference in order to keep the network in sync.

1.3.1.2

GCM8000 Comparators Motorola will provide the 10 new GCM8000 comparators to support the 10 channel expansion. Five (5) comparators will be placed at System A prime site and five (5) comparators at System B prime site. The GCM8000 Comparator is the only comparator that supports IP Simulcast capabilities. Please see Section 02 of the proposal for more details on the GCM8000 comparator.

1.3.1.3

Prime Site Ethernet LAN Switches The Ethernet LAN switches provided under the Baseline ASTRO25 system upgrade will be expanded by one switch to support the addition of the 10 comparators to support the 10 additional channels.

1.3.1.4

TRAK 9100 Time and Frequency Standard To synchronize the transmissions of all RF sites in the radio system, a precision timing device is used to control simulcast operations. The Prime Site will reuse the existing TRAK9100 GPS-based Time and Frequency Standard that provides a frequency/timing device for synchronized simulcast transmissions. Motorola will expand the existing TRAK9100 unit to support the additional 10 comparators required for the channel expansion.

City of Philadelphia ASTRO 25 Upgrade System Description / Technical Overview June 13, 2008 Option 1-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1.4

Simulcast Remote-Site Overview Motorola is proposing to add ten (10) GTR 8000BR base stations to each Simulcast RF Site to the upgraded ASTRO 25 system. Thus, there will be a total of twenty (20) simulcast channels for system A and twenty-five (25) for System B.

1.4.1 Ethernet LAN Switches The Ethernet LAN switches provided under the Baseline ASTRO25 system upgrade will be expanded by one switch each for System A and System B to support the 10 channel expansion.

1.4.2 ASTRO 25 GTR8000 Base Radio Motorola is proposing to the City of Philadelphia the use of the ASTRO 25 GTR8000BR base radio in IP Simulcast mode for the 10-channel expansion. Motorola will provide one (1) additional 7-foot tall rack and Motorola requires a rack space at each site assumed to be off the end of the row’s cable tray. Please see Section 02 of the proposal for more details on the GTR8000BR.

1.4.2.1

TRAK 9100 Time and Frequency Standard Motorola will expand the existing TRAK 9100 by adding the appropriate distribution cards to support the 10 channel expansion.

1.5

System Design Details The City of Philadelphia 10 channel expansion will add five (5) channels to System A and five (5) channels to System B. No new antennas and transmission line will be required because Motorola will utilize/expand existing combiner designed during the 5 channel upgrade in 2005. The Philadelphia School District channels assumed to be used for this expansion are as follows:

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade System Description / Technical Overview June 13, 2008 Option 1-3

Philadelphia, PA 10 Ch. Expansion Frequencies CH# 1 2 3 4 5 6 7 8 9 10

Base Tx 855.7875 856.8375 857.9125 858.8125 858.8375 859.8125 859.8375 860.8125 860.8375 860.9125

Base Rx 810.7875 811.8375 812.9125 813.8125 813.8375 814.8125 814.8375 815.8125 815.8375 815.9125

Any changes to the above frequency list will invalidate the proposed combining scheme and may require additional equipment such as, but not limited to additional combiners, filters, antennas and/or transmission lines. Motorola is also not responsible for any existing interference on these frequencies.

1.5.1 System Components The City of Philadelphia 10 channel expansion is proposed to have the following equipment.

1.5.1.1

10 Channel Expansion 1. Prime Site w/ Co-located Remote Site (Domino & City Hall 10th Floor) ♦ Qty (5) GTR8000 Base radios for System A ♦ Qty (5) GTR8000 Base radios for System B ♦ Qty (5) GCM8000 Comparators for System A ♦ Qty (5) GCM8000 Comparators for System B ♦ Qty (1) Additional Prime Ethernet Switch for System A ♦ Qty (1) Additional Prime Ethernet Switch for System B ♦ Qty (1) Additional co-located Site Ethernet Switch for System A ♦ Qty (1) Additional co-located Site Ethernet Switch for System B ♦ Reuse existing co-located Site Router at System A ♦ Reuse existing co-located Site Router at System B ♦ Reuse and expand existing TRAK9100 GPS ♦ Reuse and expand existing Combining ♦ Reuse existing Antennas and Transmission Line Network City of Philadelphia ASTRO 25 Upgrade System Description / Technical Overview June 13, 2008 Option 1-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

2. Each Remote RF Site (South Hampton, Police Academy, S.W.W.W.T.P, Eng. #9, 31st & Grays Ferry, Streets & Highway Dept, Ford & Belmont, and Bustleton & Hofnagle): ♦ Qty (5) GTR8000 Base radios for System A ♦ Qty (5) GTR8000 Base radios for System B ♦ Qty (1) Additional co-located Ethernet Switch for System A ♦ Qty (1) Additional co-located Ethernet Switch for System B ♦ Reuse existing co-located Site Router at System A ♦ Reuse existing co-located Site Router at System B ♦ Reuse and expand existing TRAK9100 GPS ♦ Reuse and expand existing Combining ♦ Reuse existing Antennas and Transmission Line Network

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade System Description / Technical Overview June 13, 2008 Option 1-5

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade System Description / Technical Overview June 13, 2008 Option 1-6

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 1b. Statement of Work 10 Channel Expansion 1b.1 General Information This Statement of Work (SOW) defines the principal activities and responsibilities of all parties for the implementation of additional channels described in this proposal to expand the City of Philadelphia Project 25 system. The System Description provides information on the equipment implemented under this scope. A System Description is included in this proposal.

1b.2 Statement of Work Overview The following major subsystems are included as components of the Project Statement of Work:

1b.2.1 Option 1: 10 Channel Expansion Add 10 channels to each of the ten (10) RF sites

1b.3 System Implementation Overview Motorola’s proposal to the City of Philadelphia provides systems integration and implementation services to deploy a fully functional communications system. Motorola’s experience as a Systems Integrator, deploying large and complex communication and software systems, will provide a smooth system implementation and cutover to the new communications system. This SOW specifically addresses the implementation of the expansion option to add 10 channels to the City’s 800 MHz Project 25 network.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 – Statement of Work June 13, 2008 Option 1b.- 1

Motorola’s local Systems Integration teams are highly skilled at deploying systems of the size and complexity of this communications system. Motorola provides a phased approach to implementation, with the following phases: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Project Initiation and Kick Off Design Review Civil Review and Civil Work Order Processing, Manufacturing & Factory Testing Installation and Upgrades Systems Integration & Optimization Acceptance Testing Training Cutover Project Finalization Warranty Support

Motorola has provided a preliminary design as a part of this proposal, which serves as a baseline for the Design Review. The Design Review encompasses the design finalization, such as finalization of the equipment locations and frequency compatibility verification. Motorola will work closely with the City of Philadelphia to develop a cutover plan gracefully add the new channels to the system. At the end of the Design Review phase, detailed Design Documents will be provided to the City of Philadelphia. While the Design Review progresses, Motorola will work in parallel to perform site audits, identifying any site issues associated with the implementation of the new system. Equipment manufacturing is followed by factory staging of the radio infrastructure at Motorola’s Customer Center for Solutions Integration (CCSi) in Schaumburg, Illinois. Factory staging provides for initial assembly and testing of all Motorola manufactured radio system components. Factory staging will allow testing of the functional capabilities of the communications system. This process will allow the City of Philadelphia to witness factory testing in a controlled environment, as well as provide a smooth and easy field installation. Motorola’s local implementation team will install and optimize the communications system at the City of Philadelphia sites as staged at CCSi. Motorola’s implementation includes the integration of all proposed subsystems to provide an end-to-end solution. To close the loop between proposed functionality with the deployed system, Motorola will execute Acceptance Testing according to an Acceptance Test Plan (ATP). The ATP includes Functional Performance Tests. City of Philadelphia ASTRO 25 Upgrade

Option 1 – Station of Work June 13, 2008 Option 1b.- 2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

The final steps to full system implementation are delivery of system documentation, punch list resolution, and final acceptance. The project team and the post-acceptance service team will work with City of Philadelphia during this phase, to ensure a smooth transition to the post acceptance support period.

1b.4 Project Scope The project scope is outlined below, with the major project elements described. The total project implementation is based on three major phases. Each phase will have the elements described below, unless indicated.

1b.5 Contract Initiation - Kickoff Meeting and Initiation Activities The project will be initiated with a Project Kickoff meeting including key City of Philadelphia and Motorola project participants. The objectives of the Kickoff meeting include: ♦ ♦ ♦ ♦ ♦ ♦

Introduce and exchange contact information of all project participants. Review roles of key participants and project review procedures. Establish a clear chain of communication and authority. Review overall project scope and objectives. Review resource and scheduling requirements. Review preliminary project schedule with the City of Philadelphia.

During the Project Initiation phase, Motorola will review and work with the City of Philadelphia to finalize the following project processes and procedures: ♦

Detailed Project Schedule ♦ Risk Management Plan ♦ Change Control Plan ♦ Issues Document and Action Item Log

1b.6 Design Review The City of Philadelphia and Motorola will review the channel expansion design through analysis of the sites and frequencies, as mutually agreed between Motorola and City of Philadelphia. During this portion of the project, the Project Plan will be developed.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 – Statement of Work June 13, 2008 Option 1b.- 3

Design Review deliverables include: ♦

Final Equipment locations ♦ Intermodulation and combiner compatibility analysis ♦ Cutover Plan ♦ Final Implementation Schedule

1b.7 Civil Review The required sites for channel expansion will be reviewed for site readiness prior to equipment implementation. The City is responsible for providing sites that are suitable for the implementation of the system.

1b.8 Staging The City’s equipment will be staged at Motorola’s staging facility in Schaumburg, IL. City of Philadelphia representatives will have the option to witness the testing and demonstration of their system. Because the system is composed existing equipment and new equipment, the staging effort will include the stagable subsystems. Full system testing will occur when the new and upgraded equipment are integrated in the field during Field Acceptance Testing.

1b.9 Installation and Optimization The installation and optimization of the equipment will prepare the system for acceptance testing and cutover. This includes the installation and programming Fixed Network Equipment (FNE).

1b.10 Acceptance Testing The acceptance testing for the City will be executed in accordance with the baseline ATP executed under the current contract with the City of Philadelphia.

1b.11 Training No training is included in this phase of the project.

1b.12 Cutover The cutover will be executed in accordance with a mutually agreed upon cutover plan that will minimize the impact to the users of the City of Philadelphia system.

City of Philadelphia ASTRO 25 Upgrade

Option 1 – Station of Work June 13, 2008 Option 1b.- 4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1b.13 System Acceptance System acceptance will be governed by the successful execution of the ATPs, as well as delivery of deliverables such as the training, documentation, and resolution of any punch list items.

1b.14 Responsibility 1b.14.1

Customer Responsibility It will be the City’s responsibility to provide: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Site links Frequencies Generators Shelters Towers UPS equipment Type I & Type II surge suppression Tower and shelter space Electrical Sufficient HVAC Environmental and grounding facilities

The City will be responsible to verify the existing backup power systems are sufficient to support the new equipment additions to existing facilities. All frequency licensing will remain the responsibility of the City of Philadelphia.

1b.14.2

Assumptions Motorola has made the following assumptions in development of this budgetary quotation: ♦

All sites will meet Motorola’s R56 2005 Standards for Communications sites. If the City does not have a copy of the “R56 v.2005 Standards & Guidelines for Communications site”, one will be provided by Motorola ♦ Sufficient space exists at the radio locations ♦ Adequate power is available to support the new equipment ♦ Grounding meets Motorola’s R56 installation standards

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 – Statement of Work June 13, 2008 Option 1b.- 5



♦ ♦ ♦ ♦ ♦ ♦ ♦

New frequencies can be implemented using existing combiners and antennas ♦ Existing towers can support the loading required for the system (if new antennas are required ♦ Existing generators have adequate capacity to support the equipment The City will provide the necessary 800 MHz frequency pairs and FCC licenses System backhaul will be provided by the City of Philadelphia that meets Motorola’s link specifications. No spares are included No subscriber services or template creation are included in this project The City is responsible for all licenses, permits, etc required for the implementation of this system No civil work or site upgrades are included in Motorola’s quotation Coverage verification is included in this quotation, not a full Coverage Acceptance Test Plan

City of Philadelphia ASTRO 25 Upgrade

Option 1 – Station of Work June 13, 2008 Option 1b.- 6

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 1c. Equipment List 10 Channel Expansion Qty 100 100 100 100 100 100 100

Model Number T7039 CA00855AA CA00025AF CA00883AA CA00952AA X153AW X265AH

Item Description

Sys Seg

GTR 8000 BASE RADIO ADD: 700/800 MHZ MID POWER ADD: CIRCUIT BASED MULTISITE BASE R ADD: 800 MHZ TX FILTER W/PMU ADD: QUANTAR RETROFIT HARDWARE ADD: RACK MOUNT HARDWARE ADD: NARROW PRESELECTOR, 800 MHZ

GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 1 - Equipment List June 13, 2008 Option 1c.-1

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade Option 1 - Equipment List June 13, 2008 Option 1c.-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 1c. Equipment List 5 Channel Expansion Qty 50 50 50 50 50 50 50

Model Number T7039 CA00855AA CA00025AF CA00883AA CA00952AA X153AW X265AH

Item Description

Sys Seg

GTR 8000 BASE RADIO ADD: 700/800 MHZ MID POWER ADD: CIRCUIT BASED MULTISITE BASE R ADD: 800 MHZ TX FILTER W/PMU ADD: QUANTAR RETROFIT HARDWARE ADD: RACK MOUNT HARDWARE ADD: NARROW PRESELECTOR, 800 MHZ

GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 1 - Equipment List June 13, 2008 Option 1c.-1

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade Option 1 - Equipment List June 13, 2008 Option 1c.-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 1d. Acceptance Test Plan 10 Channel Expansion 1d.1 Coverage Acceptance Test Plan (CATP) Motorola is proposing to the City of Philadelphia a 10 Channel Expansion. The 10 Channel Expansion will provide five (5) channels to System A and five (5) channels to System B. System A will be expanded to a total of 20 channels and System B will be expanded to a total of 25 channels. This expansion will reuse the existing antenna, transmission line and combining network, thus coverage should not be impacted by the addition of these channels to the system. Motorola does understand if the City of Philadelphia feels it is necessary to complete a CATP, Motorola would perform a similar CATP test as identified in Section 4 of the Baseline system offering documented in the ASTRO 25 Upgrade Proposal however instead of testing a full coverage grid set, a statistically relevant subset (>800) of randomly selected grids would be tested. This would be in line with the testing performed for the previous Five Channel Expansion Project.

