Richard B. Russell Oxygen Diffuser System Replacement NALMS 2003 November 5, 2003 Foxwoods Resort, Connecticut Mark H. Mobley, Mobley Engineering, In...

2MB Sizes 0 Downloads 3 Views

Recommend Documents

1 Application of a Reservoir Oxygen Diffuser - Mobley Engineering
Jon Knight, Ph.D., 206 Presbyterian Road, Mooresville, NC 28115. Paul J. Wolff, Ph.D., WolffWare Ltd., PO Box 554, Norri

2012 Richard B. Russell Lake Hunting Map
Page 1. Richard B. Russell Lake. Hunting Map. U.S. Army Corps of Engineers-Savannah.

Richard Russell - Advisor Perspectives
Richard Russell. December 2, 2015 by Jeffrey Saut of Raymond James. A couple of weeks ago I wrote a strategy report titl

CV - Richard Russell
Richard Russell CV page 2 of 9. Russell, R., Kramer, S.S., & Jones, A.L. (In press) Facial contrast declines with age bu

Richard Russell - MIT
Richard Russell. Graduate Student [email protected] Page 2. The Problems: Which computational image similarity metrics c

Stock Guide - Richard Russell
SIZE CONVERSIONS. Metric (mm). Feet. Inches. 915 X 610. 3 X 2. 36 X 24. 915 X 915. 3 X 3. 36 X 36. 1220 X 610. 4 X 2. 48

Richard Russell - WordPress.com
Richard Russell. 2114 Lear Ln. Austin, TX 78745 (512) 299-1261. Relevant. Experience. 5 years of experience managing e-c

Richard A. Russell
Richard A. Russell is a former Senior National Intelligence Service. Executive who served in progressively responsible p

Digital Archives Processing Manual Richard B. Russell Library for
Jun 22, 2015 - Richard B. Russell Library for Political Research and Studies. University of Georgia. Page 1. Note: conta

The Richard B. Russell National School Lunch Act requires the
Aug 22, 2013 - The Richard B. Russell National School Lunch Act requires the information on this application. You do not

Richard B. Russell Oxygen Diffuser System Replacement NALMS 2003 November 5, 2003 Foxwoods Resort, Connecticut

Mark H. Mobley, Mobley Engineering, Inc., PO Box 600 Norris TN 37828 (865) 494-0600, [email protected] J. Stephens Adams, Tennessee Valley Authority, Engineering Pine Rd. Norris, TN 37828 (865) 632-1961, [email protected] John Hains, USACE Trotter’s Shoals Limnological Research Facility, USACE-ERDC PO Box 533, Calhoun Falls, SC 29628, (864) 447-8561, [email protected] James Sykes, USACE Richard B. Russell Operations, 3144 Russell Dam Drive Elberton, GA 30635, (706) 213-3425, [email protected]

Mobley Engineering, Inc., PO Box 600, Norris, TN 37828; (865) 494-0600

Richard B Russell Oxygen Diffuser Replacement – NALMS 2003

Introduction: Since 1985, the Richard B. Russell hydro project on the Savannah River near Calhoun Falls, South Carolina has used pure oxygen distributed in the reservoir to meet water quality requirements in the hydropower releases. The project uses up to $1M worth of oxygen each year to maintain dissolved oxygen levels. The original oxygen diffuser system included diffuser lines immediately upstream of the dam to operate with turbine use and 2,000 feet of diffuser approximately one mile upstream of the dam to operate continuously. All of these diffusers were originally equipped with ceramic diffuser heads that required chemical cleaning, and frequent maintenance. Over the years, the use of the diffusers immediately upstream of the dam was discontinued. About one half of the ceramic diffuser heads on the continuous diffuser were replaced with membrane diffusers to reduce clogging. Nevertheless, leaks and uneven oxygen distribution continued to be a problem.

Line Diffuser: In 2001, the original continuous diffuser was replaced with a porous hose line diffuser design that has ten lines, each 4,000 feet long extending along the old river channel upstream of the Richard B. Russell dam. The oxygen is distributed along the full length of each of these lines during operation, thus spreading the oxygen over a large area to achieve high oxygen transfer efficiencies and reduce oxygen expenditures.

