Victorian Playhouse Manual 6x8 and 8x8 Tools Needed: -Cordless Drill (12V or higher) -#2 Square Drive Bit -Hammer -6’ Step Ladder -Tape Measure -Squa...

7MB Sizes 2 Downloads 14 Views

Recommend Documents

gateway playhouse 1 - Gateway Playhouse | Past Seasons
Sally Struthers), ice shows at Rockefeller Plaza, corporate events, bios of Jacqueline Kennedy and Helen Keller, and pro

lajolla playhouse
Apr 25, 2013 - 1 in a custom-built, temporary space called Kazino in. Manhattan's Meatpacking District. SEE ALSO:A Round

AWSG Induction manual final v3_6 - Victorian Wader Study Group
Cannon-netting Induction Manual. Final vers 3.5. Australasian Wader Studies Group (inc VWSG). Table of Contents. INTRODU

playhouse - Funktion-One
Owners Rob Vinokur, Elie Samaha and Mike. Israyelyan have transformed the space during a complete redesign with the help

Artistic Backgrounder - Geffen Playhouse
Garcia, Betty Gilpin, John Goodman, Ginnifer Goodwin, Anna Gunn, Uta Hagen, ... Lathan, Linda Lavin, Laura Linney, Chris

Tacoma Musical Playhouse
Based on Federico Fellini's semi-autobiographical film “8 1/2”. Adapted from the Italian by Mario Fratti. Broadway P

Ariel, Flounder - Improv Playhouse
SIDE 1 (Ariel, Flounder). FLOUNDER. Hey, Ariel! There you are! ARIEL. Just look, Flounder! The sun, the sand... isn't it

Untitled - Nottingham Playhouse
Count Arthur Strong. Ellie Taylor. Henning When. Jasper Carrott. Dave Gorman. 22 nottinghamplayhouse.co.uk nottingham Pl

at the PLAYHOUSE THEATRE
the upstairs foyer. A Funny Thing Happened On. The Way To The Forum. Sondheim's joyous, musical romp through Rome has de

volunteer guide - Ogunquit Playhouse
Above: Sally Struthers and cast in. Anything Goes (2016). Sandi Clark, Front of House. Coordinator. (207) 646-2402 ext.

Victorian Playhouse Manual 6x8 and 8x8

Tools Needed: -Cordless Drill (12V or higher) -#2 Square Drive Bit -Hammer -6’ Step Ladder -Tape Measure -Square utility knife w/ blade & hook blade -Speed Square ®

Little Cottage Co. PO Box 455 Berlin, OH 44610 330-893-4212 www.cottagekits.com

© 2007-2008 Little Cottage Co.

Victorian Playhouse Manual 6x8 and 8x8

2

1

Lay (2) 4x4 flooring sections side by side. Make sure it is on a level area.

3

Make sure the plywood is even before fastening! If it is not you will have an uneven floor.

4

Screw the sections together. Put one screw towards the plywood, and the other toward the top. Put 4 screws on each side roughly 8”-10” apart.

Next add additional sections. Note: 8x8 floor will be larger.

6

5

Again, make sure the plywood is even or you will have an uneven floor.

Construction Manual

Fasten these in the same manner. Space screws in sets of two 8”-10” apart.

© 2007-2008 Little Cottage Co.

Page 1

Victorian Playhouse Manual 6x8 and 8x8

8

7

This shows optional 4x4 runners, you will need three in order to have one under the joint. If you use only 2 the floor will sag. Note: these aid in moving the building later, but are optional, unless you are adding the deck & rail, then you MUST add them or the child door will not clear the deck.

9

Turn the floor on the back with the plywood facing up. Make certain the ground is level where the floor sets or you may have problems with the panels or roof.

10

Install section A.

make sure it is even with the edge of the floor.

12

11

Install header block B.

Push the wall in as shown so the siding is against the floor. Fasten the panel to the floor.

Construction Manual

© 2007-2008 Little Cottage Co.

Page 2

Victorian Playhouse Manual 6x8 and 8x8

14

13

Fasten, make sure it is even on top.

Install panel C onto the header block.

15

16

Fasten panel C.

Measure from 2x3 to 2x3 in the doorway. not from the door stops. This should measure 20”.

18

17

Fasten front of the header block.

Construction Manual

Note: the edge on panel D. Panel E’s edge will fit over panel D.

© 2007-2008 Little Cottage Co.

Page 3

Victorian Playhouse Manual 6x8 and 8x8

20

19

Install panel E to panel D.

Fasten this panel.

21

22

Fasten onto the floor.

Install panel F. Keep top even with the other panel.

24

23

Keep the siding in against the floor

Construction Manual

Install panel G, keep level with the other panel.

© 2007-2008 Little Cottage Co.

Page 4

Victorian Playhouse Manual 6x8 and 8x8

26

25

Make sure these are even, and fasten on top. Note: If your floor is uneven, it may start to show up here.

The edge of panel G will fit over panel F.

27

28

Fasten on the bottom.