1d.2 10 Channel Expansion Acceptance Test Plan 1d.2.1 General This Acceptance Test Plan (ATP) shall specify the demonstration procedures to ensure Motorola's compliance with the applicable RF remote site field performance specifications set forth under the contract. The failure of one test will not necessarily require that the entire ATP be run again. In the event of a test failure, Motorola will determine the cause of the failure, make the required corrections, and that particular test will be run again.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option

Option 1 - Acceptance Test Plan September 14, 2007 Option 1d.-1

Representatives of the City will attend the testing that takes place at the remote sites. Acceptance by the City of Philadelphia will be achieved with one signature per individual demonstration. In the event of non-acceptance of items associated with a particular demonstration, those items of non-acceptance will be noted on a "punch list" and will be corrected before final acceptance for the phase. After all deficiencies noted on the "punch list" are corrected, a representative of the City of Philadelphia and Motorola will acknowledge all items are completed with appropriate signatures.

1d.2.2 Description This procedure lists the tests that are required to verify the specifications of the GTR trunked Stations and associated RF ancillary equipment. Each test has been performed on each station at all sites during equipment optimization. The test data has been recorded in the site log (site data). Each of the following tests require that all site log records be verified by comparing testing measurements with the data contained in the Site Log for each station. Test results are to be recorded on 821 MHz Base Station TX/RX Power and Level Test Checklists. A test checklist is to be completed for each station at each site. Initial either (Pass) or an exception (Fail w/Exception code). Tests have been grouped into categories, thereby minimizing the number of cable and configuration changes required during testing. Although a test may be written to repeat for all remaining stations at the site, it shall be the Motorola technician’s discretion to determine if all applicable tests or subsets thereof should be completed for a given station before moving to the next station.

1d.2.3 Required Test Equipment The following list of test equipment is required to perform the 821 MHz Field Specification Test. ♦ ♦ ♦ ♦ ♦

Motorola R2975 Series Service Monitor (or approved equal) ASTRO CAI and P25 equipped. Transmission Impairment Measurement Set Min. two In-Line bi-directional wattmeter (Bird Model 43 or approved equal) 50 ohm RF power termination load (50ohm dummy load) IBM PC (or 100% compatible computer) with GTR Communications Service Software (CSS)

All test equipment used for 821 MHz specification testing will have been calibrated within the last year. The calibration of the test equipment will be verified by the presence of a calibration sticker or a calibration certificate for all equipment used in testing. City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.2.4 Setup Performing these tests requires that the stations be taken out of service. Follow the CSS service procedure for station access disable/enable. Test equipment setup procedures to be perform by qualified personnel. In addition, it is required that all power and level measurements for the site have been conducted prior to testing the site and all measurements are recorded on the log at the site. This site log will be located on site for reference during testing.

1.2.4.1

821 MHz Trunked Base Station/NPSPAC Base Station Testing The purpose of this testing is to verify the equipment and setup specifications for the new trunked base stations located at the new RF site. Test 1.

Measure and Verify Station Transmitter Output Power at the Combining System Input Port.

Step 1.

Using CSS or NMS, take the station under test Out Of Service by disabling it. Using a RG142 test cable (or other cable of known loss), or directly if possible, connect an in-line wattmeter between the transmitter combiner input port and the ½” Superflex coaxial cable that is connected to said port for the transmitter under test. Using CSS, key the station locally. Read transmitter power level on the in-line wattmeter. Verify that the power level displayed on the wattmeter is within tolerance of the projected value listed on the test checklist for the station under test. Repeat step 3 to de-key the station under test. Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist.

Step 2.

Step 3. Step 4. Step 5. Step 6. Step 7. Note:

Repeat steps 1 through 7 for all stations at the site. Test will be performed with station at rated power output necessary to comply with site licensed ERP based on measured combiner system and projected antenna system gains.

Test 2.

Measure and Verify Station Transmit RF Frequency.

Step 1.

Connect the service monitor to the respective transmit combiner test port for the station under test. Using CSS, key the station locally. Read the station transmit frequency on the service monitor display.

Step 2. Step 3.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-3

Step 4.

Step 5. Step 6.

Note:

Verify that the frequency displayed on the service monitor is within tolerance of the station transmit frequency as depicted on the label located on the front of the station. Repeat step 2 to de-key the station under test. Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist. Repeat steps 1 through 6 for all remaining stations at the site.

Test 3.

Transmitter Deviation Measure and Verify V.52 Test Pattern Deviation

Step 1.

With the connection of the service monitor still configured as per Test 2, set up the service monitor to display modulation. Select the V.52 test pattern via the RSS/CSS program. Key the station under test generating the V.52 test pattern as modulation via the appropriate function key in the RSS/CSS program. Read the transmitter deviation for the station on the service monitor Verify that the deviation level is within tolerance of the specification as listed on the test checklist for the station under test (2.83KHz, ±0.57). De-key the station under test via the appropriate function key in the RSS/CSS program. Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist.

Step 2. Step 3. Step 4. Step 5. Step 6. Step 7.

Note:

Repeat steps 1 through 7 for all remaining trunked stations at the site.

Test 4.

Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port.

Step 1.

Using the RG142 test cable (or other cable of known loss), connect an inline wattmeter between the transmitter RF output port of the station and the ½” superflex coaxial cable that is connected to the transmitter output port of the station. Using CSS key the station locally. Read reflected power. Repeat step 2 to de-key the station under test. Record results and/or initial in the corresponding field(s) of the base station testing checklist. Reconnect coaxial cable to the station.

Step 2. Step 3. Step 5. Step 6. Step 7.

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Note:

Test 5.

Receiver Sensitivity Test Measured at the Multicoupler RF Output Port Receiver Sensitivity Test

Step 1.

Disconnect the superflex cable for the selected station receiver from the Multicoupler RF output port. Connect the superflex cable to the service monitor. Set up the service monitor to generate an on frequency signal at the selected receivers’ frequency at a level of 0.3 uvolts. Set up the service monitor to modulate the carrier with a V.52 test pattern at a level of +/- 2.83KHz of deviation. Using the RSS/CSS program note the value at which the BER stabilizes as the station captures the V.52 pattern. The BER value should be no more than 5%. Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist. Reconnect superflex cable to the receiver multicoupler RF output port.

Step 2. Step 3. Step 4. Step 5.

Step 6. Step 7. Note:

1.2.4.2

Repeat steps 1 through 7 for all stations at the site. Test will be performed with station at rated power output necessary to comply with site licensed ERP based on measured combiner system and projected antenna system gains.

Repeat steps 1 through 7 for all remaining trunked stations at the site.

Combiner Output Power Testing and Combining System Loss Verification The purpose of this test is to measure the combining system forward and reflected output power for all stations interfaced to the combining systems at the site and to verify the combining system loss. This test is to be conducted only after all individual station testing has been completed at the site. Test 1.

Measure and Verify Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System.

Step 1.

Performing this test requires that all stations be taken out of service via CSS. Using the RG142 test cable (or other cable of known loss); connect an inline wattmeter to the associated combining system output (hybrid antenna port) and the 50-ohm RF termination load (dummy load).

Step 2.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-5

Step 3. Step 4. Step 5. Step 6. Step 7.

Step 8.

Note:

1.2.4.3

Via CSS, locally key each station sequentially that is connected to the combining system. Read the forward and reflected power at the output of the combining system for each station. Verify the forward and reflected power levels against what is recorded in the Site Log for the selected base station. Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist. Once all stations for the combining system have been tested remove the wattmeter/dummy load and reconnect the ½” combiner output jumper cable. Verify combiner loss. Combiner Loss = [LOG(Combiner Input in Watts) X 10] – [LOG(combiner Output in Watts) X 10] Repeat steps 2 through 7 for all combining systems located at the site.

Existing TTA/Multicoupler System The Existing TTA/Multicoupler System will not be individually tested as part of the ATP. Instead, each Site will be tested by injecting a signal through the TTA test port on three (3) frequencies (High/Mid/Low). The results will be compared to the most recent PM base line test documents. The intent is to show no change in performance of the existing TTA/Multicoupler after adding the 10 new channels to existing multicoupler ports. The 50ohm loads will be removed and replaced with the 10 new channels at each RF site.

1.2.4.4

PUNCHLIST PROCEDURE AND FORM The Punchlist will a record of all items that did not meet the terms and conditions of this contract and requires corrective action or resolution. All Punchlist items will be addressed until each item has been resolved. An item gets recorded as a Punchlist item when the City of Philadelphia decides a test has failed. Resolution of Punchlist items shall be addressed by priority as indicated in the Exception Procedure Code. The Punchlist will contain: 1. 2. 3. 4. 5.

A specific acceptance test reference. The person or persons witnessing the failure. The date. The equipment, feature or facility involved, if applicable. A description of the exception or failure.

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-6

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

6. The Exception Procedure Code that categorizes the City’s exception for proper priority of the efforts to resolve the item. 7. A resolution/action plan with target completion date. 8. Two (2) signature blocks for the Motorola and City representative/s. One for recording the exception item and a second for approving that the item was resolved and tested. 9. A completion date. 10. Resolution comments. Exception Procedures Codes (EPC's) are: 1. AI - Accept as Is, Exception item minor and does not require any corrective action. 2. CS - Correction to Specifications or procedures, Not an exception item, but recorded for future reference. Delineate corrections to specification or ATP procedure on the Punchlist. 3. CI - Critical Item, Exception item which requires correction prior to any system transition/cut-over. When an item is considered critical, one of the following Exception Codes are also required (CA, or CR). 4. CA - Corrective Action required as part of Contract. Exception item that falls within Motorola's Contract commitment. 5. CR - Change Request with or without additional cost. Exception item beyond Motorola's Contract commitment. In this case, the City may find a problem at a site where the work responsibility is beyond Motorola's Contract work commitment. If corrected, the correction may be at the City’s costs.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-7

1d.3 City Hall 10th Flr 821 MHz Base Station Tx/Rx Power and Level Check List Site Name

City Hall

Motorola System Technologist:

Site Licensed E.R.P

Date

CUST. Technician:

1d.3.1 821 MHz Trunked Base Station Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦ Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%.

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #2: Measure and Verify Station Transmit RF Frequency. ♦ Channel

Measured value should = Transmit frequency ±87Hz

Frequency

Measured Frequency Error

PASS

FAIL

A16 A17 A18 A19 A20

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-8

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Channel

Frequency

Measured Frequency Error

PASS

FAIL

B21 B22 B23 B24 B25

Test #3: Transmitter Deviation ♦

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only)

(2.83KHz ±0.56 KHz) ♦ Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) ♦ ♦ Channel

(2.4 KHz ±0.24 KHz)

Frequency

Measured Deviation

PASS

FAIL

Frequency

Measured Deviation

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. ♦ Channel

Frequency

4 watts, ± 5% Measured Reflected Power

PASS

FAIL

A16 A17 A18 A19 A20

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-9

Channel

Frequency

Measured Reflected Power

PASS

FAIL

B21 B22 B23 B24 B25

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦ Channel

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV

Frequency

Measured Sensitivity

PASS

FAIL

Frequency

Measured Sensitivity

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.3.2 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss ♦

Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load.



Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB.

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-10

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Channel

Frequency

Measured Input Power

Measured Fwd. Output Power

Frequency

Measured Input Power

Measured Fwd. Output Power

Measured Reflected Output Power

Calculated Combiner Loss

PASS

FAIL

Calculated Combiner Loss

PASS

FAIL

A16 A17 A18 A19 A20

Channel

Measured Reflected Output Power

B21 B22 B23 B24 B25

1d.3.3 Existing TTA/Multicoupler System Verify PM base line test document for TTA/Multicoupler level setting for the High/Median/Low frequencies being used. Frequency

PM Base line test level

Site ATP Base line test level

B15 – 821.1000 MHz A9 – 822.5875 MHz A1 – 823.8375 MHz

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-11

1d.3.4 Punchlist Form Test Description: Test Number: Noted By: Date: Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-12

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.4 Southampton 821 MHz Base Station TX/Rx Power and Level Check List Site Name

Southampton

Site Licensed E.R.P.

Motorola System Technologist:

Date

CUST. Technician:

1d.4.1 821 MHz Trunked Base Station Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦ Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%.

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-13

Test #2: Measure and Verify Station Transmit RF Frequency. ♦ Channel

Measured value should = Transmit frequency ±87Hz

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #3: Transmitter Deviation ♦

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only)

(2.83KHz ±0.56 KHz) ♦ Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) (2.4 KHz ±0.24 KHz) Channel

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20

Frequency

Measured Forward Power

PASS

FAIL

Channel B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-14

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. ♦ Channel

4 watts, ± 5%

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦ Channel

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-15

1d.4.2 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss ♦

Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load. Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB.

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.4.3 Existing TTA/Multicoupler System Verify PM base line test document for TTA/Multicoupler level setting for the High/Median/Low frequencies being used. Frequency

PM Base line test level

Site ATP Base line test level

B15 – 821.1000 MHz A9 – 822.5875 MHz A1 – 823.8375 MHz

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-16

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.4.4 Punchlist Form Test Description: Test Number: Noted By: Date: Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-17

1d.5 Domino Lane 821 MHz Base Station TX/Rx Power and Level Check List Site Name:

Domino Lane

Site Licensed E.R.P.:

Motorola System Technologist:

Date:

CUST. Technician:

1d.5.1 821 MHz Trunked Base Station Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦ Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%.

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-18

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Test #2: Measure and Verify Station Transmit RF Frequency. ♦ Channel

Measured value should = Transmit frequency ±87Hz Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #3: Transmitter Deviation • • Channel

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only) (2.83KHz ±0.56 KHz) Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) (2.4 KHz ±0.24 KHz)

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-19

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. 4 watts, ± 5%

♦ Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦ Channel

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-20

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.5.2 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss ♦

Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load. Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB.

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.5.3 Existing TTA/Multicoupler System Verify PM base line test document for TTA/Multicoupler level setting for the High/Median/Low frequencies being used. Frequency

PM Base line test level

Site ATP Base line test level

B15 – 821.1000 MHz A9 – 822.5875 MHz A1 – 823.8375 MHz

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-21

1.5.3.1

Punchlist Form Test Description: Test Number: Noted By: Date:

Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-22

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.6 Victory Garden 821 MHz Base Station TX/Rx Power and Level Check List Site Name

Victory Garden

Site Licensed E.R.P.

