TS Kensington_Shopfront Proposed

TS Kensington_Shopfront Proposed

GENERAL NOTES NOTE: This drawing is to be read in conjunction with standard details and specifications. All dimensions are to be verified on site. All...

550KB Sizes 0 Downloads 6 Views

Recommend Documents

TS mark
Oct 1, 2017 - The b inspec. Report to insurance company. Report to police. For those when a TS mark affixed on their bic

Leseprobe - Societäts-Verlag
(Tennessee Williams, Die Glasmenagerie). Der Herr machte dem Kain ein Zeichen, damit ihn niemand er- schlage, wer immer

RÄ TS EL - Cooperation
bekannt und später Regisseur. In welchem. Film führte er allerdings nicht Regie? a Mein Führer – Die wirklich wahrste. W

Download - TS Selb
Trio Roland Dorschner, Volker Eheim und Robert Schönberner, und das sehr eifrig, .... Gosbert Durchholz, zbV Manfred Pa

porträts - Grafilu
... unter [email protected] Abdigani Diriye für MIT Technology Review. Joachim Kaiser für SZ-Magazin. Digitale

151206 Produzentenporträts
«Confrérie des Chevaliers du Tastevin» und gehört zum. Degustationsteam der Fachzeitschrift «Bourgogne aujourd'huiÂ

TO TO TS TS AB Kl Kl - Agfeo
Anschaltung eines Ritto Twinbus TFV 4680/00 an die AGFEO-Telekommunikationsanlagen. AS 190 und AS191. Die Weitergabe und

TS 102 613 - ETSI
The present document specifies the Single Wire Protocol (SWP). SWP is the interface between the UICC and the CLF. The pr

HERZ TS-3000
HERZ-3000-Thermostatventile, Bypasskörper für Einrohranlagen mit ... Beim Einsatz von HERZ- Klemmsets für Kupfer- und

GENERAL NOTES NOTE: This drawing is to be read in conjunction with standard details and specifications. All dimensions are to be verified on site. All works are to comply with current building regulations.

NOTES: 1. CENTRAL EXTERIOR MARBLE PILLASTER TO BE CLAD: * SATIN ALUMINIUM SHEET (BLACK RAL 9005) APPLIED TO FRONT & SIDE FACES ONLY. 2. PAINT FIRST FLOOR WINDOW BULKHEAD - BLACK (FRONT FACE & UNDER SIDE). 3. LIGHTS TO BE POSITIONED ONTO MANNEQUINS. 4. LIGHTING CANS TO BE APPLIED TO SIDES OF GROUND FLOOR WINDOWS.

SETTING OUT THE CONTRACTOR SHALL NOTE THAT ALL DRAWINGS HAVE BEEN PREPARED FROM DIGITAL SURVEY DETAILS OR 'AS EXISTING' DRAWINGS PROVIDED BY OTHERS AND AS SUCH ACCURACY CANNOT BE ASSUMED. IT IS THE MAIN CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL NECESSARY CHECKS TO ENSURE ACCURACY OF CONSTRUCTION DRAWINGS AND ACTUAL CONSTRUCTION. ALL MAIN CONTRACTOR CONSTRUCTION DRAWINGS (TO A MINIMUM SCALE OF 1:20) REQUIRE WRITTEN APPROVAL BY ARCADIA GROUP LTD PRIOR TO PROCUREMENT/INSTALLATION. IN THE EVENT OF ANY DRAWING DISCREPANCIES IT IS THE MAIN CONTRACTOR'S SOLE RESPONSIBILITY TO HIGHLIGHT THEM IN A TIMELY MANOR TO ARCADIA GROUP LTD TO ENSURE ANY DISCREPANCIES CAN SUITABLY ASSESSED PRIOR TO CONSTRUCTION WORKS. ANY/ALL MATERIAL CHANGES MADE BY THE MAIN CONTRACTOR TO THE DESIGN INFORMATION ISSUED BY ARCADIA GROUP LTD TO RECEIVE WRITTEN APPROVAL IN ADVANCE PRIOR TO PROCUREMENT OR INSTALLATION. IT IS THE MAIN CONTRACTOR'S RESPONSIBILITY TO DETAIL ALL NECESSARY TECHNICAL ELEMENTS (FOR EXAMPLE: MAKE UP FLOOR SCREEDS, STRUCTURAL WORKS, EXPANSION/ADPATATION/REFURBISHMENT OF ELECTRICAL SUPPLY) OF BUILD TO FACILITATE THE INSTALLATION OF DESIGN INTENT ELEMENTS AS DETAIL.