Fasten 1 screw approximately 8”-10” apart from each other.

30

29

Fasten the top together.

Fasten panels H&I to each other. Make sure they are even on the bottom. Fasten. Piece may bow slightly, this can be made straight in the following steps.

Construction Manual

© 2007-2008 Little Cottage Co.

Page 5

Victorian Playhouse Manual 6x8 and 8x8

32

31

Push in the top of the gingerbread together and fasten.

33

Install these on top of panels G&F.

34

Align, mark by the edge of the 2x3 and put a screw in to hold in place. Note: If there is no mark you can measure in 5.5” and make your own mark.

Have someone push the trim in against the siding. This will take the bow out of the top piece.

36

35

While the other person pushes from the outside, fasten on the inside. Put screws on either side of the splice. Do this on both splices.

Construction Manual

Install panel J.

© 2007-2008 Little Cottage Co.

Page 6

Victorian Playhouse Manual 6x8 and 8x8

38

37

Next fasten panels L&M together. Note keep the edge even. This will be the top of the door so this is very important.

Install panel K.

39

40

Keep the edge of the door frame even and push in trim against the siding.

Put these on top of panels J & K.

42

41

Do the same thing on the other side of the door.

Construction Manual

Install (3) 2x3x36” pieces over top of the door and sides over joints. This will provide strength for the door. Keep even with the edge of the door.

© 2007-2008 Little Cottage Co.

Page 7

Victorian Playhouse Manual 6x8 and 8x8

44

43

Install 2x6 gingerbread, match sets of 3 with numbers on the pieces.

Install screws over the joints as shown.

45

46

Install the other side.

Next install the center piece.

48

47

Note: the speed square will keep these edges even. Fasten, be sure to use enough screws.

Construction Manual

Fasten the 1x3 to the center section using black screws. This will straighten the 2x6 and make it stronger.

© 2007-2008 Little Cottage Co.

Page 8

Victorian Playhouse Manual 6x8 and 8x8

50

49

Put the truss angles together. Note: 8x6 angles are the same, but you will need to match the correct 8x8 angles that match the truss scabs. Do not use the rear truss it is slightly shorter.

51

Fasten the truss scabs, keep top even. Install one scab on either side of the truss.

52

Install dormer piece. Keep gingerbread even in the front.

Install the trusses in the premarked spots. Place them to the edge of the 2x6 as the picture shows, not on the gingerbread.

54

53

Fasten the dormer.

Construction Manual

Fasten the dormer on the inside.

© 2007-2008 Little Cottage Co.

Page 9

Victorian Playhouse Manual 6x8 and 8x8

56

55

Slide the T-bar piece on top of the dormer, and in between trusses.

Fasten 2 pieces together to form a T-bar. Use premarked center to make sure it is centered. Make sure to use the correct pieces.

57

58

Slide to the front against the gingerbread and fasten.

Center the T-bar on the trusses and fasten.

60

59

Install the rear truss centered between the trusses and on the T-bar.

Construction Manual

Now fasten the rear truss.

© 2007-2008 Little Cottage Co.

Page 10

Victorian Playhouse Manual 6x8 and 8x8

62

61

Install the next piece of OSB.

Put 4x4 piece of OSB on trusses. Fasten only on the bottom outside corners. Use black headed screws.

63

64

Fasten only on the bottom outside edges.

VERY IMPORTANT: Center the OSB on the rear truss. A mistake here will throw the whole roof off!

66

65

Once centered as the picture shows fasten. The rear truss must be in the center of the overall building.

Construction Manual

Then fasten onto the edgewall truss. Note the gap between the 2x2 and OSB. The picture shows as it should look. Then fasten onto the rest of the truss.

© 2007-2008 Little Cottage Co.

Page 11

Victorian Playhouse Manual 6x8 and 8x8

68

67

Fasten this piece on the bottom.

Install the top 2 sheets. Install the front dormer piece.

69

70

There should be a gap between the 2x2 and OSB like there was on the back side.

Install the front piece of OSB with angle cut. Note: see how it “shoot’s up” into the corner of the T-bar. Next install the top piece.

72

71

Install the dormer piece and fasten. Then repeat the steps on the other side of the dormer.

Construction Manual

These are the V-channel roof braces.

© 2007-2008 Little Cottage Co.

Page 12

Victorian Playhouse Manual 6x8 and 8x8

74

73

Fasten using black headed screws from the top.

Have someone hold these in place from the inside. Make sure all 3 pieces of OSB are included with the correct angle of the V-brace to the top of the roof.

75

76

Next install the dripedge, purchased at a local home improvement store.

Next cut the tabs off of the shingles and install a strter strip. Use 3/4” roofing nails.

78

77

Install more shingles allowing them to go up the dormer as pictured.

Construction Manual

When you have installed the shingles up one side, snap a chalk line down the cneter of the valley.

© 2007-2008 Little Cottage Co.

Page 13

Victorian Playhouse Manual 6x8 and 8x8

80

79

Next shingle the back side.