Motorola System Technologist

Date

CUST. Technician

1d.6.1 821 MHz Trunked Base Station Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦ Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%. Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-23

Test #2: Measure and Verify Station Transmit RF Frequency. Measured value should = Transmit frequency ±87Hz Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #3: Transmitter Deviation ♦

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only)

(2.83KHz ±0.56 KHz) ♦ Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) (2.4 KHz ±0.24 KHz) Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-24

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. ♦ Channel

4 watts, ± 5%

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦ Channel

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-25

1d.6.2 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss

Channel



Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load.



Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB.

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.6.3 Existing TTA/Multicoupler System Verify PM base line test document for TTA/Multicoupler level setting for the High/Median/Low frequencies being used. Frequency

PM Base line test level

Site ATP Base line test level

B15 – 821.1000 MHz A9 – 822.5875 MHz A1 – 823.8375 MHz

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-26

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1.6.3.1

Punchlist Form Test Description: Test Number: Noted By: Date:

Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-27

1d.7 Streets & Highway 821 MHz Base Station TX/Rx Power and Level Check List Site Name

Streets & Highway

Site Licensed E.R.P.

Motorola System Technologist:

Date

CUST. Technician:

1d.7.1 821 MHz Trunked Base Station Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦ Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%.

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-28

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Test #2: Measure and Verify Station Transmit RF Frequency. Measured value should = Transmit frequency ±87Hz Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #3: Transmitter Deviation ♦

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only)

(2.83KHz ±0.56 KHz) ♦ Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) (2.4 KHz ±0.24 KHz) Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-29

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. ♦ 4 watts, ± 5% Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦ Channel

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-30

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.7.2 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss ♦ Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load. Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB. Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.7.3 Existing TTA/Multicoupler System Verify PM base line test document for TTA/Multicoupler level setting for the High/Median/Low frequencies being used. Frequency

PM Base line test level

Site ATP Base line test level

B15 – 821.1000 MHz A9 – 822.5875 MHz A1 – 823.8375 MHz

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-31

1.7.3.1

Punchlist Form Test Description: Test Number: Noted By: Date:

Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-32

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.8 Bustleton & Hoffnagle 821 MHz Base Station TX/Rx Power and Level Check List Site Name:

BUSTLETON & HOFFNAGLE

Motorola System Technologist:

Site Licensed E.R.P.:

Date:

CUST. Technician:

1d.8.1 821 MHz Trunked Base Station Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦ Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%.

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-33

Test #2: Measure and Verify Station Transmit RF Frequency. Measured value should = Transmit frequency ±87Hz Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #3: Transmitter Deviation ♦

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only)

(2.83KHz ±0.56 KHz) ♦ Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) (2.4 KHz ±0.24 KHz) Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-34

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. ♦ Channel

4 watts, ± 5%

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦ Channel

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-35

1d.8.2 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss ♦

Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load. Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB.

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.8.3 Existing TTA/Multicoupler System Verify PM base line test document for TTA/Multicoupler level setting for the High/Median/Low frequencies being used. Frequency

PM Base line test level

Site ATP Base line test level

B15 – 821.1000 MHz A9 – 822.5875 MHz A1 – 823.8375 MHz

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-36

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.8.4 Punchlist Form Test Description: Test Number: Noted By: Date: Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-37

1d.9 Police Academy 821 MHz Base Station TX/Rx Power and Level Check List Site Name:

Police Academy

Site Licensed E.R.P.:

Motorola System Technologist:

Date:

CUST. Technician:

1d.9.1 821 MHz Trunked Base Station Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦ Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%.

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-38

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Test #2: Measure and Verify Station Transmit RF Frequency. Measured value should = Transmit frequency ±87Hz Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #3: Transmitter Deviation ♦

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only) (2.83KHz ±0.56 KHz)



Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) (2.4 KHz ±0.24 KHz)

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-39

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. ♦ Channel

4 watts, ± 5%

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦ Channel

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-40

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.9.2 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss ♦

Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load. Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB.

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.9.3 Existing TTA/Multicoupler System Verify PM base line test document for TTA/Multicoupler level setting for the High/Median/Low frequencies being used. Frequency

PM Base line test level

Site ATP Base line test level

B15 – 821.1000 MHz A9 – 822.5875 MHz A1 – 823.8375 MHz

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-41

1d.9.4 Punchlist Form Test Description: Test Number: Noted By: Date: Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-42

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.10 Engine 9 821 MHz Base Station TX/Rx Power and Level Check List Site Name

Engine 9

Site Licensed E.R.P.

Motorola System Technologist:

1d.10.1

Date

CUST. Technician:

821 MHz Trunked Base Station Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦

Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%.

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-43

Test #2: Measure and Verify Station Transmit RF Frequency. Measured value should = Transmit frequency ±87Hz Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #3: Transmitter Deviation ♦

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only)

(2.83KHz ±0.56 KHz) ♦ Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) (2.4 KHz ±0.24 KHz) Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-44

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. ♦ Channel

4 watts, ± 5%

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦ Channel

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-45

1d.10.2 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss ♦

Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load. Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB.

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.10.3

Existing TTA/Multicoupler System Verify PM base line test document for TTA/Multicoupler level setting for the High/Median/Low frequencies being used. Frequency

PM Base line test level

Site ATP Base line test level

B15 – 821.1000 MHz A9 – 822.5875 MHz A1 – 823.8375 MHz

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-46

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.10.4

Punchlist Form

Test Description: Test Number: Noted By: Date: Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-47

1d.11 Ford & Belmont 821 MHz Base Station TX/Rx Power and Level Check List Site Name:

Ford & Belmont

Site Licensed E.R.P.:

Motorola System Technologist:

1d.11.1

Date:

CUST. Technician:

821 MHz Trunked Base Station Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦

Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%.

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #2: Measure and Verify Station Transmit RF Frequency. Measured value should = Transmit frequency ±87Hz Channel

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-48

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A19 A20 Channel B21 B22 B23 B24 B25

Test #3: Transmitter Deviation ♦

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only) (2.83KHz ±0.56 KHz)



Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) (2.4 KHz ±0.24 KHz)

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. ♦ Channel

Frequency

4 watts, ± 5% Measured Forward Power

PASS

FAIL

A16 A17 Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-49

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦ Channel

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.11.2 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss ♦

Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load.

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-50

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB. Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.11.3

Existing TTA/Multicoupler System Verify PM base line test document for TTA/Multicoupler level setting for the High/Median/Low frequencies being used.

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-51

1d.11.4

Punchlist Form

Test Description: Test Number: Noted By: Date: Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-52

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.12 31st & Graysferry 821 MHz Base Station TX/Rx Power and Level Check List Site Name

31st & Graysferry

Site Licensed E.R.P.

Motorola System Technologist:

1d.12.1

Date

CUST. Technician:

821 MHz Trunked Base Station Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦

Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%.

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #2: Measure and Verify Station Transmit RF Frequency. Measured value should = Transmit frequency ±87Hz Channel

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-53

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #3: Transmitter Deviation ♦

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only)

(2.83KHz ±0.56 KHz) ♦ Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) (2.4 KHz ±0.24 KHz) Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. ♦ Channel

4 watts, ± 5%

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-54

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Channel

Frequency

Measured Forward Power

PASS

FAIL

B21 B22 B23 B24 B25

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦ Channel

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.12.2 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss ♦

Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load.

Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-55

Channel

Frequency

Measured Forward Power

PASS

FAIL

Frequency

Measured Forward Power

PASS

FAIL

A16 A17 A18 A19 A20 Channel B21 B22 B23 B24 B25

1d.12.3

Existing TTA/Multicoupler System Verify PM base line test document for TTA/Multicoupler level setting for the High/Median/Low frequencies being used.

Frequency

PM Base line test level

Site ATP Base line test level

B15 – 821.1000 MHz A9 – 822.5875 MHz A1 – 823.8375 MHz

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-56

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

1d.12.4

Punchlist Form

Test Description: Test Number: Noted By: Date: Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-57

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade

Option 1 - Acceptance Test Plan June 13, 2008 Option 1d.-58

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 2a. System Description/Technical Overview Addition of 11th Site 2a.1 Project Scope Motorola has always designed systems with expandability and future migration in mind. In the past, it has been difficult to upgrade a system without replacing major components. The easy migration and expandability is one of the benefits of the new ASTRO 25 IP Radio System technology. This innovative capability allows for incremental upgrades within systems via hardware and/or software to avoid total infrastructure replacement. The flexibility that the ASTRO 25 system offers allows the City to grow the system as needed. Motorola understands the need for the City of Philadelphia to improve certain area(s) of coverage within the City’s limits; thus; Motorola is proposing an 11th Simulcast Site add-on to the new ASTRO 25 system. This new site will utilize Motorola’s new GTR station utilizing IP Simulcast mode to be consistent with new baseline system configuration of GTR8000BR stations and IP Simulcast. This document is intended to provide a general overview of the 11th Simulcast Site add-on System for the City of Philadelphia. Included is the City of Philadelphia project overview, system architecture and design details.

2a.2 Project Overview This proposal would add an 11th site to the proposed ASTRO 25 IP Radio System. The proposed site add-on is predicated that the 11th site will be a newly developed or “Green” site. Please see Option Section 2c SOW for full details on site development of the proposed 11th Site.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 2 – System Description/Technical Overview June 13, 2008 Option 2a.-1

The 11th site will contain RF equipment for both A and B simulcast systems. At the City’s direction, a single T1 will be required for each of the remote RF sites for connectivity back to their associated simulcast prime site. Please see Section 2 of the proposal for additional details on site link performance specifications.

2a.3 System Architecture This section is intended to detail the proposed equipment to support adding an 11th site to ASTRO25 IP Radio System. For specific details about the equipment discussed herein please see Section 2 of the proposal. This option assumes that the 10 Channel Expansion Option has also been exercised.

2a.3.1 ASTRO 25 Simulcast Prime Site Design No significant impact to either of the Simulcast Prime Sites is proposed. The ASTRO25 IP Radio System utilizing IP Simulcast technology will already be capable of accepting connectivity for up to fifteen (15) simulcast remote sites via its integrated Site Access Switching Center. System licensing to support this 11th site is already included in the Baseline proposal.

2a.3.2 Simulcast Remote-Site Design The 11th simulcast RF site is intended to improve coverage in the Morris Arboretum area for the City of Philadelphia. The simulcast RF sites operate under the direction and control of the Master/Prime Site. The 11th simulcast RF site add-on fixed network equipment will be virtually identical to the equipment used in the new ASTRO 25 IP Radio simulcast system with the exception of the possible use of customized antenna networks to optimize coverage performance once a location for said site is established.

2a.3.2.1 Remote Site Router Motorola will supply two remote site routers at the new RF Simulcast site. At the direction of the City, one router will support the WAN interface to and from System A prime site and the remaining router will support the WAN interface to and from System B prime site. Please see Section 2 of the proposal for details on site interconnectivity requires and performance specifications.

City of Philadelphia ASTRO 25 Upgrade Option 2 – System Description/Technical Overview June 13, 2008 Option 2a.-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

2a.3.3 Ethernet LAN Switches Motorola will supply six (6) Ethernet LAN switches. Three (3) LAN switches will support System A 20 channels and three (3) LAN switches to support System B 25 channels.

2a.3.4 ASTRO 25 GTR8000 Base Radio Motorola is proposing to the City of Philadelphia the use of the ASTRO 25 GTR8000BR base radio in IP Simulcast mode for the 11th site add-on system. The site will have a total of forty-five (45) GTR 8000s to support the channel capacity for both Systems assuming the 10 Channel Expansion Option is also exercised.

2a.3.5 TRAK 9100 Time and Frequency Standard The simulcast RF site will have a GPS-based time and frequency standard to provide the critical frequency/timing data needed to allow synchronization of simulcast transmissions. This unit will match the existing TRAK9100 units at the other RF Sites with support for up to forty-five (45) base stations.

2a.3.6 Antenna System The antenna system consists of a Tower Top Amplifier (TTA), transmit antenna, receive antenna, antenna line kit, combiner and receiver multi-coupler. Motorola is proposing hybrid combiners in the same configuration as the other existing RF Sites to support the forty-five (45) 800 MHz frequencies. Motorola will make every attempt to acquire the same combiners and TTA as is deployed in the existing system however Motorola cannot guaranty said equipment will be available. If that is the case, Motorola will provide similar equipment matching as closely as possible the existing TTA performance specifications.

2a.3.7 MOSCAD RTU Motorola will provide a new MOSCAD SDM3000 based RTU at the new simulcast RF site. Similar monitoring provided at the other 10 RF sites will be provided for the new 11th site.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 2 – System Description/Technical Overview June 13, 2008 Option 2a.-3

2a.4 System Design Details 2a.4.1 11th Site Add-on ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦



Qty(1) A-System Remote Site – Prime Site Link Router Qty(3) A System Remote Site Ethernet switches Qty (20) A-System GTR8000BR IP Simulcast stations Qty(1) B-System Remote Site – Prime Site Link Router Qty(3) B System Remote Site Ethernet switches Qty (25) B-System GTR8000BR IP Simulcast stations Qty (1) SDM3000 MOSCAD NFM with 48 digital inputs, 16 digital outputs and 8 analog inputs Qty (1) TRAK9100 GPS Qty (1) Transmit Antenna, Transmission Line & Combining Network Includes: • Qty(2) TX Antennas • Qty(4) 10 Ch. Combiners configured in pairs via hybrids (configured for 10 Ch. Expansion option) • Qty(2) 5 Ch. Combiners configured in a pair via hybrid (FCE combiner configured for 10 Ch. Expansion option) • Qty(3) Bird ACM Power Monitoring (1 per combiner) Qty (1) Receive Antenna, Transmission Line & Multi-coupling TTA Network

City of Philadelphia ASTRO 25 Upgrade Option 2 – System Description/Technical Overview June 13, 2008 Option 2a.-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 2b. Statement of Work Addition of 11th Site 2b.1 General Information This Statement of Work (SOW) defines the principal activities and responsibilities of all parties for the implementation of option to add an 11th site described in this proposal to expand the City of Philadelphia Project 25 system. The System Description provides information on the equipment implemented under this scope. A System Description is included in this proposal.