Richard B Russell Oxygen Diffuser Layout

Mobley Engineering, Inc., PO Box 600, Norris, TN 37828; (865) 494-0600

Richard B Russell Oxygen Diffuser Replacement – NALMS 2003

Individual supply lines to each diffuser were installed in a ½ mile trench from the existing oxygen supply facility along a peninsula near the diffuser locations. The diffuser installation in the reservoir was conducted from the surface without divers. The diffusers were assembled from a temporarily closed boat ramp and floated into final position in the reservoir in sections. Floating over a mile of diffuser piping at a time across a popular reservoir required seven workboats, deep anchor points, long rope spans and a patrol boat to warn public boaters. The workboats and anchor points were used to maintain the diffuser location despite changing wind conditions. Once the diffuser was satisfactorily floating above the final location, a buoyancy pipe chamber was pumped full of water to sink the diffuser in a controlled manner to the bottom. This process can be reversed to retrieve the diffuser for maintenance or repositioning.

Line Diffuser Schematic

Mobley Engineering, Inc., PO Box 600, Norris, TN 37828; (865) 494-0600

Richard B Russell Oxygen Diffuser Replacement – NALMS 2003

Initial Operation: The diffuser installation was completed with some preliminary testing in September 2001. Results indicated some disparity in the individual diffuser line flows and difficulty in obtaining full system design flow during test conditions that included temporary piping and flow control.

Oxygen Supply Facility Modifications During 2002, the existing liquid oxygen supply facility was modified to reliably achieve the maximum design flow capacity, a new oxygen flow control system was completed, and several diffuser lines were modified to provide better flow capacity. The WaterView® performance monitoring system was installed to monitor operation of the oxygen system, provide annunciation of system alarms, and provide remote control from the powerhouse of the valves that control individual line flows. Startup testing was completed in August 2002 including operation of the system at over 200 tons of oxygen per day.

Richard B Russell Oxygen Distribution and Flow Control Manifold

Results: The oxygen system was operated successfully for the remainder of the 2002 season and all of the 2003 season to maintain release dissolved oxygen levels. Late in 2003, an additional diffuser line was run laterally on top of an old cofferdam near the powerhouse to distribute some of the oxygen input higher and closer to the dam.

Mobley Engineering, Inc., PO Box 600, Norris, TN 37828; (865) 494-0600

Richard B Russell Oxygen Diffuser Replacement – NALMS 2003

0

Depth (m)

10 20 30 40

14 August 2002 0

2

4

6

8

10

12

14

16

Distance from Dam (km)

0

DO mg/L

O2 Injection Rate (tons/day)

120

1

2

3

4

5

6

7

Dissolved Oxygen (mg/l)

8

9

10

11

O2 Injection Rate (tons/day)

100

10 9 8

80

7

60

6

40

5

20

4

0 May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Dissolved Oxygen (mg/l)

0

3 2002

Richard B Russell Profiles Upstream 8/03

500

Downstream 8/03

480

Upstream 9/30/03 460

Downstream 9/30/03

Elevation (ft)

440 420

Intake Elevation

400 380 360

Top of Coffer Dam

340 320 300 0

1

2

3

4

5

6

7

8

DO (mg/L)

Mobley Engineering, Inc., PO Box 600, Norris, TN 37828; (865) 494-0600

9

Richard B Russell Oxygen Diffuser Replacement – NALMS 2003

Waterview® Performance Monitoring System Environmental Display Screen

Conclusion: The new diffuser system at Richard B. Russell offers tremendous flexibility with individual control of each diffuser line, but this system places oxygen differently in the reservoir from what the operators are accustomed to and continued monitoring will be required to optimize the operation. Compared to the old continuous system, the line diffuser places oxygen much lower in the reservoir due to the low energy bubble plume and high oxygen transfer efficiency of its design. The oxygen input is also spread over almost a mile in the forebay instead of a single cross-section point. Thus, the operation characteristics of the new diffuser system will require new approaches to optimize the timing and rate of the oxygen placement to meet release DO requirements. The WaterView® performance monitoring system will provide valuable control and monitoring functions as the diffuser operations are adjusted to match turbine operation, total water flow and seasonal oxygen demands in the reservoir. Flexibility in oxygen placement, monitoring and control will be even more important in meeting the more complicated demands of maintaining downstream DO requirements with the re-initiation of pumped storage operations at Richard B. Russell.