Install the shingles on the dormer side, then use the hook knife to cut the excess shingles. Do not cut into the next layer of shingles. Do this on both sides.

81

82

When you reach the center make the cuts as the picture shows.

Cut pieces for the ridge cap. See instructions on the shingle package. A regular utility knife will work good to cut this, cut the shingles from the back side. Then install on the top using 7/8” roofing nails.

84

83

Install more ridge caps making cuts as needed.

Construction Manual

Cut a ridge cap with a rounded edge as pictured and install.

© 2007-2008 Little Cottage Co.

Page 14

Victorian Playhouse Manual 6x8 and 8x8

86

85

Install the small pieces of siding beneath the door.

Finish the ridge cap with the tab as pictured.

87

88

Place the door on the spacer bar. Fasten using only one screw per hinge. This way if adjustments are needed you will not have to undo all of the screws.

Place the provided spacer bar by edge.

90

89

Next install the top door piece. Try to center the door between the header block and the bottom door. If both doors work well, install the rest of the screw and remove the spacer bar.

Construction Manual

Install the 3 door pulls and turner knob.

© 2007-2008 Little Cottage Co.

Page 15

Victorian Playhouse Manual 6x8 and 8x8

92

91

Install the siding beneath the door and put the spacer bar on top. You may have to screw it in place to keep it from sliding away since it is a larger door.

Install the top door piece on the large door.

93

94

Measure 34” between the door. You may have to loosen back wall slightly to obtain this measurement. Install the top of the door, centering between the top door trim and the bottom half of the door.

Install the latch.

96

95

Install the shutters, then the top of the window and the flowerboxes.

Construction Manual

Install the heart window using the small OSB strips. Then install the corner trim using small white nails. Be careful to not “wrinkle” the corners when installing.

© 2007-2008 Little Cottage Co.

Page 16

Victorian Playhouse Manual 6x8 and 8x8

Thank you for purchasing from Little Cottage Co. We appreciate your business and hope that you enjoy your building for years to come!!! If you have any questions or comments please contact us at 330-893-4212 or [email protected]

Construction Manual

© 2007-2008 Little Cottage Co.

Page 17

Chimney Option 1

2

Locate and prepare to assemble chimney sections.

3

Secure corners of chimney using two (2) 1¼” black headed screws per side.

4

Complete chimney assembly.

Carefully lift chimney to the roof. Measure inward 6” from end of roof and set chimney in place.

5

Secure chimney to roof using two (2) 2½” screws along base of chimney on both sides.

Construction Manual

© 2007 Little Cottage Co.

Page 1

Playhouse Loft Manual

Please note: Window above the loft is an option

Cordless Drill (12V or higher) #2 square drive bit

Tools Needed:

Hammer 6’ step ladder Tape measure Square utility knife w/ blade & hook blade

Little Cottage Co. PO Box 455 Berlin, OH 44610 330-893-4212 © 2007 Little Cottage Co.

Playhouse Loft Manual 1

2

Place two pieces of loft beside each other.

3

Slide loft pieces together and fasten with screws in front. Make sure loft pieces are tight together or loft may not fit in the house.

4

Turn loft around and fasten with screws from

5

Use a 36” 2x3 brace to the front bottom of loft. Use plenty of screws.

6

Add a 36” 2x3 brace to the back bottom of the loft.

Construction Manual

© 2007 Little Cottage Co.

Install the two loft bottoms. This is what the loft will rest on. Install the slanted edge toward the front. From the top of the 2x3 to the floor it should measure 42 1/4”.

Page

Playhouse Loft Manual 9

10

Install the loft bottom or main piece, this slides on top of the loft bottoms. Fasten this with screws. Make sure it is secure.

Install left and right railing. Note how it is fastened on the inside of the 2x6.

11

Install the ladder. Put screws in the top and bottom by the floor. Make sure everything is fastened securely before using.

Construction Manual

© 2007 Little Cottage Co.

Page

Little Cottage Co.

You will need to buy the following to complete your 8*8 kit. 5- Bundles shingles (There are usually 3 bundles per square if they want to sell it by the square) 5-10’ foot long pieces drip edge with 1” face Floor-If floor kit was not purchased (Refer to build your own floor instructions) You must either purchase a floor kit or build your own floor, it does not work to place it directly on the ground. Optional-3-Pressure treated 4”*4”*8’ These are NOT optional if you want to put deck and rail in front of playhouse. Otherwise the child door will hit the deck. These posts are to use beneath the floor. Be sure to use one under the center splice so that the floor does not sag. When building your own floor you only need to use 2-4*4’ Note- Deck and rail are not attached to playhouse. The deck justs “sits” in front of the house.

Hardware Box (included with kit) Use: ¾” 7/8” 2 ½” 1 ¼” 1”

Roofing nails for main part of roof. Roofing nails for the ridge cap. Screws to fasten main parts of playhouse. Black headed screws to fasten roof and doors. White aluminum nails for outside corner trim.

Downloadable instructions are available online at www.cottagekits.com/manual6888.htm Be sure to download manual before starting!