2b.2 Statement of Work Overview The following major subsystems are included as components of the Project Statement of Work:

2b.2.1 Option 2: 11th Site Expansion Add an 11th site to the City’s Project 25 System

2b.3 System Implementation Overview Motorola’s proposal to the City of Philadelphia provides systems integration and implementation services to deploy a fully functional communications system. Motorola’s experience as a Systems Integrator, deploying large and complex communication and software systems, will provide a smooth system implementation

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 2 – Statement of Work June 13, 2008 Option 2b.-1

and cutover to the new communications system. This SOW specifically addresses the implementation of the expansion option to add an 11th site for both the A and B simulcast cells to the City’s 800 MHz Project 25 network. Motorola’s local Systems Integration teams are highly skilled at deploying systems of the size and complexity of this communications system. Motorola provides a phased approach to implementation, with the following phases: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Project Initiation and Kick Off Design Review Civil Review and Civil Work Order Processing, Manufacturing & Factory Testing Installation and Upgrades Systems Integration & Optimization Acceptance Testing Training Cutover Project Finalization Warranty Support

Motorola has provided a preliminary design as a part of this proposal, which serves as a baseline for the Design Review. The Design Review encompasses the design finalization, such as finalization of the site location and the coverage design. Motorola will work closely with the City of Philadelphia to develop a cutover plan gracefully add the new site to the system. At the end of the Design Review phase, detailed Design Documents will be provided to the City of Philadelphia. While the Design Review progresses, Motorola will work in parallel to perform site development. Assumptions regarding the site development are included in this SOW, since a location for the 11th site has not been identified. Equipment manufacturing is followed by factory staging of the radio infrastructure at Motorola’s Customer Center for Solutions Integration (CCSi) in Schaumburg, Illinois. Factory staging provides for initial assembly and testing of all Motorola manufactured radio system components. Factory staging will allow testing of the functional capabilities of the communications system. This process will allow the City of Philadelphia to witness factory testing in a controlled environment, as well as provide a smooth and easy field installation. Motorola’s local implementation team will install and optimize the communications system at the City of Philadelphia sites as staged at CCSi. Motorola’s implementation includes the integration of all proposed subsystems to provide an end-to-end solution.

City of Philadelphia ASTRO 25 Upgrade Option 2 – Statement of Work June 13, 2008 Option 2b.-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

To close the loop between proposed functionality with the deployed system, Motorola will execute Acceptance Testing according to an Acceptance Test Plan (ATP). The ATP includes Functional Performance Tests, Coverage Acceptance Testing, and a 90Day Reliability Test. The final steps to full system implementation are delivery of system documentation, punchlist resolution, and final acceptance. The project team and the post-acceptance service team will work with City of Philadelphia during this phase, to ensure a smooth transition to the post acceptance support period.

2b.4 Project Scope The project scope is outlined below, with the major project elements described. The total project implementation is based on three major phases. Each phase will have the elements described below, unless indicated.

2b.5 Contract Initiation - Kickoff Meeting and Initiation Activities The project will be initiated with a Project Kickoff meeting including key City of Philadelphia and Motorola project participants. The objectives of the Kickoff meeting include: ♦ ♦ ♦ ♦ ♦ ♦

Introduce and exchange contact information of all project participants. Review roles of key participants and project review procedures. Establish a clear chain of communication and authority. Review overall project scope and objectives. Review resource and scheduling requirements. Review preliminary project schedule with the City of Philadelphia.

During the Project Initiation phase, Motorola will review and work with the City of Philadelphia to finalize the following project processes and procedures: ♦

Detailed Project Schedule ♦ Risk Management Plan ♦ Change Control Plan ♦ Issues Document and Action Item Log

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 2 – Statement of Work June 13, 2008 Option 2b.-3

2b.6 Design Review The City of Philadelphia and Motorola will review the channel expansion design through analysis of the sites and frequencies, as mutually agreed between Motorola and City of Philadelphia. During this portion of the project, the Project Plan will be developed. Design Review deliverables include: ♦

Finalize Coverage Design ♦ Finalize Acceptance Test Plans ♦ Cutover Plan ♦ Final Implementation Schedule

2b.7 Civil Review During this phase of the project, a final location will be identified to develop a radio site to house the equipment for the 11th site. Motorola assumes the use of a prefab 12’x 24’ building equipped with the appropriate environmental support for the new site. The building includes an indoor generator in a separate generator room. In addition Motorola assumes that a 100’ self supporting tower will be constructed to support the equipment for the 11th site. Motorola will provide engineering drawings during the design phase of the site construction. Motorola will prepare permits as required for construction. Motorola assumes that road access is available, no road development or improvements are included in this proposal. Motorola will connect utilities to the equipment shelter, assuming utilities are within 50’ of the shelter.

2b.8 Staging The City’s equipment will be staged at Motorola’s staging facility in Schaumburg, IL. City of Philadelphia representatives will have the option to witness the testing and demonstration of their system. Because the system is composed existing equipment and new equipment, the staging effort will include the stageable subsystems. Full system testing will occur when the new and upgraded equipment are integrated in the field during Field Acceptance Testing.

2b.9 Installation and Optimization The installation and optimization of the equipment will prepare the system for acceptance testing and cutover. This includes the installation and programming Fixed Network Equipment (FNE). City of Philadelphia ASTRO 25 Upgrade Option 2 – Statement of Work June 13, 2008 Option 2b.-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

2b.10 Acceptance Testing Acceptance testing will be conducted in accordance with the final ATPs defined during the Design Review. Motorola’s proposal includes Functional Acceptance Testing, a full Coverage Acceptance Test, as the addition of the 11th site may impact the coverage of existing sites, and a 90-Day Reliability Test, which consists of three (3) contiguous 30-Day Reliability Tests.

2b.11 Training No training is included in this phase of the project.

2b.12 Cutover The cutover will be executed in accordance with a mutually agreed upon cutover plan that will minimize the impact to the users of the City of Philadelphia system.

2b.13 System Acceptance System acceptance will be governed by the successful execution of the ATPs, as well as delivery of deliverables such as the training, documentation, and resolution of any punchlist items.

2b.14 Responsibility 2b.14.1 Customer Responsibility It will be the City’s responsibility to provide: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Site links Frequencies Generators Shelters Towers UPS equipment Type I & Type II surge suppression Tower and shelter space

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 2 – Statement of Work June 13, 2008 Option 2b.-5



Electrical ♦ Sufficient HVAC ♦ Environmental and grounding facilities The City will be responsible to verify the existing backup power systems are sufficient to support the new equipment additions to existing facilities. All frequency licensing will remain the responsibility of the City of Philadelphia.

2b.14.2 Assumptions Motorola has made the following assumptions in development of this budgetary quotation: ♦

♦ ♦ ♦ ♦ ♦ ♦ ♦

All sites will meet Motorola’s R56 2005 Standards for Communications sites. If the City does not have a copy of the “R56 v.2005 Standards & Guidelines for Communications site”, one will be provided by Motorola • Sufficient space exists at the radio locations • Adequate power is available to support the new equipment • Grounding meets Motorola’s R56 installation standards • New frequencies can be implemented using existing combiners and antennas • Existing towers can support the loading required for the system (if new antennas are required • Existing generators have adequate capacity to support the equipment The City will provide the necessary 800 MHz frequency pairs and FCC licenses System backhaul will be provided by the City of Philadelphia that meets Motorola’s link specifications. No spares are included No subscriber services or template creation are included in this project The City is responsible for all licenses, permits, etc required for the implementation of this system No civil work or site upgrades are included in Motorola’s quotation Coverage verification is included in this quotation, not a full Coverage Acceptance Test Plan

City of Philadelphia ASTRO 25 Upgrade Option 2 – Statement of Work June 13, 2008 Option 2b.-6

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 2c. Equipment List Addition of 11th Site Qty 2 2 2 12 1 1 2 2 2 2 1 1 1 1 1 1 1 2 2 2 12 1 1 2 2

Model Number T7054 CA00855AA X306AC X591AE CA00877AA CA00883AA CA00303AA X591AF CA00884AA X882AH DLN6566 DLN6567 DLN6634 DLN1306 DLN6569 DLN6568 DLN6636 T7054 CA00855AA X306AC X591AE CA00877AA CA00883AA CA00303AA X591AF

Item Description GTR 8000 EXPANDABLE SITE SUB-SYSTEM ADD: 700/800 MHZ MID POWER ADD: QTY (6) GTR 8000 BASE RADIOS ENH: ASTRO 25 SITE REPEATER SW ADD: CABINET RMC FOR EXPANSION RACK ADD: 800 MHZ TX FILTER W/PMU ADD: QTY (1) SITE CONTROLLER ENH: ASTRO 25 SITE REPEATER SITE CO ADD: QTY (1) XHUB ADD: 7.5 FT OPEN RACK, 48RU FRU: GTR 8000 TRANSCEIVER 700/800 M FRU: GTR 8000 PA 700/800 MHZ FRU: 700/800 MHZ SITE LNA FRU: 700/800 MHZ CABINET LNA FRU: GCP 8000/GCM 8000 FRU: GTR 8000/GCP 8000 POWER SUPPLY FRU: GTR 8000 EXPANSION HUB GTR 8000 EXPANDABLE SITE SUB-SYSTEM ADD: 700/800 MHZ MID POWER ADD: QTY (6) GTR 8000 BASE RADIOS ENH: ASTRO 25 SITE REPEATER SW ADD: CABINET RMC FOR EXPANSION RACK ADD: 800 MHZ TX FILTER W/PMU ADD: QTY (1) SITE CONTROLLER ENH: ASTRO 25 SITE REPEATER SITE CO

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

System UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG

Sys Seg GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 SPARES SPARES SPARES SPARES SPARES SPARES SPARES GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000 GTR8000

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Equipment List June 13, 2008 Option 2c.-1

Qty 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 3 1 1 3 3 1 1 1 12 12 1 1 2 1 1 12 12 1 1 2 1 1 1 1 3 1

Model Number CA00884AA X882AH DLN6566 DLN6567 DLN6634 DLN1306 DLN6569 DLN6568 DLN6636 ST2500 ST2512 ST2500 ST2512 ST2500 ST2512 ST2500 ST2512 DSOP820B DS1101378 DSTSJ48CLT DSTSJADP DSOP820B DS1101378 DSTSJ48CLT DSTSJADP F2463 V844 V845 V833 V834 V846 V839 F2463 V844 V845 V833 V834 V846 V839 F4544 V260 V803 V592 F4568

Item Description ADD: QTY (1) XHUB ADD: 7.5 FT OPEN RACK, 48RU FRU: GTR 8000 TRANSCEIVER 700/800 M FRU: GTR 8000 PA 700/800 MHZ FRU: 700/800 MHZ SITE LNA FRU: 700/800 MHZ CABINET LNA FRU: GCP 8000/GCM 8000 FRU: GTR 8000/GCP 8000 POWER SUPPLY FRU: GTR 8000 EXPANSION HUB S2500 MULTIPROTOCOL WAN ROUTER S2500 ROUTER T1/E1 DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 ROUTER T1/E1 DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 ROUTER T1/E1 DAUGHTER BOARD S2500 MULTIPROTOCOL WAN ROUTER S2500 ROUTER T1/E1 DAUGHTER BOARD POWER DIST. UNIT SURGE PROTECT RACK MOUNTING PLATE ADAPTER , DSOP8 8 WIRE MOD PROT. , RJ-45 (4 WIRE P HORIZONTAL RACK BUS BAR FOR TSJ AND POWER DIST. UNIT SURGE PROTECT RACK MOUNTING PLATE ADAPTER , DSOP8 8 WIRE MOD PROT. , RJ-45 (4 WIRE P HORIZONTAL RACK BUS BAR FOR TSJ AND REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C ADD:RTU SFWR LICENSE FOR ASTROTAC 9 ADD:RTU SFWR LICENSE FOR MOSCAD I/O REMOTE TERMINAL UNIT DEVICE INTERFA ADD:RTU SFWR LICENSE FOR ASTRO 25 8 ADD: RTU SOFTWARE LICENSE FOR INTEL ADD:RTU SFWR LICENSE FOR PREMISYS A ADD:RTU SFWR LICENSE FOR PREMISYS C ADD:RTU SFWR LICENSE FOR ASTROTAC 9 ADD:RTU SFWR LICENSE FOR MOSCAD I/O SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI R-MUX 1004

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Equipment List June 13, 2008 Option 2c.-2

System UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG

Sys Seg GTR8000 GTR8000 SPARES SPARES SPARES SPARES SPARES SPARES SPARES NETWORK NETWORK SPARES SPARES NETWORK NETWORK SPARES SPARES SURGE SURGE SURGE SURGE SURGE SURGE SURGE SURGE RTULicence RTULicence RTULicence RTULicence RTULicence RTULicence RTULicence RTULicence RTULicence RTULicence RTULicence RTULicence RTULicence RTULicence MOSCADRTU MOSCADRTU MOSCADRTU MOSCADRTU MOSCADRTU

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Qty 1 1 1 3 1 1 1

Model Number F4544 V260 V803 V592 F4568 TRN7343 TRN7343

Item Description SITE MANAGER ADVANCED ADD: 48 VDC PS TO SM ADD: SDM3000 ASTRO F/W FOR A6.7/7.0 AAD TERM BLCK & CONN WI R-MUX 1004 SEVEN AND A HALF FOOT RACK SEVEN AND A HALF FOOT RACK

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

System UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG UNDRGNDUPG

Sys Seg MOSCADRTU MOSCADRTU MOSCADRTU MOSCADRTU MOSCADRTU RACK RACK

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Equipment List June 13, 2008 Option 2c.-3

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Equipment List June 13, 2008 Option 2c.-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 2d. Acceptance Test Plan Addition of 11th Site 2d.1 Coverage Acceptance Test Plan (CATP) Motorola is proposing to the City of Philadelphia an 11th Site Add-on as an option to improve certain area(s) of coverage within the City’s limits. The 11th site will support System A and System B, thus providing to both systems an 11th site. Motorola will perform a similar CATP test identified in Section 4 of the Baseline system offering documented in the ASTRO 25 IP Radio Upgrade Proposal. Final coverage maps and IM studies (as applicable) for the 11th site will be provided to the City of Philadelphia within a mutually agreed upon time frame after receiving appropriate site information from the City. Until Motorola is able to provide appropriate coverage maps there can be no guaranty of coverage for the 11th Site or for the rest of the system with respect to the new 11th Site.

