Permit Fee - City of Kingston

Permit Fee - City of Kingston

City of Kingston Building Services Fees Summary (For accurate Reference, Refer to Rates and Fees By-law Schedule) Effective January 1, 2018 Classes ...

53KB Sizes 0 Downloads 7 Views

City of Kingston Building Services Fees Summary (For accurate Reference, Refer to Rates and Fees By-law Schedule)

Effective January 1, 2018

Classes of Permits

Permit Fee ($ per m²)

Minimum Fee (all permits unless otherwise noted below) Group A: Assembly Buildings 20.53 Shell Permit 26.28 New and Additions 5.75 Alterations and Renovations Group B: Institutional Buildings 20.78 Shell Permit 26.53 New and Additions 5.75 Alterations and Renovations Group C: Residential Buildings 11.79 New and Additions (Single Detached, Semi-Detached and Row House) 13.83 New and Additions (Multi-Unit Buildings, Motels, Hotels) 3.80 Alterations and Renovations 3.80 Secondary Suites (Single Detached, Semi-Detached and Row House) Swimming Pool Enclosures Accessory Structures (Garage/Carport, Shed) Solar Panels (any area) Group D: Business and Personal Services Buildings 12.77 Shell Permit 18.52 New and Additions 5.75 Alterations and Renovations Group E: Mercantile Buildings 9.94 Shell Permit 15.69 New and Additions 5.75 Alterations and Renovations Group F: Industrial and Agricultural Buildings 6.50 Shell Permit 12.25 New and Additions 5.75 Alterations and Renovations Other Permit Classes: Decks/Patios (each) Solar panels (Non-Residential) – per application Temporary Structures - per application 0.86 Demolitions (each) Wood Burning Appliances (each) Designated Structures (each) Signs (per application) Mechanical and Fire Protection Systems: (independent of Building Permit) HVAC Permit (Residential and Non-Residential per suite) New and Alterations to Sprinkler System, Standpipe System or Fire Suppression System Commercial Kitchen Exhaust Systems, Spray Booths, Dust Collectors New and Alterations to Fire Alarm System Electromagnetic Locks, Hold Open Devices, Emergency Lighting (per application) Plumbing Permits: (independent of Building Permit) New and Alterations (Residential per fixture) New and Alterations (Non-Residential per fixture) Backflow Prevention Devices (per application) Sewer Lateral (each) Back Water Valve (each) Administration Fees: Conditional Permit Fee (10% of the required permit fee) Pre Inspection (prior to permit issuance) or Re-Inspection Fee (per inspection or suite) Expedited Plan Review (per hour) Fence and Sign By-law Appeal (each) Alternative Solution proposal (300.00 per hour) Preliminary project review and Revisions to an issued permit (per hour) Limiting Distance Agreement (each) Change of use permit (no construction) Construction prior to permit issuance (40% of the required permit fee)

Flat Fee ($)

120.00

199.00 199.00 268.00

199.00 536.00 199.00 199.00 380.00 200.00 199.00 507.00 360.00 199.00 199.00 10.00 12.00 120.00 199.00 120.00 Min 300.00 50.00 93.00 300.00 Min 2000.00 93.00 300.00 300.00 Min 200.00

City of Kingston Building Services Fees Summary (For accurate Reference, Refer to Rates and Fees By-law Schedule)

Effective January 1, 2018 Rules for Determining Permit Fees: Gross Floor Area means the area of the proposed work measured to the outer face of exterior walls and to the centreline of party walls, firewalls or demising walls and shall include mechanical penthouses and floors, mezzanines, lofts, habitable attics, interior balconies, openings within floor areas (stairs, elevators, shafts, etc.) with the exception of interconnected floor areas, but not unfinished basements and attached garages for single detached, semi- detached, duplex, and townhouse dwellings. Where there is no floor or walls, the gross floor area shall be the greatest horizontal area of the structure. • In the case of interior finishes, alterations or renovations, area of proposed work is the actual space receiving the work, e.g. tenant suite. • Where Demolition of partitions or alterations to existing ceilings are part of an alteration or renovation Permit, no additional charge is applicable. • Corridors, lobbies, washrooms, lounges, etc. are to be included and classified according to the major occupancy for the floor area on which they are located. • The occupancy categories in this Schedule correspond with the major occupancy classifications in the Ontario Building Code. For multiple occupancy floor areas, the Permit fees for each of the applicable occupancy categories may be used, except where an occupancy category is less than 10% of the floor area.

Water : Revenue Meter Installation Service Charges (New installations) Size 5/8” ¾” x 5/8” ¾” 1” 1 ½” 2” (PD) 2” (MAG) 3” (MAG) 4” (Mag) 6” (Mag) 8” (Mag)

Price

Building Water

HST 13%

Total

$215 $215 $270 $335 $735 $860 $2565 $2730 $3645 $4790 $6715

$20 $20 $20 $25 $40 $50 $50 $65 $75 $100 $125

$30.55 $30.55 $37.70 $46.80 $100.75 $118.30 $339.95 $363.35 $483.60 $635.70 $889.20

$265.55 $265.55 $327.70 $406.80 $875.75 $1028.30 $2954.95 $3158.35 $4203.60 $5525.70 $7729.20

Please Note: All meter prices include applicable connection hardware (ie. strainers, flange sets and tail pieces) All prices are based on existing stock and may change without notice. For Meter pricing greater than 8” please contact Richard Rodrigue in Meter Dept. for a Quote and Availability @ 613-546-1181 x 2248

2018 Development Charges and Impost Fees Residential (per unit)

Service Single and SemiDetached Dwelling

Development Charge

$11,316

Impost Fee

$9,723

Apartments

Non-residential (per square foot of gross floor area ) Other Multiple Dwellings

Exempt Industrial

(Duplex, Row House)

(approved exemption form required)

2+ Bedrooms

Bachelor and 1 Bedroom

2+Bedrooms

Dwelling <750 sq. ft. with 1 Bedroom

$7,241

$5,025

$8,667

$3,957

$0.00

NonExempt Industrial

Long Term Care Nursing Homes

$5.71

$5.71

$12.70

$8.89

($2.88) $6,222

$4,318

$7,445

$4,318

$0.00 ($5.27)

Education development charge

NonIndustrial and

$254

Revised: December 4, 2017

$254

$254

$254

$254