2

3080

GRAPHICS

3080

SCALE DIMENSIONS ON SITE AND ALL EQUIPMENT SIZES TO BE VERIFIED PRIOR TO WORK COMMENCING.

GRAPHICS

SPECIFICATION & STANDARD DETAIL DOCUMENTS THIS DWG SHALL BE READ IN CONJUNCTION WITH STANDARD DETAIL DWGS AND SPECIFICATION OF WORKS WHERE PROVIDED BY THE ARCADIA GROUP LTD.

LOUVRED AREA

GRAPHICS

FINISHES SCHEDULE REFER TO CURRENT FINISHES SCHEDULE FOR SPECIFICATIONS OF FINISHES REFERENCED WITHIN THIS AND RELATED DWGS. ALL FINISHES TO BE SUBMITTED AS ACTUAL SAMPLES TO ARCADIA GROUP LTD FOR APPROVAL PRIOR TO PROCUREMENT OR INSTALLATION.

GRAPHICS GRAPHIC WINDOW DISPLAY

TOPSHOP WINDOW DISPLAY

It is the contractors responsibility to ensure that all elements of the project build are installed as per the layouts, designs and details within this and accompanying drawings. Any site variations or technical restrictions preventing this must be highlighted to the relevant Arcadia project manager as a matter of urgency prior to relevant works commencing. It is then the role of the project manager to ensure approval of any site/design changes with Arcadia Store Design Dept in writing along with that of the brand. Any changes made without the express authorisation of the Arcadia Design Team will be deemed to be errors and should be rectified without cost to Arcadia Group Ltd. In all instances, if in doubt ask for clarification.

NEW PANEL

A SHOPFRONT

MISS.SIXTY SHOPFRONT

TOPSHOP WINDOW DISPLAY

EXISTING SHOPFRONT

B ISSUE FOR PLANNING. A FIRST ISSUE ISSUE REVISION

TOPSHOP WINDOW DISPLAY

L/L

4

MISS.SIXTY SHOPFRONT

OLD COURT PLACE

4

WORKS

12/11/12 20/09/12 DATE

This drawing is the property of Arcadia Group Limited. Copyright is reserved. This drawing is issued on the condition that it is not copied, reproduced, retained or disclosed to any unauthorised person, either wholly or in part.

L/L

1 EXTERNAL

PTG PTG INIT

SHOPFRONT ELEVATION AS PROPOSED 1:100 @ A3 STORE DESIGN COLEGRAVE HOUSE, 70 BERNERS ST, LONDON W1T 3NL TELEPHONE 0207 636 8040 FAX 0207 291 2940

P

Project

SHOPFRONT PLAN AS PROPOSED

1

TOPSHOP MODERNISATION

EXTERNAL WORKS

Part Unit C, 44 (42/60) Kensington High Street, Kensington, Greater London, W8 4PE.

1:100 @ A3 Title

SHOPFRONT ELEVATION AS PROPOSED

Drawn By

PTG Frame Size

1:100 @ A3

SCALE 1:100 0

1

2

3

4

20/09/2012

CAD Ref No.

F:/STOREDESIGN/TOWN/KENSINGTON/ 2012 WORKS/2D DRAWINGS

5

6m

Drawing No. 050

A3

Date

Scale

Rev. B

Prop ID. Status -