2d.2 11th Site Addition Option Acceptance Test Plan 2d.2.1 General This Acceptance Test Plan (ATP) shall specify the demonstration procedures to ensure Motorola's compliance with the applicable RF remote site field performance specifications set forth under the contract. The failure of one test will not necessarily require that the entire ATP be run again. In the event of a test failure, Motorola will determine the cause of the failure, make the required corrections, and that particular test will be run again.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-1

Representatives of the City will attend the testing that takes place at the remote sites. Acceptance by the City of Philadelphia will be achieved with one signature per individual demonstration. In the event of non-acceptance of items associated with a particular demonstration, those items of non-acceptance will be noted on a "punch list" and will be corrected before final acceptance for the phase. After all deficiencies noted on the "punch list" are corrected, a representative of the City of Philadelphia and Motorola will acknowledge all items are completed with appropriate signatures.

2d.2.2 Description This procedure lists the tests that are required to verify the specifications of the GTR trunked Stations and associated RF ancillary equipment. Each test has been performed on each station at all sites during equipment optimization. The test data has been recorded in the site log (site data). Each of the following tests require that all site log records be verified by comparing testing measurements with the data contained in the Site Log for each station. Test results are to be recorded on 821 MHz Base Station TX/RX Power and Level Test Checklists. A test checklist is to be completed for each station at each site. Initial either (Pass) or an exception (Fail w/Exception code). Tests have been grouped into categories, thereby minimizing the number of cable and configuration changes required during testing. Although a test may be written to repeat for all remaining stations at the site, it shall be the Motorola technician’s discretion to determine if all applicable tests or subsets thereof should be completed for a given station before moving to the next station.

2d.2.3 Required Test Equipment The following list of test equipment is required to perform the 821 MHz Field Specification Test. ♦ ♦ ♦ ♦ ♦

Motorola R2975 Series Service Monitor (or approved equal) ASTRO CAI and P25 equipped. Transmission Impairment Measurement Set Min. two In-Line bi-directional wattmeter (Bird Model 43 or approved equal) 50 ohm RF power termination load (50ohm dummy load) IBM PC (or 100% compatible computer) with GTR Communications Service Software (CSS)

All test equipment used for 821 MHz specification testing will have been calibrated within the last year. The calibration of the test equipment will be verified by the presence of a calibration sticker or a calibration certificate for all equipment used in testing.

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

2d.2.4 Setup Performing these tests requires that the stations be taken out of service. Follow the CSS service procedure for station access disable/enable. Test equipment setup procedures to be perform by qualified personnel. In addition, it is required that all power and level measurements for the site have been conducted prior to testing the site and all measurements are recorded on the log at the site. This site log will be located on site for reference during testing.

2d.2.4.1 821 MHz Trunked Base Station/NPSPAC Base Station Testing The purpose of this testing is to verify the equipment and setup specifications for the new trunked base stations located at the new RF site. Test 1.

Measure and Verify Station Transmitter Output Power at the Combining System Input Port.

Step 1.

Using CSS or NMS, take the station under test Out Of Service by disabling it.

Step 2.

Using a RG142 test cable (or other cable of known loss), or directly if possible, connect an in-line wattmeter between the transmitter combiner input port and the ½” Superflex coaxial cable that is connected to said port for the transmitter under test.

Step 3.

Using CSS, key the station locally.

Step 4.

Read transmitter power level on the in-line wattmeter.

Step 5.

Verify that the power level displayed on the wattmeter is within tolerance of the projected value listed on the test checklist for the station under test.

Step 6.

Repeat step 3 to de-key the station under test.

Step 7.

Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist.

Note:

Repeat steps 1 through 7 for all stations at the site. Test will be performed with station at rated power output necessary to comply with site licensed ERP based on measured combiner system and projected antenna system gains.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-3

Test 2.

Measure and Verify Station Transmit RF Frequency.

Step 1.

Connect the service monitor to the respective transmit combiner test port for the station under test.

Step 2.

Using CSS, key the station locally.

Step 3.

Read the station transmit frequency on the service monitor display.

Step 4.

Verify that the frequency displayed on the service monitor is within tolerance of the station transmit frequency as depicted on the label located on the front of the station.

Step 5.

Repeat step 2 to de-key the station under test.

Step 6.

Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist.

Note:

Repeat steps 1 through 6 for all remaining stations at the site.

Test 3.

Transmitter Deviation Measure and Verify V.52 Test Pattern Deviation.

Step 1.

With the connection of the service monitor still configured as per Test 2, set up the service monitor to display modulation.

Step 2.

Select the V.52 test pattern via the RSS/CSS program.

Step 3.

Key the station under test generating the V.52 test pattern as modulation via the appropriate function key in the RSS/CSS program.

Step 4.

Read the transmitter deviation for the station on the service monitor

Step 5.

Verify that the deviation level is within tolerance of the specification as listed on the test checklist for the station under test (2.83 KHz, ±0.57).

Step 6.

De-key the station under test via the appropriate function key in the RSS/CSS program.

Step 7. Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist. Note: Repeat steps 1 through 7 for all remaining trunked stations at the site.

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Test 4.

Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port.

Step 1.

Using the RG142 test cable (or other cable of known loss), connect an inline wattmeter between the transmitter RF output port of the station and the ½” superflex coaxial cable that is connected to the transmitter output port of the station.

Step 2.

Using CSS key the station locally.

Step 3.

Read reflected power.

Step 5.

Repeat step 2 to de-key the station under test.

Step 6.

Record results and/or initial in the corresponding field(s) of the base station testing checklist.

Step 7.

Reconnect coaxial cable to the station.

Note:

Repeat steps 1 through 7 for all stations at the site. Test will be performed with station at rated power output necessary to comply with site licensed ERP based on measured combiner system and projected antenna system gains.

Test 5.

Receiver Sensitivity Test Measured at the Multicoupler RF Output Port.

Step 1.

Disconnect the superflex cable for the selected station receiver from the Multicoupler RF output port.

Step 2.

Connect the superflex cable to the service monitor.

Step 3.

Set up the service monitor to generate an on frequency signal at the selected receivers’ frequency at a level of 0.3 uvolts.

Step 4.

Set up the service monitor to modulate the carrier with a V.52 test pattern at a level of +/- 2.83 KHz of deviation.

Step 5.

Using the RSS/CSS program note the value at which the BER stabilizes as the station captures the V.52 pattern. The BER value should be no more than 5%.

Step 6.

Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist.

Step 7.

Reconnect superflex cable to the receiver multicoupler RF output port.

Note:

Repeat steps 1 through 7 for all remaining trunked stations at the site.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-5

2d.2.4.2 Combiner Output Power Testing and Combining System Loss Verification The purpose of this test is to measure the combining system forward and reflected output power for all stations interfaced to the combining systems at the site and to verify the combining system loss. This test is to be conducted only after all individual station testing has been completed at the site. Test 1.

Measure and Verify Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System.

Step 1.

Performing this test requires that all stations be taken out of service via CSS.

Step 2.

Using the RG142 test cable (or other cable of known loss), connect an inline wattmeter to the associated combining system output (hybrid antenna port) and the 50-ohm RF termination load (dummy load).

Step 3.

Via CSS, locally key each station sequentially that is connected to the combining system.

Step 4.

Read the forward and reflected power at the output of the combining system for each station.

Step 5.

Verify the forward and reflected power levels against what is recorded in the Site Log for the selected base station.

Step 6.

Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist.

Step 7.

Once all stations for the combining system have been tested remove the wattmeter/dummy load and reconnect the ½” combiner output jumper cable.

Step 8.

Verify combiner loss. Combiner Loss = [LOG (Combiner Input in Watts) X 10] – [LOG (combiner Output in Watts) X 10]

Note:

Repeat steps 2 through 7 for all combining systems located at the site.

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-6

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

2d.2.4.3 TTA/Multicoupler System Testing The purpose of this test is to verify the receive sensitivity of each base station at the site through the TTA/multicoupler system for both the primary and secondary tower top amplifiers. This test is to be conducted only after all individual station testing has been completed at the site. Test 1. Receiver Sensitivity Measured at the Receiver TTA Test Port Input. TTA/Multicoupler System Receiver Sensitivity Test (ASTRO Trunked Stations Only) Step 1.

Using the TTA Test/Control Panel, disconnect antenna from the TTA antenna input port which terminates the input into a 50 ohm load internal to the TTA.

Step 2.

Using an RG142 test cable (or other cable of known loss), connect the service monitor to the TTA Test Input Port on the TTA Test/Control Panel.

Step 3.

Set up the service monitor to generate an on frequency signal at the selected receivers’ frequency at a level of 0.25 μ-volts after line losses to the TTA and the –30dB RF Test Port Tap within the TTA are taken into account.

Step 4.

Set up the service monitor to modulate the carrier with a V.52 test pattern at ±2.83 KHz deviation.

Step 5.

Using the RSS program, note the value at which the BER stabilizes as the station captures the V.52 pattern. The BER value should be no more than 5%.

Step 6.

Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist.

Step 7.

Repeat steps 1 through 6 for all remaining trunked stations at the site.

Step 8.

If available, from the TTA Control Panel institute a switch from the Primary tower top amplifier to the Secondary tower top amplifier and repeat Steps 1 through 7.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-7

TTA/Multicoupler System Receiver Sensitivity Test (NPSPAC Stations Only) Step 1.

Using the TTA Test/Control Panel, disconnect antenna from the TTA antenna input port, which terminates the input into a 50-ohm load internal to the TTA.

Step 2.

Using an RG142 test cable (or other cable of known loss), connect the service monitor to the TTA Test Input Port on the TTA Test/Control Panel.

Step 3.

Set up the service monitor to generate an on frequency signal at the selected receivers’ frequency.

Step 4.

Set up the service monitor to modulate the carrier with a 1000 Hz tone at a level of ± 2.4 KHz of deviation (60% deviation).

Step 5.

Adjust the signal level of the service monitor until the 12 dB SINAD level of the receiver is reached.

Step 6.

Read and verify that the Service Monitor signal level is equal to or less than 0.25μV after taking into account line losses to the TTA and the – 30dB RF Test Port Tap in the TTA. Verify result is recorded in the site log.

Step 7.

Record testing results and/or initial PASS/FAIL in the corresponding field(s) of the base station testing checklist.

Step 8.

Repeat steps 1 through 7 for each of the NPSPAC stations at the site as applicable.

Step 9.

If available, from the TTA Control Panel institute a switch from the Primary tower top amplifier to the Secondary tower top amplifier and repeat Steps 1 through 8.

Step 10.

Reconnect antenna to the TTA antenna input port using the TTA Test/Control Panel.

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-8

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

TTA/Multicoupler System Gain Calculation (As Applicable) Step 1.

Verify the loss of the in-line attenuator (where applicable) placed before the multicoupler against what is recorded in the site log.

Step 2.

Verify the readings of both the DC Voltmeter and DC Ammeter on the front panel of the TTA panel against the levels recorded in the site log for proper operation for the given installation.

Step 3.

Subtract the TTA/Multicoupler System receiver sensitivity levels (in dBm, normalized to output of the –30dB RF Test Port Tap in the TTA) from the sensitivity readings taken directly from the station receive port. Verify result against what is recorded in the site log.

Step 4.

Repeat for results obtained when using Secondary TTA

Note:

Repeat Steps 2 - 4 for the Highest, Mid-range and Lowest Frequencies of the stations on the TTA/multicoupler.

2d.2.4.4 Bird ACM Integrated Alarm Monitor The purpose of this test is to verify the calibration and setup of the Bird ACM at the output of the combining system (connected to Hybrid Antenna Port). This test is to be conducted only after all individual station testing has been completed at the site. The Bird ACM product installed on the combining system output port requires calibration. All sensors will be calibrated during site optimization prior to specification testing. The tolerance of the Bird wattmeter is 7 % while the tolerance of the sensors is 10 %. Therefore, a tolerance of +/- 10 % for the Decibel handheld wattmeter test will be used. The measurement criteria for this test will be as follows. The value depicted on the Bird ACM wattmeter will be referenced against the combiner output measurement to be within 10 % of the combiner output value. Test 1.

Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System. (For Information Only) Step 1. Performing this test requires that the stations be taken out of service via CSS. Step 2. Connect a wattmeter in-line with the Bird ACM sensor connected to the hybrid antenna output port for the combining system under test.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-9

Step 3. Using CSS, locally key each station connected to the combining system individually. Step 4. Measure forward and reflected power on both the Bird ACM Sensor and the in-line wattmeter. Record/Verify test results in the corresponding field(s) of the base station test checklist (See Note) Notes:

Repeat the above procedures for all combining systems located at the site. To ensure a sufficient measurable power level for the sensor, remove site antenna line when measuring reflected power.

2d.2.4.5 Functional Testing Of Fault Tolerant GPS/Rb Frequency-Time Standard In this “hot-standby” configured unit, in addition to the primary GPS/Rb frequency and timing standard, there is a secondary GPS/XO standard. If the primary (A-side) GPS unit fails, operation continues on the Rb standard. Should the Rb standard fail the unit automaticly switches to the hot-standby (B-side) GPS unit. If this secondary GPS were to fail, the system would continue to operate by freewheeling on the secondary (B-side) Crystal Oscillator (XO) frequency standard. Test 1.

Primary and Secondary GPS/Rb Operation

Step 1.

Using CSS, determine that the simulcast Quantar base stations are operating with timing and frequency reference signals from the GPS/Rb unit.

Step 2.

Disable the Primary GPS unit and verify the system continues to operate on the Rubidimum standard..

Step 4.

Disable the Rubidium standard and verify the system automatically switches to the Secondary GPS unit.

Step 5.

Disable the Secondary GPS unit and verify the system continues operating on the Secondary Crystal Oscilator standard

Step 6.

Return all disabled modules to normal operation and re-establish Primary (A-side) GPS/Rb operation from the front panel of the TRAK9100 unit.

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-10

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

2d.2.5 MOSCAD Physical Digital Input Verification The purpose of this section is to verify that the DI module properly processes the physical inputs that interface to the MOSCAD Digital Input (DI) modules. Status inputs are tested from the punchblock termination interface as shown on the MOSCAD Punchblock Diagrams in the respective site design drawing package. The status can be simulated by shorting/opening the input to the MOSCAD ground reference or by creating the actual condition with the actual device being monitored. The verification is made by observing the response at the front panel of the respective DI module.

2d.2.6 Transmission Line Time Domain Reflectometry (TDR) Review Description All RF sites containing 821 MHz RF equipment will have all antenna transmission lines TDR tested and a printout of the results of each line will be provided to the City of Philadelphia. The printouts will be reviewed and analyzed as part of the 821 MHz Specification Testing procedures. Following this review the antenna systems for the site will be marked as a pass or fail. If a TDR test of antenna transmission line is in question it will become a punch list item to be corrected and re-tested. The 821 MHz antenna transmission line TDR data will be collected, copied and provided to the City of Philadelphia prior to the beginning of specification testing in the field. This will allow a review and signoff of the 821 MHz antenna systems prior to conducting any and all measurement testing in the field.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-11

2d.2.7 821 MHz Antenna Transmission Line TDR Checklist SITE #

NEW 11th SITE

Note:

# of Antenna Lines 4

PASS

FAIL

COMMENTS Includes TTA ½” RF test line.

This is a sample form depicting form and format. A specific sheet by site will be database generated for recording TDR review results and comments.

2d.2.7.1 Punchlist Procedure and Form The Punchlist will a record of all items that did not meet the terms and conditions of this contract and requires corrective action or resolution. All Punchlist items will be addressed until each item has been resolved. An item gets recorded as a Punchlist item when the City of Philadelphia decides a test has failed. Resolution of Punchlist items shall be addressed by priority as indicated in the Exception Procedure Code. The Punchlist will contain: 1. 2. 3. 4. 5. 6.

A specific acceptance test reference. The person or persons witnessing the failure. The date. The equipment, feature or facility involved, if applicable. A description of the exception or failure. The Exception Procedure Code that categorizes the City’s exception for proper priority of the efforts to resolve the item. 7. A resolution/action plan with target completion date. 8. Two (2) signature blocks for the Motorola and City representative/s. One for recording the exception item and a second for approving that the item was resolved and tested. 9. A completion date. 10. Resolution comments.

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-12

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Exception Procedures Codes (EPC's) are: 1. AI - Accept as Is, Exception item minor and does not require any corrective action. 2. CS - Correction to Specifications or procedures, not an exception item, but recorded for future reference. Delineate corrections to specification or ATP procedure on the Punchlist. 3. CI - Critical Item, Exception item which requires correction prior to any system transition/cut-over. When an item is considered critical, one of the following Exception Codes are also required (CA, or CR). 4. CA - Corrective Action required as part of Contract. Exception item that falls within Motorola's Contract commitment. 5. CR - Change Request with or without additional cost. Exception item beyond Motorola's Contract commitment. In this case, the City may find a problem at a site where the work responsibility is beyond Motorola's Contract work commitment. If corrected, the correction may be at the City’s costs.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-13

2d.2.7.2 Punchlist Form Test Description: Test Number: Noted By: Date: Exception Code and/or Comment

Resolution/Action Plan

Philadelphia Representative

Motorola Representative

Retest Completion Date

Philadelphia Representative

Motorola Representative

Resolution Comments

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-14

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

2d.2.8 821 MHz Base Station Tx/Rx Power and Level Check List NEW 11TH SITE

Site Name

Date

Site Licensed E.R.P.

Motorola System Technologist

CUST. Technician

2d.2.9 821 MHz Trunked Base Station/NPSPAC Base Station Testing Test #1: Measure and Verify Station Transmitter Output Power at the input to the Combining System. ♦ Channel

Measured value should be 100 Watts (full station rated value) or T.B.D. Watts (as required for site licensed ERP.) ±5%. Frequency

Measured Forward Power

PASS

FAIL

A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-15

Channel

Frequency

Measured Forward Power

PASS

FAIL

B16 B17 B18 B19 B20 B21 B22 B23 B24 B25

Test #2: Measure and Verify Station Transmit RF Frequency. ♦ Measured value should = Transmit frequency ±87Hz Channel

Frequency

Measured Frequency Error

PASS

FAIL

A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-16

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Test #3: Transmitter Deviation ♦

Measure and Verify V.52 Test Pattern Deviation (ASTRO Trunked Stations Only) (2.83KHz ±0.56 KHz) ♦ Measure and Verify Transmit Deviation Test (NPSPAC Stations Only) (2.4 KHz ±0.24 KHz) Channel

Frequency

Measured Deviation

PASS

FAIL

A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-17

Test #4: Measure and Verify Station Transmitter Reflected Power at the Transmitter Output RF Port. ♦ 4 watts, ± 5% Channel

Frequency

Measured Reflected Power

PASS

FAIL

A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-18

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Test #5: Receiver Sensitivity Test Measured at the Station Receiver Input RF Port ♦

Receiver Sensitivity Test (ASTRO Trunked Stations Only) V.52 BER is 5% or less @ 0.3μV ♦ Receiver Sensitivity Test (NPSPAC Stations Only) 0.30μV or less for 12 dB SINAD Channel

Frequency

Measured Sensitivity

PASS

FAIL

A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-19

2d.2.10 Combiner Output Power Testing and Combiner Loss Verification Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and Verify Combining System Loss ♦

Measure Input Power at input to combining system & Output Power at output of combining system (Hybrid antenna port) using an in-line wattmeter with combiner output terminated into dummy load. ♦ Insertion loss should not exceed 8.1dB (329 Domino, City Hall & Southampton) or 6.8dB (other sites) ±1dB. Channel

Frequency

Measured Input Power

Measured Fwd. Output Power

Measured Reflected Output Power

Calculated Combiner Loss

PASS

FAIL

A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-20

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Channel

Frequency

Measured Input Power

Measured Fwd. Output Power

Measured Reflected Output Power

Calculated Combiner Loss

PASS

FAIL

B18 B19 B20 B21 B22 B23 B24 B25

2d.2.11

TTA/Multicoupler System Sensitivity Testing Test #1: Receiver Sensitivity Test Measured at the TTA/ Multicoupler System Input (TTA antenna port terminated in 50 ohm load) ♦

TTA/Multicoupler System Receiver Sensitivity Test (Trunked Stations Only) V.52 BER is 5% or less @ 0.25μV ♦ TTA/Multicoupler System Receiver Sensitivity Test (NPSPAC Stations Only) 0.25μV or less for 12 dB SINAD Channel

Frequency

Measured Sensitivity Primary TTA AMP

Measured Sensitivity Secondary TTA AMP

PASS

FAIL

A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-21

Channel B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25

Frequency

Measured Sensitivity Primary TTA AMP

Measured Sensitivity Secondary TTA AMP

PASS

FAIL

TTA/Multicoupler System Gain Calculation ♦

All Multicoupler Ports Terminated (Receiver or 50 ohm Load) ♦ (Gain should be 1 to 1 (0dB) or better) FYI: In-line attenuator loss is:

dB

Voltmeter Reading is

Volts (Primary Amp)

Volts (Secondary Amp)

Ammeter Reading is:

mA (Primary Amp)

mA (Secondary Amp) Primary TTA Calculated Result

Measure Multicoupler Lowest Frequency Range Gain/Loss Measure Multicoupler Mid-Frequency Range Gain/Loss Measure Multicoupler Highest Frequency Range Gain/Loss

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-22

Secondary TTA Calculated Result

PASS

FAIL

FYI FYI FYI

FYI FYI FYI

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

2d.2.12

Decibel Integrated Alarm Monitor DB8802B-1000 Test #1: Measure Station Transmitter Forward and Reflected Power at the Output Port of the Associated Transmitter Combining System and verify calibration of DB8802B-1000 power sensor. ♦

Channel

Readings should be ±10% of readings taken with Bird in-line wattmeter. Frequency

Measured Forward Power Bird / Sensor

Measured Reflected Power Bird / Sensor

PASS

FAIL

A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-23

2d.2.13 Functional Testing Of Fault Tolerant Gps/Rb Frequency-Time Standard PASS

FAIL

All Quantars Receiving 5MHz & 1pps signals All DSM-II Cards receiving 1pps signals All ASTRO-TAC3000 Comparators receiving 1pps signals Proper GPS/Rb. Primary and backup operation

2d.2.14

Verification of MOSCAD Digital Inputs INPUT

SWR ALARM #1 SWR ALARM #2 TTA ALARM #1 TTA ALARM #2 TTA ALARM #3 TTA ALARM #4 48VDC TVSS SUMMARY ALARM HVAC DDC VENT FAN FAILURE HVAC DDC VENT INTAKE DAMPER FAILURE HVAC DDC UNIT COMMON FAILURE HVAC DDC EQ. RM. HIGH TEMP HVAC DDC EQ. RM. LOW TEMP HVAC DDC EQ. RM. HIGH HUMIDITY RECTIFIER SUMMARY ALARM URGENT/NONURGENT RECTIFIER ACTIVE (LOW-FLOAT) 48VDC INVERTER ALARM ATS IN EMERGENCY POSITION ATS NORMAL VOLTAGE SOURCE PRESENT TOWER LIGHTING CONTROLER 1 & 2 SUMMARY ALARMS GENERATOR FAILURE GENERATOR COMMON ALARM GENERATOR LOW FUEL/GAS PRESSURE BATTER CHARGER FAULT/LOW VOLTAGE GENERATOR RUNNING DOOR ALARM TYPE 2 TVSS ALARM TYPE 1 TVSS ALARM FIRE ALARM PANEL TROUBLE FIRE ALARM PANEL ALARM

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-24

PB POSITION

PASS

FAIL

PB1-PR15 PB1-PR16 PB1-PR17 PB1-PR18 PB1-PR19 PB1-PR20 PB2-PR1 PB2-PR2 PB2-PR3 PB2-PR4 PB2-PR5 PB2-PR6 PB2-PR7 PB2-PR8 PB2-PR9 PB2-PR10 PB2-PR11 PB2-PR12 PB2-PR13 PB3-PR1 PB3-PR2 PB3-PR3 PB3-PR4 PB3-PR5 PB3-PR6 PB3-PR7 PB3-PR8 PB3-PR9 PB3-PR10

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

2d.2.15

821 MHz Antenna Transmission Line TDR Checklist

LINE Main TX #1 Main TX #2 Main RX ½ In. TTA Test

PASS

FAIL

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

COMMENTS

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-25

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade

Option 2 - Acceptance Test Plan June 13, 2008 Option 2d.-26

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 3a. System Description / Technical Overview MCC 7500 3a.1 Project Scope Motorola is proposing the addition of eleven (11) MCC 7500 dispatch operator positions for the City of Philadelphia Prison System. These eleven (11) operator positions will each be installed in a separate location within the prison system. Motorola is also proposing four (4) MCC 7500 dispatch operator positions for Police Training Facility. These four (4) operator positions will be installed at the 990 Spring Garden Street Training Facility. The MCC 7500 is Motorola’s newest technology in dispatch solutions. This document is intended to provide a general overview of the eleven (11) dispatch operator positions for the City of Philadelphia Prison System and the four (4) dispatch operator positions for Police Training Facility training. Included is the project overview, system architecture and design details.

3a.2 Project Overview This option will add eleven (11) MCC 7500 dispatch operator positions for the City of Philadelphia Prison System. Each location will have an MCC 7500 operator position which will be mounted on existing furniture. A site router and Ethernet switch will be rack-mounted in an equipment room within 200 feet from the operator position. Each position will be tied into the City’s ASTRO25 system via Citysupplied T1s from the Master Site (Room 626m City Hall) to each location. Please refer to Section 02 of this proposal for T1 performance specifications. This option will also add four (4) MCC 7500 dispatch operator positions for the Police Training Facility, mounted on existing furniture at the 990 Spring Garden Street Training Facility. A site router and Ethernet switch will be rack-mounted in an Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-1

equipment room within 200 feet from the operator positions. The dispatch site will be tied into the City’s ASTRO25 7.6 system via City-supplied T1 from the Master Site (Room 626m City Hall) to the Training Facility. Please refer to Section 02 of this proposal for T1 performance specifications.

3a.3 System Architecture The MCC 7500 is Motorola’s Mission Critical IP console. The MCC 7500 system uses packet-based IP architecture to deliver ease of operation, expandability, flexibility, and supportability. The MCC 7500 console features an easy to use Graphical User Interface (GUI). It operates under the Microsoft Windows XP platform and follows the same standards as other Windows-based programs. The screen layout is simple and uses valuable space efficiently. Key information and critical functions are clearly identified with easy to understand icons. Dispatchers can quickly recognize these icons instead of reading text, maximizing their productivity. Many tasks can be completed more quickly and easier than ever before with the MCC 7500 consoles. ♦

Dispatchers can rapidly see information about who is calling, the time of call, and the call type. ♦ The critical tools dispatchers require to communicate with field personnel are at their fingertips. Channels or talkgroups are displayed in on-screen “folders” for prioritization. ♦ Flashing red indicators easily identify incoming emergencies. ♦ Trunked callers can also be identified by real names versus numerical IDs if the City of Philadelphia prefers.

3a.4 System Design Details Most of the features of our previous console systems have been carried forward to the Motorola MCC 7500 product. In addition to these legacy features, the Motorola MCC 7500, Figure 3-1, product provides new features. Some these new features include: ♦

Seamless integration with ASTRO 25 trunking systems: • Supports the IP protocols of the trunking system's transport network; no circuit-switched network to packet-switched network conversion equipment is necessary.

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page



Encryption and decryption can be performed within the dispatch console, which allows true end-to-end encryption in the radio system. This proposal includes DES-OFB encryption capabilities in each MCC7500 operator position. • Participation in the radio system’s agency partitioning functionality. • Configuration of the console subsystem via the radio system’s centralized configuration subsystem (Network Manager) so the City Radio System Manager has a single point for configuring the radio system. The configuration subsystem may be accessed from multiple remote locations so users can still have convenient access while enjoying the benefits of centralized configuration. • Management of the console subsystem via the radio system’s centralized network management subsystem so the City has a single point for managing faults, accounting, performance, and security of the radio system. The network management subsystem may be accessed from multiple remote locations so the City can still have convenient access while enjoying the benefits of centralized management. ♦ Centralized and/or distributed logging of conventional and trunked radio audio, associated radio call information, and certain radio system events when used with the MCC7500 IP Logger (not included in this proposal) ♦ Higher capacities in numerous areas (64,000 talkgroups, thousands of logging “tracks”).

Figure 3-1: Typical layout of the MCC 7500 console in a dispatch center along with two other public safety terminals.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-3

3a.4.1 MCC 7500 System Components Motorola MCC 7500 console equipment connects directly to the trunking system’s IP transport network. It uses IP packet protocols for passing call control data and call audio through the system.

3a.4.1.1 Proposed Equipment Description The MCC 7500 dispatch console is based on a Motorola-certified, commercially available personal computer customized with Motorola-provided hardware and software. The proposed Motorola hardware includes the following equipment at each of the operator positions: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

One (1) Motorola-certified personal computer, including keyboard, mouse, and 19-inch LCD touch screen monitor One (1) Voice Card installed inside the computer One (1) Secure Card installed inside the computer One (1) General Purpose Input/Output Module (GPIOM) Two (2) desktop speakers Two (2) headset jacks Two (2) Headsets with Headset Base and PTT Switch One (1) desktop microphone One (1) dual pedal footswitch One (1) software based dual Instant Recall Recorder

The hardware elements that comprise the dispatch console are described in the following paragraphs. General Purpose Input/Output Module (GPIOM) The GPIOM connects to the Voice Card and performs the digital-to-analog and analog-to-digital conversions for all analog audio flowing into or out of the dispatch console. It is designed so it can be mounted in furniture, placed on top of a writing surface, or mounted in an EIA 19-inch rack. It is also capable of supporting monitors weighing up to 80 pounds (36 kg). It provides the connections for the following items: ♦

Speakers ♦ Headset Jacks ♦ Microphone ♦ Footswitch

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page



Local Logging Recorder (not included) ♦ 911 Telephone Headset (not included) ♦ Instant Recall Recorder for Radio The connections for the above items use RJ45 connectors except for the headset jack connectors, which are DB15. The audio inputs and outputs are 600 Ohms, balanced and transformer coupled, except for the microphone, which is 2000 Ohms, balanced, and does not use a transformer. The headset jack connectors accept or provide audio levels appropriate for the devices being connected. The Voice Card in the operator PC provides the vocoding and audio processing services for the dispatch console. It is capable of supporting IMBE (for ASTRO 25) vocoder algorithms as well as supporting audio level adjustments, summing and filtering. It is also capable of supporting multiple simultaneous streams of audio. The Secure Card in the operator PC provides the encryption and decryption services for the dispatch console. It is capable of supporting multiple simultaneous encryption/decryption sessions using up to four encryption algorithms and multiple secure keys. If no Secure Card is present, the LAN connection for the dispatch console is provided by the Voice Card. If a Secure Card is present, then the LAN connection is provided by the Secure Card to ensure the proper separation of coded and clear audio. Figure 3-1 shows the hardware architecture of the Motorola MCC 7500 dispatch console. The paragraphs that follow provide additional detail on the hardware components of the MCC 7500 dispatch console positions.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-5

Desktop Speakers Desktop Microphone

Headset Jacks

Analog

Console Site Link (WAN)

GPIOM Footswitch Local Logging Recorder Instant Recall Recorder External Paging Encoder External Telephone Set

LAN Switch

IEEE 1394

Router

Dispatch Console PC Voice Card

MCC 7500 Dispatch Consoles

H.100 Crypto Card

LAN Note: If Secure Capability is not used in the op, then the Crypto Card is not included and the LAN connection is made to the Voice Card.

Figure 3-2: Motorola MCC 7500 Dispatch Console Hardware Architecture

Personal Computer (PC) The dispatch console uses a customized Motorola certified personal computer running the Microsoft Windows operating system and containing a Motorola-designed Voice Card and a Motorola-designed Secure Card. The PCs used in ASTRO 25 systems have a mini tower form factor. The PCs are processed through Motorola factories so that the application software, Voice Cards, and Secure Cards can be installed and tested to ensure they are operating properly. Desk Microphone The dispatch console is capable of supporting a single desk microphone. The desk microphone contains a microphone cartridge on a flexible shaft and two buttons in its base. One button controls the General Transmit feature and the other controls the Monitor feature. The desk microphone may be permanently fastened down or it may be left loose so the dispatch console user can pick it up during use. The 18-inch long flexible shaft allows the base to be placed behind a keyboard or writing area and still be able to position the microphone cartridge within a few inches of the speaker's mouth.

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-6

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

If a desk microphone is connected to a dispatch console while no headsets are connected, the desk microphone is active whenever any transmit function is active. If a desk microphone is connected to a dispatch console while one or two headsets are connected, then the desk microphone is only active during a transmit function if its transmit button is pressed. This prevents the desk microphone from picking up unwanted background sound while the dispatch console user is using a headset to transmit.

Figure 3-3: The MCC 7500 is Motorola’s latest IP based console.

Headset Jack A dispatch console is capable of supporting up to two headset jacks. A headset jack allows a dispatch console user to use a headset while operating the dispatch console. The headset jack supports headsets which use either PJ7 (6-wire) or PJ327 (4-wire) long frame connectors (6-wire headsets have a PTT button while 4-wire headsets do not have a PTT button). The headset jack contains two volume controls; one for adjusting the level of received radio audio and one for adjusting the level of received telephone audio. A small dimple is molded into the headset jack housing near the telephone volume control so the dispatch console user can tell them apart without having to look at them. Desktop Speaker A dispatch console is capable of supporting multiple speakers through which audio is presented to a dispatch console user. Each speaker on a dispatch console contains unique audio; that is, an audio source cannot appear in multiple speakers at a single dispatch console.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-7

The speaker is a self-contained unit that may be placed on a desktop, mounted in a rack/furniture, mounted on a wall, or mounted on a computer monitor. It contains an amplifier that provides a maximum of 2 Watts of power output. Input Power for the speaker is obtained from the GPIOM via it’s interconnect cable. A mounting bracket is included with the speaker. Footswitch The dispatch console is capable of supporting a single footswitch. The footswitch can contain either one or two pedals. Telephone/Headset Port The Telephone/Headset Port allows an external telephone set to be connected to the dispatch console. The dispatch console’s headset can then be used to communicate on both the radio system and the telephone set. The port provides the following inputs and outputs: ♦

A balanced 600 Ohm analog audio output containing the headset’s microphone audio ♦ A balanced 600 Ohm analog audio input for the external telephone’s received audio ♦ An input buffer for the Off Hook signal from the external telephone ♦ An input buffer for an Auxiliary Jack Sense signal from the external telephone When the dispatch console senses a dry closure on the Off Hook input buffer, it removes the selected radio audio from the headset earpiece and puts it back in the appropriate speaker(s). It then routes any audio appearing at the Telephone/Headset Port’s audio input to the headset earpiece. It also routes headset microphone audio to the Telephone/Headset Port’s audio output. This allows the dispatch console user to communicate hands-free on the telephone set. When the dispatch console senses a dry closure on the Auxiliary Jack Sense input buffer, it ignores any closures on the Off Hook input buffer. This causes the headset to work with the radio system instead of the external telephone system. This allows the dispatch console headset to be used for radio operations when another person is staffing the telephone set. If the dispatch console user transmits on any radio resources while the Off Hook signal is active, the headset microphone is re-routed to the radio system for the duration of the transmission. When the transmission is ended, the headset microphone is routed back to the Telephone Headset Port’s audio output. The headset earpiece audio routing is not changed during the transmission, so the dispatch console user can still hear the telephone’s received audio.

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-8

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

The Telephone/Headset Port allows a dispatch console user to use a single headset to communicate on both the radio system and a telephone system (e.g., a 911 system). Instant Recall Recorder Port (for Radio) The Instant Recall Recorder Port (for Radio) allows an instant recall recorder to be connected to a dispatch console. The port provides an RJ45 connector with a balanced, 600 Ohm analog audio output containing the receive radio audio on the selected channels. Transmit audio of any type (from either this dispatch console or a parallel dispatch console) as well as tones generated by the dispatch console (emergency tones, callback tones, busy tones) are not included in the audio output. If transmit audio is desired for the instant recall recorder, the Long Term Logging Port may be used instead of the Instant Recall Recorder Port. Both outputs have the same electrical characteristics; only the content of the audio is different. No playback speaker input or recording control line output are provided on the port. Dispatch console generated tones (e.g., emergency alarm tones, trunking busy tones, error tones, etc.) are not included in the audio appearing at the analog audio output. This is done so that they do not interfere with the dispatch console user’s ability to understand the voice audio that was recorded. Short-term, console-specific audio recording is a mechanism used to record a portion of the inbound audio present on a specific dispatch console and make it readily available to the dispatch console user. This recorded audio is retained by the recording system for a short period (typically about 60 minutes) and is easily played back by the dispatch console user. This allows the dispatch console user to replay received audio, which the user may have missed. Long Term Logging Port The Long Term Logging Port allows an external logging recorder (customer provided) to be connected to a dispatch console. The port provides an RJ45 connector with a 600 Ohm balanced analog output. The audio that appears on this output is configurable, but is typically the audio that was transmitted and/or received at that dispatch console. The configuration of audio to be presented at this port is tied to the physical dispatch console, so that no matter what user is logged into the console, the same type of audio is logged. This configuration is done as part of configuring the dispatch console at the radio system's network manager. The long term logging port can be configured to log any combination of these audio sources: ♦

Audio received from the currently selected radio resources (note that the level of this audio is not affected by either the individual volume setting of the radio resource or the master volume control on the speaker or headset jack)

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-9



Microphone audio being transmitted to the currently selected radio resources by this dispatch console user ♦ Microphone audio being transmitted to unselected radio resources by this dispatch console user ♦ Any tones generated by the dispatch console that appear in its speakers (trunking tones, emergency tones, etc.) ♦ Tones generated by an external paging encoder Please note that this output may be used with an instant recall recorder as well as a long term logging recorder. Long term, console-specific audio recording is a mechanism used to record a portion of the inbound and outbound audio present on a specific dispatch console. This is historically done by providing a logging port at the dispatch console, and wiring that port to a track of an audio recording device. The recordings are then archived for long-term storage, and provide a historical record of the radio communications made at a given dispatch console.

3a.4.1.1.1 Network Connectivity All IP devices within the console site connect to the same network segment, which, in turn, connects to the main P25 network. Figure 3-4 is a simplified diagram of the general network structure employed:

Figure 3-4: Simplified Diagram of the General Network Structure

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-10

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

3a.4.1.1.2 Backup City-provided portable subscriber radios will be used for backup to the MCC 7500 console system at the City of Philadelphia Prison System locations. These radios will serve as emergency backup for each of the console positions. For training purposes, four (4) high-tier mobile subscribers, XTL5000 Consolettes are included for use as backup control stations at the 990 Spring Garden Street Training Facility, to mimic the setup at the Police Administration Building (PAB) Dispatch site. Each of the four XTL Consolettes shall be connected in to the MCC7500 console system via a Conventional Channel Gateway (CCGW) thus allowing each Consolette to appear as a resource tile in the Elite Dispatch GUI on the MCC7500. These stations will allow dispatchers to continue communications should the main console positions become inoperative. Each station and its power supply can be integrated into the furniture of its respective dispatch position. One (1), eight (8)-port control station combiner is used to connect the control stations into two (2), roof-mounted antennas. Each control station connects to the combiner network through a run of up to twohundred (200) feet of1/4-inch super flex transmission line. Backup stations are included to provide an alternate half-duplex wireless path to the radio network. Each station includes AC surge and coaxial lightning suppression.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-11

This page left intentionally blank.

City of Philadelphia ASTRO 25 Upgrade Option 3 - System Description / Technical Overview June 13, 2008 Option 3a.-12

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 3b. Statement of Work Prisons and Training Consoles 3b.1 General Information This Statement of Work (SOW) defines the principal activities and responsibilities of all parties for the implementation of option to install eleven (11) consoles to the prisons and provide four (4) consoles for the training purpose, described in this proposal as part of the City of Philadelphia Project 25 system proposal. The System Description provides information on the equipment implemented under this scope. A System Description is included in this proposal.

3b.2 Statement of Work Overview The following major subsystems are included as components of the Project Statement of Work:

3b.2.1 Option 3: Prisons and Training Consoles ♦

Provide and install eleven (11) MCC 7500 dispatch operator positions ♦ Provide four (4) MCC 7500 dispatch operator positions for Police Training Facility

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 3 – Statement of Work June 13, 2008 Option 3b.-1

3b.3 System Implementation Overview Motorola’s proposal to the City of Philadelphia provides systems integration and implementation services to deploy fully functional consoles. Motorola’s experience as a Systems Integrator, deploying large and complex communication and software systems, will provide a smooth system implementation and cutover to the new communications system. This SOW specifically addresses the implementation of the Prisons and Training Consoles. Motorola’s local Systems Integration teams are highly skilled at deploying systems of the size and complexity of this communications system. Motorola provides a phased approach to implementation, with the following phases: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Project Initiation and Kick Off Design Review Order Processing, Manufacturing & Factory Testing Installation Systems Integration & Optimization Acceptance Testing Training Cutover Project Finalization Warranty Support

Motorola has provided a preliminary design as a part of this proposal, which serves as a baseline for the Design Review. The Design Review encompasses the design finalization, such as finalization of the site location and the coverage design. Motorola will work closely with the City of Philadelphia to develop a cutover plan gracefully add the new site to the system. At the end of the Design Review phase, detailed Design Documents will be provided to the City of Philadelphia. Equipment manufacturing is followed by factory staging of the radio infrastructure at Motorola’s Customer Center for Solutions Integration (CCSi) in Schaumburg, Illinois. Once the City decides to purchase this option as part of the base proposal, factory staging will provide for initial assembly and testing of all Motorola manufactured radio system components. Factory staging will allow testing of the functional capabilities of the communications system. This process will allow the City of Philadelphia to witness factory testing in a controlled environment, as well as provide a smooth and easy field installation.

City of Philadelphia ASTRO 25 Upgrade

Option 3 – Statement of Work June 13, 2008 Option 3b.-2

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Motorola’s local implementation team will install the consoles. Motorola will then execute Acceptance Testing according to an Acceptance Test Plan (ATP). The final steps to full system implementation are delivery of system documentation, punchlist resolution, and final acceptance. The project team and the post-acceptance service team will work with City of Philadelphia during this phase, to ensure a smooth transition to the post acceptance support period.

3b.4 Project Scope Motorola is proposing the addition of eleven (11) MCC 7500 dispatch operator positions for the City of Philadelphia Prison System. These eleven (11) operator positions will each be installed in a separate location within the prison system. Motorola is also proposing four (4) MCC 7500 dispatch operator positions for Police Training Facility. These four (4) operator positions will be installed at the 990 Spring Garden Street Training Facility. The MCC 7500 is Motorola’s newest technology in dispatch solutions.

3b.5 Contract Initiation - Kickoff Meeting and Initiation Activities The project will be initiated with a Project Kickoff meeting including key City of Philadelphia and Motorola project participants. The objectives of the Kickoff meeting include: ♦ ♦ ♦ ♦ ♦ ♦

Introduce and exchange contact information of all project participants. Review roles of key participants and project review procedures. Establish a clear chain of communication and authority. Review overall project scope and objectives. Review resource and scheduling requirements. Review preliminary project schedule with the City of Philadelphia.

During the Project Initiation phase, Motorola will review and work with the City of Philadelphia to finalize the following project processes and procedures: ♦ ♦ ♦ ♦ ♦ ♦

Site Access Procedures Site Installation Requirements Detailed Project Schedule Risk Management Plan Change Control Plan Issues Document and Action Item Log

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 3 – Statement of Work June 13, 2008 Option 3b.-3

3b.6 Design Review The City of Philadelphia and Motorola will review the channel expansion design through analysis of the sites and frequencies, as mutually agreed between Motorola and City of Philadelphia. During this portion of the project, the Project Plan will be developed. Design Review deliverables include: ♦

Finalize Console Design ♦ Finalize Acceptance Test Plans ♦ Cutover Plan ♦ Final Implementation Schedule

3b.7 Site Requirements Review During this phase of the project, the final location of the consoles will be determined. It is not within the scope of this contract to provide, assemble, and/or repair any existing console furniture. The installation of the console equipment will commence upon notification from the City that any required furniture is ready for use. The City shall assign one (1) representative to work with Motorola on the console installation issues. This representative shall have full authority to accept any and all equipment layouts and installations. Any changes made once the City has agreed to an installation layout shall result in a change order for services to Motorola. All furniture (if metal) shall be common-bonded. All electrical distribution points shall be installed and provided for by the City. The electrical connection points and network connection points must be within 3 feet of the final console equipment being powered. Any and all surge, UPS, generator backup systems must be connected to this AC power connection point for all console positions, and are the responsibility of the City. Console furniture ventilation must be provided for by the City. Furniture cavities must have proper air flow as to prevent superheating of hardware components. Any equipment cavity reaching an excess of 80 degrees F, shall be grounds to cancel all manufacturer warranty claims.

City of Philadelphia ASTRO 25 Upgrade

Option 3 – Statement of Work June 13, 2008 Option 3b.-4

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

3b.8 Staging As part of the base system, the console equipment will be staged at Motorola’s staging facility in Schaumburg, IL. City of Philadelphia representatives will have the option to witness the testing and demonstration of their system. Because the system is composed existing equipment and new equipment, the staging effort will include the stageable subsystems. Full system testing will occur when the new and upgraded equipment are integrated in the field during Field Acceptance Testing.

3b.9 Installation and Optimization The installation and optimization of the equipment will prepare the system for acceptance testing and cutover. This includes the installation and programming.

3b.10 Acceptance Testing Acceptance testing will be conducted in accordance with the final ATPs defined during the Design Review. Motorola’s proposal includes Functional Acceptance Testing.

3b.11 Training The required training is included in the base proposal of the project.

3b.12 Cutover The cutover will be executed in accordance with a mutually agreed upon cutover plan that will minimize the impact to the users of the City of Philadelphia system.

3b.13 System Acceptance System acceptance will be governed by the successful execution of the ATPs, as well as delivery of deliverables such as documentation, and resolution of any punchlist items.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade

Option 3 – Statement of Work June 13, 2008 Option 3b.-5

3b.14 Responsibility 3b.14.1 Customer Responsibility It will be the City’s responsibility to provide: ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦

Access to the sites on a timely basis The necessary escorts for the installations or site visits Site links within 3 feet of the console equipment AC Power within 3 feet of the console equipment Any required Generators The required space Any required console furniture UPS equipment Type I & Type II surge suppression Sufficient HVAC Environmental and grounding facilities

The City will be responsible to verify the existing backup power systems are sufficient to support the new equipment additions to existing facilities.

3b.14.2 Assumptions Motorola has made the following assumptions in development of this budgetary quotation: ♦ ♦

♦ ♦ ♦ ♦

One-time installation is included in this proposal. All sites will meet Motorola’s R56 2005 Standards for Communications sites. • Sufficient space exists at the equipment locations • Adequate power is available to support the new equipment • Grounding meets Motorola’s R56 installation standards • Existing generators have adequate capacity to support the equipment System backhaul will be provided by the City of Philadelphia that meets Motorola’s link specifications. No spares are included The City is responsible for all licenses, permits, etc required for the implementation of this system No civil work or site upgrades are included in Motorola’s quotation

City of Philadelphia ASTRO 25 Upgrade

Option 3 – Statement of Work June 13, 2008 Option 3b.-6

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Option 3c. Acceptance Test Plan 3c.1 Sample Functional Acceptance Test Plan This Sample Acceptance Test Plan (ATP) has been developed to demonstrate the functional operation of the MCC7500 Console positions for Prisons and Police Training proposed as an option to the ASTRO 25 IP Radio System Upgrade. The final ATP procedures may differ from the detailed procedures outlined in this document. As long as the intent of the test is verified, the test will be considered a pass. The final ATP document will be mutually agreed upon prior to testing.

3c.1.1 Test Methodology Both the City of Philadelphia and Motorola will complete each test according to an ATP script with various pass/fail checkpoints and signoff after the tests are completed.

3c.1.2 Post ATP Requirements Upon completion of the fixed network ATP, a punch list of issues and timelines will be developed, if necessary.

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 3 – Acceptance Test Plan June 13, 2008 Option 3c.-1

3c.1.2.1 MCC 7500 Features

Talkgroup Selection and Call 1. DESCRIPTION

2. TEST

The Talkgroup Call is the primary level of organization for communications on a trunked radio system. Dispatchers with Talkgroup Call capability will be able to communicate with other members of the same talkgroup. This provides the effect of an assigned channel down to the talkgroup level. When a Talkgroup Call is initiated from a subscriber unit, the call is indicated on each dispatch operator position that has a channel control resource associated with the unit's channel/talkgroup.

Step 1. Initiate a wide area call from any operator position on TALKGROUP 1. Step 2. Observe that RADIO-1 and RADIO-3 will be able to monitor the call. De-key the console and have either radio respond to the call. Step 3. Observe that all Consoles with TALKGROUP 1 can monitor both sides of the conversation.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 2 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2 C1 - TALKGROUP 1 C2 - TALKGROUP 2

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Option 3 – Acceptance Test Plan Option 3c.-2

Step 4. Initiate a wide area call from any operator position on TALKGROUP 2. Step 5. Observe that RADIO-2 and RADIO-4 will be able to monitor the call. De-key the console and have either radio respond to the call. Step 6. Observe that all Consoles with TALKGROUP 2 can monitor both sides of the conversation.

Pass____ Fail____

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title pageJune 13, 2008

MCC 7500 Features

2. TEST

Gold Elite/MCC 7500 Interoperability Talkgroup Selection and Call

Step 1. Initiate a wide area call from any Gold Elite operator position on TALKGROUP 1.

1. DESCRIPTION The talkgroup call is the primary level of organization for communications on a trunked radio system. Dispatchers with talkgroup call capability will be able to communicate with other members of the same talkgroup. This provides the effect of an assigned channel down to the talkgroup level. When a talkgroup call is initiated from a subscriber unit, the call is indicated on each dispatch operator position that has a channel control resource associated with the unit's channel/talkgroup.

Step 2. Observe that RADIO-1 and RADIO-3 will be able to monitor the call. Step 3. Observe that any MCC 7500 Console on TALKGROUP 1 is able to monitor the call. Step 4. De-key the Gold Elite console and have either radio respond to the call. Step 5. Observe that all Consoles (both Gold Elite and MCC 7500) with TALKGROUP 1 can monitor both sides of the conversation. Step 6. Initiate a wide area call from any MCC 7500 operator position on TALKGROUP 2.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 2 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2

Step 7. Observe that RADIO-2 and RADIO-4 and any Gold Elite Console monitoring TALKGROUP 2 will be able to monitor the call. Step 8. De-key the MCC 7500 console and have either radio respond to the call. Step 9. Observe that all Consoles (both Gold Elite and MCC 7500) with TALKGROUP 2 can monitor both sides of the conversation.

VERSION #1.02 SPS #7.5

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

Pass____ Fail____

City of Philadelphia ASTRO 25 Upgrade Option 3 – Acceptance Test Plan June 13, 2008 Option 3c.-3

MCC 7500 Features

2. TEST

Secure Talkgroup Selection and Call

Step 1. Initiate a secure wide area call from any Gold Elite operator position on TALKGROUP 1.

1. DESCRIPTION The talkgroup call is the primary level of organization for communications on a trunked radio system. Dispatchers with talkgroup call capability will be able to communicate with other members of the same talkgroup. This provides the effect of an assigned channel down to the talkgroup level. When a talkgroup call is initiated from a subscriber unit, the call is indicated on each dispatch operator position that has a channel control resource associated with the unit's channel/talkgroup.

Step 2. Observe that RADIO-1 and RADIO-3 will be able to monitor the secure call. Also observe that any MCC 7500 Console on TALKGROUP 1 is able to monitor the secure call. Step 3. Dekey the Gold Elite console and have either radio respond in secure to the call. Step 4. Observe that all Consoles (both Gold Elite and MCC 7500) with TALKGROUP 1 can monitor both sides of the conversation.

Note: Radios used in this test must be secure capable.

Step 5. Dekey the radio.

SETUP

Step 6. Initiate a secure wide area call from any MCC 7500 operator position on TALKGROUP 2.

RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 1 RADIO-3 - TALKGROUP 1 RADIO-3 - SITE - SITE 2 RADIO-4 - TALKGROUP 2 RADIO-4 - SITE - SITE 2 TALKGROUP 1 uses "CKR1" and TALKGROUP 2 uses "CKR2". All radios are set for secure transmit. All Consoles (MCC 7500 and Gold Elite) are configured with TALKGROUP 1 and TALKGROUP 2 with CKR1 and CKR2 assigned, respectively. Encryption Keys for "CKR1" and "CKR2" are properly loaded in all Radios and Consoles.

Step 7. Observe that RADIO-2 and RADIO-4 will be able to monitor the secure call. Also observe that any Gold Elite Console on TALKGROUP 2 is able to monitor the secure call. Step 8. Dekey the MCC 7500 console and have either radio respond in secure to the call. Step 9. Observe that all Consoles (both Gold Elite and MCC 7500) with TALKGROUP 2 can monitor both sides of the conversation. Step 10. Dekey the radio.

VERSION #1.02 SPS #7.5

City of Philadelphia ASTRO 25 Upgrade Option 3 – Acceptance Test Plan Option 3c.-3-4

Pass____ Fail____

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title pageJune 13, 2008

MCC 7500 Features

2. TEST

Console Operator Secure/Clear Mode Mismatch Indication

Step 1. Initiate a Secure Talkgroup call on RADIO1 by hitting the PTT.

1. DESCRIPTION This test validates the ability of the console to show a visual indication of a Secure and Clear mode mismatch during the following conditions: 1. Talkgroup on the Console is in secure transmit mode but receiving clear audio. 2. Talkgroup on the Console is in clear transmit mode but receiving secure audio.

Step 2. Verify that C1 is able to receive audio from RADIO-1. Step 3. Place RADIO-1 in clear TX mode. Step 4. Initiate a Talkgroup call on RADIO-1 by hitting the PTT. Step 5. Verify that C1 is able to receive audio from RADIO-1 and displays a secure mode mismatch indication.

SETUP Step 6. Place RADIO-1 in secure transmit mode and place C1 in clear transmit mode.

RADIO-1 TALKGROUP 1 (Secure TX mode) RADIO-1 - SITE - SITE 1 Console 1 - C1 C1 TALKGROUP 1 (Secure TX mode)

Step 7. Initiate a Secure Talkgroup call on RADIO1 by hitting the PTT.

VERSION #1.02 SPS #7.5

Step 8. Verify that C1 is able to receive audio from RADIO-1 and displays a secure mode mismatch indication.

Pass____ Fail____

Motorola Confidential Restricted Use or disclosure of this proposal is subject to the restrictions on the title page

City of Philadelphia ASTRO 25 Upgrade Option 3 – Acceptance Test Plan June 13, 2008 Option 3c.-3-5

MCC 7500 Features

2. TEST

Multigroup Call

Step 1. Select the ATG 1 resource, which corresponds to TALKGROUP 1, TALKGROUP 2, and TALKGROUP 3.

1. DESCRIPTION This trunking feature allows an equipped console operator position to transmit an announcement to several different talkgroups simultaneously. As with Talkgroup Calls, multigroup calls operate across sites as well as within the same site. * Multigroups are set up through both the UCM and the Subscriber Programming software.

SETUP RADIO-1 - TALKGROUP 1 RADIO-1 - SITE - SITE 1 RADIO-2 - TALKGROUP 2 RADIO-2 - SITE - SITE 2 RADIO-3 - TALKGROUP 3 RADIO-3 - SITE - SITE 3 (SITE 1 if only 2 Sites) RADIO-4 - RANDOM RADIO-4 - SITE - SITE 4 (SITE 2 if only 2 Sites) * TALKGROUP 1, TALKGROUP 2, & TALKGROUP 3 are members of ATG 1. * RANDOM is any talkgroup not a member of ATG 1.

Step 2. Initiate the Multigroup Call from the operator position. Step 3. Observe that RADIO-1, RADIO-2 and RADIO-3 receive the Multigroup Call. Step 4. Verify that RADIO-4 does not receive the Multigroup Call because it is not a member of ATG 1. Step 5. Answer the Multigroup Call using RADIO-1 and observe the console(s) receive the response. Step 6. Verify that if the call is answered within the repeater hang time, the console will receive the call on the ATG 1 resource tile, otherwise the console will receive the call on the TALKGROUP 1 tile. Step 7. Verify that if the call is answered withi